ConcessionaireDetails/MPR May 2014

advertisement
MPR – May 2014
NATIONAL HIGHWAY AUTHORITY OF INDIA
(MINISTRY OF ROAD TRANSPORT & HIGHWAYS)
Rehabilitation, Strengthening and Four Laning of Srinagar to Banihal Section from
Km 187.000 to 189.350 (Banihal Bypass) and Km 220.700 to 286.110 of NH 1-A in the
State of Jammu & Kashmir (Package No. NHDP–Phase-II/BOT/I/J&K).
Monthly Progress Report for the Month of May’2014
Employer
: National Highways Authority of India
Independent Consultant : Nicholas O’ Dwyer & Company Ltd – SA Infrastructure Pvt .Ltd in
association with VKS Infratech Management Pvt. Ltd. (Placed in the month of March 2012).
Concessionaire
: Srinagar Banihal Expressway Limited.
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
1
MPR – May 2014
TITLE: MPR May’ 2014
(Chainage –187+000 to 189+350, 220+700 to 286+110)
INDEPENDENT ENGINEER:
Nicholas O’ Dwyer & Company Ltd – SA Infrastructure Pvt .Ltd in association with VKS
Infratech Management Pvt. Ltd. (Placed in the month of March 2012).
CONCESSIONAIRE:
Srinagar Banihal Expressway Limited
.-
SPV
CONTRACTOR:
RAMKY INFRASTRUCTURE LIMITED
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
2
MPR – May 2014
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project NH-1A
Monthly Report Index
May – 2014
Sr. No
01
02
03
04
05
06
07
08
09
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
DESCRIPTION
Cover Sheet
Title
Index
Description of Project
Project Alignment
Organization Chart SPV & PMC
Organization Chart EPC
Mobilization Report
Logistics
Material Resource Report
Methodology Statement & Source Approval Letters
Status of Change or Variations
Status of Stretches
Approvals and Permits
Status of Road & Structure Works
Progress of Roads Works & Structures Works (S-Curve)
Major Correspondences from SBEL
Site Progress Photographs
Annexure – I (Strip Plan) + IPC Status
Annexure – II (Land Acquisition Strip Chart)
Annexure – III (Land Acquisition Status)
Annexure – IV (Strip Chart Highway)
Annexure –V (Structure Status)
Annexure – VI( QA QC Report) + (Weather Report)
Annexure – VII(Mobilization of Man Power & Mobilization of
Equipments )
Annexure – VIII(Drawing Status )
Annexure – IX(Targets V/S Achieved ) +Achievements
PAGE
1
3
3
4
11
14
15
16
17
31
33
33
34
37
38
40
41
43
-
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
3
MPR – May 2014
1.
1.0
DESCRIPTION OF THE PROJECT:
INTRODUCTION:
This is the Progress Report for the month of May’ 2014 being submitted by the Concessionaire’s
office which reflects the on-site progress and Executive summary of general information about the
project is furnished hereunder.
1.1
Description of the Project
The contract package Srinagar Banihal Road Project involves four laning and strengthening of the
Existing National Highway NH- 1A between Srinagar and Banihal – Km 187+000 to 189+350 &
220+700 to 286+110.
1.2.
Executive Summary:
In the 67.76 km stretch of the road project SBEL has constructed 5 no’s of Camps namely Camp-I
(Banihal) at chainage 188+000 Km, Camp-II (Vessu) at chainage 234+200 km, Camp-III (Samthan)
at chainage 249+800Km , Camp-IV (Lethpora) at chainage 270+900 Km and Camp-V (Lasjan) at
chainage 282+500 Km. Apart from the camps mentioned above SBEL has also constructed a Steel
Yard at chainage 252+980 Km, as shown in the attached Logistic Plan. At these camps SBEL has
operated with 2 no’s of Hot mix Plants, 5 no’s of Batching Plants, 4 no’s of Crushers and 3 no’s of
Wet mix Plants. All the crushers are functional; also 3 numbers of Batching Plants are functional.
Other than plants, Office buildings, Lab, Staff Quarters, Labour Hutments, Security Sheds,
Workshops and Cement Stores etc have also been constructed in all the camps. Pre-Cast yard has
also been established at the Samthan Camp and functional, where pre-casting of 230 cells of Box
Culverts are completed
In Structure Works, SBEL has completed works on 80 no’s culverts on both Sides. Apart from the
above mentioned completed culverts, work on 55 no’s culverts are in progress. Work is also being
executed on 6 no’s of VUP’s, 4 no’s PUP’s, 5 no’s Major Bridges and 4 no’s Minor Bridges and 1 no
Fly-over. The detailed progress is elaborated in tabular form of physical program chart.
In Highway Works SBEL has executed 39.5 lac Cum of earthwork. Other than earthwork SBEL has
also executed approximately 1.92 lac Cum of GSB work, 1.43 lac Cum of WMM and 35000 Cum of
DBM. The detailed progress is elaborated in tabular form of physical program chart. Apart from the
permanent work Concessionaire has done the maintenance of Existing road in the month of April &
May 2014 from Panth Chowk, Srinagar up to Qazugund Starting Chainage i.e 220+700. Including
the Banihal Bye Pass i.e from Ch. 187+000 to 189+350.
Concessionaire had executed the test of PFVD (Prefabricated Vertical Drain) at external laboratory
for ground improvement where the high embankment exists and the test report of the same had
submitted vide their office letter number RIL/SBEL/IE/NH-1A/2013/354 dated 22nd Jan 2013 &
RIL/SBEL/IE/NH-1A/2013/371 dated 02nd Feb 2013 The agency Tech Feb had already execute the
work.
The Concessionaire has requested vide their office letter number RIL/SBEL/IE/NH-1A/11-12/88
dated 17th Aug 2012, RIL/SBEL/IE/NH-1A/11-12/57 dated 12th July 2012 & RIL/SBEL/IE/NH1A/11-12/76 dated 08th Aug 2012 to approve Shyam Steel for their permanent work against which
the approval is still pending.
The Concessionaire has requested vide their office letter number RIL/SBEL/IE/NH-1A/12-13/386
dated 21st Feb 2013 to approve TCI Max Cement for their permanent work against which the
approval is still pending.
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
4
MPR – May 2014
The Concessionaire has given proposal of via duct for Banihal Section from Km 187+000 to
189+350 vide their office letter number RIL/SBEL/IE/NH-1A/12-13/388 dated 25th Feb 2013 against
which the approval is still pending.
The Concessionaire had also submitted 3 (Three) sets of video recording for quarter ending 1st
Oct. 2012 to 31st Dec 2012. vide their office letter number RIL/SBEL/NH-1A/12-13/340 dated 20th
Feb 2013.
The Concessionaire has mobilised additional manpower and resources to expedite the progress of
work and the same has been communicated vide their office letter number RIL/SBEL/IE/NH1A/2013/393 dated 26th Feb 2013.
The concessionaire has been executing the work of PFVD in section – III over the new alignment.
The Concessionaire intimated Authority vide their office letter number RIL/SBEL/NH1-A/2013/347
dated 2nd March 2013 regarding the non availability of 100% land as per Article 10 and clause
37.2.1 (a) becomes default of Authority as per Concession Agreement which got Material Adverse
effect on the Concessionaires.
The Concessionaire intimated to authority vide their office letter number RIL/SBEL/NH1-A/2013/353
dated 8th March 2013 regarding the month wise stretches made available by the client and the
status of land Acquisition as on 28.02.2013.
The Concessionaire once again intimated to authority vide their office letters number
RIL/SBEL/NH1-A/2013/356 dated 11th March 2013 and RIL/SBEL/NH-1A/2013/358 dated 16th
March 2013 regarding the achievement of mile stone- I and status of land acquisition.
The Concessionaire intimated to authority vide their office letters number RIL/SBEL/NH1A/2013/359 & 360 dated 16th March 2013 regarding the Force Majeure (Curfew in Valley of
Kashmir) due to militant attack and death of Army Jawans on 13th March 2013 and subsequent
curfew in the valley and strike called by Hurriyat Conference on 13th March 2013.
The Concessionaire intimated to authority vide their office letters number RIL/SBEL/NH1A/2013/362 dated 19th March 2013 regarding the Force Majeure (Sabotage at Samthan Camp)
located at Km 249+700 mentioned that stone pelting on 6th March 2013 by unknown mob of around
30-35 people and consequences due to which 75 of our staff including 25 Engineers left the place
and the progress of the work effected badly.
The Concessionaire intimated to authority vide their office letters number RIL/SBEL/NH1A/2013/363 dated 19th March 2013 regarding the Force Majeure (Curfew in Kashmir) against the
death of boy belongs to Baramullah district. Under the prevailing circumstances even the internet
services were barred and SBEL was forced to stop the work.
The Concessionaire intimated to authority vide their office letters number RIL/SBEL/NH1A/2013/372 dated 31st March 2013 regarding the Force Majeure (Strike called by MMM demanding
the body of Afzal Guru) against the Afzal Guru’s body on 28th March 2013. Under the prevailing
circumstances even the internet services were barred and SBEL was forced to stop the work.
The Concessionaire intimated to Authority vide their office letter number RIL/SBEL/NH-1A/2013/373
dated 30th March 2013 regarding the additional structures required which are missing from schedule
‘B’ of Concession Agreement.
The Concessionaire intimated to I.E vide their office letter number RIL/SBEL/I.E/NH-1A/2013/429
dated 1st June 2013 regarding the Month wise working stretches available and status of land
acquisition as on 31.03.13.
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
5
MPR – May 2014
The Concessionaire intimated to I.E vide their office letter number RIL/SBEL/I.E/NH-1A/2013/432
dated 1st June 2013 regarding the Force Majeure (Sabotage at Samthan Camp & Curfew in
Kashmir Valley).
The Concessionaire intimated to I.E vide their office letter number RIL/SBEL/I.E/NH-1A/2013/451
dated 9th June 2013 regarding the Submission of Sub Soil Investigation reports of 58 Location for
High Embankment.
The Concessionaire intimated to Authority vide their office letter number RIL/SBEL/NH-1A/2013/378
dated 6th June 2013, RIL/SBEL/NH-1A/2013/386 dated 13th June 2013 & RIL/SBEL/NH1A/2013/393 dated 30th June 2013 regarding the Entry Tax Exemption for the equipments bringing
for this project.
The Concessionaire intimated to Authority vide their office letter number RIL/SBEL/NH-1A/2013/380
dated 8th June 2013 regarding the Land Acquisition status both for Pulwama & Anantnag District.
RIL/SBEL/NH-1A/2013/297 dated 29th June 2013 regarding the Land Acquisition status for Banihal
District.
The Concessionaire intimated to Authority vide their office letter number RIL/SBEL/NH-1A/2013/381
dated 8th June 2013 regarding the work stopped by the Land Owner at Banihal because the
compensation against the land and structures not yet received by the land owners.
The Concessionaire intimated to Authority vide their office letter number RIL/SBEL/NH-1A/2013/385
dated 10th June 2013 regarding the Project Milestones and shifting of appointed date under clause
47.10 of Concession Agreement.
The Concessionaire intimated to Authority vide their office letter number RIL/SBEL/NH-1A/2013/382
dated 09th June 2013 & RIL/SBEL/NH-1A/2013/388 dated 13th June 2013 regarding the Quarry on
Strike.
The Concessionaire intimated to I.E vide their office letter number RIL/SBEL/I.E/NH-1A/2013/457
dated 16th June 2013 regarding the 03 (Three) sets of Video Recording for Quarter 01.01.2013 to
31.03.2013.
