1 Minutes of the 61st meeting of State Environment Impact Assessment Authority held on 28th & 29th Nov. 2013 under the Chairpersonship Mrs. Saroj Siwatch IAS (Retd.), Chairperson, SEIAA held in the meeting room of office of SEIAA Haryana, Sector-2 Panchkula, regarding Environmental Clearance under EIA Notification dated 14.9.2006. The full Authority is present. The 21 Cases recommended by SEAC/EAC for Environmental Clearance or otherwise, 8 no. of deferred cases and Brick earth mining cases as listed in the Agenda item circulated vide letter No. 1193-1195 dated 13-11-2013 were discussed. Following decisions were taken:On 28-11-2013 Item No. [1] Environmental Clearance for the proposed Residential Plotted Colony at Sector-70, Faridabad, Haryana by M/S FERROUS Township Pvt. Ltd. The recommendation of SEAC to accord Environmental Clearance was earlier considered in the 53rd meeting of SEIAA held on 14-06-2013, wherein it was decided to refer back this case to SEAC with the advice to get the revised EIA on the updated baseline data; appraise the same and send its recommendations accordingly. The SEAC in its 89th meeting held on 27-08-2013, appraised the revised EIA on the updated data and compared the same with the earlier baseline data permitted by SEAC to use the same for preparation of EIA report. The SEAC observed that there is insignificant variation in the values and are within permissible tolerance limits the SEAC was of the view that the mitigation measures already provided by the project proponent are in order and again recommended to accord environmental clearance by imposing stipulations stated therein as per earlier recommendation. It was found that the project proponent has proposed the development of residential Plotted Colony at Sector-70, Faridabad, Haryana on a total plot area of 413558.68 sqmt. The total built up area shall be 414703.92 sqmt. The project shall have 878 Residential Plots (698 General plots + 178 EWS + 2 Nursing homes). The total water requirement shall be 1872 KLD. The fresh water requirement shall be 1097 KLD. The waste water generation shall be 1356 KLD, which will be treated in the STP of 1630 KLD capacities. In the today’s meeting the recommendation of SEAC and the project details were taken up for consideration in the presence of representative of the project proponent and consultant. Detailed discussions were held regarding existence of revenue rasta, HT line, Gas pipe line, Others land, canal, water requirement, quality of water, green belt development plan, Ambient Air Quality, NOC from Forest department regarding noninvolvement of Forest land recycle and reuse of water etc. The representative of the project proponent submitted NOC issued by DFO, Faridabad regarding non-involvement of Forest land and assurance of HUDA for the supply of water. It was noticed that in the proposed plotted colony certain vacant pockets of land belonging to others also exists. The representative of the project proponent was directed that the infrastructure services 2 to be provided on the common roads covering his project and the areas of others land will have the provision to take additional load arising from population residing in others land to avoid multiplicity of same services on such common roads falling within the project limits. Prior approval from HUDA shall be taken in this respect. The representative of the project proponent was directed that their project will have the provision for infrastructure services to accommodate the additional load arising from population residing in others land falling within the project limits. The representative of the project proponent agreed to provide the same. The representative of the project proponent was also advised to shift the proposed Primary school site near the HT line to the proposed Dispensary site viceversa. The representative of the project proponent submitted the revised plan earmarking space for Primary School in place of Dispensary vice-versa as was advised by the Authority and also earmarking site for solid waste management. It was noticed that the values of parameter PM2.5, PM10 are exceeding the prescribed limits. The representative of the project proponent was asked to submit plan for controlling PM2.5, PM10 levels and also directed to adopt water sprinkling system to suppress the dust generation. The representative of the project proponent was also directed to keep ROW for HT line and Gas pipe line as per Government instructions. After detailed deliberations, the Authority decided to agree with the recommendations of SEAC to accord Environment Clearance to this project by imposing the following condition in addition to the usual conditions in practice. [1] The project proponent shall ensure that no construction activity is undertaken either on surface or below or above surface of revenue rasta passing through the project area. [2] The project proponent shall indicate the width and length of revenue rasta passing through the project area on sign board and shall display the same at both the ends of revenue rasta stretch, for awareness of public. Sign board shall also display the message that this is public rasta/road and any citizen can use it. There shall not be any gate with or without guards on revenue rasta. [3] The project proponent shall not raise any construction activity in the ROW reserved/acquired for High Tension Wire passing through the project area and shall maintain horizontal and vertical ROW as required under Indian Electricity Rules, 1956/DHBVN latest instructions. [4] ROW for approaching gas pipe line shall be kept as per relevant rules and prior permission from HUDA/Relevant authority shall be taken. [5] The project shall provide the infrastructure services (water supply, sewer, storm water lines etc) on the common roads covering his project and the areas of others land to take additional load arising from population residing in others land to avoid 3 multiplicity of same services on such common roads falling within the project limits. [6] The project proponent shall maintain the distance between STP and water supply line. [7] The project proponent shall provide sufficient space for ETP in the nursing home project. [8] The project proponent shall ensure proper Air Ventilation and light system in the basements area for comfortable living of human being and shall ensure that number of Air Changes per hour/(ACH) in basement never falls below 15. Item No. [2] Environmental Clearance for modification/expansion of existing residential group housing of “Aura” at Sector – 110-A, Gurgaon, Haryana by M/S Mahindra Life Estate Developers Ltd. The recommendation of SEAC to accord Environmental Clearance was earlier considered in the 51st meeting of SEIAA held on 15-05-2013, wherein it was decided that this matter may be referred to SEAC with the advise to examine the revision/amendment minutely as to its impact on common facilities, utilities, infrastructure of the project; in particular but not limited to the impact of increased population on common utility capacity, parking unavailability, traffic congestion, evacuation time in case of the fire disaster STP capacity, pipelines capacity, lifts congestion etc must be analysed. The SEAC in its 90th meeting held on 04-09-2013 again recommended this project of Modification and Expansion for Environmental Clearance. In the today’s meeting the recommendation of SEAC and the project details were taken up for consideration in the presence of representative of the project proponent Detailed discussions were held regarding water requirement, quality of water, green belt development plan, Ambient Air Quality, NOC issued by DC regarding non-applicability of Aravalli Notification etc. It was noticed that the project proponent has already submitted assurance of water supply, power supply, NOC from DFO Gurgaon, permission of Forest Department for cutting of trees. The representative of the project proponent also submitted copy of validated license but failed to submit certificate issued by DC regarding non-applicability of Aravalli Notification. The representative of the project proponent submitted a plan earmarking space for solid waste management site. After detailed deliberations it was decided to defer this case with the decision that the project proponent may be asked to submit reply to the below mentioned observations within 15 days. [1] The project proponent shall submit certificate of DC regarding non-applicability of Aravalli Notification. Item No. [3] Environmental Clearance for construction of Group Housing Project at Village-Fazilpur-Jharsa, Sector-71, Gurgaon, Haryana (10.89 acres.) by M/s Raj Buildwell Pvt. Ltd. The SEAC has recommended this project for Environmental Clearance subject to stipulation stated therein. The Project Proponent has proposed the construction of Group 4 Housing Project at Village-Fazilpur-Jharsa, Sector-71, Gurgaon, Haryana on a plot area of 44070.266 sqmt (10.89 Acres). The total built up area shall be 104171.519 sqmt. The project shall have 5 Towers having 1 basement + GF + maximum 34 Floors. The proposed Group Housing project shall have 185 no. of DU and 33 EWS Units. The maximum height of the building shall be 118.65 meters. The total water requirement shall be 277 KLD. The fresh water requirement shall be 155 KLD. The waste water generation shall be 176 KLD, which will be treated in the STP of 250 KLD capacities. The total power requirement shall be 4000 KVA which will be supplied by DHBVN. The Project Proponent has proposed to develop green belt on 30% of project area (20% tree plantation + 10% landscaping). The Project Proponent proposed to construct 11 rain water harvesting pits. The solid waste generation will be 515.1 kg/day. The biodegradable waste will be treated in the project area by adopting appropriate technology. The total parking spaces proposed are 752 ECS. In the today’s meeting the recommendation of SEAC and the project details were taken up for consideration in the presence of representative of the project proponent and consultant. Detailed discussions were held regarding existence of revenue rasta, water requirement, quality of water, green belt development plan, Ambient Air Quality, NOC of Deputy Commissioner, regarding non-applicability of Aravalli notification, recycle and reuse of water, parking plan, traffic circulation etc. The representative of the project proponent submitted the NOC of Deputy Commissioner, Gurgaon regarding non applicability of Aravalli notification, assurance of HUDA for supply of drinking water based on canal water supply. The representative of the project proponent also submitted a plan earmarking site for solid waste management. It was noticed that the service lines proposed to be laid by the project proponent do not intercept the revenue rasta. The representative of the project proponent assured the Authority to provide helipad facility as required under NBC norms. The representative of the project proponent was also directed to revise the water requirement for EWS @ 5 persons instead of @ 2 persons and also use 50 KLD of treated water for water body instead of fresh water and submit revised water requirement and water balance diagram accordingly. The representative of the project proponent was also directed to ensure proper pumping arrangements keeping in view the height of the building. The representative of the project proponent was directed to submit an undertaking declaring that there is no encroachment on the revenue rasta existing within the project area, permission of Mines and Geology Department shall be obtained for excavation of soil for basement purpose, EDC/IDC has been paid to DTCP as per demand by the department up to date, provision for multi stage pumping, use of ultra low sulphur diesel and provision for helipad. The representative of the project proponent submitted the desired undertaking. The representative of the project proponent was directed to correct the heat gain factor. 