78th Air Base Wing 78TH AIR BASE WING RAFB Construction Program Presented By: Rebecca McCoy, P.E. Director 778 Civil Engineer Squadron 78 Civil Engineer Group 78 Air Base Wing 15 Aug 12 “The Installation of Excellence … The Place to Live, Learn, Work and Play” 1 78 ABW Strategic Focus & Alignment Air Force Sustainment Center Robins Air Force Base Deliver War-Winning Technology ... Acquisition … Sustainment … Test … Expeditionary Capabilities To The Warfighter SAFETY 78 ABW Vision and Strategic Initiatives “The Installation of Excellence … The Place To Live, Learn, Work, and Play” Capture The Voice Of Our Customer Exceed Warfighter And Customer Expectations Respect And Care For Our People (QoL) Lead DoD In Cost Management Re-Energize And Sustain CPI 78 ABW Mission Statement “Enable Team Robins Success … Through Timely, Reliable Service and Support” “The Installation of Excellence … The Place to Live, Learn, Work and Play” Overview Robins Air Force Base 78th Civil Engineer Group Construction • Active Construction Projects • Military Construction Program (MILCON) • Sustainment, Restoration, and Modernization Contract (SRMC) Program • Depot Maintenance Activity Group (DMAG) Program • Indefinite Deliverable/Indefinite Quantity (IDIQ) Contracts Contract Execution Methods Questions “The Installation of Excellence … The Place to Live, Learn, Work and Play” MILCON Projects Under Construction 78TH AIR BASE WING ORG PROJECT NO UHHZ PROJECT TITLE/DESCRIPTION COST (Millions) 033011 ADVANCED METAL FINISHING FACILITY (Transformation Project) $30,000 023012 DEPLOYMENT, READINESS & TRAINING CENTER (Congressional Insert) $5,599 GRG 113001 CONVERT B/660 TO C-17 COMBINED PROGRAM OFFICE (P-341) $1,881 AMX 110047 ADAL CORROSION CONTROL HANGAR B/89 (P-341) $1,861 AMX 110048 ADAL CORROSION CONTROL HANGAR B/54 (P-341) $1,803 MXW AFRC “The Installation of Excellence … The Place to Live, Learn, Work and Play” MILCON Projects Under Construction (cont.) 78TH AIR BASE WING FY07 033011 TRANSFROMATION PROJECT ADVANCED METAL FINISHING FACILITY 9113 SM/98100 SF COST - $30,000,000 BOD – NOV 2012 FY10 023012 CONGRESSIONAL INSERT DEPLOYMENT READINESS & TRAINING CENTER 1765 SM/19000 SF COST - $5,599,000 BOD – FEB 2013 FY12 110047 & 110048 P-341 PROJECTS UPGRADE CORROSION CONTROL HANGAR BLDGS 89 & 54 307 SM/3304 SF & 339 SM/3652 SF COST - $1,860,300 & $1,861,000 BOD – TBD FY11 113001 P-341 PROJECT CONVERT B/660 TO WR-ALC/ GRG C-17 PROGRAM OFFICE 3066 SM/33000 SF COST - $1,881,000 BOD – SEP 2012 “The Installation of Excellence … The Place to Live, Learn, Work and Play” N Active MILCON Projects Under Construction (cont.) 78TH AIR BASE WING Advanced Metal