The Concessionaire intimated to I.E vide their office letter number RIL/SBEL/I.E/NH-1A/2013/459
dated 20th June 2013 regarding the Selection for type of Well/Pile foundation.
The Concessionaire intimated to I.E vide their office letter number RIL/SBEL/I.E/NH-1A/2013/472
dated 25th June 2013 regarding the Submission of method statement for Mackintosh Probe Test.
The Concessionaire intimated to Authority vide their office letter number RIL/SBEL/NH-1A/2013/394
dated 25th June 2013 regarding the stoppage of work by villagers of Bumthan & Jadur villages
between Km 236+500 to 237+500 (Force Majeure).
The Concessionaire intimated to I.E vide their office letter number RIL/SBEL/NH-1A/2013/473
dated 27th June 2013 regarding the Snow Fall Accumulation Depth.
The Concessionaire submitted mix design of DBM – Grading II Zewan Quarry vide their office letter
number RIL/SBEL/NH-1A/2013/542 dated 29th June 2013.
The Concessionaire submitted the details of machineries & equipments deployed at site against
which the entry tax exemption got obtained vide their office letter number RIL/SBEL/NH-1A/1314/429 dated 01st June 2013.
The Concessionaire submitted month wise land acquisition details to Authority vide their office letter
number RIL/SBEL/NH-1A/2013/434 dated 01st June 2013.
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
6
MPR – May 2014
The Concessionaire intimated Authority vide their office letter number RIL/SBEL/NH-1A/2013/441
dated 09th June 2013 regarding the Force Majeure at Banihal Section.
The Concessionaire intimated Authority vide their office letter number RIL/SBEL/NH-1A/2013/442
dated 09th June 2013 regarding the Force Majeure at Lasjan Camp.
The Concessionaire intimated Authority vide their office letter number RIL/SBEL/NH-1A/2013/443
dated 09th June 2013 regarding the Force Majeure (243+900 to 244+100, Qazigund).
The Concessionaire informed Authority regarding the status of land acquisition at Banihal vide their
office letter number RIL/SBEL/NH-1A/2013/446 dated 13th June 2013.
The Concessionaire informed Authority regarding the disbursement of compensation and Land
Acquisition issues at Banihal Bye Pass (Km 187+000 to 189+350) vide their office letter number
RIL/SBEL/NH-1A/2013/449 dated 16th June 2013.
The Concessionaire informed Authority regarding the additional land required for Weigh Bridge for
Toll Plaza vide their office letter number RIL/SBEL/NH-1A/2013/454 dated 23rd June 2013.
The Concessionaire informed Authority regarding the dismantling and shifting of Police Lines shed
at Km272+820 with in toe vide their office letter number RIL/SBEL/NH-1A/2013/458 dated 26th June
2013.
The Concessionaire informed Authority regarding the dismal progress on National Highways (Four
Lanning) Project in District Pulwama, where in a land made available in bits and pieces to
Concessionaire vide their office letter number RIL/SBEL/NH-1A/2013/460 dated 26th June 2013.
The Concessionaire intimated Authority vide their office letter number RIL/SBEL/NH-1A/2013/462
dated 30th June 2013 regarding the Force Majeure due to stoppage of works on the Highway for
Security reason during the visit of Hon’ble Prime Minister to Kashmir Valley on 25 th & 26th June
2013.
The Concessionaire intimated Independent Engineer vide their office letter number RIL/SBEL/NH1A/2013/547 & 570 dated 1st June 2013 & 13th June 2013 regarding the Construction of Project
Highway “Banihal Section” Ch. 187+000 to 189+350.
The Concessionaire Submitted Mix designs of DBM- Grade – I Zewan Quarry vide their office letter
number RIL/SBEL/NH-1A/2013/565 dated 12th June 2013.
The Concessionaire intimated Authority vide their office letter number RIL/SBEL/NH-1A/2013/572
dated 15th June 2013 regarding the Force Majeure due to unseasonal rain fall.
The Concessionaire Submitted test results of Granular Sub Base material (Navayuga Tunnel
Muck/Qazigund Screening Plant vide their office letter number RIL/SBEL/NH-1A/2013/580 dated
16th June 2013.
The Concessionaire intimated Authority vide their office letter number RIL/SBEL/NH-1A/2013/601
dated 26th June 2013 regarding the Force Majeure due to unseasonal rain fall.
The Concessionaire intimated Authority vide their office letter number RIL/SBEL/NH-1A/2013/602
dated 26th June 2013 regarding the Project Mile stone - I.
The Concessionaire informed Authority regarding the non availability of land acquisition at Major
Structures vide their office letter number RIL/SBEL/NH-1A/2013/603 dated 26th June 2013.
The Concessionaire Submitted mix designs for all grades of concrete being used in our project with
Vikram Premium & ACC OPC – 43 grades vide their office letter number RIL/SBEL/NH1A/2013/630 dated 3rd July 2013 & RIL/SBEL/NH-1A/2013/631 dated 3rd July 2013 respectively.
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
7
MPR – May 2014
The Concessionaire intimated Authority vide their office letter number RIL/SBEL/NH-1A/2013/632
dated 6th July 2013 regarding the review of designs.
The Concessionaire informed Authority regarding the work could not get done on 9th & 10th July
2013 because of unseasonal rain fall vide their office letter number RIL/SBEL/NH-1A/2013/635
dated 10th July 2013.
The Concessionaire Submitted the TCI Max Cement test report vide their office letter number
RIL/SBEL/NH-1A/2013/638 dated 13th July 2013.
The Concessionaire Submitted the Petrography test report from Zewan Quarry and Navayuga
Tunnel rock vide their office letter number RIL/SBEL/NH-1A/2013/640 dated 13th July 2013.
The Concessionaire Submitted the inclusion of material in RC list vide their office letter number
RIL/SBEL/NH-1A/2013/647 dated 18th July 2013.
The Concessionaire intimated Authority vide their office letter number RIL/SBEL/NH-1A/2013/649
dated 22nd July 2013 regarding the Force Majeure due to Curfew in the Valley on 22nd July 2013.
The Concessionaire Submitted approval letters to the authority regarding the use of Shyam Steel
vide their office letter number RIL/SBEL/NH-1A/2013/466 dated 07th July 2013.
The Concessionaire intimated the authority regarding the additional Hume Pipes Culverts to be
provided for Irrigation purpose vide their office letter number RIL/SBEL/NH-1A/2013/467 dated 08th
July 2013.
The Concessionaire intimated the authority regarding the stoppage of work by the villagers from Ch.
258+700 to 259+200 on want of reduction in Embankment height vide their office letter number
RIL/SBEL/NH-1A/2013/470 dated 13th July 2013.
The Concessionaire intimated the authority regarding the non availability of land for launching of
Girders on both sides of the Abutments of MJB @ 277+076 vide their office letter number
RIL/SBEL/NH-1A/2013/473 dated 15th July 2013.
The Concessionaire intimated the authority regarding the stoppage of work by the villagers at Ch
260+080, 260+210, 277+489 & 279+026 vide their office letter number RIL/SBEL/NH-1A/2013/477
dated 16th July 2013.
The Concessionaire intimated the authority regarding the assessment for cutting of Chinar trees
vide their office letter number RIL/SBEL/NH-1A/2013/486 dated 31st July 2013.
The Concessionaire intimated authority regarding the construction of additional structure under
change of scope vide their office letter number RIL/SBEL/NH-1A/2013/488, 500 & 505 dated 03rd
Aug 2013, 24th Aug 2013 & 28th Aug 2013 respectively.
The Concessionaire submitted time extension intimated vide their office letter number
RIL/SBEL/NH-1A/2013/495 dated 22nd Aug 2013.
The Concessionaire requested Authority regarding the additional land required for shifting of
Graveyard from Ch. 271 + 600 to 272+000 vide their office letter number RIL/SBEL/NH1A/2013/501 dated 25th Aug 2013.
The Concessionaire requested Authority regarding the additional land required for construction of
Trumpet portion for Fly over vide their office letter number RIL/SBEL/NH-1A/2013/498 dated 24th
Aug 2013.
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
8
MPR – May 2014
The Concessionaire replied Authority regarding the Non Achievement of Project Milestone vide their
office letter number RIL/SBEL/NH-1A/2013/498 dated 24th Aug 2013.
The Concessionaire submitted design and drawing for ROB @ 243+012 vide their office letter
number RIL/SBEL/NH-1A/2013/506 dated 28th Aug 2013.
The Concessionaire requested possessions of land @ 277+076 vide their office letter number
RIL/SBEL/NH-1A/2013/507 dated 29th Aug 2013.
The Concessionaire submitted source approvals of TCI Max Cement vide their office letter number
RIL/SBEL/NH-1A/2013/685 & 713 dated 03rd Aug 2013 & 29th Aug 2013.
The Concessionaire submitted replies of inspection report of Independent Engineer vide their office
letter number RIL/SBEL/NH-1A/2013/688 dated 04th Aug 2013.
The Concessionaire submitted video recordings for quarter ending June 2013 vide their office letter
number RIL/SBEL/NH-1A/2013/689 dated 31st July 2013.
The Concessionaire submitted details regarding the increase in cost of Toll Tax in the state of
Jammu & Kashmir vide their office letter number RIL/SBEL/NH-1A/2013/692 dated 12th Aug 2013.
The Concessionaire intimated Authority vide their office letter number RIL/SBEL/NH-1A/2013/696
dated 16th Aug 2013 regarding the Force Majeure due to Unseasonal rain fall, High security and
strike in Valley from 13th to 16th Aug 2013.
The Concessionaire proposed Authority vide their office letter number RIL/SBEL/NH-1A/2013/705
dated 22nd Aug 2013 regarding the use of Evotherm Warm Mix Technology in Bituminous Works.
The Concessionaire applied entry tax exemption for equipments vide their office letter number
RIL/SBEL/NH-1A/2013/700 dated 21st Aug 2013.
The Concessionaire submitted corrective action report for NCPN 27, 32 & 51 vide their office letter
number RIL/SBEL/NH-1A/2013/712 dated 27th Aug 2013.
The Concessionaire submitted test and inspection report on composite Girders for Major Bridge @
277+076 are being manufactured by M/s Lloyd Corporation Ltd. vides their office letter number
RIL/SBEL/IE/NH-1A/2013/727 dated 05th Sept 2013.
The Concessionaire intimated Authority vide their office letter number RIL/SBEL/IE/NH1A/2013/732 dated 10th Sept 2013 regarding the Force Majeure due to Kashmir shuts against
Shopian Killings and Zublin Mehta Concert.
The Concessionaire submitted Geo-Technical Reports on High Embankment vides their office letter
number RIL/SBEL/IE/NH-1A/2013/735 dated 12th Sept 2013.
The Concessionaire intimated Authority vide their office letter number RIL/SBEL/IE/NH1A/2013/736 dated 14th Sept 2013 regarding the Force Majeure due to Curfew against Shopian
Killings.
The Concessionaire intimated Authority vide their office letter number RIL/SBEL/IE/NH1A/2013/755 dated 28th Sept 2013 regarding the Force Majeure due to non supply of cement
because of strike called by truck union in Srinagar and attack by militants in Jammu region.
The Concessionaire submitted request for Extension of time vides their office letter number
RIL/SBEL/NH-1A/2013/531 dated 28th Sept 2013 for 18 months.
A cumulative 15 working days lost in the month of Sept 2013 due to disturbance in Kahmir valley
because of Zublin Mehta concert, Shopian killings, non supply of cement and attack by militant in
Jammu region.
