2014/11/5 12:07 PM

advertisement
Name:___________________ _________________________
Due Wed Dec 3, 2014
Assignment #4 – Tables! - COST BENEFIT ANALYSIS PROJECT

Make a copy of the following tables on separate pages
Sample Benefits Table:
Possible Benefits
Benefit Score
+1 small benefit
+2 moderate
+3 significant
Sample Risks Table:
Possible Cost



Cost Score
-1 small
-2 moderate
-3 significant
Justification
for Benefit
Score
Justification
for Cost
Score
Probability
%
Justification
Probability
%
Justification
Score
x
Probability
Score
x
Probability
Score the benefits and costs:
o Give each of your benefits and costs a score out of 3. One means small and three means it is significant.
o Identify your justification for each score in the appropriate columns.
Probability (Likelihood of Occurrence).
o Rate the probability of each benefit/risk from occurring. Use percentages.
o Identify your justification for each percentage.
Calculate the Score x Probability.
Multiply the score you gave each by the probability of occurrence.
Need more help!
 See sample cost benefit table posted to online conference for H1N1 (note this table does not include
embedded citations as yours will)
Evaluation Checklist: Cost Benefit Tables








topics succinct and easily understood on their own
appropriate benefit score
appropriate justification for benefit score
appropriate probability
appropriate justification for probability score
correct score x probability and put in order of significance from most to least in chart
totals shown and accurate
Well developed main points directly related to the question. Supporting examples are concrete and detailed
Download