QUESTIONS AND ANSWER FOR REQUEST FOR PROPOSAL:ENTERPRISE RESOURCE PLANNING (ERP) PROJECT RFP NO: SPAD/RFP/027/12/2013 AS AT 23 JANUARY 2014 Note: i. This questions are unedited (verbatim) ii. The clarification session has been closed, no further questions will be entertained. iii. The RFP closing date will be on 12 noon, 27 January 2014 NO. QUESTIONS S.P.A.D. RESPONSE How many of Prasarana staff will be involved in the following and what are their role in this project and skillset: a. SAP technical Project (2 months) b. SAP AMS (1 year) SPAD and Prasarana are 2 (Two) different organizations, hence will not be collaborating in this Project. 2. How many persons will be involved in knowledge transfer? The knowledge transfer will only be among the Project Team members and Key users, approximately 20 employees. 3. What are the current documentations available for SAP BASIS and Netweaver (in scope for AMS)? At present we do not have any SAP solutions installed in SPAD environment. 4. What are the other systems interfaced to SAP? Please provide brief on each interfaced system? At present we do not have any SAP solutions installed in SPAD environment. 5. What is current hardware configuration? Any plan for upgrade current system patch level, kernal level, spam level of each system? At present SPAD prefers to use VMware virtual servers and its network is being managed by GiTN. 1. 23 January 2014 SPAD has not decided on any ERP products yet (whether it’s SAP or others). It will be based on the tender evaluation outcome. Page-1 Tenderer must propose a complete infra setup based on the requirement stated in the technical compliance table (appendix T5). 6. What are the modules currently in use and good if can provide total number of users? Please refer to the technical compliance table (appendix T5) 7. Do you have an architecture diagram or system landscape diagram? Please refer to Appendix A included at the end of this FAQ. 8. Can we get the OS/DB details of all the systems? Please refer to the tender’s appendix. Any integration or connection to the DB must use open standard industry protocol. 9. Kindly provide some ideas about the amount of data size for the data migration requirement. Most of the data are in Excel files. At present, SPAD still uses manual files for its daily operation. 10. Regarding the training of new ERP system, would you opt for train the trainer approach? Please propose your best option that would best suit our requirement. 11. Any room to discuss and prolong the project implementation time line if been awarded? Any discussions in regards to the changes to the project implementation will be done once the tender is awarded and it will be upon management’s approval. 12. There are 3,475 line items in the compliance document, indeed needs more time to run through and fill up the answers. We would like to request for an extension. Does SPAD have any other company, subsidiary etc which are separate legal entities? If yes, these companies should be considered as part of the implementation? There will be no extension to the RFP submission date. Number of Users for below: a. iProcurement (for local/remote users to submit Purchase Requisitions only). a. 50 users for Purchase Requisition 13. 14. 23 January 2014 We do have 1, SPADPro Berhad where HR will do the payroll part, & maybe small procurement & admin. We have 15 State Offices throughout Malaysia and they are considered as part of the implementation. b. 1000 staff to submit claims and advances. Page-2 b. Claims & Advances: What is the number of staff that will be submitting claims and advances? 15. Volume of data (GL, Suppliers/Vendors, Customers, Employees, All data since the establishment of SPAD in 2011. Projects, Stock, Assets, etc.) for data migration, and how many years historical data need to be migrated to the new system? 16. Disaster Recovery: vendor to quote for DR server. Is it an option or part of the tender? 17. Appendix 6 and 8 are blank. No information is provided. Is the page Appendix 6 and 8 are included in the RFP left blank intentionally? addendum. 18. Staff Advances: who is the main owner of the module? Finance or HR will be the main owner – ie creation of staff IDs HR? etc. 19. ROAMBI: Will SPAD continue to use the ROAMBI or the new BI Yes. analytics modules to be proposed will replace ROAMBI? Business Intelligence module is not in-scope in this phase. 20. Common Requirements 1.1.16 The system shall be accessed using web-based client for users and administrators, and support dashboard reporting on mobile device. ENC: Can you describe the type of mobile device that users are going to use? What is the mobile type or model? Is there any other function that need to be accessed through mobile device other than dashboard reporting? Common Requirements 1.8.4 The system shall be able to facilitate immediate notification of violation on highly restricted resources. ENC: Can you explain what you mean by highly restricted resources. Common Requirements 1.8.5 The system shall be able to produce a variety of audit reports giving details of sensitive transactions, including 21. 