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
9
MPR – May 2014
The Concessionaire requested Authorities for considering the composite girder in physical progress
vide their office letter number RIL/SBEL/IE/NH-1A/2013/764 & 786 dated 05th Oct 2013 & 19th Oct
2013 respectively.
The Concessionaire clarified the observation made on force majeure due to non supply of cement
vide their office letter number RIL/SBEL/IE/NH-1A/2013/772 dated 08th Oct 2013.
The Concessionaire submitted land acquisition status as on 30th Sept 2013 vides their office letter
number RIL/SBEL/NH-1A/2013/787 dated 19th Oct 2013 & RIL/SBEL/NH-1A/2013/540 dated 9th Oct
2013.
The Concessionaire requested Authority regarding the lifting of river bed material from Rambiyara
Nalla vide their office letter number RIL/SBEL/NH-1A/2013/537 dated 06th Oct 2013.
The Concessionaire submitted the Company profile of M/s Teracom to Authority regarding the
shifting of utilities vide letter number RIL/SBEL/NH-1A/2013/555 dated 02nd Nov 2013.
Concessionaire also requested the approval of escalation clause.
The Concessionaire requested for extension of time Authority vides letter number RIL/SBEL/NH1A/2013/556 & 841 dated 02nd Nov 2013 & 20th Nov 2013 respectively. Concessionaire also
mentioned that Authority fail to provide the encumbrance free land and as a result the delayed in
progress after mobilising more than sufficient resources at site.
The Concessionaire intimated Authority regarding the substitute structure (Siphon near Lethpora)
vides letter number RIL/SBEL/NH-1A/2013/557 dated 09th Nov 2013. Concessionaire also
submitted the minutes of meeting held with the Deputy Commissioner, Pulwama regarding the
Siphon vide their letter number RIL/SBEL/NH-1A/2013/562 dated 19th Nov 2013.
The Concessionaire intimated Authority regarding the arrangements of snow clearance has done
vide letter number RIL/SBEL/NH-1A/2013/558 dated 11th Nov 2013.
The Concessionaire intimated Authority regarding the non availability of land at Banihal Section
(Ch. 187+000 to 189+350) vide letter number RIL/SBEL/NH-1A/2013/559 dated 11th Nov 2013.
Concessionaire also mentioned that Authority failed to provide the encumbrance free land and as a
result Concessionaire forced to stop the work after mobilising resources at site.
The Concessionaire replied Authority regarding the Claim for damage under clause 12.4.2 of
Concession arrangement vide letter number RIL/SBEL/NH-1A/2013/560 dated 12th Nov 2013.
The Concessionaire requested Authority regarding the reimbursement of amount spent due to
frequent damages of PHE lines at different locations at Sampora Junction, Kadalbal and HP Gas
storage and Awantipora junction vide letter number RIL/SBEL/NH-1A/2013/561 & 563 dated 16th
Nov 2013 & 19th Nov 2013 respectively.
The Concessionaire submitted alternate proposal for ROB @ 243+018 vide letter number
RIL/SBEL/NH-1A/2013/566 dated 21st Nov 2013.
The Concessionaire submitted source approval of water for Lasjan, Samthan & Vessu Camp vide
letter number RIL/SBEL/NH-1A/2013/814 dated 06th Nov 2013.
The Concessionaire submitted errection methodology of composite girders vide letter number
RIL/SBEL/NH-1A/2013/815 dated 11th Nov 2013.
The Concessionaire submitted company profile of M/s Kashmir Steel Rolling Mills vide letter
number RIL/SBEL/NH-1A/2013/819 dated 11th Nov 2013 for source approval.
The Concessionaire submitted design and drawing for bearing details of Major Bridge @ Ch.
264+625, 268+065, 277+076 & 252+848 vide letter number RIL/SBEL/NH-1A/2013/820 dated 12th
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
10
MPR – May 2014
Nov 2013, RIL/SBEL/NH-1A/2013/821 dated 12th Nov 2013, RIL/SBEL/NH-1A/2013/822 dated 12th
Nov 2013 & RIL/SBEL/NH-1A/2013/823 dated 12th Nov 2013 respectively for source approval.
The Concessionaire submitted company profile of M/s Steel Auto Industries (SAI) vide letter
number RIL/SBEL/NH-1A/2013/824 dated 12th Nov 2013 for source approval.
The Concessionaire submitted Vertical Pile Load Test @ Km 245+890, Minor Bridge vide letter
number RIL/SBEL/NH-1A/2013/825 dated 12th Nov 2013 for source approval.
The Concessionaire submitted reconstruction of existing culverts under change of scope vide letter
number RIL/SBEL/NH-1A/2013/830 dated 16th Nov 2013.
The Concessionaire submitted design of retaining wall of various heights vide letter number
RIL/SBEL/NH-1A/2013/831 dated 17th Nov 2013.
The Concessionaire submitted method statement for conducting routine vertical load test on routine
piles at Fly Over @ Km 286+116 vide letter number RIL/SBEL/NH-1A/2013/831 dated 17th Nov
2013.
The Concessionaire submitted plan & profile of graveyards vide letter number RIL/SBEL/NH1A/2013/845 dated 24th Nov 2013.
The Concessionaire requested to Client regarding the cutting down of trees at Lasjan vide letter
number RIL/SBEL/NH-1A/2013/569 dated 04th Dec 2013.
The Concessionaire requested Client to intervene in the matter of royalty with the geological and
mining department vide letter number RIL/SBEL/NH-1A/2013/570 & 577 dated 05th & 15th Dec 2013
respectively.
The Concessionaire requested for Extension of time under clause 12.4.2 of Concession agreement
vide letter number RIL/SBEL/NH-1A/2013/578 dated 16th Dec 2013.
The Concessionaire intimated authority regarding the stoppage of work by the villagers vide letter
number RIL/SBEL/NH-1A/2013/579 dated 17th Dec 2013.
The Concessionaire intimated authority vide letter number RIL/SBEL/NH-1A/2013/580 dated 17th
Dec 2013 regarding the land to be made available on the right hand side of Fly over so that the
piling work can be taken up.
The Concessionaire intimated authority vide letter number RIL/SBEL/NH-1A/2013/581 dated 17th
Dec 2013 regarding the stoppage of work of PUP @ Ch. 280+658 by the villagers. The demand of
villagers is to increase the height and letter from the Chief Planning Commission is submitted and
the decision from your end is pending.
The Concessionaire submitted report on joint visit of site with the supervision consultant and the
Client vide letter number RIL/SBEL/NH-1A/2013/582 dated 22nd Dec 2013.
The Concessionaire intimated authority regarding the construction of additional structures vide letter
number RIL/SBEL/NH-1A/2013/583 dated 19th Dec 2013.
The Concessionaire submitted vertical pile load test report for VUP @ 224+780 vide letter number
RIL/SBEL/NH-1A/2013/863 dated 21st Dec 2013.
The Concessionaire submitted third party test report of VG 10 Bitumen from HPCL vide letter
number RIL/SBEL/NH-1A/2013/864 dated 17th Dec 2013.
The Concessionaire submitted proposal of cast – in situ culverts to pre cast culverts vide letter
number RIL/SBEL/NH-1A/2013/869 dated 21st Dec 2013.
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
11
MPR – May 2014
The Concessionaire requested Client for vender approval of POT/PTFE bearings and expansion
joint vide letter number RIL/SBEL/NH-1A/2013/876 dated 24th Dec 2013.
The Concessionaire requested for approval of Elastomeric bearings for various structures vides
letter number RIL/SBEL/NH-1A/2013/879 & 900 dated 2nd Jan 2014 & 23rd Jan 2014 respectively.
The Concessionaire submitted compliance of the comments on report submission of vertical pile
load test for MNB @ 245+890 vides letter number RIL/SBEL/NH-1A/2014/881 dated 4th Jan 2014.
The Concessionaire submitted summary of PDA test report and correlation done vide letter number
RIL/SBEL/NH-1A/2014/885 dated 6th Jan 2014.
The Concessionaire intimated Authority regarding the progress affected due to heavy Snowfall &
low temperature vide letter number RIL/SBEL/NH-1A/2014/889 dated 9th Jan 2014.
The Concessionaire submitted video recording (3 sets) for quarter Oct 2013 to Dec 2013 vide letter
number RIL/SBEL/NH-1A/2014/890 dated 9th Jan 2014.
The Concessionaire submitted PDA test report for MJB @ 222+144 (P2 & P1 (LHS)), 245+890 (A2,
P4 (LHS)) & 250+309 (A2, P17 (LHS)) vide letter number RIL/SBEL/NH-1A/2014/892 dated 11th
Jan 2014.
The Concessionaire submitted report on safety week observed from 11th Jan 2014 to 17th Jan 2014
vide letter number RIL/SBEL/NH-1A/2014/894 dated 13th Jan 2014.
The Concessionaire submitted report on safety week observed from 11th Jan 2014 to 17th Jan 2014
vide letter number RIL/SBEL/NH-1A/2014/894 dated 13th Jan 2014.
The Concessionaire submitted revised plan and profile of ROB at Km 243+012 vide letter number
RIL/SBEL/NH-1A/2014/595 dated 10th Jan 2014.
The Concessionaire submitted extension of Performance Bank Guarantee vide letter number
RIL/SBEL/NH-1A/2014/597 dated 16th Jan 2014.
The Concessionaire submitted revised GAD of ROB at Km 243+012 vide letter number
RIL/SBEL/NH-1A/2014/598 dated 21st Jan 2014.
The Concessionaire submitted report on safety week observed from 11th to 17th Jan 2014 vide letter
number RIL/SBEL/NH-1A/2014/599 dated 21st Jan 2014.
The Concessionaire intimated Authority regarding the Vehicle stranding near Chanderkut &
Udhampur vide letter number RIL/SBEL/NH-1A/2014/600 dated 21st Jan 2014.
The Concessionaire submitted report on Vertical and Lateral Pile load test vide letter number
RIL/SBEL/NH-1A/2014/904 dated 2nd Feb 2014.
The Concessionaire submitted SSI report for Major & Minor Bridges vide letter number
RIL/SBEL/NH-1A/2014/906 dated 8th Feb 2014.
The Concessionaire requested I.E regarding the Force Majeure from 9th Feb 2014 to 11th Feb 2014
because of complete shutdown in the valley called by Hurriyat Conference on the first death
Anniversary of Mohd. Maqbool Bhatt vide letter number RIL/SBEL/NH-1A/2014/908 dated 12th Feb
2014.
The Concessionaire submitted Co-relation report between PDA & Static load test report vide letter
number RIL/SBEL/NH-1A/2014/908 dated 12th Feb 2014.
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
12
MPR – May 2014
The Concessionaire submitted observation on Environmental management plan vide letter number
RIL/SBEL/NH-1A/2014/910 dated 13th Feb 2014.
The Concessionaire submitted factory visit report on SHYAM Steel Industries Ltd. vide letter
number RIL/SBEL/NH-1A/2014/911 dated 15th Feb 2014.
The Concessionaire submitted factory visit report on SRMB SRIJAN Ltd. Regarding the supply of
reinforcement steel for approval vide letter number RIL/SBEL/NH-1A/2014/911 dated 15th Feb
2014.
The Concessionaire submitted extension of Performance Bank Guarantee vide letter number
RIL/SBEL/NH-1A/2014/605 dated 13th Feb 2014.