5 After detailed deliberations, the Authority decided to agree with the recommendations of SEAC to accord Environment Clearance to this project by imposing the following condition in addition to the usual conditions in practice. [1] The project proponent shall ensure that no construction activity is undertaken either on surface or below or above surface of revenue rasta passing through the project area. [2] The project proponent shall indicate the width and length of revenue rasta passing through the project area on sign board and shall display the same at both the ends of revenue rasta stretch, for awareness of public. Sign board shall also display the message that this is public rasta/road and any citizen can use it. There shall not be any gate with or without guards on revenue rasta. [3] The project proponent shall provide helipad facility as required under NBC norms and shall seek permission of helipad from AAI/Relevant Authority. [4] The project proponent shall provide stage pumping (Different Levels) for lifting water to rooftop. [5] The project proponent shall ensure structural stability to withstand earthquake of even Richter Scale 8.2 or more. [6] The project proponent shall seek NOC from Town and Country department regarding height of the building allowed in the skyline of that city. [7] The project proponent shall maintain the distance between STP and water supply line. [8] The project proponent shall calculate the water requirement for EWS @ 5 persons instead of @ 2 persons and also use 50 KLD of treated water for water body instead of fresh water and shall submit revised water requirement and water balance diagram before the start of construction. [9] The project proponent shall ensure that the stack height is more than the highest tower. [10] The project proponent shall ensure proper Air Ventilation and light system in the basements area for comfortable living of human being and shall ensure that number of Air Changes per hour/(ACH) in basement never falls below 15. Item No. [4] Environmental Clearance for construction of Commercial project at Sector-63A, Village Berampur, District Gurgaon, Haryana by M/s Yule Propbuilt Pvt. Ltd. The SEAC has recommended this project for Environmental Clearance subject to stipulation stated therein. The Project Proponent has proposed the construction of Commercial Project at Sector-63A, Village Berampur, District Gurgaon, Haryana on a plot area of 8903.08 sqmt. The total built up area shall be 31218.27 sqmt. The proposed commercial complex shall have 3 basements + GF + maximum 14 Floors. The maximum height of the building shall be 70 meters. The total water requirement shall be 237 KLD. 6 The fresh water requirement shall be 134 KLD. The waste water generation shall be 103 KLD, which will be treated in the STP of 130 KLD capacities. The total power requirement shall be 2750 KVA which will be supplied by DHBVN. The Project Proponent has proposed to develop green belt on 20% of project area (15% tree plantation + 5% landscaping). The Project Proponent proposed to construct 03 rain water harvesting pits. The solid waste generation will be 600 kg/day. The bio-degradable waste will be treated in the project area by adopting appropriate technology. The total parking spaces proposed are 406 ECS. In the today’s meeting the recommendation of SEAC and the project details were taken up for consideration in the presence of representative of the project proponent and consultant. Detailed discussions were held regarding water requirement, quality of water, green belt development plan, Ambient Air Quality, NOC of Deputy Commissioner, regarding non-applicability of Aravalli notification, recycle and reuse of water, Parking plan, traffic circulation plan. The representative of the project proponent submitted the NOC of Deputy Commissioner, Gurgaon regarding non applicability of Aravalli notification, NOC from AAI regarding height clearance and assurance of HUDA for supply of water. The representative of the project proponent also submitted basement parking plan and location of STP. It was noticed that the project proponent has proposed parking in the 3 basements but the Authority was the view that 3rd basement parking should be discouraged as there is no proper provision for natural light and Air Ventilation. The representative of the project proponent submitted brief design of HVAC system proposed for 1st, 2nd and 3rd basement as per National building code and gave brief of system involved and Air circulation. The representative of the project proponent was advised to use treated water for HVAC makeup instead of 76.34 KLD of fresh water. The representative of the project proponent assured to submit revised water balance diagram before the start of construction. The Authority also directed the representative of the project proponent to ensure that adequate distance between STP and water supply should be maintained. The representative agreed to provide the same. The representative of the project proponent was advised to use only LED lights and install solar panel on the roof of the building. The representative of the project proponent assured to provide the same and submitted an undertaking in this regard. After detailed deliberations, the Authority decided to agree with the recommendations of SEAC to accord Environment Clearance to this project by imposing the following condition in addition to the usual conditions in practice. [1] Vertical fenestration shall not exceed 40% of total wall area. [2] The project proponent shall use treated water for HVAC make up instead of total fresh water and shall submit revised Water balance diagram before the start of construction. 7 [3] The project proponent shall provide helipad facility as required under NBC norms and shall seek permission of helipad from AAI accordingly /relevant authority. [4] The project proponent shall provide solar panel of the roof on the building. [5] The project proponent shall use only LED lights. [6] The project proponent shall ensure proper Air Ventilation and light system in the basements area for comfortable living of human being and shall ensure that number of Air Changes per hour/(ACH) in basement never falls below 15. Item No. [5] Environmental Clearance for construction of proposed Group Housing Project at Village Naurangpur, Sector-79, Gurgaon, Haryana by M/s Bestech India Pvt. Ltd. The SEAC has recommended this project for Environmental Clearance subject to stipulation stated therein. The Project Proponent has proposed the construction of Group Housing Project at Village Naurangpur, Sector-79, Gurgaon, Haryana on a plot area of 40873.25 sqmt. The total built up area shall be 93503.70 sqmt. The project shall have 7 Towers + 1 basement + GF + maximum 19 Floors. The Group Housing shall have 613 Dwelling units (521 General plots + 92 EWS). The maximum height of the building shall be 59.9 meters. The total water requirement shall be 500 KLD. The fresh water requirement shall be 293 KLD. The waste water generation shall be 355 KLD, which will be treated in the STP of 430 KLD capacities. The total power requirement shall be 3053.40 KW which will be supplied by DHBVN. The Project Proponent has proposed to develop green belt on 34.33% of project area (24% tree plantation + 10.33% landscaping). The Project Proponent proposed to construct 10 rain water harvesting pits. The solid waste generation will be 1324.2 kg/day. The bio-degradable waste will be treated in the project area by adopting appropriate technology. The total parking spaces proposed are 989 ECS. In the today’s meeting the recommendation of SEAC and the project details were taken up for consideration in the presence of representative of the project proponent and consultant. Detailed discussions were held regarding water requirement, quality of water, green belt development plan, Ambient Air Quality, NOC of Deputy Commissioner, regarding non-applicability of Aravalli notification, recycle and reuse of water, parking plan, traffic circulation etc. The representative of the project proponent submitted the NOC of Deputy Commissioner, Gurgaon regarding non applicability of Aravalli notification, assurance of HUDA for supply of drinking water and photocopies of EDC/IDC deposited to the DTCP for the services of supply of water supply, sewerage connection and drainage system. The representative of the project proponent submitted a plan earmarking site for solid waste management. The representative of the project proponent also assured the Authority to provide helipad facility as required under NBC norms. The representative of the project proponent was directed to revise the water 8 requirement for EWS @ 5 persons instead of @ 3 persons and submit revised water requirement and water balance diagram accordingly. After detailed deliberations, the Authority decided to agree with the recommendations of SEAC to accord Environment Clearance to this project by imposing the following condition in addition to the usual conditions in practice. [1] The project proponent shall provide helipad facility as required under NBC norms and shall seek permission of helipad from AAI accordingly/relevant authority. [2] The project proponent shall maintain the distance between STP and water supply line. [3] The project proponent shall calculate the water requirement for EWS @ 5 persons instead of @ 3 persons and shall submit revised water requirement and water balance diagram before the start of construction. [4] The project proponent shall ensure that the stack height is more than the highest tower. [5] The project proponent shall ensure proper Air Ventilation and light system in the basements area for comfortable living of human being and shall ensure that number of Air Changes per hour/(ACH) in basement never falls below 15. Item No. [6] Environmental Clearance for the Proposed Commercial Colony of 5.715 acres at Village-Wazirpur, Sector-92, Gurgaon, Haryana by M/s Bestech India Pvt. Ltd. The SEAC has recommended this project for Environmental Clearance subject to stipulation stated therein. The Project Proponent has proposed the construction of Commercial Colony at Village-Wazirpur, Sector-92, Gurgaon, Haryana on a plot area of 23117.487 sqmt (5.715Acres). The