Finishing Facility FY07 Transformation Project; 98,100 SF; Cost: $30M ($33M Equipment) Construction: 89% BOD: Nov 12 Transforms manually controlled mechanical/chemical metal prep operation to latest applied technology Relocates Ground Support Equipment Facility “The Installation of Excellence … The Place to Live, Learn, Work and Play” 6 Active MILCON Projects Under Construction (cont.) 78TH AIR BASE WING Deployment Readiness & Training Center (AFRC) FY10 Congressional Insert; 19,000 SF; Cost: $6M Construction: 82% BOD: Nov 12 DRTC New facility will replace a current facility that has been condemned Facility will provide space for readiness and training that is currently being performed off-base “The Installation of Excellence … The Place to Live, Learn, Work and Play” 7 Active MILCON Projects Under Construction (cont.) 78TH AIR BASE WING Convert B/660 (Old Commissary) to C-17 Program Office FY11 P-341 Project; 33,000 SF; Cost: $2M Construction: 95% BOD: Jun 12 Supports FY11/12 C-17 workload/manning growth Product Supporter Integrator (PSI) for C-17 future sustainment starting in FY12 “The Installation of Excellence … The Place to Live, Learn, Work and Play” 8 O&M & DMAG Construction Projects Project Title Contract Total Cost % Complete ECD 78TH AIR BASE WING Project Revised Contract Completion Mod Date Count RPR/UPGRD LIGHTING, MAINT DOCK, L/A, B/2026,2030,AND B/2304 $509K 99 30-Sep-11 31-Aug-12 2 RPR/RETROFIT LIGHTING, HQ GROUP, B/350 $629K 99 30-Sep-11 31-Aug-12 2 RPR/RPL HVAC SYS, AC PLT 25 - 100 TN, B/827 $501K 95 26-Mar-12 26-Jul-12 1 RPR/RPL FIRE DAMAGE, IND WST TRMT&DSPL, B/352 $463K 95 30-Mar-12 31-Dec-12 0 $15K 2 31-Oct-12 RPR HANNAH ROAD BRIDGE, FAC 8510 $780K 98 5-Jul-10 29-Apr-10 4 CNST/INST AREA LIGHTING, FUNCTIONAL TEST AREA, FAC/8145 $578K 55 21-Dec-11 30-Aug-12 0 CONST STORAGE AREA NEAR, B/132 $270K 2 28-Feb-12 16-Nov-12 0 RPR ROOF/ WNDWS/SDG, SHP AFT GEN PUR,B/169 $9.8M 32 30-Apr-12 15-Jan-13 4 RPR/RPL SLIDING EXTERIOR DOORS, HG MAINT DEP, B/125 $100K 96 8-Jun-12 31-Jul-12 1 RPR/RPL ROOF OVER HAZ. SITE, SOLVENTS, B/636 $108K 80 28-Sep-12 0 CNST AIRCRAFT TRAINING PAD, NEAR B/1602 $599K 15 11-Nov-12 0 RPR/RPL INDUSTRIAL WASTEWATER LIFT STATION “The Installation of Excellence … The Place to Live, Learn, Work and Play” 0 9 O&M & DMAG Construction Projects (cont.) Project Title Contract Total Cost % Complete ECD 78TH AIR BASE WING Project Revised Contract Completion Mod Date Count RPR/UPGRD FIRE ALARM SYS, AUTO FR DTECTN SYS, B/323 $419K 1 15-Nov-12 CNST PURGE STATION ADMIN FACILITY $692K 37 28-Nov-12 0 CONSTRUCT FIRST ARTICLE TESTING $570K 38 7-Dec-12 1 CONSTRUCT NDI STORAGE/PERSONNEL FAC, EAST OF B/91 $599K 66 