The Concessionaire submitted reports on Routine & Vertical Pile load test of Fly over vide letter
number RIL/SBEL/NH-1A/2014/913, 914 & 915 dated 15th Feb 2014.
The Concessionaire submitted details of Pile load tests conducted at various structures vide letter
number RIL/SBEL/NH-1A/2014/916 dated 16th Feb 2014.
The Concessionaire intimated Authority for Schedule “B” to be followed up for Design of Road
Pavement vide letter number RIL/SBEL/NH-1A/2014/606 dated 13th Feb 2014.
The Concessionaire requested for uses of TCI Max Cement above M30 grade concrete vide letter
number RIL/SBEL/NH-1A/2014/607 dated 18th Feb 2014.
The Concessionaire intimated Authority regarding the safety implication at site by putting more sign
boards according to the specification of CA and also put blinkers at diversion vide letter number
RIL/SBEL/NH-1A/2014/612 dated 23rd Feb 2014.
The Concessionaire submitted Escrow account statement for the period of 01.12.2013 to
31.12.2013 under clause 31.2&31.3 of Article 31 of CA vide letter number RIL/SBEL/NH1A/2014/614 dated 24th Feb 2014.
The Concessionaire submitted variation in scope of structure work for Srinagar Project
RIL/SBEL/NH-1A/2014/621 dated 03rd March 2014.
The Concessionaire intimated Authority regarding the Work stopped by the Villagers @ MJB
252+848 (Jammu Side) vide RIL/SBEL/NH-1A/2014/622 dated 08th March 2014.
The Concessionaire submitted Escrow account statement for the period of 01.01.2014 to
28.02.2014 under clause 31.2&31.3 of Article 31 of CA vide letter number RIL/SBEL/NH1A/2014/625 dated 13th March 2014.
The Concessionaire requested Authority regarding the additional land required for Toll Plaza vide
RIL/SBEL/NH-1A/2014/626 dated 13th March 2014.
The Concessionaire intimated Authority regarding the change in authorisation from Mr. C S Sastry
to Mr. Ayaz Jawad Hussain vide RIL/SBEL/NH-1A/2014/627 dated 14th March 2014.
The Concessionaire replied Authority regarding the suspension of construction work of structures
like Major & Minor Bridges/Flyover/VUPs vide RIL/SBEL/NH-1A/2014/628 dated 17th March 2014.
The Concessionaire intimated Authority regarding the closure of Main Gate by Local Villagers vide
RIL/SBEL/NH-1A/2014/629 dated 17th March 2014.
The Concessionaire requested Authority regarding the shifting of 33 KVA electric line as per DPR
vides RIL/SBEL/NH-1A/2014/632 dated 26th March 2014.
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
13
MPR – May 2014
The Concessionaire submitted PDA tests and Correlation approach for minor Bridges vide
RIL/SBEL/NH-1A/2014/924 dated 3rd March 2014.
The Concessionaire intimated Authority vide RIL/SBEL/IE/NH-1A/2014/932 dated 20th March 2014
regarding the Force Majeure due to heavy snowfall and curfew in Valley of Kashmir.
The Concessionaire submitted test reports of POT/PTFE bearing for Major Bridges at Location Km
252+848, 264+625, 268+065 & 277+076 vide RIL/SBEL/I.E/NH-1A/2014/938 dated 22nd March
2014.
The Concessionaire submitted video recording for the quarter ending March 2014 i.e from 1st Jan
2014 to March 2014 vide RIL/SBEL/I.E/NH-1A/2014/964 dated 25th April 2014.
The Concessionaire submitted revised plan & profile of Km 225 to Km 226 & 227 vide
RIL/SBEL/I.E/NH-1A/2014/961 dated 24th April 2014.
The Concessionaire submitted detailed drawing for super structure & deck slab of MNB @ 261+026
vide RIL/SBEL/I.E/NH-1A/2014/960 dated 24th April 2014.
The Concessionaire submitted revised drawing for Elastomeric bearing for VUP @ 224+780, MNB
@ 239+856, MNB @ 245+890, MNB @ 250+309, MNB @ 261+026 & Fly over @ 286+110 vide
RIL/SBEL/I.E/NH-1A/2014/959 dated 24th April 2014.
The Concessionaire submitted drawing for deck slab details of Fly over @ Ch 287+466 vide
RIL/SBEL/I.E/NH-1A/2014/952 dated 12th April 2014.
The Concessionaire submitted revised plan & profile at various locations from Ch. 222+600 to
275+600 vide RIL/SBEL/I.E/NH-1A/2014/950 dated 12th April 2014.
The Concessionaire intimated Client regarding the severe climatic condition in the valley and
resulting poor progress of work for entire month vide RIL/SBEL/I.E/NH-1A/2014/942 dated 1st April
2014.
The Concessionaire submitted estimate & drawing for shifting of electrical utility along the National
Highway in Banihal Section vide RIL/SBEL/I.E/NH-1A/2014/649 dated 28th April 2014.
The Concessionaire submitted the action taken report to Client regarding the meeting convened by
Chief Secretary of J&K on 19th April 2014 vide RIL/SBEL/I.E/NH-1A/2014/646 dated 25th April 2014.
The Concessionaire submitted compliance on Critical issues & Maintenance of Existing Road vide
RIL/SBEL/I.E/NH-1A/2014/645 dated 25th April 2014.
The Concessionaire submitted compliance on Maintenance of Existing Highway & Safety issues
vide RIL/SBEL/I.E/NH-1A/2014/643 dated 22nd April 2014.
The Concessionaire submitted escrow account statement for the month of March 2014 under
clause 31.2 & 31.3 of article 31 of CA vides RIL/SBEL/I.E/NH-1A/2014/638 dated 10th April 2014.
The Concessionaire submitted revised GAD of ROB @ 243+012 with single span of 45m vide
RIL/SBEL/I.E/NH-1A/2014/637 dated 02nd April 2014.
The Concessionaire requested Authority to provide land for construction of service road from Ch.
224+400 to 225+300 vide RIL/SBEL/I.E/NH-1A/2014/636 dated 01st April 2014.
The Concessionaire submitted source approval of SRMB Srijan Reinforcement steel vide
RIL/SBEL/I.E/NH-1A/2014/967 dated 04th May 2014.
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
14
MPR – May 2014
The Concessionaire submitted pile integrity test reports for fly over 286 vide RIL/SBEL/I.E/NH1A/2014/968 dated 04th May 2014.
The Concessionaire intimated to authority vide their office letters number RIL/SBEL/IE/NH1A/2014/971 dated 05th May 2014 regarding the Force Majeure (Curfew in Valley of Kashmir) due to
death of Youth in CRPF firing at Nawakadal from 01st May 2014 to 3rd May 2014 resulting all our
works have come to stand still.
The Concessionaire submitted recheck test reports of Embankment, GSB & WMM layers for quality
audit of NHAI vide RIL/SBEL/I.E/NH-1A/2014/974 dated 08th May 2014.
The Concessionaire submitted High Embankment designs with additional SSI reports vide
RIL/SBEL/I.E/NH-1A/2014/975 dated 10th May 2014.
The Concessionaire requested approval of Speedway Petro Infra Pvt. Ltd. For CRMB vide
RIL/SBEL/I.E/NH-1A/2014/978 dated 12th May 2014.
The Concessionaire submitted elastomeric bearing for Minor Bridges &
RIL/SBEL/I.E/NH-1A/2014/981 dated 29th May 2014.
Flyover vide
The Concessionaire submitted design & drawing of PSC superstructure, elastomeric bearing with
pedestal for Minor Bridges vide RIL/SBEL/I.E/NH-1A/2014/982 dated 29th May 2014.
The Concessionaire intimated Authority regarding the maintenance of existing road from Pantha
Chowk up to Qazigund including Banihal Section vide RIL/SBEL/I.E/NH-1A/2014/650 & 662 dated
01st & 15th May 2014 respectively.
The Concessionaire submitted Contractor All Risk insurance Policy vide to Authority vide
RIL/SBEL/NH-1A/2014/652 dated 05th May 2014.
The Concessionaire intimated to Authority regarding the stoppage of work by local Villagers
between Ch. 262+600 to 264+700 vide RIL/SBEL/NH-1A/2014/653 dated 05th May 2014.
The Concessionaire submitted variation/change of scope for additional structures to Authority vide
RIL/SBEL/NH-1A/2014/654 dated 06th May 2014.
The Concessionaire submitted Escrow account statement to Authority for the month of April 2014
under clause 31.2 & 31.3 of Article 31 of Concession agreement vide RIL/SBEL/NH-1A/2014/659
dated 10th May 2014.
The Concessionaire deposited the welfare cess of workers under (RE & CS) Act 1969 vide
RIL/SBEL/NH-1A/2014/660 dated 10th May 2014.
The Concessionaire intimated Authority regarding the restoration of irrigation bund which was cut
while the execution of pile work at MJB 277 vide RIL/SBEL/NH-1A/2014/663 dated 20th May 2014.
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
15
MPR – May 2014
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
16
MPR – May 2014
1.2.1













Contractual Details: (Total Project)
Length of the Proposed Road
Fly-Over / Grade Separator
Railway Over Bridge
Major Bridge
Minor Bridge
Box & Slab Culverts
Pipe Culverts
Vehicular Underpasses
Pedestrian / Cattle Underpass
Truck Lay Bay
Bus Lay Bay
Service Road
Toll Plaza
Si. No.
Description
67.76 Km.
01 Nos. ( Total Length 347.46 m)
01 Nos.
8 Nos.
7 Nos.
197 Nos.
04 Nos.
10 Nos.
8 Nos.
02 Nos.
17 Nos.
4.8 Km. (Approx.)
1 No.
Unit
Total Quantity
1
Clearing & Grubbing
Hector
2
3
4
Excavation
Earthwork in Embankment
Sub grade/Shoulder
Cum
Cum
Cum
383,300
5,609,798
971,639
5
6
7
GSB
WMM
DBM
Cum
Cum
Cum
3,826,51.5
329,719.5
135,279.7
Cum
61,046.24
8
BC
1.3 Important Features :
1
2
3
4
5
6
7
:
:
:
:
:
:
:
:
:
:
:
:
:
Total Project Length
Contract Value
Date of Letter of Acceptance
Concession Agreement Signed
Appointed Date
Appointment of IE
Appointment of Safety Consultant
400.5
67.76 Km
Rs. 1101 Crores. (As per Financial Closure)
27-06-2011
28-12-2010
27-06-2011
26-03-2012
Not Yet Appointed.
Financial Progress
Table: Physical Progress up to May-14. (As per new work program)
Achieved Financial Progress
Scheduled Financial
(Rs.)
Progress till 31st May 2014
Up to Last month
This Month
Up to This Month
815,82,73,037
476,86,70,980
52,81,000
477,39,51,980
Fall/slippage +/(Rs.)
338,43,21,057
Table: Physical Progress in %
Progress in %
(of Total Project Cost )
Cumulative up to end of May- 2014
Planned
69.43
Actual
30.36
Shortfall
39.07%
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
17
MPR – May 2014
1.4 Milestone:
Contract Value - 1175.00 (As per Concession Agreement)
Project Mile
Stone(MS)
Days from
Expended
Appointment
Cost
Date
Percentage Financial
Package
Remarks
MS-I
180
117.50
10%
Construction of Project Highway
Commenced
MS-II
450
411.25
35%
Commenced Construction of all
Bridges
MS-III
750
822.50
70%
Commenced Construction of all
Project Facilities
Four Laning
1095
-
-
As per Schedule 'G' of Concession
Agreement
2.0 Project Length Division:
Project
Km 187+000 to Km 189+350 & 220+700 to 286+110
Section I
From Km 187+000 to
Km 189+350
Section II
From Km 220+700 to
Km 252+800
Section III
From Km 252+800 to
Km 286+110
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
18
MPR – May 2014
ORGANISATION CHART SPV
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
19
MPR – May 2014
ORGANISATION CHART EPC
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
20
MPR – May 2014
MOBILISATION REPORT
Mobilisation for the various items of Road Work & Structure Work completed and furnished below.