total built up area shall be 79342.676 sqmt. The commercial complex shall have 3 Basements + GF + maximum 13 Floors. The maximum height of the building shall be 44.97 meters. The total water requirement shall be 486 KLD. The fresh water requirement shall be 227 KLD. The waste water generation shall be 273 KLD, which will be treated in the STP of 330 KLD capacities. The total power requirement shall be 6446 KW which will be supplied by DHBVN. The Project Proponent has proposed to develop green belt on 20% of project area (15% tree plantation + 5% landscaping). The Project Proponent proposed to construct 06 rain water harvesting pits. The solid waste generation will be 1046.1 kg/day. The bio-degradable waste will be treated in the project area by adopting appropriate technology. The total parking spaces proposed are 960 ECS. In the today’s meeting the recommendation of SEAC and the project details were taken up for consideration in the presence of representative of the project proponent and consultant. Detailed discussions were held regarding water requirement, quality of water, green belt development plan, Ambient Air Quality, NOC of Deputy Commissioner, regarding non-applicability of Aravalli notification, recycle and reuse of water, Parking 9 plan, traffic circulation plan, NOC from District Wild-life Warden etc. The representative of the project proponent submitted the NOC of Deputy Commissioner, Gurgaon regarding non applicability of Aravalli notification, NOC from AAI regarding height clearance and NOC issued by Divisional Wild-life Warden Gurgaon. The representative of the project proponent submitted assurance of water supply from HUDA and photocopies of EDC/IDC paid to DGTP/HUDA for the services for supply of water, sewerage connection and drainage system. The representative of the project proponent submitted, 1st basement plan showing location of STP. The representative of the project proponent also submitted a plan earmarking site for solid waste management. It was noticed that the project proponent has not provided sufficient space/ways for smooth movement of heavy vehicle in the project area. The representative of the project proponent submitted revised traffic circulation plan earmarking adequate area having hard paved/bituminous road for heavy vehicle circulation. The representative of the project proponent was advised to use treated water for HVAC makeup instead of 82 KLD of fresh water. The representative of the project proponent assured to submit revised water balance diagram before the start of construction. The Authority also directed the representative of the project proponent to ensure that adequate distance between STP and water supply should be maintained. The representative agreed to provide the same. The representative of the project proponent was advised to use only LED lights and install solar panel on the roof of the building. The representative of the project proponent assured to provide the same and submitted an undertaking in this regard. After detailed deliberations, the Authority decided to agree with the recommendations of SEAC to accord Environment Clearance to this project by imposing the following condition in addition to the usual conditions in practice. [1] Vertical fenestration shall not exceed 40% of total wall area. [2] The project proponent shall use treated water for HVAC make up instead of 82 KLD of fresh water and shall submit revise Water balance diagram before the start of construction. [3] The project proponent shall provide solar panel of the roof on the building. [4] The project proponent shall use only LED lights. [5] The project proponent shall ensure proper Air Ventilation and light system in the basements area for comfortable living of human being and shall ensure that number of Air Changes per hour/(ACH) in basement never falls below 15. Item No. [7] Environmental Clearance for new construction project Category 8(a) of a “Group Housing Colony” on land measuring 9.60 Acre at Sector-10A, Bawal, Rewari (Haryana) by M/s Choice Real Estate Developers Pvt. Ltd. The SEAC has recommended this project for Environmental Clearance subject to stipulation stated therein. The Project Proponent has proposed the construction of Group Housing Colony at Sector-10-A, Bawal, Rewari (Haryana) on a plot area of 38849.76 10 sqmt (9.60 Acres). The total built up area shall be 29692.119 sqmt. The project shall have 4 Towers having Basements + Stilt + GF + maximum 11 Floors. The proposed Group Housing project shall have 231 no. of flats and Nursery school. The maximum height of the building shall be 40 meters. The total water requirement shall be 231 KLD. The fresh water requirement shall be 132.99 KLD. The waste water generation shall be 147.07 KLD, which will be treated in the STP of 165 KLD capacities. The total power requirement shall be 2450 KVA which will be supplied by DHBVN. The Project Proponent has proposed to develop green belt on 30.23% of project area (20% tree plantation + 10.23% landscaping). The Project Proponent proposed to construct 07 rain water harvesting pits. The solid waste generation will be 547.78 kg/day. The biodegradable waste will be treated in the project area by adopting appropriate technology. The total parking spaces proposed are 416 ECS. In the today’s meeting the recommendation of SEAC and the project details were taken up for consideration in the presence of representative of the project proponent and consultant. Detailed discussions were held regarding water requirement, quality of water, green belt development plan, Ambient Air Quality, NOC of forest department regarding non-involvement of forest land, certificate from DC concerned that Aravalli Notification is not applicable recycle and reuse of water etc. The representative of the project proponent submitted the NOC of forest department regarding non-involvement of forest land, certificate issued by DC Rewari stating that Aravalli Notification is not applicable, assurance of HUDA for supply of water, copies of IDC/EDC paid to HUDA for the services for supply of water, sewerage connection and drainage system and copy of revalidated license. The representative of the project proponent was also directed to revise the water requirement for EWS @ 5 persons instead of @ 2 persons and submit revised water requirement and water balance diagram accordingly. After detailed deliberations, the Authority decided to agree with the recommendations of SEAC to accord Environment Clearance to this project by imposing the following condition in addition to the usual conditions in practice. [1] The project proponent shall maintain the distance between STP and water supply line. [2] The project proponent shall calculate the water requirement for EWS @ 5 persons instead of @ 2 persons and shall submit revised water requirement and water balance diagram before the start of construction. [3] The project proponent shall ensure that the stack height is more than the highest tower. [4] The project proponent shall ensure proper Air Ventilation and light system in the basements area for comfortable living of human being and shall ensure that number of Air Changes per hour/(ACH) in basement never falls below 15. 11 Item No. [8] Environmental Clearance for the construction of Proposed Group Housing Project at village- Wazirpur, Sector-95, Gurgaon, Haryana by M/S Ramprastha Greens Pvt. Ltd. The SEAC has recommended this project for Environmental Clearance subject to stipulation stated therein. The Project Proponent has proposed the Group Housing Project at village- Wazirpur, Sector-95, Gurgaon, Haryana on a plot area is 99269.388 sqmt (24.53 Acres). The total built up area will be 206449.885 sqmt. The project shall comprise of 17 Towers having 4 Basement + GF + maximum 23 Floors. The proposed Group Housing project shall have Dwelling Unit, EWS unit, Servant unit, Nursery School & Primary School, shops etc. The maximum height of the tower is 76.65 meter. The total water requirement shall be 1066 KLD. The fresh water requirement shall be 704 KLD. The waste water generation shall be 888 KLD, which will be treated in the STP of 1000 KLD capacity. In the today’s meeting the recommendation of SEAC and the project details were taken up for consideration in the presence of representative of the project proponent and consultant. Detailed discussions were held regarding existence of revenue rasta, HT line, quality of water, green belt development plan, Ambient Air Quality, NOC from DC Gurgaon regarding non-applicability of Aravalli Notification, NOC from DWLW Gurgaon, recycle and reuse of water etc. The representative of the project proponent submitted NOC issued by DC Gurgaon regarding non-applicability of Aravalli Notification, assurance of HUDA for the supply of water and copies of IDC/EDC paid to HUDA/DTCP for the services for supply of water, sewerage connection and drainage system and NOC of AAI regarding height clearance. The representative of the project proponent was also directed to keep ROW for HT line as per prevailing government instructions. The representative of the project proponent was also directed to revise the water requirement for EWS @ 5 persons instead of @ 2 persons and submit revised water requirement and water balance diagram accordingly. The representative of the project proponent clarified that the services lines to be laid in the proposed project shall not intercept the revenue rasta and the services lines will be laid on 24 meter wide road. The representative of the project proponent submitted copy of service plan also. It was noticed that the project proponent has proposed 5% of the parking area for EWS which was not found in accordance with the norms. The representative of the project proponent was directed to revise the parking calculation as in the case of DU @ 1.5/DU. The representative of the project proponent assured to submit NOC from DWLW Gurgaon within week. After detailed deliberations it was decided to defer this case with the decision that the project proponent may be asked to submit reply to the below mentioned observations within 15 days. 12 [1] The project proponent shall calculate the water requirement for EWS @ 5 persons instead of @ 2 persons and shall submit revised water requirement and water balance diagram. [2] The project proponent shall submit NOC from DWLW Gurgaon. [3] The project proponent shall submit revised parking calculation @ 1.5/ EWS unit. [4] The project proponent shall submit site plan marked on sector plan. [5] Basement plans for parking and circulation of traffic showing entry and exit points shall be submitted. [6] The project proponent shall submit permission for crossing the rasta or dual plumbing plan showing layout of service lines for water supply, sewerage, drainage besides STP etc. on one plan without crossing revenue rasta. The project proponent shall submit permission of competent Authority for crossing the 60 meter dividing road for laying of services lines beneath the road for connection of different parts of the project. Item No. [9] Environmental Clearance for Commercial Complex “Agro Mall” at Karnal, Haryana being developed by H.S.A.M.Board. The SEAC has recommended this project for Environmental Clearance subject to stipulation stated therein. The Project Proponent has proposed the construction of Commercial Complex “Agro Mall” at Karnal, Haryana on a plot area of 15694.5 sqmt (3.878 Acres). The total built up area shall be 23449.85 sqmt. The project shall have 80 no. of shops having Basements + GF + 03 Floors. The maximum height of the building shall be 21.64 meters. The total water requirement shall be 126 KLD. The fresh water requirement shall be 91 KLD. The waste water generation shall be 36 KLD, which will be treated in the STP of 50 KLD capacities. The total power requirement shall be 4019.38 KW which will be supplied by UHBVN. The Project Proponent has proposed to develop green belt on 30.04% of project area (20% tree plantation + 10.04% landscaping). The Project Proponent proposed to construct 04 rain water harvesting pits. The solid waste generation will be 151 kg/day. The bio-degradable waste will be treated in the project area by adopting appropriate technology. The total parking spaces proposed are 368 ECS. In the today’s meeting the recommendation of SEAC and the project details were taken up for consideration in the presence of representative of the project proponent and consultant. Detailed discussions were held regarding water requirement, quality of water, green belt development plan, Ambient Air Quality, NOC from Forest Department, recycle and reuse of water, Parking plan, traffic circulation plan etc. The representative of the project proponent informed the Authority that the water requirement 126 KLD shall be met from existing bore-well. The representative of the project proponent further submitted that the municipal water supply and drainage system has already been laid by HUDA in the vicinity of the project area. The representative of the project proponent 13 submitted storm water plan, revised water balance diagram and also submitted a letter indicating that the Executive Engineer HSAMB Karnal will be the nodal officer for this project. After detailed deliberations, the Authority decided to agree with the recommendations of SEAC to accord Environment Clearance to this project by imposing the following condition in addition to the usual conditions in practice. [1] The Project Proponent shall adopt adequate Air Pollution Control Measures to mitigate the air pollution problem and also ensure to provide sufficient space for parking of vehicles to avoid any congestion on the road during peak season. Parking space should be calculated keeping in mind that much more space is required for trucks to turn and move as compared to smaller vehicles. [2] Under the provisions of Environment (Protection) Act, 1986, legal action shall be initiated against the Project Proponent if it was found that construction of the project has been started before obtaining environmental clearance. [3] The Project Proponent shall ensure that no dust is raised even during peak season operation phase. NAAQ standards must be maintained during both construction and operation phase. [4] The Project Proponent shall ensure that plinth is 1.5 meter above 100 years flood level and facility is not prone to water logging. [5] The Project Proponent shall ensure that ground water is not contaminated due to leache of spoiled organic material. [6] The Project Proponent shall ensure the proper and safe disposal of spoiled/rotten material. [7] The project proponent shall use only LED lights. [8] Nodal Officer nominated by HSAM Board shall be responsible for implementation of all conditions of Environmental Clearance letter. Item No. [10] Environmental Clearance for Ware House Project, at VillageHassangarh, Tehsil-Sampla, Distt. Rohtak, Haryana by M/s Vision Realtech Pvt. Ltd. The SEAC has recommended this project for Environmental Clearance subject to stipulation stated therein. The Project Proponent has proposed the development of Ware House Project, at Village-Hassangarh, Tehsil-Sampla, Distt. Rohtak, Haryana on a total plot area of 138145.35 sqmt (34.136 Acres). The total built up area shall be 63919.85 sqmt. The Ware House complex shall comprise of 9 sheds and Ground floor. The maximum height of the building shall be 12 meter. The total water requirement shall be 43.92 KLD. The fresh water requirement shall be 1.68 KLD. The waste water generation shall be 2.18 KLD which will be treated in Septic Tank with Soak pits. In the today’s meeting the recommendation of SEAC and the project details were taken up for consideration in the presence of representative of the project proponent 14 Detailed discussions were held regarding existence of HT line, drain and water requirement, quality of water, green belt development plan, Ambient Air Quality etc. The representative of the project proponent submitted copy of NOC issued by Forest Department regarding non-involvement of forest land. It was noticed that the project proponent has proposed to provide septic tank, soak pit for treatment of waste water. The representative of the project proponent was advised to provide STP of 5 KLD capacity for treatment of waste water. The traffic circulation plan was also not found satisfactory as the project proponent did not propose wide internal roads for smooth movement of heavy vehicles. The representative of the project proponent assured to submit revised traffic circulation plan. It was noticed that the project proponent has proposed construction of 34 no. of RWH pits. The representative of the project proponent was asked to conduct the study of ground water table in order to ascertain the feasibility of proposed RWH structures otherwise alternate arrangements for disposal of storm water up to approved site of drainage shall be submitted. The representative of the project proponent was also asked to submit the inventory of Articles proposed to be stored in the Ware House. After detailed deliberations it was decided to defer this case with the decision that the project proponent may be asked to submit reply to the below mentioned observations within 15 days. [1] The project proponent shall make provision for STP of 5 KLD capacity and shall submit the details thereof and revised water balance diagram. [2] The project proponent shall submit revised traffic circulation plan. [3] The project proponent shall submit inventory of Article to be stored in proposed Ware House. [4] The project proponent shall conduct the study of ground water table in order to ascertain the feasibility of proposed RWH otherwise alternate arrangements for disposal of storm water up to approved site of drainage shall be submitted. [5] The project proponent shall submit source and quality of water for human consumption. Item No. [11] Environmental Clearance for Setting up Group Housing (37.512 acres) at Sector-67 A, Village-Dhumaspur and Maidawas, DistrictGurgaon, Haryana by M/s Precision Realtors Pvt. Ltd. The SEAC has recommended this project for Environmental Clearance subject to stipulation stated therein. The Project Proponent has proposed the construction of Group Housing project at Sector-67 A, Village-Dhumaspur and Maidawas, District-Gurgaon, Haryana on a plot area of 151804.3 sqmt (37.512 Acres). The total built up area shall be 812877.08 sqmt. The project shall have 35 Towers in which 4 Cluster (Cluster A- 10 Towers + GF-13 floors), (Cluster B- 8 Towers +GF + 13 floors), (Cluster C- 9 Towers +GF + 13 floors), (Cluster D- 8 Towers +GF + maximum 19 floors). The proposed 15 Group Housing project shall have 1780 no. of DU, 315 EWS units, Club, Nursery School & Primary Schools. The maximum height of the building shall be 73 meters. The total water requirement shall be 2359 KLD. The fresh water requirement shall be 1105 KLD. The waste water generation shall be 1320 KLD, which will be treated in the STP of 2300 KLD (4X575 each) capacities. The total power requirement shall be 15174.72 KW which will be supplied by DHBVN. The Project Proponent has proposed to develop green belt on 45.02% of project area (21.88% tree plantation + 18.93% landscaping). The Project Proponent proposed to construct 20 rain water harvesting pits. The solid waste generation will be 4800 kg/day. The bio-degradable waste will be treated in the project area by adopting appropriate technology. The total parking spaces proposed are 3545 ECS. In the today’s meeting the recommendation of SEAC and the project details were taken up for consideration in the presence of representative of the project proponent and consultant. The recommendation of SEAC was examined on the basis of prevalent procedure as prescribed in the MoEF GoI amended notification dated 22-08-2013. Detailed discussions were held regarding existence of revenue rasta, HT line, water requirement, quality of water, green belt development plan, Ambient Air Quality, NOC of DC Gurgaon regarding non-applicability of Aravalli Notification, recycle and reuse of water etc. The representative of the project proponent submitted the NOC of DC Gurgaon regarding non-applicability of Aravalli Notification, assurance of HUDA for supply of water and copies of IDC/EDC paid to HUDA/DGTCP for the services for supply of water, sewerage connection and drainage system. It was noticed that the values of parameter PM2.5, PM10 are exceeding the prescribed limits. The representative of the project proponent was asked to submit plan for controlling PM2.5, PM10 levels and also directed to adopt water sprinkling system to suppress the dust generation. The representative of the project proponent was asked to revise the RWH calculation @ 45 m/hr and the same was submitted during the meeting. The representative of the project proponent clarified that the revenue rasta will not be encroached and submitted services line plan showing that the revenue rasta is not intercepted, however it was clarified that the Entry and Exit earmarked on the plan is through 24 meter wide road and revenue rasta is part of HUDA road. The representative of the project proponent submitted an undertaking with the declaration that the revised environmental clearance for area earmarked as future development in the layout plan shall be taken before any development is undertaken in the area. After detailed deliberations, the Authority decided to agree with the recommendations of SEAC to accord Environment Clearance to this project by imposing the following condition in addition to the usual conditions in practice. 