9-Jan-13 0 MNT/RECOAT BARREL ROOFS, HGR MNT DEP, B/125 $1.9M 48 15-Feb-13 0 CNST COMPONENT REPAIR STORAGE FACILITY, SOUTH B350 $595K 10 10-May-13 2 RPR/RPL FIRE ALARM SYS, WHSE SUP& EQUIP BSE, B/350 $1.7M 93 30-Jul-10 24-Aug-12 0 $2M 95 30-Sep-10 14-Sep-12 1 RPR/RPL FIRE ALRM SYS, LOG FCLTY DEP OPS, B/300 $2.5M 25 31-Dec-10 30-Jul-13 0 PURCHASE/INSTALL ACCESS CONTROLS, COMMAND POST, B/906 $136K 89 7-Feb-11 15-Aug-12 0 RPR/INSTALL HIGH MAST LIGHTING CONTROL SYS, BASEWIDE $730K 95 22-May-11 31-May-12 0 RPR/RPL ILS MOUNTED TRESTLE, AIRFIELD, FAC 3903 $240K 48 15-Jun-11 15-Dec-12 0 MNT/GRADE CLEAR ZONE, SOUTHEND RUNWAY, FAC 3903 “The Installation of Excellence … The Place to Live, Learn, Work and Play” 22-Feb-13 0 10 O&M & DMAG Construction Projects (cont.) 78TH AIR BASE WING Project Title Contract Total Cost % Complete ECD Revised Completion Date Project Contract Mod Count REPAIR HVAC/LTG, LOG FAC DEP OPERATIONS, BAY G, B/300 E/W $1.8M 98 1-Dec-11 27-Jul-12 0 REPAIR HVAC/LTG, LOG FAC DEP OPERATIONS, BAY H, B/300 E/W $1.9M 10 1-Dec-11 31-May-13 0 CNST/INST A 5000 SF MODULAR FCLTY $416K 1 24-Apr-12 30-Jul-12 1 RPR/EXTEND PARKING LOT, VEH PKNG, FCLTY/8535 RPR/CONNECT UTILITIES TO TRAILER, SHP ACFT GEN PURP, B/145 $370K 94 1-May-12 20-Jul-12 0 $33K 1 15-Jun-12 26-Aug-12 0 CONVERT BLDG 660 TO C-17 COMBINED PROGRAM OFFICE $938K 95 20-Jun-12 RPR/RENV RECYCLING CENTER, MWR SUP/NAF C-STOR, B/987 $183K 98 28-Jun-12 15-Aug-12 2 RPR/RPL ROLLER DECK SHEAVE, ACFT ARES SYS SPT, B/4036 $206K 1 9-Jul-12 22-Aug-12 0 $8K 80 18-Jul-12 10-Aug-12 0 $13K 85 20-Jul-12 31-Jul-12 0 $102K 57 8-Aug-12 0 $23K 57 8-Aug-12 0 RPR/RENOV INTERIOR OFC, LOG FCLTY DEP OPS, B/215 CONSTRUCT/INSTALL INTERIOR FENCE @ B350 DEMOLISH/DISPOSE OF BUILDING, MWR SUP/NAF C-STOR, B/659 DEMO/REMOVE TOWER, APRON, FAC 87 “The Installation of Excellence … The Place to Live, Learn, Work and Play” 1 11 O&M & DMAG Construction Projects (cont.) Project Title DEMOLISH BLDG 657 Contract Total Cost % Complete ECD 78TH AIR BASE WING Project Revised Contract Completion Mod Date Count $102K 56 8-Aug-12 0 $48K 1 20-Aug-12 0 $1.7M 85 21-Aug-12 0 RPR/RPL FIRE ALARM SYS, COMM FCLTY,B/214 RPR/MODIFY PAVING AT SOUTH ROLL UP DR, DRIVEWAY, FCLTY/8514 $198K 87 30-Aug-12 $10K 1 7-Sep-12 0 RPR/RPL HVAC SYSTEM, AFCS MAINT FCLTY, B/963 $1.3M 40 29-Oct-12 0 RPR/RPL FIRE ALARM SYS, RDR TMTR COMP BLDG,B/1400 $1.7M 86 31-Dec-10 1 $11K 1 22-Aug-12 0 $350K 2 17-Jul-12 $6K 1 31-Jul-12 RPR/RPL FIRE SUPPRESSION SYSTEM, CHEMICAL STORAGE AREA $25K 50 5-Oct-12 30-Aug-12 0 RPR/RENOV INTERIOR FOR NEW WRKLOAD, SHP ACFT GEN PURP, B/364 $137K 1 5-Oct-12 10-Sep-12 0 Resurface Fitness Test & Training Track: Fitness