The Batching plant and allied machinery for Concrete, GSB & WMM and DBM plant are
completed.
The major site operations in progress are as follows.
Structure Works:







Construction of Box culverts & Pipe under progress.
Construction of Minor and all Major Bridges in progress.
Construction of Fly-Over in Progress.
Construction of VUP & PUP under progress.
Pre-Cast concrete works under progress.
Reinforcement (HYSD) works under progress for Structures.
Composite Girder for Major Bridges stocked at site.
Road Works:









Excavation for Road Work is under progress.
Construction of Embankment under progress.
PFVD work is under progress.
Laying of Sub-Grade under progress.
Laying of GSB under progress.
Laying of WMM under progress.
Maintenance works of Existing Carriage Way under progress.
Kerb laying in Progress.
DBM Laying in progress
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
21
MPR – May 2014

LOGISTIC
:
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
22
MPR – May 2014
 Lab Equipment Status Mobilized at Section – II (Ch. 220+700 to Ch. 252+800)
Srinagar Banihal Road Project
LAB -1
NAME OF LAB EQUIPMENTS
Sr. No.
SOIL
1
Hot Oven (0 – 250 C) 60 X 60 X 60 cm, S.S.CHAMBER, With Digital temp.
controller and forced air circulation
2
Max. Dry Density Mould (2250 cc) with rammer 4.89 kg
√
3
Max. Dry Density Mould (1000 cc) with rammer 4.89 kg
√
4
CBR Testing Machine set - With Proving ring, dial gauge & plunger
√
5
CBR Mould set (2250 cc) with perforated plate
√
6
Surcharge weight 147mm dia. 2.5 kg wt. (Annular)
√
7
Surcharge weight 147mm dia. 2.5 kg wt. (slotted)
√
8
Spacer disc 148mm dia, 47.5mm height with handle
√
9
Tripod stand for holding dial gauge (set)
√
10
Cassagrande Apparatus Hand operated
√
11
Cone Penetro meter. As per IS:2720
√
12
Sand equivalent apparatus (Automatic)
13
Proving Ring Cap.
50 kn.
√
14
Proving Ring Cap. , 30 kn.
√
15
Proving Ring Cap.
√
16
Nuclear Density Gauge
17
RADIATION SURVEY METER
18
Sand Pouring Cylinder (20 Cm)with Tray and Calibrating Container
√
19
Sand Pouring Cylinder (15 Cm)with Tray and Calibrating Container
√
20
Sand Pouring Cylinder (10 Cm)with Tray and Calibrating Container
√
21
Rapid moisture meters Deluxe quality
√
22
Hydrometer - Soil (0.75 to 1.0 & 1.0 to 1.3 gm/cc density range) each
23
Tray different size(60*30 CM)
√
24
Steel/Aluminium Container (Approx 100 ml.150 & 200.0 ml vol.) per group
60 nos. in each lab
√
25 kn.
√*
CONCRETE
25
Mortar cube Vibrating Machine-With Crompton Motor
26
Cube Moulds Vibrating Table of 1m X 1m
√
27
Vicate Apparatus
√
28
Soundness apparatus (Le-Chatelier mould-set of 6)
√
29
Slump test Apparatus
√
30
Lab Concrete Trial Mixer
31
Cube Testing Machine (2000 KN) Cap -Digital
(Cap. 1 cu. Feet)
√
√
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
23
MPR – May 2014
32
Specific gravity bottle (1000 ml/ 100 ml/50ml)Cap
√
33
Concrete Cube Moulds (15X15X 15 cm) - Weight 9.5 kg
√
34
Cement test Mould size 7.07 *7.07 * 7.07 cm
√
35
Mortar Cube Mould of size 5cm X 5cm X 5cm
36
Le- chatelier flask for cement specific gravity test
√
AGGREGATE
37
Sieve Shaker- for 20cm and 45 cm dia sieves-Combined
√
38
Aggregate Impact Value Apparatus
√
39
Flakiness Gauge
√
40
Elongation Gauge
√
41
Pycnometer (1000 ML)
42
Wire Basket for density
43
Los Angeles abrasion Test Apparatus
44
Crushing Value Apparatus
45
Riffle Box of (40mm and 20mm )
√
46
10% fines value testing apparatus set
√
47
SCOOP
√
√
√*
BITUMEN/BITUMINOUS MIXES
51
Modified Marshall stability apparatus (Complete set)
√
52
Modified Marshall Rammer 150mm dia (Automatic) EIE MAKE
√
53
Modified Marshall Rammer for 150mm dia (10.2 kg wt.)(Manual)
√
54
Modified Marshall compaction Pedestal for 150mm dia
55
Modified Marshall Mould 150mm Ø
√
56
Standard Marshall Stability Apparatus
√
57
Standard Marshall compaction Apparatus for 100mm dia (Automatic)
√
58
Standard Marshall compaction Pedestal for 100mm dia (Manual)
59
Marshall Rammer 100 mm Ø (4.9kg )
√
60
Marshall Moulds sets of 100mm dia, with base plate and collar
√
61
Water bath - DIGITAL FOR 6 MARSHAL MOULDS(24*16*12")
√
62
Water bath - DIGITAL FOR 12 MARSHAL MOULDS(48*32*24")
√
63
Bitumen Penetration Apparatus-Automatic with timer
√
64
Centrifugal Bitumen Extractor- Motorized
√
65
Bitumen Mixer
66
Vacuum Pump with filter flask and rubber tubing
√
67
Specific gravity bottles of 50ml capacity set
√
68
Softening Point Apparatus – DIGITAL
√
69
Kinematic Viscometer - With U Tube Viscometers
√
70
Saybolt Viscometer
(Aimil make only)
√*
√*
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
24
MPR – May 2014
71
Flash & Fire point Apparatus
√
72
Ductility Apparatus
√
73
Core cutting machine - with water pump & silent DG Set
√
74
Diamond core bit of 100mm dia with barrel (100 × 200)
√
75
Diamond core bit of 150mm dia with barrel (150 × 200)
√
76
Straight edge 3 METER WITH MEASURING WEDGE
√
77
Bump indicator Apparatus
78
Hydraulic De-mould Extractor (100mm Dia)
79
Conical flask of 2lit capacity (with made of side neck suction arrangement)
80
Thin Film OVEN
81
Beaker 600 ml (Borosil make)
√
√
GENERAL
82
Hot Oven (0 – 250 C) 60 X 90 X 60 cm, S.S.CHAMBER, With Digital temp.
controller and forced air circulation
√
83
Micrometer 0-25mm (Deflection gauge)
√
84
Vernier Caliper-300mm (Digital)
√
85
Hot Plate-20cm dia
√
86
Electronic Weighing Balance (50 Kg),5gm
√
87
Electronic Weighing Balance (30 Kg) , 1gm
√
88
Electronic Weighing Balance (20 Kg) 1 gm
√
89
Electronic Weighing Balance (15 Kg) 1 gm
√
90
Electronic Weighing Balance (6 Kg) , 0.5gm
√
91
Electronic Weighing Balance (600G) , 0.01gm
√
92
Platform Balance of 300kg capacity with 50gm accuracy(p2 & P3 200KG)(P-4 - 150 kg)
93
Pan balance of 50kg capacity
√
94
Pan balance of 30kg capacity with 2gm accuracy
√
95
Pan balance of 10kg capacity with 1gm accuracy
√
96
Pan balance of 5kg capacity 0.5gm accuracy
√
97
Standard Weights(50 Kg)
√
98
Standard Weights(20 Kg)
√
99
Standard Weights(10 Kg)
√
100
Standard Weights(05 Kg)
√
101
Standard Weights(02 Kg)
√
102
Standard Weights(01 Kg)
√
103
Standard Weights(500 G)
√
104
Standard Weights(200 G)
√
105
Standard Weights(100 G)
√
106
Standard Weights(50 G)
√
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
25
MPR – May 2014
107
Brass wt. Box
√
108
Standard Weights(0-200 G)
√
109
Standard Weights(10 G)
√
110
Standard Weights(5 G)
√
111
Cylinder for checking of DLBD 50 lit. Cap
√
112
Volume measuring container of 20lit capacity
√
113
Volume measuring container of 15lit capacity
√
114
Volume measuring container of 10lit capacity
√
115
Volume measuring container of 3lit capacity
√
116
Sample trays of 1m X 0.6m
√
117
Sample trays of 0.6m X 0.6m
√
118
Sample trays of 0.45m X 0.45m
√
119
Conical flask of 2lit capacity
120
Conical flask of 1lit capacity
√
121
measuring jars of 1000ml capacity(Borosil)
√
122
measuring jars of 1000ml capacity( Plastic)
√
123
measuring jars of 500ml capacity (Borosil)
√
124
measuring jars of 500ml capacity(Plastic)
√
125
measuring jars of 250ml capacity (Glass)
√
126
measuring jars of 250ml capacity (Plastic)
√
127
measuring jars of 100ml capacity (glass)
√
128
measuring jars of 50ml capacity (glass)
√
129
Stop watch DIGITAL
√
130
Glass thermometers of 250oc- Yellow back German Glass
√*
131
Glass thermometers of 100 c Yellow back German Glass
√
132
Glass thermometers of 50oc Yellow back German Glass
√
133
Dial gauge thermometers of 300oc
√
134
Spirit level
√
135
Pippet glass of 25ml
√
136
Rain gauge - Non recording type, Fibre Glass body
√
137
DIGITAL HYGRO METER
√
138
Steel scale 1.0 meter
√
139
DIGITAL THERMOMETER
√
o
IS SIEVES
G.I. Sieves (400 mm Dia.)
140
90 mm
√*
141
80 mm
√*
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
26
MPR – May 2014
142
75 mm
√*
143
63 mm
√*
144
53 mm
√*
145
45 mm
√*
146
40 mm
√*
147
37.5 mm
√*
148
31.5 mm
√*
149
26.5 mm
√*
150
25 mm
√*
151
22.4 mm
√*
152
20 mm
√*
153
19 mm
√*
154
16 mm
√*
155
14mm
√*
156
13.2 mm
√*
157
12.5 mm
√*
158
11.2 mm
√*
159
10 mm
√*
160
9.5 mm
√*
161
6.3 mm
√*
162
5.6 mm
√*
163
4.75mm
√*
164
2.36mm
√*
165
1.18mm
√*
166
pan & lid
√*
G.I. Sieves (300 mm Dia.)
167
90 mm
√*
168
80 mm
√*
169
75 mm
√*
170
63 mm
√*
171
53 mm
√*
172
45 mm
√*
173
40 mm
√*
174
37.5 mm
√*
175
31.5 mm
√*
176
26.5 mm
√*
177
25 mm
√*
178
22.4 mm
√*
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
27
MPR – May 2014
179
20 mm
√*
180
19 mm
√*
181
16 mm
√*
182
14mm
√*
183
13.2 mm
√*
184
12.5 mm
√*
185
11.2 mm
√*
186
10 mm
√*
187
9.5 mm
√*
188
6.3 mm
√*
189
5.6 mm
√*
190
4.75mm
√*
191
2.36mm
√*
192
1.18mm
√*
193
pan & lid
√*
Brass Sieves (200 mm Dia.)