16 [1] The project proponent shall ensure that no construction activity is undertaken either on surface or below or above surface of revenue rasta passing through the project area. [2] The project proponent shall indicate the width and length of revenue rasta passing through the project area on sign board and shall display the same at both the ends of revenue rasta stretch, for awareness of public. Sign board shall also display the message that this is public rasta/road and any citizen can use it. There shall not be any gate with or without guards on revenue rasta. [3] All system of water supply, sewerage system, STP etc. shall be provided based on revised requirement of @135lpcd. STP will not be below first basement. [4] The project proponent shall maintain the distance between STP and water supply line. [5] The project proponent shall not raise any construction activity in the ROW reserved/acquired for High Tension Wire passing through the project area and shall maintain horizontal and vertical ROW as required under Indian Electricity Rules, 1956/DHBVN latest instructions. [6] The project proponent shall seek the revised Environmental Clearance if any construction is taken up in the left over unplanned area of the project. [7] The project proponent shall ensure that the stack height is more than the highest tower. [8] The project proponent shall ensure proper Air Ventilation and light system in the basements area for comfortable living of human being and shall ensure that number of Air Changes per hour/(ACH) in basement never falls below 15. On 29-11-2013 Item No. [12] Environmental Clearance for Proposed Modification & Expansion of Existing Group Housing Project “Park View” at Sec-92, Vill.Wazipur, Tehsil & distt. Gurgaon by M/s Bestech India Pvt. Ltd. The SEAC has recommended this project for Environmental Clearance subject to stipulation stated therein. The Project Proponent has proposed the construction of Commercial Colony at Village Mewka, Sector-92, Gurgaon, Haryana. Items Plot area Existing Proposed Variation 10.0375 Acres (40,619.96 sqmt) 4449.24 sqmt 12.7875 Acres (51749.171 sqmt) 4581.11 SQMT Addition of 2.75 Acres 8.9375 11.6555 Acres Addition of 2.71 Acres 84264.463 127036.846 sqmt Green Area (sqmt) 11637.866 (32.176) 18882.00 (40.03%) Main dwelling Unit 402 628 Addition of 42772.383 sqmt Addition of 7244.134 (7.85%) Addition of 226 numbers Area in Road widening Effective Plot Area (Acre) Built up area (sqmt) Addition of 131.87 sqmt 17 EWS Unit Service Personals Building height (m) 72 40 44.95 111 63 59.9 Number of floors B+G+14 No. of level of basements 1 2 Basement + Ground + 19 Floors 2 (43690.4 sqmt) Addition 39 numbers Addition of 23 personals Addition of 14.95 meters Addition of One Basement+5 Floors Addition of one No. of car parking (ECS) Power requirement Capacity of back up DG sets (KVA) 651 1193 basement Addition of 542 ECS 4378 kw 5 D.G Sets of total 6500 KVA (1X500 KVA + 4X1500 KVA) 440 4629 kw 3 D.G Sets of total 4000 KVA (2X1500 KVA & 1X100 KVA) 640 Addition of 251 KW Reduction of 2500 KVA 210 256 351 458 Addition of 141 KLD Addition of 202 KLD 300 10 550 13 956 1723 Addition of 250 KLD Addition of 03 no. of RWH Addition of 767 kg/day 2457 4100 Total water requirement (KLD) Fresh Water (KLD) Sewage generation (KLD) STP capacity (KLD) No. of rain water harvesting pits Solid wastes generation (kg/day) Estimated population Addition of 200 KLD Addition of 1643 persons In the today’s meeting the recommendation of SEAC and the project details were taken up for consideration in the presence of representative of the project proponent and consultant. Detailed discussions were held regarding water requirement, quality of water, green belt development plan, Ambient Air Quality, NOC of Deputy Commissioner, regarding non-applicability of Aravalli notification, recycle and reuse of water, Parking plan, traffic circulation plan, NOC from District Wild-life Warden etc. The representative of the project proponent submitted the NOC of Deputy Commissioner, Gurgaon regarding non applicability of Aravalli notification, NOC from AAI regarding height clearance and NOC issued by Divisional Wild-life Warden Gurgaon. The representative of the project proponent submitted assurance of water supply from HUDA and photocopies of EDC/IDC paid to DGTP/HUDA for the services for supply of water, sewerage connection and drainage system. The representative of the project proponent submit 1st basement plan showing location of STP. The representative of the project proponent also submitted a plan earmarking site for solid waste management. It was noticed that the project proponent has proposed water calculation for EWS @ 2 persons. The representative of the project proponent was asked to submit revised water calculation @ 5 persons for EWS @ 135 lpcd and revised water balance diagram before the start of construction. The parking plan proposed by the project proponent was found unsatisfactory. The representative of the project proponent submitted the revise parking plan 18 by increasing the parking area in the lower basement. It was noticed that with the revision in the parking area the total parking would be 1320 ECS against the earlier proposed 1193 ECS. The Authority also directed the representative of the project proponent to ensure that adequate distance between STP and water supply should be maintained. The representative agreed to provide the same. It was noticed that the parking calculation has been carried out for MDU @ 1.5 and for EWS and Service Personal Units @1/3 which was not in accordance with norms. The representative of the project proponent was advised to revise the parking calculation for EWS + Service Personal Units @ 1.5 instead of @ of 1/3 per/unit and submit the same before the start of construction. The representative of the project proponent was advised to use only LED lights. After detailed deliberations, the Authority decided to agree with the recommendations of SEAC to accord Environment Clearance to this project by imposing the following condition in addition to the usual conditions in practice. [1] The project proponent shall ensure that no construction activity is undertaken either on surface or below or above surface of revenue rasta passing through the project area. [2] The project proponent shall indicate the width and length of revenue rasta passing through the project area on sign board and shall display the same at both the ends of revenue rasta stretch, for awareness of public. Sign board shall also display the message that this is public rasta/road and any citizen can use it. There shall not be any gate with or without guards on revenue rasta. [3] The project proponent shall use treated water for HVAC make up instead of fresh water and shall submit revised Water balance diagram before the start of construction. [4] The project proponent shall use only LED lights. [5] The project proponent shall provide helipad facility as required under NBC norms and shall seek permission of helipad from AAI accordingly/Relevant Authority [6] The project proponent shall calculate the water requirement for EWS @ 5 persons instead of @ 3 persons @ 135 lpcd and shall submit revised water requirement and water balance diagram before the start of construction. [7] The project proponent shall ensure that the stack height is more than the highest tower. [8] The project proponent shall submit revised parking calculation @ 1.5/ EWS + Service Personal Unit before the start of construction. [9] The project proponent shall ensure proper Air Ventilation and light system in the basements area for comfortable living of human being and shall ensure that number of Air Changes per hour/(ACH) in basement never falls below 15. 19 Item No. [13] Environmental Clearance for construction of Plotted Colony (53.837 Acre) at village-Dharuhera, Sector-3,3A & 4, Rewari, Haryana by M/s S. N. Jee Buildwell Pvt. Ltd. The SEAC has recommended this project for Environmental Clearance subject to stipulation stated therein. The Project Proponent has proposed the construction of Plotted Colony (53.837 Acre) at village-Dharuhera, Sector-3,3A & 4, Rewari, Haryana on a plot area is 217870.60 sqmt (53.837 Acres). The total built up area will be 52113.4 sqmt. The project shall comprise of 456 no. of Residential plots, 2 Nursing Home, 1 Primary School, 1 Nursery School, Taxi stand, Clinic, ATM, Beauty parlor, Multi- purpose booth and commercial area. The maximum height of the tower is 25 meter. The total water requirement shall be 1378 KLD. The fresh water requirement shall be 744 KLD. The waste water generation shall be 805 KLD, which will be treated in the 3 STPs of 725 KLD, 220 KLD, 125 KLD and the ETP of 60 KLD capacity. In the today’s meeting the recommendation of SEAC and the project details were taken up for consideration in the presence of representative of the project proponent Detailed discussions were held regarding existence of revenue rasta, HT line; water requirement, quality of water, green belt development plan, Ambient Air Quality etc. The assurance of water supply submitted by the representative of the project proponent was not found in order. Accordingly the representative of the project proponent was asked to submit proof of IDC/EDC paid to HUDA. The representative of the project proponent clarified that HUDA is in process of acquiring the land for approach roads and sector roads through which the plotted colony and Group Housing project will be accessed. The representative of the project proponent further informed that they have submitted bank guarantee with Town and Country Planning Department as per the terms and the condition of Town and Country Planning Department. He further clarified that they have already made full and final payment of the EDC/IDC to DGTCP for Group Housing Colony which is part of plotted colony. The representative of the project proponent also submitted a self contained note as was advised by the Authority. The representative of the project proponent informed the Authority that they are not encroaching the revenue rasta. It was noticed that the project proponent has proposed services line under the 45 meter wide sector road. The Authority was of the view that the DGTP/HUDA does not grant permission for laying of services lines beneath the 45 meter sector road. The representative of the project proponent was advised to seek the permission of competent Authority for laying of service lines beneath 45 meter sector road. The representative of the project proponent was also advised to revise the water calculation @ 135 lpcd instead of @111 lpcd. The representative of the project proponent agreed and submitted the same. 20 After detailed deliberations it was decided to defer this case with the decision that the project proponent may be asked to submit reply to the below mentioned observations within 15 days. [1] The project proponent shall submit NOC from DFO regarding non-involvement of Forest land. [2] The project proponent shall submit permission of competent Authority for laying of services lines beneath the 45 meter wide sector road. [3] The project proponent shall submit an undertaking with the declaration that they will not encroach the revenue rasta. [4] The project proponent shall submit a plan earmarking sites park ETP, STP, Solid Waste Management and services lines. Item No. [14] Environmental Clearance for the Residential Plotted colony project located at Vill Naglu, Umarpur, Maidawas, Ullawas & Kadarpur in Gurgaon Manesar Complex Haryana by M/s Brahma City Pvt. Ltd. The SEAC has recommended this project for Environmental Clearance subject to stipulation stated therein. The recommendation of SEAC was examined on the basis of prevalent