Cntr-B7518 RPR/DO MODIFICATIONS TO CHILLED WTR SYS,HTG FAC BLDG, B/177 CNST/INST WALL/DOOR, ACFT COR CON, B/54 MNT/PNT INTERIOR, SHP ACFT GEN PURP, B/670 RPR/RPL ROLL UP DOOR, SHP AVIONICS, B/640 “The Installation of Excellence … The Place to Live, Learn, Work and Play” 14-Sep-12 0 27-Aug-12 1 0 12 O&M & DMAG Construction Projects (cont.) Project Title Contract Total Cost % Complete ECD 78TH AIR BASE WING Project Revised Contract Completion Mod Date Count RPR/UPGDR ELEC POWER, INTEGR SUP FCLTY, B/228 $117K 1 15-Oct-12 0 RPR/RENV 8 1ST FLR RESTROOMS, GP HQ, B/2051 $171K 42 17-Oct-12 0 RPR/RENV 461ST UPSTAIRS R/R, GP HQ, B/2051 $141K 1 17-Oct-12 0 Projects w/ contract modifications Projects that have exceeded the construction completion date “The Installation of Excellence … The Place to Live, Learn, Work and Play” 13 Active Construction Summary 78TH AIR BASE WING MILCON Program • Five Active Projects • $41M Total Cost O&M & DMAG Program • 56 Active Projects • $39M Total Cost “The Installation of Excellence … The Place to Live, Learn, Work and Play” 14 Lessons Learned 78TH AIR BASE WING Dos • Read all specifications provided prior to proposal • Request information if necessary • Follow specifications after contract award (know the RAFB Standards) • Account for security measures in proposal • Pay sub-contractors on time Don’ts • Underbid the contract • Deviate from specifications • Plant millet grass EVER “The Installation of Excellence … The Place to Live, Learn, Work and Play” 15 MILCON Projects Projected Priority 1-n List PRI ORG FY PROJECT NO UHHZ 1 ABW 14 073011 2 AMXG 14 3 AMXG 4 78TH AIR BASE WING COST RANGE PROJECT TITLE/DESCRIPTION (Millions) ADAL GATE 5 $10-20 073001P1 C-17 MAINTENANCE HANGAR, B/81 $10-18 14 073001P2 C-17 MAINTENANCE HANGAR, B/81/82/83 $8-15 ABW 14 103005 CHILD DEVELOPMENT CENTER $13-21 5 ABW 14 103001 NEW FIRE STATION (RPL B/2086) $2-5 6 ABW 14 103000 ADAL FIRE STATION NO. 1 B/377 $3-7 7 CMXG 15 910002 AIRCRAFT RADOME REPAIR FACILITY $10-16 8 GRG 14 113002 CONVERT COOLER AREA B/660 TO ADMIN $1-3.5 9 MXSG 14 093005 DEPOT QUALITY CONTROL LABORATORY $12-18 10 SMXG 14 093001 SOFTWARE SUPPORT FACILITY EXPANSION $5-10 11 CBSS 14 113000 SECOND FLOOR ADDITION B/231 $12-17 12 ABW 15 053015 REFUEL VEHICLE MAINT FACILITY $2.