√*
194
19mm
√*
195
13.2mm
√*
196
12.5mm
√*
197
10.mm
√*
198
9.5mm
√*
199
5.6mm
√*
200
4.75mm
√*
201
3.35mm
√*
202
2.8mm
√*
203
2.36mm
√*
204
2.0mm
√*
205
2.12mm
√*
206
1.70mm
√*
207
1.4mm
√*
208
1.18mm
√*
209
1.00mm
√*
210
.850mm
√*
211
.710mm
√*
212
0. 600mm
√*
213
0. 425mm
√*
214
0. 300mm
√*
215
.180mm
√*
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
28
MPR – May 2014
216
0. 150mm
√*
217
0. 090mm
√*
218
0.075mm
√*
219
.053mm
√*
220
0. 045mm
√*
221
Filter paper 100 mm & 150 mm dia.(pkd) (each)
√
222
Mixture machine (small)
√
223
Measuring tape (30m)
√
224
Permeability test machine
√
 Lab Equipment Status Mobilized at Section –Section - III (Ch. 252+800 to 286+110)
Srinagar - Banihal Road Project
LAB -2
LAB -3
NAME OF LAB EQUIPMENTS
Sr.
No.
SOIL
1
CBR Testing Machine with Proving ring set
√
√
2
Nuclear Density Gauge (5804&3780 at mordu)
√
√
3
Max. Dry Density Mould (1000 cc) with 4.89kg rammer
√
√
4
Max. Dry Density Mould (2250 cc) with 4.89kg rammer
√
√
√
√
√
√
√
√
√
√
√
√
5
6
7
8
CBR Mould set (2250 cc) With perforated plate, 01 annular
weight (2.5kg) of slot hole and 01 annular weight(2.5kg) of
center hole.
Sand Replacement apparatus (20 Cm) with tray and calibrating
cylinder
Sand Replacement apparatus (15 Cm) with tray and calibrating
cylinder
Sand Replacement apparatus (10 Cm) with tray and calibrating
cylinder
9
Hot Oven ( 0 – 250 C)
10
Hot Oven ( 0 – 150 C)
√
√
11
Rapid moisture meters with calcium carbide
√
√
12
Cassagrande Apparatus
√
√
13
Cone Penetration Test
√
√
14
Hydrometer 1.00 to 1.500
√*
√*
15
Hydrometer 0.950 to 1.000
√
√
16
Hydrometer 0.750 to 1.100
√
√
17
C and Phy value apparatus
√*
√*
18
Spatula
√
√
19
Glass rod
√*
√*
CONCRETE
√
√
Mortar cube Vibrating Machine
√
√
20
200lit
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
29
MPR – May 2014
21
Cube Moulds Vibrating Table of 1m X 1m
√
√
22
Vicate Apparatus
√
√
23
Soundness apparatus
√
√
24
Flexural Beam Mould (70X15X15 cm)
√
√
25
Flexural Beam Mould Vibrating Table
√
√
26
Slump test Apparatus with tamping rod
√
√
27
Mortar Cube Mould of size 7.06cm X7.06cm X 7.06cm
√
√
28
Mortar Cube Mould of size 5cm X5cm X 5cm
√
√
29
Lab Concrete Trial Mixer
√
√
30
Cube Testing Machine (2000 KN) Cap
√
√
31
Cube Testing Machine (500 KN) Cap
√
√
32
Flexural Testing Machine ( 100 KN) Cap
√
√
33
Pycnometer (50ML )
√
√
34
Concrete Cube Moulds (15X15X 15 cm)
√
√
35
Concrete Cylinder Moulds
√
√
36
Vibrating Hammer for DLC
√
√
37
Air Entrainment meter
√
√
38
Wheel Barrow
√
√
39
Grouting cube mould (10cmX10cmX10cm)
√
√
40
Compaction factor
√
√
41
Flow table
√
√
AGGREGATE
42
Sieve Shaker
√
√
43
Aggregate Impact Value Apparatus
√
√
44
Flakiness Gauge
√
√
45
Elongation Gauge
√
√
46
Pycnometer (1000 ML)
√
√
47
Wire Basket for density
√
√
48
Los Angeles abrasion Test Apparatus
√
√
49
Crushing Value Apparatus
√
√
50
Riffle Box of (40mm)
√
√
51
Riffle Box of (20mm )
√
√
52
10% fines value testing apparatus set
√
√
53
Permeability test app
√
√
BITUMEN/BITUMINOUS MIXES
54
Marshall Stability Apparatus set with 25 KN Pro.
√
√
55
Marshall Holder
√
√
56
Bitumen Penetration Apparatus
√
√
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
30
MPR – May 2014
57
Mould for Bitumen Penetration test
√
√
58
Centrifugal Bitumen Extractor, electrical operated
√
√
59
Centrifugal Bitumen Extractor, Hand operated
√*
√*
60
Watman filter paper 24" dia for Bitumen Extractor (100/packet)
√
√
61
Marshall Moulds sets of 100mm dia
√
√
62
Marshall Moulds sets of 150mm dia
√
√
63
Max. Spe Gra. Appa.
√
√
64
GMM bottle 1000ml
√
√
65
GMM bottle 500ml
√
√
66
Marshall compaction Pedestal for 100mm dia
√
√
67
Marshall rammers of 100mm dia
√
√
68
Marshall rammers of 150mm dia
√
√
69
Automatic compactor of 100mm dia for marshall moulds
√
√
70
Automatic compactor of 150mm dia for marshall moulds
√
√
71
Water bath(6 mould - 24X24X36)
√
√
72
Specific gravity bottles of 50ml capacity set
√
√
73
Softening Point Apparatus
√
√
74
Ductility Apparatus
√
√
75
Kinematic Viscometer with U tube
√
√
76
Tar viscometer
√
√
77
Core cutting machine,100mmdia &150mm dia
√
√
78
Diamond core bit of 100mm dia with barrel
√
√
79
Diamond core bit of 150mm dia with barrel
√*
√*
80
Straight edge
√*
√*
81
Bump integrator Apparatus
√*
√*
82
Marshel mould extractor 100mm / 150 mm
√
√
83
Elastic recovery mould in set
√
√
84
Max. Spe Gra. bottle - 5000ml
√*
√*
85
Max. Spe Gra. bottle - 2000ml
√*
√*
86
Gas stove
√
√
87
LPG Gas cylinder-19kg
√
√
88
Benzene
√*
√*
89
Thin film oven
√
√
90
Asphalt mixer
√
√
91
Vacuum pump for GMM test
√
√
92
Flash point apparatus
√
√
√
√
GENERAL
93
Venire Calliper -Digital
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
31
MPR – May 2014
94
Hot Plate
95
Platform Electronic Weighing Balance (125Kg),10gm
√
√
96
Electronic Weighing Balance (40 Kg),2gm
√
√
97
Electronic Weighing Balance (60 Kg),1gm
√
√
98
Electronic Weighing Balance (30 Kg),1gm
√
√
99
Electronic Weighing Balance (12 Kg) , 1gm
√
√
100
Electronic Weighing Balance (3 Kg),
√
√
101
Electronic Weighing Balance (20 Kg) , 1gm
√
√
102
Electronic Weighing Balance (15 Kg)
√*
√*
103
Electronic Weighing Balance (10 Kg) , 0.5gm
√
√
104
Electronic Weighing Balance (6 Kg) , 0.1gm
√
√
105
Electronic Weighing Balance (600G) , 0.2gm
√
√
106
Tribul beam balance of 25kg capacity with 2gm accuracy
√*
√*
107
Pan balance of 5kg capacity 0.5gm accuracy
√*
√*
108
Pan balance of 30kg capacity
√
√
109
Pan balance of 25kg capacity
√
√
110
Pan balance of 20kg capacity
√
√
111
Standard Weights(20 Kg)
√
√
112
Standard Weights(10 Kg)
√
√
113
Standard Weights(05 Kg)
√
√
114
Standard Weights(02 Kg)
√
√
115
Standard Weights(01 Kg)
√
√
116
Standard Weights(500 G)
√
√
117
Standard Weights(200 G)
√
√
118
Standard Weights(100 G)
√
√
119
Standard Weights(50 G)
√
√
120
Standard Weights(20 G)
√
√
121
Standard Weights(10 G)
√
√
122
Standard Weights(5 G)
√
√
123
Digital Thermometer- 50 to 280
√
√
124
Infra red Thermometer - 0 to 250
√
√
125
Thermometer Glass Range - 0 to 360
√
√
126
Thermometer Glass Range - 10 to 110
√
√
127
Volume measuring container of 50lit capacity
√
√
128
Volume measuring container of 20lit capacity
√
√
129
Volume measuring container of 15lit capacity
√
√
130
Volume measuring container of 10lit capacity
√
√
131
Volume measuring container of 3lit capacity
√
√
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
32
MPR – May 2014
132
Sample trays of 1m X 1m
√
√
133
Sample trays of 0.6m X 0.6m
√
√
134
Sample trays of 0.45m X 0.45m
√
√
135
Sampling containers of 500gm capacity (Moisture container)
√
√
136
Sampling containers of 100gm capacity
√*
√*
137
Glass measuring jars of 500ml capacity 100mm dia
√
√
138
Glass measuring jars of 1000ml capacity 100mm dia
√
√
139
Glass measuring jars of 250ml capacity 40mm dia
√
√
140
Glass measuring jars of 100ml capacity 20mm dia
√
√
141
Glass measuring jars of 50ml capacity
√
√
142
Glass beaker 1000ml capacity
√
√
143
Glass beaker 500ml capacity
√
√
144
Stop watch
√
√
145
Glass thermometers of 250oc(300 c)
√*
√*
146
Glass thermometers of 100oc
√*
√*
147
Dial gauge thermometers of 300oc
√*
√*
148
Spirit level
√
√
149
Pipette glass of 25ml
√
√
150
Rain gauge
√
√
151
Spatula
√
√
152
PVC jar - 1 lit
√
√
153
PVC jar - 2 lit
√
√
154
PVC jar - 500ml
√
√
155
PVC bucket - 20 lit
√
√
156
Hygrometer
√
√
157
Steel trowel for cement test
√
√
158
Pick axe
√*
√*
159
Shovel
√*
√*
160
mortar pan
√*
√*
161
Gas stove
√*
√*
162
Rubber hammer
√
√
163
Wooden hammer
√*
√*
164
Proving ring - 50 KN
√
√
165
Proving ring - 25 KN
√
√
166
Steel tape 3 mtr
√
√
167
Steel scale 1mtr
√
√
168
Steel scale 300 mm
√
√
169
Water testing kit
√
√
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
33
MPR – May 2014
170
Steel Hammer 2 kg
√
√
171
Steel Hammer 1 kg
√
√
172
Gas cylinder-05 kg with mounted burner
√*
√*
173
Chisel steel, 300mm long
√*
√*
174
Spanner 10/11, 14/15, 17/18, 20/21 both open & close
√
√
175
Steel scoop 2 kg
√
√
IS SIEVES
G.I Sieves (450 mm Dia) :
176
100 mm
√*
√*
177
75 mm
√*
√*
178
63 mm
√*
√*
179
53 mm
√
√
180
45 mm
√
√
181
37.5 mm
√
√
182
26.5 mm
√*
√*
183
25.0 mm
√*
√*
184
22.4 mm