procedure as prescribed in the MoEF GoI amended notification dated 22-082013. The Project Proponent has proposed the Residential Plotted colony project located at Vill Naglu, Umarpur, Maidawas, Ullawas & Kadarpur in Gurgaon Manesar Complex Haryana on a plot area is 596029.10 sqmt (147.282 Acres). The total built up area will be 507155.13 sqmt. The project shall comprise of 6 pockets having 1060 no. of Residential plots (845 General plots + 215 EWS), 1 Community center, 2 Nursery Schools, 3 Primary Schools, 1 High School, 1 Nursing Home, 1 Dispensary, 1 Religious building, 3 Creche. The maximum height of the tower is 20 meter. The total water requirement shall be 3010 KLD. The fresh water requirement shall be 1601 KLD. The waste water generation shall be 1967 KLD, which will be treated in the STPs of 2350 KLD and the ETP of 30 KLD capacity. In the today’s meeting the recommendation of SEAC and the project details were taken up for consideration in the presence of representative of the project proponent Detailed discussions were held regarding existence of revenue rasta, water requirement, quality of water, green belt development plan, Ambient Air Quality etc. The representative of the project proponent submitted assurance of HUDA for water supply. The representative of the project proponent was asked to submit proof of IDC/EDC paid to HUDA/DGTCP. The representative of the project proponent submitted proof of IDC paid to DGTCP/HUDA but failed to submit proof of payment of EDC, however he submitted the papers of bank guarantee submitted with DGTCP. The representative of the project proponent informed the Authority that they are not encroaching the revenue rasta and the revenue rasta will be part of 60 meter wide road of HUDA. The representative of the project proponent submitted that the project proposal has been divided in 5 pockets 21 separated by 60 meter wide road and each pocket will have independent HTP WTP/ESS/PSS. The collage plot will have own STP. The entire services will be integrated with HUDA services on 60 meter wide road. The representative of the project proponent submitted an undertaking in this regard. The representative of the project proponent was also advised to revise the water calculation @ 135 lpcd instead of @111 lpcd. The representative of the project proponent agreed and submitted the same. The representative of the project proponent also submitted revised layout plan After detailed deliberations it was decided to defer this case with the decision that the project proponent may be asked to submit reply to the below mentioned observations within 15 days. [1] The project proponent shall submit NOC from DC Gurgaon regarding nonapplicability of Aravalli Notification. [2] The project proponent shall submit an undertaking with the declaration that they will not encroach the revenue rasta. [3] The project proponent shall submit a plan earmarking sites park ETP, STP, Solid Waste Management and services lines. Item No. [15] Environmental Clearance for the Warehousing project at villageTauru, Tehsil Tauru, Mewat, Haryana by M/S Gokaldas Warehousing Corporation. The SEAC has recommended to file this case on the grounds that the built up area of the proposed project is less than 20000 sqmt and does not fall under the purview of the EIA Notification dated 14-09-2006. The SEAC in its recommendation has also given reference of project proponent letter dated 11-06-2013; wherein the project proponent has informed that after the finalization of drawings and other planning they found that their built up are is less than 20000 sqmt hence environmental clearance under EIA Notification is not required. The above recommendation of SEAC was considered in the today’s meeting in the presence of representative of the project proponent. It was found that as per approved building plan the built up area of proposed project is 16479.937 sqmt which is less than 20000 sqmt. Finding no reason to disagree with the recommendation of SEAC the Authority decided to file this case in view of the circumstances explained above. It is clarified that in case of any expansion which results in combined built up area more than 20000 sqmt, the complete Environment Clearance of the combined project shall be required as per EIA Notification dated 14-09-2006. 22 Item No. [16] Environmental Clearance for proposed “Commercial Project” at Village- Dharuhera, in Residential Setor-2A, District- Rewari, Haryana by M/S Raheja Developers Limited. The SEAC has recommended to file this case on the grounds that the built up area of the proposed project is less than 20000 sqmt and does not fall under the purview of the EIA Notification dated 14-09-2006. The SEAC in its recommendation has also given reference of project proponent letter dated 31-05-2013; wherein the project proponent has informed that after the finalization of drawings and other planning they found that their built up area is less than 20000 sqmt hence environmental clearance under EIA Notification is not required. The project proponent also submitted copy of approved site plan. The above recommendation of SEAC was considered in the today’s meeting. It was found that as per approved site plan the built up area of proposed project is 18385.94 sqmt which is less than 20000 sqmt. Finding no reason to disagree with the recommendation of SEAC the Authority decided to file this case in view of the circumstances explained above. It is clarified that in case of any expansion which results in combined built up area more than 20000 sqmt, the complete Environment Clearance of the combined project shall be required as per EIA Notification dated 14-09-2006. Item No. [17] Environmental Clearance for the Warehousing Project “located at village- Pathrari, District- Gurgaon, Haryana by M/S SUNSAT Infotech Pvt. Ltd. The SEAC has recommended to file this case on the grounds that the project proponent has requested for withdrawal of the case as they are in the process of revising the design and layout of Ware House project. The above recommendation of SEAC was considered in the today’s meeting. It was found that the project proponent on 20-04-2012 submitted application for environmental clearance for construction of Ware House project on plot area of 73930.85 sqmt having built up area 55448.14 sqmt. The project proponent failed to respond to the observations of the SEAC conveyed vide letter no. 71 dated 21-05-2012. The SEAC on 21-05-2013 issued final notice and the project proponent on 21-08-2013 requested for withdrawal of the proposal as they are in process of revising the layout plan of the proposed Ware House project. Finding no reason to disagree with the recommendation of SEAC the Authority decided to file this case in view of the circumstances explained above with the condition as under. [1] The project proponent shall submit fresh application with the revised layout plan/design for new construction project and not for expansion project. 23 Item No. [18] Environmental Clearance for the “University of Engineering and Technology Professional and Management College” Project located at Village- Sohna, Gurgaon, Haryana by M/S Genuine Promoters. The SEAC has recommended to file this case on the grounds that the project proponent has informed that they are under contemplation to make some fundamental changes in the conceptual plans of the projects and requested for withdrawal of the case. The above recommendation of SEAC was considered in the today’s meeting. It was found that the project proponent on 28-05-2012 submitted application for environmental clearance for construction of “University of Engineering and Technology” project on plot area of 80964.48 sqmt having built up area 87290.74 sqmt. The project proponent on 23-07-2012 submitted the reply to the observations raised by SEAC vide letter dated 26-0-2012. The case was appraised in the 64th meeting of SEAC held on 05-09-2012. The observations of 64th meeting of SEAC were conveyed on 18-092012. The project proponent on 05-02-2013 submitted the reply which was considered in the 78th meeting of SEAC held on 25-03-2013 and the observations of this meeting was conveyed to the project proponent on 03-04-2013 but the project proponent vide letter dated 10-06-2013 informed that they are under contemplation to make some fundamental changes in the conceptual plan of the project and requested for withdrawal of the case. After detailed deliberations the Authority decided to refer back this case to SEAC with the decision that the SEAC should visit the site to check status of construction if any and submit its recommendation on merits along with the inspection report within stipulated period. Item No. [19] Environmental Clearance for Proposed Expansion of “Oriant Craft Fashion Village” (SEZ) Project at Manesar, Gurgaon, Haryana by M/S Oriant Craft Infrastructure Ltd. The SEAC has recommended to file this case on the grounds that the project proponent vide letter received on 06-06-2013 informed that they have requested the State Government to convert their SEZ proposal under the Industrial Park Scheme with some changes in the land use. Finding no reason to disagree with the recommendation of SEAC the Authority decided to file this case in view of the circumstances explained above. Item No. [20] Environmental Clearance for construction of Common Effluent Treatment Plant (CETP) of 10 MLD capacity and development of Infrastructure at Industrial Estate Refinery Road, Panipat over an area of 373 hect by Haryana State Industrial & Infrastructure Development Corporation Ltd. The SEAC has recommended that the project proposal now falls under the jurisdiction of MoEF, GoI as the project proponent vide letter dated 10-06-2013 has informed that the HSIIDC has reserved 25 % of plots for Petro- Chemical projects which falls in category A and environmental clearance is to be granted by EAC of MoEF GoI. 24 The above recommendation of SEAC was considered in the today’s meeting. Finding no reason to disagree with the recommendation of SEAC the Authority decided to transfer this case to MoEF, GoI for consideration of this project proposal as this project proposal now falls in Category A. Item No. [21] Environmental Clearance for existing Engineering & Technology College Building Project at Village- Pattikalyana (70 km. Milestone), Samalakha, Distt. Panipat, Haryana by M/S VIDYA PEETH Educationa Trust. The SEAC has recommended to file this case on the grounds that the project proponent has requested for more time as they are in search of an alternative agency for helping out in their case of environmental clearance from SEIAA for the expansion of existing building project. The above recommendation of SEAC was considered in the today’s meeting. It was found that the project proponent on 01-12-2011 submitted application for environmental clearance for construction of existing Engineering & Technology College Building Project on plot area of 54037.72 sqmt having built up area 41172.89 sqmt (existing 19012.88 sqmt + proposed 22160.01 sqmt). The project proponent failed to respond to the observations of the SEAC