REVISED-COST-PROPOSAL-AND-UNIT-PRICE

advertisement
REVISED COST PROPOSAL AND UNIT PRICE
SCHEDULE
March 17, 2015
RFP for Special Inspections and Material Testing Services
Project:
Rowan University College of Engineering
Contracting Agent:
Gloucester County Improvement Authority
Architect:
Clarke Caton Hintz
Agency Construction Manager:
Stantec Consulting Services with LF Driscoll
The Gloucester County Improvement Authority is soliciting solicit proposals from 3rd party
independent construction inspection and material testing laboratories to perform testing and related
field inspection services during the construction of the above referenced project. The testing and
inspection shall be as per this RFP and the final project specifications, drawings and documents
and performed by qualified personnel under the supervision of a Licensed Professional Engineer.
Please note that special inspectors are required to hold all certifications required by the State of
New Jersey DCA and by the IBC. We invite proposals for performing this work based on the
following unit prices (at a minimum) and the estimated "not to exceed" cost:
Item
Description
1.0
Deep Foundation System (Piles)
1.1
Field Inspection of aggregate piers & testing. (Stricken)
2.0
Foundation System and Bearing Material
2.1
Verification and inspection of footing bottom before
construction work is performed, including verification of
required design bearing capacities.
Unit
Unit Price
Per 1/2 Day
$ N/A
Per Full Day
$ N/A
Per 1/2 Day
$
Per Full Day
$
3.0
Excess/Fill Materials and Compactions
3.1
Laboratory test of soil material to determine maximum
dry density (ASTM D698/D1557 Test Methods).
Per Test
$
3.2
Laboratory Grain Size Analysis
Per Test
$
3.3
Field testing of compacted fill/backfill for in place
density and moisture (ASTM D6938 Test Methods and
Project Specifications).
Per 1/2 Day
$
Per Full Day
$
4.0
Concrete
4.1
NJDCA Certified field inspector to verify that approved
mix is batched and batch weights conform with approved
mix design. Verify addition of correct admixtures.
Check moisture in aggregates and verify total water in
mix.
Per 1/2 Day
$
Per Full Day
$
NJDCA Certified field inspector to inspect the concrete
reinforcement, including but not limited to rebar size,
count, spacing, chair size and spacing, etc. prior to
concrete placement for compliance with approved
drawings and documents.
Per 1/2 Day
$
Per Full Day
$
NJDCA licensed field inspector to observe concrete truck
mixing procedures, perform slump tests, monitor and test
concrete temperature, test air content and fabricate
concrete cylinders. Unit weight testing on lightweight
concrete or as requested. Quantity and frequency of
testing to comply with project specifications.
Per 1/2 Day
$
Per Full Day
$
4.4
Laboratory compression tests of concrete cylinders based
on five (5) 6"x12" cylinders - 2 @ 7 days, 2 @ 14 days,
2, @ 28 days and 1 spare for later testing.
Per Cylinder
$
4.5
Drilled Concrete Cores Drilling Crew
Per Trip
$
Concrete Core Drilling and Patching
Per Core
$
Compressive strength testing of cores
Per Core
$
4.2
4.3
5.0
Floor Flatness/Levelness Test
5.1
Certified Technician and equipment to perform floor
flatness and floor levelness testing over the designated
slab areas in accordance with ASTM E1155
Per 1/2 Day
$
Per Full Day
$
6.0
Masonry
6.1
Field inspector to inspect the masonry reinforcement
prior to mortar/grout placement for compliance with
approved drawings and documents.
Per 1/2 Day
$
Per Full Day
$
Preparation and testing of any required grout specimens
and/or mortar specimens.
Per 1/2 Day
$
Per Full Day
$
6.3
Laboratory testing of mortar cubes/grout cubes/grout
prisms at 7, 14 and 28 days
Per Cube/Prism
$
7.0
Structural Steel
7.1
NJDCA Certified Inspector to perform visual inspection
of welds for conformance to AWS-D1.1 quality
requirements. Verify correct weld size, length and
location in accordance with approved project and/or shop
drawings. Verify minimum tension requirements of high
strength connections using a calibrated torque wrench or
visually for tension control bolts. Verify deck welding,
side lap connectors, and adequacy of shear stud
attachment. Verify joist bridging installation and
attachments.
Per 1/2 Day
$
Per Full Day
$
NJDCA Certified Inspector to perform visual inspection
of welds for conformance to AWS-D1.1 quality
requirements and perform field testing of welds using
NDT methods per the approved drawings and
specifications.
Per 1/2 Day
$
Per Full Day
$
6.2
7.2
8.0
Spray Applied Fireproofing
8.1
NJDCA Certified inspector to test and inspect the
application of spray-applied fireproofing materials
including conformance with UL design requirements,
perform thickness and bond strength tests and obtain
density tests for laboratory testing.
Per 1/2 Day
$
Per Full Day
$
Density test in accordance with ASTM E605
Per Test
$
Bond strength test in accordance with ASTM E736
Per Test
$
Per 1/2 Day
$
Per Full Day
$
Per 1/2 Day
$
Per Full Day
$
a. Visual inspection and monitoring of asphalt for
thickness, placement temperature and conformance
with project specifications and applicable standards.
Per 1/2 Day
$
Per Full Day
$
b. Field testing for compaction.
Per 1/2 Day
$
Per Full Day
$
a. Visual inspection and monitoring of timber pile
installation and reporting.
Per 1/2 Day
$
Per Full Day
$
b. Field testing with Pile Dynamic Analyzer (PDA) test.
Per 1/2 Day
$
9.0
Fire Stopping
9.1
Field Inspector to perform inspection of fire stopping to
the project specifications and documents.
10.0
Waterproofing
Inspector must be a Qualified Waterproofing Membrane
Manufacture Representative to inspect substrate
conditions; surface penetrations; membrane application,
flashings, protections and drainage components.
11.0
Asphalt
Asphalt Paving Inspection & Testing - Asphalt paving
inspections and material testing shall include the
following:
12.0
Timber Piles
Timber Pile Inspection & Testing – Timber pile
inspection and material testing shall include the
following:
13.0
Per Full Day
$
Multi-Disciplined Inspector - Perform multiple
inspections and/or testing of soils, footing bottoms,
paving, concrete, reinforcing steel and masonry.
Per 1/2 Day
$
Per Full Day
$
Professional Engineers Rate for additional services
Per Hour
$
Project Manager attendance at project meetings
Per Meeting
$
Preparation of Final Test Report for DCA
Lump Sum
$
General Rates
$
Estimated Total "Not To Exceed" Cost of Project (for
budgetary purposes)
Estimated Total "Hours" for Duration of the Project
Based on Attached Schedule of Activities
Acknowledgement of Addendum No. 1
Acknowledgement of Addendum No. 2
Signature:
Signature:
No. of Hours
_________________