√*
√*
185
20 .0 mm
√*
√*
186
19. 0 mm
√*
√*
187
18.0 mm
√*
√*
188
13.2 mm
√*
√*
189
12.5 mm
√*
√*
190
11.2 mm
√
√
191
9.5 mm
√*
√*
192
6.3 mm
√*
√*
193
4.75mm
√*
√*
194
Pan
√
√
195
Lid
√*
√*
G.I Sieves (300 mm Dia) :
196
90 mm
√
√
197
75 mm
√*
√*
198
63 mm
√*
√*
199
53 mm
√
√
200
45 mm
√*
√*
201
40 mm
√*
√*
202
37.5 mm
√
√
203
31.5 mm
√*
√*
204
26.5 mm
√
√
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
34
MPR – May 2014
205
25 mm
√
√
206
22.4 mm
√*
√*
207
20 mm
√*
√*
208
19 mm
√*
√*
209
16 mm
√
√
210
14 mm
√*
√*
211
13.2 mm
√*
√*
212
12.5 mm
√
√
213
11.2 mm
√*
√*
214
10 mm
√*
√*
215
9.5 mm
√*
√*
216
6.3 mm
√*
√*
217
5.6 mm
√*
√*
218
4.75mm
√*
√*
219
Pan
√*
√*
220
Lid
√*
√*
Brass Sieves (200 mm Dia) :
221
10.0mm
√
√
222
4.75mm
√
√
223
3.35 mm
√*
√*
224
2.8 mm
√*
√*
225
2.36mm
√
√
226
2.00 mm
√
√
227
1.80mm
√*
√*
228
1.18mm
√
√
229
1.00mm
√
√
230
0. 710mm
√
√
231
0. 600mm
√
√
232
0. 425mm
√
√
233
0. 300mm
√
√
234
0. 150mm
√
√
235
0. 090mm
√
√
236
0. 075mm
√
√
237
0. 045mm
√
√
238
Pan
√
√
239
Lid
√
√
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
35
MPR – May 2014
5.0 STATUS OF MATERIAL RESOURCES:
Borrow areas approved details are as follows:
 Package A
 Borrow Areas for Earth Work:
RAMKY INFRASTRUCTURE LIMITED
QUALITY MANAGEMENT SYSTEM
Monthly Progress Report
SRINAGAR BANIHAL ROAD PROJECT
May-14
For Section – II (220+700 to 252+800): Barrow Areas for Earth Work:
List of
Borrow
Areas
23
Chainages
Side
Offset from
NH (in Km)
Status of Tests
227+700
LHS
6.7KM
APPROVED
13
222+140
RHS
4.500KM
APPROVED
15A
224+800
LHS
8.500KM
APPROVED
Emb/ sub grade
15B
229+100
LHS
4.500KM
APPROVED
5
Emb/ sub grade
27
229+100
LHS
10KM
APPROVED
6
Emb/ sub grade
07
229+300
LHS
3.100KM
APPROVED
7
Emb/ sub grade
02
229+300
LHS
5.200KM
APPROVED
8
Emb/ sub grade
18
230+600
LHS
0.200KM
APPROVED
9
Emb/ sub grade
26
232+200
RHS
1.2KM
APPROVED
10
Emb/ sub grade
08
232+800
LHS
1.500KM
APPROVED
11
Emb/ sub grade
17
233+600
RHS
0.100KM
APPROVED
12
Emb/ sub grade
14
246+200
LHS
13.000KM
APPROVED
13
Emb/ sub grade
25
247+000
RHS
7.800KM
APPROVED
14
Emb/ sub grade
1
247+650
LHS
7.200KM
APPROVED
15
Emb/ sub grade
11
247+660
LHS
7.000KM
APPROVED
16
Emb/ sub grade
21
250+800
LHS
1.3KM
APPROVED
17
Emb/ sub grade
22A
251+400
RHS
3.00KM
APPROVED
18
Emb/ sub grade
31
232+700
LHS
0.500 KM
APPROVED
19
Emb/ sub grade
32
232+700
LHS
0.500 KM
APPROVED
20
Emb/ sub grade
33
247+645
LHS
5.500 KM
APPROVED
21
Emb/ sub grade
34
240+070
LHS
12.5 KM
APPROVED
22
Emb/ sub grade
35
240+070
LHS
18.5 KM
APPROVED
Sr. No.
Description
1
2
Emb/ sub grade
Emb/ sub grade
3
Emb/ sub grade
4
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
36
MPR – May 2014

GSB
Sr. No.
1
Description
List of
Borrow
Areas
Chainage
Side
Offset from
NH
1
232+800
LHS
3.8 KM
2
233+100
RHS
1.5KM
3
236+040
LHS
12KM
Submitted
Submitted
4
239+000
LHS
4KM
Submitted
Package 1
Approval Status
Submitted
 Section – III (252+800 to 286+110):
 Borrow Areas for Earth work:
Approved Borrow area details are as follows:
Sr. No.
Description
List of
Borrow
Areas
Chainages
Side
Offset from NH
(in Km)
Approval Status
1
Emb/ sub grade
6
253+000
LHS
2.5KM
Approved
2
Emb/ sub grade
12
253+000
RHS
4KM
Approved
3
Emb/ sub grade
5
253+000
RHS
8KM
Approved
4
Emb/ sub grade
22
256+800
RHS
3KM
Approved
5
Emb/ sub grade
20
259+900
RHS
2.KM
Approved
6
Emb/ sub grade
24
260+900
RHS
2.5KM
Approved
7
Emb/ sub grade
10
267+300
RHS
9.4KM
Approved
8
Emb/ sub grade
16
270+700
RHS
.5KM
Approved
9
Emb/ sub grade
19
278+450
LHS
14.5KM
Approved
10
Emb/ sub grade
9
280+700
RHS
6KM
Approved
11
Emb/ sub grade
3
281+000
LHS
13.2KM
Approved
12
Emb/ sub grade
28
268+000
RHS
1KM
Approved
13
Emb/ sub grade
4
281+000
RHS
18km
Approved
14
Emb/ sub grade
30
275+600
RHS
1.5 KM
Approved
 Borrow Areas for GSB
Sr.
No.
Description
List of
Borrow
Areas
Chainages
Side
Offset from NH
Approval Status
1
GSB
6
269+600
RHS
4
Submitted
2
GSB
5
286+110
RHS
3.5
Submitted
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
37
MPR – May 2014
10.0 METHODOLOGY STATEMENT’S
The Source Approval and Method Statements submitted up to Month of March’14 are following below:
Sr.
No.
LETTER NO.
DATE
DESCRIPTION
1
RIL/SBEL/SPV/NH-1A/12-13/63
05.02.13
Test Pile at P2 major bridge (268+065)
2
RIL/SBEL/SPV/NH-1A/12-13/49
07.01.13
Construction of Major Bridge
3
RIL/SBEL/SPV/NH-1A/12-13/47
03.01.12
Lateral Pile load Test 277+070 A1 TEST PILE
4
RIL/SBEL/SPV/NH-1A/23
14.12.12
Construction of Box Culvert/Pipe culvert
5
RIL/SBEL/IE/NH-1A/11-12/36
09.12.12
Construction of Minor Bridge
6
RIL/SBEL/SPV/NH-1A/11-12/07
22.11.12
Plate load test
7
RIL/SBEL/SPV/NH-1A/11-12/19
12.11.12
Pile Integrity test
8
RIL/SBEL/SPV/NH-1A/09
23.10.12
Lateral pile load Test
9
RIL/SBEL/SPV/NH-1A/07
22.10.12
Plate load test
10
RIL/SBEL/IE/NH-1A/11-12/04
21.10.12
Rock fill in Embankment
11
RIL/SBEL/IE/NH-1A/11-12/01
18.10.12
Pile load test
RIL/SBEL/IE/NH-1A/11-12/30
26.06.12
GSB methodology
13
RIL/SBEL/IE/11-12/12
28.05.12
Filter media (GSB & Dust)
14
RIL/SBEL/NH-1A/11-12/04
10.05.12
Construction methodology (QAP)
15
RIL/SBEL/NH-1A/11-12/07
14.03.12
Filter media (10mm & Sand)
16
RIL/SBEL/NH-1A/10-11/47
02.12.11
PQP (PD NH-1A)
17
RIL/SBEL/SPV/NH-1A/12-13/100
12.03.13
18
RIL/SBEL/SPV/NH-1A/12-13/104
13.03.13
12
Methodology for Installation of PVD drains in
High Embankment
Design Methodology for A1 Test Pile at
Km:261+026
11.0 STATUS OF CHANGES FOR VARIATIONS: So far no variation is coming under this project.
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
38
MPR – May 2014
12.0 STATUS OF STRETCHES
Status of Land Acquired-- SRINAGAR – BANIHAL (Km. 187+000 To Km. 189+350 & Km. 220+700 To 286+110)
District
Length
in Km
Land
Acquired
Land
Acquired
Hindrance
free
Land Acquired
with
Hindrance
Balance to
be Acquired
Chainage
Sr.
No.
From
To
1
187+000
189+350
RAMBAN
2.35
2.35
0
2.35
0
2
220+700
257+600
ANANTNAG
36.90
35.80
32.2
3.6
1.1
3
257+600
280+000
PULWAMA
22.40
18.3
16.9
1.4
4.1
4
280+000
284+400
BUDGAM
4.40
4.40
4.40
0
0
5
284+400
286+110
SRINAGAR
1.71
1
0
1
.71
67.76
61.85
53.5
8.35
5.91
Total
Utility Relocated: The Present status of Utility relocation is given below
Utility Relocation / Removal of Encroachments / Tree cutting Table 1 : Details and status of utilities,
encroachments and trees- District: Anantnag
Utility /
encroachment
Utilities: Electrical
Ser
Unit
Quantity
Removed
Balance
Status
1
HT tower
No
8
0
0
Estimates approved
2
LT poles
No
635
497
138
LT poles shifting work at
Anantnag Dist in
Progress
Transformers
Telephone
4
cable (OFC)
Utilities: Public health
Water
5
pipeline
6
Hand pumps
Encroachments
No
36
3
33
Km
20.4
0
0
Km
16
No
11
3
Estimates approval awaited from NHAI, HQ.
No's
Removed Balance
7
Residential
buildings
No
251
211
40
8
Shops
No
855
712
143
9
Mosque
No
12
1
11
No
No
1
3
0
1
1
2
10 FCI go downs
11 CRPF camps
Trees
12 Social forestry
No
Not in Scope
1942
Cut
1942
Compensation not paid
fully for all
structures/buildings.
Dismantling in progress
where payment made.
Matter lies with
Authorities. Both NHAI
and Administration has
to take quick decision
and shift the same.
Balance
0
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
39
MPR – May 2014
13
Under public(80%
Compensation to
be made for land)
No
21946
21126
820
14
15
Walnut
Chinar
No
No
1094
32
787
17
307
15
1. Upon the compensation made for land, land owners will cut all the trees which are under public.
2. For Chinar trees & walnut trees, Divisional Commissioner has to give permission and later auction to be
done.
3. Unless compensation made for land / building / encroachment cannot be removed.
4. Authorities have to take action for shifting of Mosque, Go down and CRPF camps.
Details and status of utilities, encroachments and trees - District: Pulwama
Ser
Utility /
encroachment
Unit
Status
Quantity
Utilities: Electrical
Removed
Balance
1
HT tower
No
1
0
1
2
LT poles
No
385
97
288
3
Transformers
No
25
1
24
4
Telephone cable
(OFC)
km
13.72
Not in Scope
Utilities: Public health
5
6
Water pipeline
Hand pumps
km
No
6.00
Estimates approval waited
from NHAI, HQ.