conveyed vide letter no. 828 dated 27-11-2012. The SEAC on 03-06-2013 issued final notice but requested for more time as they are in search of an alternative agency for helping out in their case of environmental clearance from SEIAA for the expansion of existing building project. Finding no reason to disagree with the recommendation of SEAC the Authority was of the view that the cases of environmental clearance cannot be kept pending for a longer time and decided to file this case in view of the circumstances explained above. Item No. [22] Environmental Clearance for Expansion of Proposed Residential Plotted Colony Project krom 108.068 acres to 126.674 acres at Sector102 & 102A, Village- Kherkimajra & Dhankot, Gurgaon, Haryana by M/S Countrywide Promoters Private Limited. This case was lastly considered in the 58th meeting held on 04-10-2013 wherein, it was decided to defer this case with the decision that the project proponent may be asked to submit reply to the below mentioned observations within 15 days. [1] The project proponent shall submit NOC from Deputy Commissioner, Gurgaon regarding non applicability of Aravalli notification. [2] The project proponent shall submit write up on STP channel constructed by irrigation/HUDA along with letters. The project proponent shall ensure that the arrangement made shall not obstruct the natural/ proposed flow in the Nallah. In the today’s meeting the reply dated 31-10-2013 submitted by the project proponent was considered. After detailed deliberations, the Authority decided to agree 25 with the recommendations of SEAC to accord Environment Clearance to this project by imposing the following condition in addition to the usual conditions in practice. [1] The project proponent shall ensure that the plinth level of the building block to be 1.5 meter above 100 years flood level of the said Najafgarh Jheel. [2] The project proponent shall obtain NOC from HUDA as well as Irrigation Department before the start of construction, regarding possible adverse effect of project proposal on the said Najafgarh Jheel. [3] The project proponent shall not raise any construction activity in the ROW reserved/acquired for High Tension Wire passing through the project area and shall maintain horizontal and vertical ROW as required under Indian Electricity Rules, 1956/DHBVN latest instructions. [4] The project shall have the provision for infrastructure services (water supply, sewer, storm water lines etc) to accommodate the additional load arising from population residing in other lands falling within the project limits/vicinity. [5] The project proponent shall maintain the distance between STP and water supply line. [6] The project proponent shall ensure that no construction activity is undertaken either on surface or below or above surface of revenue rasta passing through the project area. [7] The project proponent shall indicate the width and length of revenue rasta passing through the project area on sign board and shall display the same at both the ends of revenue rasta stretch, for awareness of public. Sign board shall also display the message that this is public rasta/road and any citizen can use it. There shall not be any gate with or without guards on revenue rasta. [8] The project proponent shall get the renewal of licenses of the proposed plotted colony from time to time. [9] Rain water harvesting has not been proposed. The project proponent shall make alternate arrangement for disposal of storm water and excess of treated sewage from STP into storm drainage & sewerage system of HUDA respectively. [10] The project proponent shall provide helipad facility as required under NBC norms and shall seek permission of helipad from AAI accordingly /relevant authority. [11] The project proponent shall submit NOC from Airport Authority regarding height clearance. [12] The project proponent shall ensure that the stack height is more than the highest tower. [13] The project proponent shall ensure proper Air Ventilation and light system in the basements area for comfortable living of human being and shall ensure that number of Air Changes per hour/(ACH) in basement never falls below 15. 26 Item No. [23] Environmental Clearance for Construction of setting-up Commercial Complex Project (3.937 Acres) at Sector-59, Village Ullawas & Behrampur, Gurgaon, Haryana by M/s SU Estates Pvt. Ltd. This case was lastly considered in the 57th meeting held on 25-09-2013 wherein, it was decided to defer this case with the decision that the project proponent may be asked to submit reply to the below mentioned observations within 15 days. [1] The project proponent shall submit NOC from Deputy Commissioner, Gurgaon regarding non applicability of Aravalli notification. In the today’s meeting the reply was submitted by the project proponent on 05-11- 2013. After detailed deliberations, the Authority decided to agree with the recommendations of SEAC to accord Environment Clearance to this project by imposing the following condition in addition to the usual conditions in practice. [1] Vertical fenestration shall not exceed 40% of total wall area. [2] The project proponent shall ensure that no construction activity is undertaken either on surface or below or above surface of revenue rasta passing through the project area. [3] The project proponent shall indicate the width and length of revenue rasta passing through the project area on sign board and shall display the same at both the ends of revenue rasta stretch, for awareness of public. Sign board shall also display the message that this is public rasta/road and any citizen can use it. There shall not be any gate with or without guards on revenue rasta. [4] The project proponent shall ensure that natural flow of existing nallah is never obstructed and shall seek NOC from Irrigation Department regarding this before the start of the construction. [5] The project proponent shall ensure that in case of excessive flow of water in, nallah, the structural integrity of buildings along-side the nallah is not breached in any circumstances. [6] The project proponent shall ensure that there should not be any water logging on the bed of nallah even in case of excessive rain. [7] The project proponent shall ensure that sewerage pipe line should not cross over the nallah and project proponent shall maintain separate STP in the plot area across the nallah. [8] The project proponent shall ensure that sewerage line shall be planned by taking into account the natural slope and gravity of original land. [9] The project proponent shall ensure that bed of nallah is not encroached in any manner, while constructing the culvert over the nallah. [10] The project proponent shall get the inspection of nallah before the onset of monsoon season every year from Irrigation Department. 27 [11] The project proponent shall ensure plinth level of the building block is 1.5 meter above 100 years flood level. [12] The project proponent shall provide pervious surface instead of impervious and hard surface in order to reduce overflow water in nallah. [13] The project proponent shall not discharge untreated water in the nallah and also shall not throw any solid waste in the nallah. [14] The project proponent shall provide helipad facility as required under NBC norms and shall seek permission of helipad from AAI accordingly /relevant authority. [15] The project proponent shall ensure proper Air Ventilation and light system in the basements area for comfortable living of human being and shall ensure that number of Air Changes per hour/(ACH) in basement never falls below 15. Item No. [24] Environmental Clearance for “Group Housing Project – Expansion under Cluase 7 (ii) of EIA Notification (SO 1533), Dated 14.09.2006 located at Sector 66, Village- Maidabas, Gurgaon, Haryana by M/s SU Estates Pvt. Ltd. This case was lastly considered in the 59th meeting held on 18-10-2013 wherein, it was decided to defer this case with the decision that the project proponent may be asked to submit reply to the below mentioned observations within 15 days. [1] The Project Proponent shall submit NOC from Deputy Commissioner, regarding non-applicability of Aravalli notification. In the today’s meeting the reply was submitted by the project proponent on 05-11- 2013. After detailed deliberations, the Authority decided to agree with the recommendations of SEAC to accord Environment Clearance to this project by imposing the following condition in addition to the usual conditions in practice. [1] The project proponent shall provide helipad facility as required under NBC norms and shall seek permission of helipad from AAI accordingly/Relevant Authority. [2] The project proponent shall not encroach the BANDH existing in the project area and shall not lay service lines under the BANDH. [3] The project shall have the provision for infrastructure services (water supply, sewer, storm water lines etc) to accommodate the additional load arising from population residing in other lands falling within the project limits/vicinity. [4] The project proponent shall ensure that the stack height is more than the highest tower. [5] The project proponent shall ensure proper Air Ventilation and light system in the basements area for comfortable living of human being and shall ensure that number of Air Changes per hour/(ACH) in basement never falls below 15. 28 Item No. [25] Environmental Clearance for “Group Housing Project – Expansion under Cluase 7 (ii) of EIA Notification (SO 1533), Dated 14.09.2006 located at Sector 58, Village- Ghata and Behrampur, Gurgaon, Haryana by M/S SU Estates Pvt. Ltd. This case was lastly considered in the 57th meeting held on 24-09-2013 wherein, it was decided to defer this case with the decision that the project proponent may be asked to submit reply to the below mentioned observations within week before the next meeting. [1] The project proponent shall submit permission for disposal of excess of treated waste water in the main sewer laid/to be laid by HUDA. [2] The project proponent shall submit NOC from Deputy Commissioner, Gurgaon regarding non applicability of Aravalli notification. In the today’s meeting the reply was submitted by the project proponent on 05-11- 2013. After detailed deliberations, the Authority decided to agree with the recommendations of SEAC to accord Environment Clearance to this project by imposing the following condition in addition to the usual conditions in practice. [1] The project proponent shall ensure that no construction activity is undertaken either on surface or below or above surface of revenue rasta passing through the project area. [2] The project proponent shall indicate the width and length of revenue rasta passing through the project area on sign board and shall display the same at both the ends of revenue rasta stretch, for awareness of public. Sign board shall also display the message that this is public rasta/road and any citizen can use it. There shall not be any gate with or without guards on revenue rasta. [3] The project proponent shall provide helipad facility as required under NBC norms and shall seek permission of helipad from AAI accordingly. [4] The project proponent shall provide stage pumping (Different Levels) for lifting water to rooftop. [5] The project proponent shall ensure structural stability to withstand earthquake of even Richter Scale 8.2 or more. [6] The project proponent shall seek NOC from Town and Country department regarding height of the building allowed in the skyline of that city. [7] The project proponent shall maintain the distance between STP and water supply line. [8] The project proponent shall ensure that the stack height is more than the highest tower. [9] The project proponent shall ensure proper Air Ventilation and light system in the basements area for comfortable living of human being and shall ensure that number of Air Changes per hour/(ACH) in basement never falls below 15. 