-7 13 GRM 14 103010 RENOVATE B/301, BAY D $7-12 15 993009 53RD COMBAT COMM SQ OPS FACILITY $12-19 14* 689 CCW * Mission Partner “The Installation of Excellence … The Place to Live, Learn, Work and Play” MILCON Projects Projected Priority 1-n List (cont.) 78TH AIR BASE WING PRI ORG FY PROJECT NO UHHZ 15* 689 CCW 15 033001 GROUP HQ/COMBAT SUPPORT SQ FACILITY $4-9 16 ABW 13 053001 ADAL PHYSICAL FITNESS CENTER $2-8 17* 689 CCW 14 983006 54TH COMBAT COMM SQ OPS FACILITY $11-17 18 ABW 14 023000 ADAL COMMUNICATIONS FACILITY $6-10 19 ABW 14 013009 SECURITY FORCES FACILITY $15-21 20 EMXG 14 073008 CONSOLIDATED PMEL/GYRO FACILITY $25-35 21 ABW 14 063000 CONTROL TOWER/BASE OPS COMPLEX $7-15 22* AFRC 13 073004 HQ COMPLEX FACILITY (PHASE 1) $22-35 23* AFRC 17 073003 HQ COMPLEX FACILITY (PHASE 2) $30-40 24* AFRC 19 073005 HQ COMPLEX FACILITY (PHASE 3) $28-40 25* 689 CCW 15 003004 52ND COMBAT COMM SQ OPS FACILITY $11-19 26* 689 CCW 15 013001 51ST COMBAT COMM SQ OPS FACILITY $10-18 27 CMXG 14 093004 A/C FIRE BOTTLE FACILITY $8-15 28 CMXG 17 983009 WARFIGHTER LIFE SUPPORT FACILITY $6-13 29 GRC 14 103002 C2ISR (RPL B/350) $130-150 30 CMXG 16 093003 CONSOLIDATED COMPONENT REPAIR FACILITY PROJECT TITLE/DESCRIPTION “The Installation of Excellence … The Place to Live, Learn, Work and Play” COST RANGE (Millions) $11-17 MILCON Projects Projected Priority 1-n List (cont.) 78TH AIR BASE WING PRI ORG FY PROJECT NO UHHZ 31 ABW 15 983002 UPGD DOMESTIC SEWAGE $3-9 32 ABW 15 053006 COMBAT ARMS FACILITY $1-5 33 ABW 14 113004 RPR/INST AT/FP IMPROVEMENTS DORMS $2-8 34 AMXG 15 080355 AIRCRAFT FUNCTIONAL TEST BLAST FENCE $1-5 35 ABW 14 103009 POV MULTI-LEVEL PARKING DECK $5-9 36* DLA 16 013011 RPR/UPGD FUEL HYDRANT SYS, B/2089 $6-11 37* DLA 16 013010 RPR/UPGD FUEL HYDRANT SYS, B/39 $6-10 38 ABW 14 093009/10/11 DORMITORY PH 1/2/3 (waiting for new DMP) $46-55 39 MXSG OY 993001 GSE CONSOLIDATION $12-18 40 AMXG OY 073009 CARGO AIRCRAFT HANGAR $23-30 41 AMXG OY 023008 MEDIUM AIRCRAFT HANGAR $28-35 42 AMXG OY 003008 LARGE AIRCRAFT HANGAR $120-130 43 AMXG OY 093008 AMXG FOM STORAGE $8-15 44 AMXG OY 093002 B/45 PURGE/REHAB $9-14 PROJECT TITLE/DESCRIPTION “The Installation of Excellence … The Place to Live, Learn, Work and Play” COST RANGE (Millions) MILCON Projects FYDP 13-17 78TH AIR BASE WING COST RANGE (Millions) ORG PROJECT NO UHHZ FY AFRC 073004 14 CONSOLIDATE AFRC – PHASE 1 $20-30 AFRC 073003 15 CONSOLIDATE AFRC – PHASE 2 $30-40 689TH 983006P1 15 54th CBCS SQUADRON WAREHOUSE FACILITY $3.5-9 AFRC 073005 16 CONSOLIDATE AFRC – PHASE 3 $35-45 ABW 073011 16 ADAL GATE 5 $10-18 FYDP PROJECT TITLE/DESCRIPTION “The Installation of Excellence … The Place to Live, Learn, Work and Play” MILCON Projects FYDP 13-17 (cont.) 78TH AIR BASE WING FY14 – 073004 CONSOLIDATE AFRC – PH 1 FY 15 – 073004 CONSOLIDATE AFRC – PH 2 FY16 – 073005 CONSOLIDATE AFRC – PH 3 FY15 – 983006PW 54th CBCS WAREHOUSE FY 16 – 073011 ADAL GATE 5 (MLK) MODIFICATIONS N “The Installation of Excellence … The Place to Live, Learn, Work and Play” Facility SRMC Execution 78TH AIR BASE