10
Encroachments
7
Residential
buildings
No
139
48
91
8
Shops
No
376
356
20
Matter lies with Authorities. Both NHAI and
Administration has to take quick decision
and shift the same.
9
Mosque
No
6
10
FCI go downs
No
1
1
Nil
11
CRPF camps
No
1
1
Nil
Trees
12 Social forestry
Under public(80%
13 payment to made
for land)
Compensation not paid fully
for all structures/buildings.
Dismantling in progress where
payment made.
No
794
Cut
794
Balance
0
No
14073
12885
1188
14
Walnut
No
157
47
110
15
Chinar
No
58
17
41
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
40
MPR – May 2014
1. Upon the compensation made for land, land owners will cut all the trees which are under public.
2. For Chinar trees & walnut trees, Divisional Commissioner has to give permission and later auction to be
done.
3. Unless compensation made for land / building / encroachment cannot be removed.
4. Authorities has to take action for shifting of Mosque, Go down and CRPF camps.
Details and status of utilities, encroachments and trees - District: Budgam
Utility / encroachment
Ser
Utilities: Electrical
Unit
Quantity
1
HT tower
No
Nil
2
LT poles
No
1
3
Transformers
No
Nil
4
Telephone cable (OFC)
km
Nil
Status
Estimates approved
Not in Scope
Utilities: Public health
5
Water pipeline
km
Nil
6
Hand pumps
No
Nil
Nil
Encroachments
7
Residential buildings
No
Nil
8
Shops
No
Nil
9
Mosque
No
Nil
10
FCI go downs
No
Nil
11
CRPF camps
No
Nil
12
Social forestry
No
Nil
13
Under public
No
600
14
Walnut
No
Nil
15
Chinar
No
Nil
Trees
Compensation not paid.( Under process)
Details and status of utilities, encroachments and trees - District: Srinagar
Ser
Utility / encroachment
Utilities: Electrical
Unit
Quantity
1
HT tower
No
Nil
2
LT poles
No
4
3
Transformers
No
Nil
4
Telephone cable (OFC)
Km
Nil
Status
Estimates approved
Not in Scope
Utilities: Public health
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
41
MPR – May 2014
6
Hand pumps
Encroachments
7
Residential buildings
No
4
Crossings
Nil
No
18
8
9
10
11
Trees
No
No
No
No
Nil
Nil
Nil
Nil
5
Water pipeline
No
Shops
Mosque
FCI go downs
CRPF camps
Estimates approved
Dismantling completed.
Cut
12
Social forestry
No
Nil
Nil
Balance
Nil
13
Under public
No
800
800
Nil
14
Walnut
No
10
10
Nil
15
Chinar
No
Nil
Nil
Nil
Approvals and Permits
Description
Ser
Status
(a)
Permission of the State Government for extraction of
boulders from quarry
Permission from state Geology & Mining
department has been obtained.
(b)
Permission of Village Panchayat and Pollution Control
Board for installation of crushers
Permission from SIDCO and Pollution
control board for the consent of
establishment has been obtained.
(c)
License for use of explosives
Not required.
(d)
Permission of the State Government for drawing water
from river/reservoir
The State Government has no objection
if we pay usage charges as per tariff.
(e)
License from Inspector of Factories/ competent
authority for setting up Batching Plant
Obtained.
(f)
Clearance of Pollution Control Board for setting up
Batching Plant
Permission from PCB has been
obtained.
(g)
Clearance of Village Panchayat and Pollution Control
Board for Asphalt Plant
Permission from PCB has been
obtained.
(h)
Agreement copies for the borrow areas
Permission of Village Panchayat and State Government
were already obtained. Permission from
for borrow earth
consent authorities obtained.
(i)
Permission of State Government for cutting of trees
Obtained from all departments for
cutting of Trees, except Chinar Trees
(j)
Any other permits or clearances applicable Laws
Sales Tax Registration obtained.
(k)
Applicable permits in relation to environmental
protection and conservation.
Obtained by NHAI.
(l)
Sewage lines & Water Mains : Permission from local
municipalities and development authorities
Obtained from all departments for
shifting.
Note: - Copes of all NOC`s submitted to IE
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
42
MPR – May 2014
14.0 STATUS OF CD WORKS & ROAD WORKS AS ON 31.05.2014:
Status of Highway – Up to May 2014
Sr.
No.
1
2
3
4
5
6
Item
C&G
Description
New Carriageway &
Existing Road
KM
Service Road
KM
New Carriageway &
Embankment Existing Road
Top
Sub grade
Top
GSB Top
WMM Top
DBM Top
Unit
KM
Service Road
KM
New Carriageway &
Existing Road
KM
Service Road
KM
New Carriageway &
Existing Road
KM
Service Road
KM
New Carriageway &
Existing Road
KM
Service Road
KM
New Carriageway &
Existing Road
KM
Service Road
KM
Total Scope
Work
Executed
Achieved
67.76
40.8
60.20%
67.76
36.30
53.56%
67.76
21.33
31.45%
67.76
13.69
22.23%
67.76
13.25
19.55%
67.76
8.175
12.06%
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
43
MPR – May 2014
13.1 Structure status
Status of Structures - Up to May 2014
Total Scope Structure Started
Structure
Completed
Sr. No.
Type of Structure
Unit
1
Culverts
No's
201
113
80
2
Minor Bridge
No's
7
4
0
3
P.U.P.
No's
8
5
3
4
V.U.P.
No's
10
6
1
5
Major Bridge
No's
8
5
0
6
Fly Over
No's
1
1
0
7
ROB
No's
1
0
0
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
44
MPR – May 2014
15.1 S-Curve: Attached as per Annexure – IV attached.
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
45
MPR – May 2014
16.0 MAJOR CORRESPONDENCE FROM SBEL in May 2014
Date
Letter Number
04th May 2014.
RIL/SBEL/I.E/NH1A/2014/966
RIL/SBEL/I.E/NH1A/2014/967
RIL/SBEL/I.E/NH1A/2014/968
RIL/SBEL/I.E/NH1A/2014/969
RIL/SBEL/I.E/NH1A/2014/971
RIL/SBEL/I.E/NH1A/2014/972
RIL/SBEL/I.E/NH1A/2014/973
RIL/SBEL/I.E/NH1A/2014/974
RIL/SBEL/I.E/NH1A/2014/976
RIL/SBEL/I.E/NH1A/2014/977
RIL/SBEL/I.E/NH1A/2014/979
RIL/SBEL/I.E/NH1A/2014/980
04th May 2014
04th May 2014
05th May 2014
05th May 2014
06th May 2014
06th May 2014
08th May 2014
10th May 2014
11th May 2014
17th May 2014
20th May 2014
29th May 2014
RIL/SBEL/I.E/NH1A/2014/982
31st May 2014
RIL/SBEL/I.E/NH1A/2014/985
RIL/SBEL/NH1A/2013/650
RIL/SBEL/NH1A/2013/651
RIL/SBEL/NH1A/2013/652
RIL/SBEL/NH1A/2013/654
RIL/SBEL/NH1A/2013/657
RIL/SBEL/NH1A/2013/659
RIL/SBEL/NH1A/2013/663
RIL/SBEL/NH1A/2013/671
01st May 2014
03rd May 2014
05th May 2014
06th May 2014
08th May 2014
10th May 2014
20th May 2014
23rd May 2014
Subject
Clarification on NCR no. 129
Regarding Source Approval for SRMB Srijan
Reinforcement Steel
Submission of Pile Integrity Test Reports-286 Fly-Over
Regarding Closing of NCPN 127
Force Majeure (Curfew in Valley of Kashmir
Submission of Drawings for MNB at KM 261+026
Submission of Drawings for Fly-Over at 287+466
Submission of recheck test reports of Embankment, GSB
& WMM Layers-NHAI Quality Audit
Submission of Drawings for Minor Bridges at KM
261+026 & 239+586
Inspection Report of Independent Engineer
Regarding Approval of M/s Shiva Bitumen
Standard Deviation of Concrete Cubes compressive
strength-Lasjan Batching Plant
Submission of Design & Drawing of PSC Superstructure,
Elastomeric Bearing with Pedestal along with compliance
for MNB at 220+809
Corrective Action Report for NCPN No. 135
Maintenance of Existing Highway & Safety Issues
Damages of Houses Falling within ROW while executing
the Work
Contractor’s All Risk Insurance Policy
Variation- Change of Scope
Damage of Existing Highway near Sempora
Submission of Escrow Account Statement for the Month of
April 2014
Cutting of Existing Irrigation Bund for casting of Piles at
MJB 277+076 P1 Location
Maintenance of Existing Highway
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
46
MPR – May 2014
Percentage of
Remarks
Establishment
Office/Camp
100%
Main Office/Camp Established at Ch 270 + 900 and at Ch 234+000.
100%
Office/Camp Established at Ch 249 + 800.
100%
Office/Camp Established at Ch 282+500
100%
SPV office, Residential Qtr work Complete at Ch 270+900.
1. Operational at km 270+900 camp.
Lab
100%
2. Operational at km 282+500 camp.
3. Operational at km 234+000 camp
Crusher
100%
Production
started
(Spalls
Extracted
621345MT,
Crushed
Aggregate Stocked 429139MT)
1. Batching Plant No. – 1(CP-30) at km 270+900, Batching
Plant No.– 2(CP-45) at KM 249+800 is in operation.
Batching Plant No. – 3 (CP-30) at km 282+500 is in
operation.
Plants
Plant,
Batching Plant No –4 foundation work in progress at km
(Batching
WMM
&
234+000
HMP)
2. WMM Plant No - 1 Established at Km 282+500 & No.-2
Established at Km 249+800, WMM Plant No. –3 proposed
at km 234+000
3. Hot MIX Plant No – 1 At Km 282+500 is in operation&
, No.-2 At Km 234+000 is in operation.
1. Quarry & Crusher operation started from 9th September’12 and
crushing is in progress at Lassipora village.
2. Quarry & Crusher crushing is in progress at km 222+400
Quarry
100%
3. Quarry & Crusher operation started from and crushing is in
progress at Lasjan village CH 282+500.
4. Mobile crusher at Ch 270 is working.
5 Mobile Crusher is working at Ch.227
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
47
MPR – May 2014
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
48
MPR – May 2014
Awantipora Town (Ch. 264+000)
Barsoo (Ch 268+000)
Galandar (Ch. 274+500)
Pampore (Ch. 277+080)
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
49
MPR – May 2014
Vessu near Green Tunnel (Ch. 251+000)
Vessu Town (Ch. 249+000)
Qazigund Town (Ch. 223+000)
Qazigund Town (Ch. 222+100)
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
50
MPR – May 2014
Safety Implication at Site
Safety Implication at Site
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
51
MPR – May 2014
Progress of Pier @ MJB 285+848
Maintenance of Existing Road in Progress
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
52
MPR – May 2014
Existing Road Maintenance
Staging in Progress at MJB 277+070
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
53
MPR – May 2014
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
54
MPR – May 2014
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
55
MPR – May 2014
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
56
MPR – May 2014
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
57
MPR – May 2014
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
58
MPR – May 2014
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
59
MPR – May 2014
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
60
MPR – May 2014
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
61
MPR – May 2014
Srinagar Banihal Expressway Limited.
Srinagar Banihal Road Project
62