Naval Surface Warfare Center Panama City Division Multi-Service Partnering Using Value Engineering & Function Analysis MAC5ISR Multi-Agency Collaborative C4ISR (MAC5ISR) Multi-Agency Collaboration for Program Specific Missions 2 MAC5ISR Concept Mission • Anti-Terrorism/Force Protection • Counter Narcotic • Logistics, maintenance & resupply • Low intensity conflict • Surveillance, analysis & planning • Aviation and other transportation modes • First Responder & Stakeholder communications Mission Security Mission Assurance Energy Resource Resource A Mission Assurance • Linear & Predictable costs System of Systems (SoS) approach. • Financial stability & surplus • Planned consumption • Mitigation of resource deficit • Do more with less “People, Finance & Natural Resources” Energy • Provide Net + Regional • Provide Net 0 for install • Re-purpose key technologies • Adaptation of Carbon Policies for cost control • Maximize the use of the environment to provide energy • Collaboration with federal, state & private entities for energy security and assurance Security • Deterrence technologies • Force Multiplier • Presence • PSEAG Charter 3 MAC5ISR Strategy Systems of Systems approach – Numerous Stakeholders are Autonomous and have: • • • • • • Varying mission requirements/needs Overlapping missions and interests Varying degrees of operational authority Varying degrees of program execution authority Varying degrees of procurement/contracting authority Different budget constraints – No single stakeholder (alone) has the capacity to make automated coordination across a region reality – Technical/Non-technical factors must be integrated simultaneously Multi-stakeholder collaboration accomplished by: – Leveraging resources – Communicating through rules based/secure links – Coordinated contracting approach *Doing more with less* 4 MAC5ISR CONUS Objectives NW Region NE Region Priority 1a. As National Needs Dictate MAC5ISR/Support of Army Energy Efforts Priority 2. MAC5ISR/Secure Border Initiative SW Region MAC5ISR/National Capital Surveillance System Priority 1b. MAC5ISR/First Responder Resource System – Gulf Network SE Region 5 NASA Goddard NCASS OV 1.0 Fort Meade Aberdeen Dulles Airport Coordinated C4ISR– USCG HQ USPP Fort Myer Fort McNair National Airport WNY Regional Security and Energy Strategy USCG HQ ROC BAFB Andrews AFB Fort Belvoir NASA Langley Navy Recognition Multiple Missions/Needs Navy Missions Overlap other Services/Agencies/Entities Shortage of Resources Need to Partner with other Services/Agencies/Entities 7 Value Engineering Directives 1993: OMB Circular A-131: All Federal agencies will conduct value engineering studies for all expenditures greater than $1 million 1996: Office of Federal Procurement Policy Act Amended: Requires Value Methodology/Value Engineering at all Federal agencies. Additional DoD/Navy guidance (but above is enough to justify use of Value Management for all). 8 Army/Navy Partnering Naval Surface Warfare Center-Panama City (NSWC-PC) approached Aberdeen Test Center (ATC) re-Partnering through Value Management/Value Engineering Aberdeen Test Center Recognized Similar Needs Value Study Partnership: NSWC-PC . . . . . . . . . . . . . . . . . Value Workshop Sponsor ATC . . . . . . . . . . . . . . . . . . . . . . Value Workshop Host 9 On-Site Workshop Over 30 Team/Participants Atlantic Region of Army Installation Management Command (IMCOM) Aberdeen Proving Ground Garrison Aberdeen Test Center Naval Surface Warfare Center-Panama City Numerous Subject Matter Experts from various industries 10 "FAST" Diagram as of 04/03/2012 NSWC-PC and MAC5ISR with respect to Aberdeen LITTORAL ONLY Scope Line HOW >>>>>>>> PROVIDE Littoral STABILITY Scope Line Reduce Energy Reduce Scp 1&2 Intensity by Grnhse Gas by 3%/yr or 30% 34% Total from FY From 2008 2003 to 2015 to 2020 EO 13423 EO 13154 These 2 Functions Occur All the Time <<<< WHY PROVIDE Littoral SECURITY PROVIDE Littoral TRANSITION PROVIDE Littoral SUPPORT Litoral MISSIONS Reconstruction OPERATIONS PROVIDE Littoral Defense Support of CIV AUTH Enhance Theatre SECURITY COOPERATIO N PROVIDE Expeditionary HOMELAND DEFENSE ENHANCE Situational AWARENES S DEPLOY and ENSURE Stable ENERGY DEPLOY and MAINTAIN MAINTAIN PERFORM Scientific Research, Engineerin g & Analysis PERFORM Pilot PROJECT S 11 On-Site Workshop Outcome Littoral Mission Brainstorming (common to BOTH entities): 86 Ideas to enhance situational awareness at Aberdeen 221 Ideas to ensure stable energy at Aberdeen 8 Proposals were identified and are being implemented for action 12 How does this apply? MAC5ISR Requirements Value = Function Cost Lean Six Sigma 13