22. 23 January 2014 Yes, Disaster Recovery environment is in-scope. The solution shall be able to be access by standard mobile web browser. The solution shall be able to prompt any unauthorized access for eg function, failed login and etc. Yes, standard audit report shall be provided from the system. Page-3 date, time, User ID, old and new values for changes Can you list the type of application data require auditing? Will standard audit reports provided by the database be sufficient? Procurement Material Master 3.2.1 The system should be integrated with Sistem Pengurusan Aset (SPA) ENC: Do SPA maintain Physical Asset/inventory Quantity? Please note that there is no write up or description on the current SPA functions in the tender document. Material Master 3.2.12 The system shall be able to support different units of measure by transaction (order quantity, goods issue quantity, stock quantity, packing quantity, shipping quantity, etc.) ENC: What is the purpose of shipping quantity Unit of measure in Procurement? What types of stocks / materials do SPAD keep? ENC: 23. 24. 25. Material Master 3.2.15 The system shall allow partial data entry, review, view by the authorised user (according to user access rights, e.g.: finance department to fill financial data, purchasing department to fill basic material data, project department to fill MRP data, etc.) ENC: Does MRP stand for Material Requirement Planning, Marketing Requirement Planning etc.? What kind of MRP Data can be entered? Is there any Sale order business process or Manufacturing business process? Is there any business process related to MRP, which is 23 January 2014 Yes, SPA does maintain assets and inventory listings. Description on SPA is provided in Appendix 6 in RFP addendum. Shipping quantity is not relevant under the Material Master system. For clarity, SPAD is not an entity such as a manufacturing outfit where supply chain management is critical in its purchasing cycle. SPAD does not purchase raw materials to be developed into finished goods. Therefore stocks / materials kept at SPAD are normally finished goods such as corporate gifts, enforcement related activities accessories, office equipment such as printing toners and printing papers, etc. Material Requirement Planning. Data such as annual purchasing items and / or activities. Not relevant again, it is important to note that SPAD is not an entity such as a manufacturing outfit where supply chain management is critical in its purchasing cycle. As such, there is no business process applicable for MRP towards SPAD. Page-4 26. 27. 28. 29. 30. normally used in a manufacturing environment. Material Master 3.2.16 The system shall be able to require approval for changes to material master based on defined approval process. ENC: Is Approval required to create a new item? Or any change for any item detail? Vendor Management Vendor Evaluation 3.3.1 The system shall be able to assist vendor evaluation processes via workflow rules (routing through the vendor evaluation process to the departments). ENC: Is Vendor evaluation process done only via Approval Hierarchy or via Vendor history? Vendor Management Vendor Evaluation 3.3.6 The system shall be able to maintain vendor assessment (job knowledge, manning effectiveness, financial, sub-contractor management, network savvy, cultural sensitivity, commercial, responsiveness of the management, personnel capability and customer support). ENC: What is the purpose of job knowledge, manning effectiveness, network savvy, cultural sensitivity, commercial, and responsiveness of the management, personnel capability and customer support? Is there any current customer support system? Who are SPAD's customers? What kind of Customer information do SPAD maintain? Purchase Requisition 3.4.1.8 The system shall support generation of PR based on MRP planned orders or forecast orders. ENC: Is there any Sales Order, MRP planning system or Forecast order system/business process? What are the parameters and source of MRP Planned orders or forecast orders (e.g. Quanti2ty, Amount etc.)? Purchase Requisition 3.4.1.15 The system shall allow automatic creation of PR from 23 January 2014 Yes. Changes to existing listing will also need approval. Approval Hierarchy and vendor evaluation process must be done in accordance to Ministry of Finance’s Procurement Guidelines SPP Bil.5/2007 : Tatacara Perolehan Kerajaan Secara Tender in Appendix 8 in RFP addendum. For SPAD record. We want the info on the customer support provided for SPAD by vendors. Not by SPAD to vendors. For tenderer to propose on the Vendor information that SPAD should maintain. SPAD customers are the public and more specifically the license applicants for land public transport industry players. However the current customer support system is being enhanced and it’s covered under a separate open tender exercise. For tenderer to propose. Example will be like purchase of stationeries where SPAD want to buy it lump sum for one whole year and not on monthly basis. Parameters will cover both quantity and amount. For tenderer to propose. Approval required Page-5 31. 