WING 25.0 $$ Million 20.0 15.0 10.0 5.0 0.0 Executed Programmed FY 10 4.5 22 FY 11 1.2 23.3 FY 12 2.1 11.8 FY13 0.0 16.9 “The Installation of Excellence … The Place to Live, Learn, Work and Play” FY13 Top 20 SRM Program 78TH AIR BASE WING PROJECT TITLE COST RANGE MNT/REMOVE TREES NORTH AND SOUTH END ZONE, AIRFIELD $120-300K CONDUCT FEASIBILITY STUDY/CHANGE PERIMETER ROAD $150-325K RPR/RPL SOUTH END STROBE LIGHTS POLES, RUNWAY, FAC 3901 $100-275K MNT JOINT SEALANT, TAXIWAY C TO D, TAXIWAY, FAC 03905 $125-350K RPR/RPL FIRE ALARM SYS, MULTI FACILITIES $600-1.5M RPR/RPL FIRE ALARM SYSTEMS IN MULTI FACILITIES $550-975K RPR/RPL FIRE ALARM SYS, AUTO FR DTECTION SYSTEM, B/947/985 $30-100K RPR/RPL FIRE ALARM SYS, MULTI FACILITIES $2.5-4.4M RPR/RPL/UPGD HOODS/DUCTS & FIRE SYS, CHILD CARE CEN, B/943 $275-550K MILL/OVERLAY TAXIWAYS A/G, FCLTY 3901 $250-500K “The Installation of Excellence … The Place to Live, Learn, Work and Play” FY13 Top 20 SRM Program (cont.) 78TH AIR BASE WING PROJECT TITLE RPR/RELOCATE ELEC AIR SWITCHES, AFLD OBSTRUCTION, FAC 03901 COST RANGE $275-550K RPR/UPGRD SUBSTATION RELAY CONTROLS $250-500K RPR/UPGRD FIRE ALARM SYS, BE MAINT SHO, B/58 $50-125K RPR/INST MASS NOTIFICATION SYS, DRS, LOG FCLTY DEP OPS, B301 $800-2.3M MILL/OVERLAY TAXIWAY C2, TAXIWAY, FCLTY/3901 $500-950K RENOVATE/CONVERT BASE CIVIL ENGINEER MAINT SHOP, B/1555 RPR/MODIFY FUEL TANK, STOR AVGAS, FCLTY/4203 $1-3M $60-95K CNST/INST CHLORINE ANALYZERS,BLD WTR SUP, FCLTY/08451 $250-600K RPR/RPL JOINT SEAL/CRACK SEAL, RUNWAY, FCLTY/3901 $225-675K CNST/INST FIRE SPRINKLER SYS, HQ GROUP, B/560 $60-130K “The Installation of Excellence … The Place to Live, Learn, Work and Play” DMAG Facility Execution 78TH AIR BASE WING 25.0 $$ Million 20.0 15.0 10.0 5.0 0.0 Executed Program FY 10 14.0 16 FY 11 24.1 15.7 FY 12 12.7 17.0 FY13 0.0 21.6 “The Installation of Excellence … The Place to Live, Learn, Work and Play” DMAG M&R Top 20 78TH AIR BASE WING PROJECT TITLE Replace Lights B140 COST RANGE $500-$700K Replace Barrel Roofs & Flat Roof Areas B125 $17-$22M Replace Fire Alarm/Suppression System $14-$18M Replace Computer Room Units (CRU) B229S $50-$100K Replace Air Compressor & Replumb Shop $150-$225K HVAC Duct Repair B229S $250-$350K Hydro Stat Truss & Ceiling Paint B150 $500-$700K Replace Roof Corrosion Control Facility B180 $450-$750K Repair/Replace Fire Alarm System B158 $1.25-$1.75M Repair/Replace Fire Suppression System B158 $1.75-$2.25M “The Installation of Excellence … The Place to Live, Learn, Work and Play” DMAG M&R Top 20 (cont.) 78TH AIR BASE WING PROJECT TITLE COST RANGE Repair Siding, Welding Shed East of B321 $150-$300K Misc Facility Fall Protection