29 Item No. [26] Environmental Clearance for the development of “Group Housing Project” located at plot No. GH-02, Sector-41, Faridabad in the revenue state of Village Sarai Khawaja, District Faridabad, Haryana by M/s Rise Projects Pvt. Ltd. This case was lastly considered in the 58th meeting held on 05-10-2013 wherein, it was decided to defer this case with the decision that the project proponent may be asked to submit reply to the below mentioned observations within 15 days. [1] The project proponent shall submit NOC from the Forest Department regarding non-involvement of Forest land. In the today’s meeting the reply was submitted by the project proponent on 06-11- 2013. After detailed deliberations, the Authority decided to agree with the recommendations of SEAC to accord Environment Clearance to this project by imposing the following condition in addition to the usual conditions in practice. [1] All system of water supply, sewerage system, STP etc. shall be provided based on revised requirement of @135lpcd. The project proponent shall keep the water requirement for EWS @ 5 persons instead of @ 2 persons and shall plan the STP, water supply and sewerage system etc accordingly. [2] The project proponent shall maintain the distance between STP and water supply line. [3] The project proponent shall ensure that the stack height is more than the highest tower. [4] The project proponent shall ensure proper Air Ventilation and light system in the basements area for comfortable living of human being and shall ensure that number of Air Changes per hour/(ACH) in basement never falls below 15. Item No. [27] Environmental Clearance for W.R.T Group Housing Project at Village Budha Khera Sector-32, Karnal Haryana by M/s Sky High Inf. Pvt. Ltd. This case was lastly considered in the 58th meeting held on 05-10-2013 wherein, it was decided to defer this case with the decision that the project proponent may be asked to submit reply to the below mentioned observations within 15 days. [1] The project proponent shall submit permission of competent Authority for laying of utility services under revenue rasta. [2] The project proponent shall submit an affidavit from consultant that no adverse judgment against his registration with NABET has been passed by any court subsequently. In the today’s meeting the reply was submitted by the project proponent on 06-11- 2013. After detailed deliberations, the Authority decided to agree with the recommendations of SEAC to accord Environment Clearance to this project by imposing the following condition in addition to the usual conditions in practice. 30 [1] The project proponent shall ensure that no construction activity is undertaken either on surface or below or above surface of revenue rasta passing through the project area. [2] The project proponent shall indicate the width and length of revenue rasta passing through the project area on sign board and shall display the same at both the ends of revenue rasta stretch, for awareness of public. Sign board shall also display the message that this is public rasta/road and any citizen can use it. There shall not be any gate with or without guards on revenue rasta. [3] All system of water supply, sewerage system, STP etc. shall be provided based on revised requirement of @135lpcd.The project proponent shall keep the water requirement for EWS @ 5 persons instead of @ 2 persons and shall plan the STP, water supply and sewerage system etc accordingly. [4] The project proponent shall ensure that the stack height is more than the highest tower. [5] The project proponent shall ensure proper Air Ventilation and light system in the basements area for comfortable living of human being and shall ensure that number of Air Changes per hour/(ACH) in basement never falls below 15. Item No. [28] Environmental Clearance for proposed Group Housing Project at Village Maheswrai and Garhi Alwalpur, Tehil Dharuhera, Distt. Rewari, Haryana by M/s AMD Estates Pvt. Ltd. This case was lastly considered in the 59th meeting held on 18-10-2013 wherein, it was decided to defer this case with the decision that the project proponent may be asked to submit reply to the below mentioned observations within 15 days. [1] The Project Proponent shall submit NOC from Forest Department regarding non involvement of forest land. In the today’s meeting the reply was submitted by the project proponent on 07-11- 2013. After detailed deliberations, the Authority decided to agree with the recommendations of SEAC to accord Environment Clearance to this project by imposing the following condition in addition to the usual conditions in practice. [1] All system of water supply, sewerage system, STP etc. shall be provided based on revised requirement of @135lpcd. [2] The project proponent shall maintain the distance between STP and water supply line. [3] The project proponent shall not raise any construction activity in the ROW reserved/acquired for High Tension Wire passing through the project area and shall maintain horizontal and vertical ROW as required under Indian Electricity Rules, 1956/DHBVN latest instructions. [4] The project proponent shall ensure that the stack height is more than the highest tower. 31 [5] The project proponent shall ensure proper Air Ventilation and light system in the basements area for comfortable living of human being and shall ensure that number of Air Changes per hour/(ACH) in basement never falls below 15. Item No. [29] Environmental Clearance for Construction of commercial complex village- Shikhopur, sector-82A, Gurgaon by Mr. Pramil Jindal and Mrs. Neeta Jindal. This case was lastly considered in the 57th meeting held on 24-09-2013 wherein, it was decided to defer this case with the decision that the project proponent may be asked to submit reply to the below mentioned observations within week before the next meeting. [1] The project proponent shall submit an undertaking with the declaration that: (i) They will provide helipad facility in the tower having height 60 meter or above. (ii) They will seek assurance of HUDA for disposal of excess of treated water in the public sewer. [2] The project proponent shall submit NOC from Deputy Commissioner, Gurgaon regarding non applicability of Aravalli notification. In the today’s meeting the reply was submitted by the project proponent on 11-11- 2013. After detailed deliberations, the Authority decided to agree with the recommendations of SEAC to accord Environment Clearance to this project by imposing the following condition in addition to the usual conditions in practice. [1] The project proponent shall ensure that no construction activity is undertaken either on surface or below or above surface of revenue rasta passing through the project area. [2] The project proponent shall indicate the width and length of revenue rasta passing through the project area on sign board and shall display the same at both the ends of revenue rasta stretch, for awareness of public. Sign board shall also display the message that this is public rasta/road and any citizen can use it. There shall not be any gate with or without guards on revenue rasta. [3] The project proponent shall provide helipad facility as required under NBC norms and shall seek permission of helipad from AAI/Relevant Authority accordingly. [4] Vertical fenestration shall not exceed 40% of total wall area. [5] The project proponent shall not encroach the village cart track. [6] The project proponent shall ensure proper Air Ventilation and light system in the basements area for comfortable living of human being and shall ensure that number of Air Changes per hour/(ACH) in basement never falls below 15. 32 Additional Item No. [30] Environmental Clearance for Proposed “Central University of Haryana” at Village Jant-Pali, Mahendergarh, Haryana by Central University Of Haryana. The SEAC has referred this case to the SEIAA with the recommendation for initiating further legal action. The SEAC has considered the project proposal in its 91st meeting held on 18-09-2013 and 94th meeting held on 12-11-2013 and noticed that the project proponent has started construction of the “Central University of Haryana” building without obtaining prior Environmental Clearance which amounts to violation of EIA Notification dated 14-09-2006. The project proponent also submitted a copy of resolution passed by Members of the Council on 30-09-2013 ensuring that violation of provisions of the Environment (Protection) Act, 1986 will not be repeated in future. The Resolution also resolved that the Company admits its mistake for carrying out construction without obtaining prior Environmental Clearance. The recommendation of SEAC in this case was examined in the light of MoEF, GoI OM no. J-11013/41/2006-IA.II (1) dated 12-12-2012. After detailed deliberations it was decided that:[1] The Principal Secretary Environment may be requested to initiate credible action on the violation by invoking powers under Section 19 of the Environment (Protection)Act,1986, for taking necessary legal action under Section 15 of the Act for the period for which the violation has taken place, against the Central University Of Haryana. Registrar, Central University Of Haryana, Govt. B.ED. College, Narnaul, Haryana for commencing construction of “Central University of Haryana” at Village Jant-Pali, Mahendergarh, Haryana without obtaining prior Environmental Clearance under EIA notification 14-09-2006. The Principal Secretary Environment may also be requested to provide the evidence of credible action taken against the project proponent. Item No. [31] Environmental Clearance under EIA Notification dated 14-09-2006 for mining of ‘Brick-Earth’ and ‘ordinary earth’ having lease area less than 5 hac. The agenda item regarding environmental clearance for mining of Brick-Earth was discussed in the today’s meeting. It was decided that the SEAC may be advised to appraise the mining of Brick-Earth project proposals in the light of OM of MoEF, GoI dated 24-06-2013 wherein certain guidelines were issued for consideration of Minor Mineral Mining projects having area less than 5 hac and the amendment dated 09-092013 to the principal EIA Notification dated 14-09-2006. Accordingly it was decided to return all the 118 Project proposals for mining of Brick-Earth to the SEAC. *****