32. 33. 34. 35. 36. project managements, linking directly with the work breakdown structure of the project. ENC: Is there any approval required for automatic PR Creation according to work breakdown structure of the project? What parameters are there to create automatic PR? Request for Quotation 3.4.2.1 The system shall be able to support different kind of requisitions based on the amount of purchase. ENC: How many requisition types are there currently? Request for Quotation 3.4.2.9 The system shall be able to integrate the quotation prices submitted by vendors between the backend system to the eProcurement portal. ENC: Do the eProcurement Portal having items (Material and Services) information? What kind of informations/data SPAD eProcurement Portal have? Is the portal existing currently or to be proposed as part of the new system? Purchase order 3.6.9 The system shall be able to generate PO number automatically in multiple number ranges based on userdefined criteria ENC: What are the types of user-defined criteria for PO Numbers? Purchase order 3.6.11 The system shall support PO for inter-company purchases (including automatic generation of relevant accounting transactions) ENC: How many companies are there as part of SPAD group? Purchase order 3.6.32 The system shall be able to specify the delivery point of the purchased items directly to subcontractor. ENC: Who are the sub-Contractors for SPAD and what kind of services are they providing? Purchase order 3.6.41 The system shall support service entry for services as in 23 January 2014 according to amount in accordance to SPAD limit of authority manual. For tenderer to propose. Requisition process currently adheres to Ministry of Finance’s Procurement Guidelines. e-Procurement portal is the system generated by Commerce Dot Com Sdn Bhd for government agencies and currently used by MoF. SPAD currently has an e-Procurement system as a software-as-a-service powered by TenderWizard platform. It would be highly desirable if integration can be done with the proposed system. Character inclusive number, alphabet and symbol. Inter company in term of vendors. Not within SPAD. Subcontractor here means SPAD regional office locations or anywhere as designated by central office in the PO. Based on man-hour/man-day/man-month which Page-6 entering the timesheet instead of performing goods receipt Is the timesheet based on amount or other attributes? Do timesheets have unit of measure for services? Purchase order 3.6.42 The system shall support integration of the PO in the backend to the eProcurement system ENC: What kind of data is eProcurement system keeping? units will calculate amounts according to the prescribed rate per unit. Tendering for Works, Services and Consultancy 3.7.10 The system shall be able to log in all details of tender document sales ENC: What kind of data are tender document sales keeping? Is it supplier sale item data? Contract Management 3.8.9 The system shall be able to monitor & track the stage of each contract from preparation to final. The process of contract preparation including engineering specifications preparation, contract & leg2al terms, approval process, BQ definition etc ENC: Is the approval process for final contract? Contract Management 3.8.10 The system shall be able to convert tender document into contract in system ENC: What kind of tender documents are there? Does the supplier enter data in online tender forms? The contact information of the vendor/s that bought tender documents open for bidding exercise. ENC: 37. 38. 39. 40. Yes, integration is highly desirable. Data kept in eProcurement are input in conducting sourcing activities such as eBidding and eTender. Correct. Tenderer to propose. Correct. Tenderer to propose a system that could extract or filter information from vendor’s bid (as entered online) relevant to come out with a standardised form of contract. Tender documents ranges from Instructions to Tenderer, Statement of Compliance, Technical Requirement to Financial/ Commercial proposal. Yes, 41. Contract Management 3.8.16 The system shall be able to monitor contractor performance based on data gathered such as: a. the contract, terms of the contract and assessment of each term b. customer support and services 23 January 2014 This is not for SPAD customers. It’s for SPAD vendors whose been awarded with contract on certain works or services. SPAD want to monitor their performance throughout the entire contractual period. Page-7 42. 