Projects $500-$700K Renovate Administrative Areas B323 $150-$250K Upgrade Paint Hanger & Fire Alarm/Suppression B55 $7.5-10.0M Connect Bldg Power Feed to Generator B229S & B229E $300-$500K Upgrade Emergency Lighting B229E $400-$600K Repair Replace Roof B229E $250-$400K Repair Replace Roof B229S $750-$1.0M Clean/Paint Structural Beams & Ceiling B140 $1.0-$2.0M Replace Fire Alarm & Suppression System B110 $1.5-$2.5M “The Installation of Excellence … The Place to Live, Learn, Work and Play” DMAG FY13 MC Program 78TH AIR BASE WING PROJECT TITLE COST RANGE Construct J-Model AMP Facility on "Nancy Row" $500-$700K Construct Concrete Equipment Storage Area Pad B46 $300-$600K Construct Shelter B20180 $350-$650K Construct De-Militarization Facility near B645 $500-$700K Construct Radar Room Rooftop B229N $500-$700K Construct New Guard Facility at Gate 38 $300-$500K Construct TOW Administrative Facility near Gate 38 $350-$550K “The Installation of Excellence … The Place to Live, Learn, Work and Play” DMAG FY14 MC Program 78TH AIR BASE WING PROJECT TITLE COST RANGE Construct/Install Underground Utilities Apron B3955 $500-$700K Construct F-15 Shop near B131 $500-$700K Construction Addition to Saw Shop B20139 $500-$700K Construct/Install Addition to B651, Warehouse Equipment Support $500-$700K Concept Study to Enclose North & South Bays of B20042 $500-$700K Construct/Install Ramp/Handrails/Sidewalk B859 $25-$50K “The Installation of Excellence … The Place to Live, Learn, Work and Play” 78th CEG IDIQ Contracts (Value of $270M/5-yrs) Contract AE Design Services 8(a) Carpet/Flooring Custodial Basewide Custodial DMAG Custodial, NISH ** Grounds Maint Mech/Elec* Paint Pavements Recycling Refuse Roofing SABER*** BOPEC D/B**** AE Environmental Services Date Exp EXPIRED* 2015 2014 2014 2012 2014 EXPIRED* 2016 2017 2015 2016 2013* 2016 New* 2015 78TH AIR BASE WING Dollar Limit $20M $5M $2M $12M $1M $6M $50M $7M $20M $2M $1M $15M $50M $50M $40M * New contract in process ** NISH (National Institute for the Severely Handicapped) *** SABER (Simplified Acquisition of Base Engineer Requirements) *** BOPEC D/B (Base Operational Program Execution Contract Design/Build) “The Installation of Excellence … The Place to Live, Learn, Work and Play” Contract Execution 78TH AIR BASE WING 78 CEG IDIQs USACE IDIQs • MATOC • SATOC Competitive Bid Sole Source 8(a) AFRC IDIQs AFCEE AFCESA NOTE: All construction contracts are small business: HUB Zone, SDV, 8(a), Women owned “The Installation of Excellence … The Place to Live, Learn, Work and Play” Discussion/Questions 78TH AIR BASE WING “The Installation of Excellence … The Place to Live, Learn, Work and Play” 31