43. 44. c. quality of deliverables (on time delivery, quantity delivered as schedule and variation orders) d. project price and payment e. project progress – completion of schedule activities f. specialty – equipment, facilities, local/ Malaysian content, local/ Bumiputra participation ( note: monitoring requirements vary by type of contract) ENC: Who are the customers and what kind of customer support and services are there? Variation Order For tenderer to propose. 3.8.17.2 The system shall be able to generate the Employer's Representative Instruction (S.P.A.D. as a client instruction) to variation order using predefined format / template. Format has various information such as contract sum, remaining value, value of VO, details of VO calculations etc ENC: What kind of information are required for “details of VO calculations”? Variation Order For tenderer to propose. 23.8.17.5 The system shall be able to detect impact of the variation order to project status, time and cost. (integrate the VO process into the WBS / project management) ENC: Please give example of the VO process into the WBS/ project management? How many ledgers do SPAD have? As per standard accounting requirement. 46. Staff loan is referring to the Bank Loan taken by staff or does SPAD Both provides the loan to the staff? Treasury: how critical is this module for SPAD, and what are the Collections & placements. Daily transactions. The volume of the transactions Collections are handled by another system that will integrate with the Financial Systems. 47. Treasury: is it handled by the specific dept (e.g. Treasury Dept) or Treasury Unit resides under Finance. external fund manager (e.g. banker)? 48. Lease Management: Is SPAD the customer for the leasing or SPAD Customer for the leasing i.e : Notebook, PC, motor provides leasing to customer. Is this requirement for leased assets 45. 23 January 2014 Page-8 only? 49. Licenses required: a. For Purchasing there are only 26 users. Does this include approver for Purchase Requisition and Purchase Order? Are they the same person approving both types? b. Who is the process owner for creating and maintaining suppliers/vendors? Is the process owner included the licences required for Finance and/or Purchasing? c. Who is the process owner for creating and maintaining customers? Is the process owner included the licences required for Finance? d. Who is the process owner for creating and maintaining Stocks/Materials? Is the process owner included the licences required for Finance and/or Purchasing? e. How about user licenses for Contract and Tender. Are they part of the 26 purchasing users? f. Do you allow branch to create journals? If yes, how many users are there? Are they part of the 15 finance users? g. Treasury: how many users to have the access to this module/function? h. Lease Management: how many users to have the access to this module/function? i. Project Costing: how many users to have the access to this module? vehicle, equipment etc for internal use a. Yes, 26 users include approver for Purchase Requisition and Purchase Order. They are not the same person. b. Personnel in the Procurement Department will be the process owner in the creation and maintenance of suppliers/vendors. Accordingly, licenses to the process owner will be required and should be included for Purchasing and Finance. c. Personnel in the Finance Department will be the process owner in the creation and maintenance of customers. Accordingly, licenses to the process owner will be required and should be included for Purchasing and Finance. d. Personnel in the Admin Department will be the process owner in the creation and maintenance of stocks/materials. Accordingly, licenses to the process owner will be required and should be included for Purchasing and Admin. e. Yes f. Yes (Plan) g. 1-3 users h. 1-3 users i. 5-10 users 50. Fixed Assets: Should vendor quote for the barcode scanner and Yes printer as part of the tender? 23 January 2014 Page-9 51. SPA: Will SPAD continue to use SPA or the new financial system Continue to use SPA, integrate with FA module. (Fixed Assets module) will replace SPA? If SPA remains, the bar coding and labelling, and what other functions will be done in? 52. Payables: Do SPAD allow suppliers/vendors to register directly using Yes. Please propose best solution. the new system? 53. Receivables: Does SPAD allow customers to register and view their Yes. Please propose best solution. transactions directly using the new system? 54. Receivables: Who are the customers from SPAD point of view in the Customers from SIKAP (this will only integrate), financial system? Is it the same customers they have in SIKAP other debtors & staff debtors. system? Trade debtors? Other debtors? 55. Receivables: Why do SPAD monitor the credit limit of the customer? Not relevant. Do you receive any sales order from customer? Can SPAD explain further on the process? 56. 57. 58. Receivables: How is the discount calculated? As per line item or as Not relevant. per payment term of the invoice? General Requirement Must have bahasa option, It’s mandatory (SAGA 2.1.11.2 The system shall have the ability to display data entry requirement) screen in multi-language (English and Bahasa Malaysia). ENC: Are there certain screens and reports that should be displayed in Bahasa, or all sceens and reports must have Bahasa option? Is Bahasa option mandatory or optional? General Requirement It is referring to PO/PR. 2.20.1.1 The system shall be automatically integrated with the following modules (but not limited to): b. Order Entry ENC: Do SPAD need order management/Order entry module to be installed? Normally Order Management is required in a sales 23 January 2014 Page-10 59. environment. Do SPAD have any sales functions, or this order means the purchase order/ purchase requisition, instead of Sales Orders? General Ledger 2.3.1.1 The system shall provide for interface/ integration with the following modules (but not limited to): j. Budget & Vote Control. ENC: Do SPAD receive Grants from the government or other institutions? Do you require Grants accounting module? Can SPAD please explain in detail on the use of the Vote Book. Yes, SPAD receive grants from government and some other funds from other government agencies for some other projects. Please advise us whether we need or not the Grant accounting module. Vote Book - to record and monitor expenditure in the public sector. The information on these books is subject to auditing to ensure that budgets are well-controlled and coincide with Financial Regulations. • Ensure no extra-budgetary spending • Highlight unnecessary expenditure out of the ordinary • Show the balance available so the organization can keep on top of their finances • Ensure that sufficient funds are available for future payments 60. 61. 62. General Ledger By calendar 2.3.3.6 The system shall enable daily closure of account. ENC: Is the GL Book required for daily closure by calendar or just by reporting to show the balances as at certain dates. Cash Management Daily closure 2.4.6.2 The system shall enable daily closure of account. ENC: Is the Cash Book required for daily closure or just by reporting to show the balances as at certain dates. Receivables One example is SIKAP, for collection. 2.6.3.3 The system shall support for third party billing. 23 January 2014 Page-11 63. 64. 65. 66. 67. 68. 69. ENC: Please give examples of Third Party billing. Receivables 2.6.4.6 The system shall be able to support dishonoured cheque processing. ENC: What is SPAD's expectation on the system towards the dishonoured cheque processing? Can you explain further. Budget 2.9.1.3k. Track and reconcile contract claims with budget allocation and budget balance. ENC: Need further explanation on how is the process flow. Cost Centre Accounting 2.11.2.1 The system shall be able to create Statistical Key Figures in the system, e.g. headcount, no of telephone units, conference rooms, no of photocopy machines ENC: How currently do cost centres maintain the statistical figures for the above requirement. Do they have a report for the statistical analysis? Loans Master File 2.18.2.1 e. Guarantor ENC: How many guarantors may exist per loan? How many loans are there still outstanding at any one point of time? Loans Processing 2.18.4.15 The system shall facilitate loan/advance status tracking, for example master file created, disbursed, active, suspended, dormant, closed, etc. ENC: Is this an audit trail for loan, or a report or inquiry screen required for this? Loans Processing 2.18.4.19 The system shall have the ability to purge settled loan/advances accounts with zero balance exceeding user defined period. ENC: What is the frequency for purging settled loan/advances? Stock Control Maintenance 2.20.2.10 The system shall be able to perform calculation on stock turnover period. 23 January 2014 Can track and identify any bounced cheque. This is when we do auto bank reconciliation, where it should trigger abnormalies. Actual against budgeted for monitoring Currently being done manually using Microsoft excel/word. Not relevant (as for now) All Staff Loans – based on HCD policies Staff Advances – to settle within 7 days after event Entry screen and shown in the report Page-12 ENC: 70. Do you require the form in the entry screen for the specific calculation or can the calculations be shown in the report. Stock Control Maintenance Not relevant 2.20.3.8: The system shall allow the inclusion completed houses as stock for sales. ENC: Please explain details of the process, what does mean by ‘completed houses’? Do SPAD also sell houses? THE REMAINDER OF THIS PAGE IS LEFT BLANK INTENTIONALLY 23 January 2014 Page-13 Appendix A 23 January 2014 Page-14