PETE 411 - Well Drilling Lesson 1 Introduction by Dr. M. Amani TAMU-Petroleum Engineering FALL, 2003 1. Introduction Pete 411 Well Drilling Slide 1 of 16 Lesson 1 - Introduction Texts Grading Syllabus (attached and on internet) Class Objectives (attached and on internet) Schedule Corrections to Textbook (on internet) http://pumpjack.tamu.edu/~juvkam-wold/ MOVIE 1. Introduction The Rotary Drilling Rig Pete 411 Well Drilling Slide 2 of 16 General Information Prerequisites: 3 credit hours Class Schedule: 1. Introduction PETE 320, 321, 322, 323 and 324 Section 501: MWF 9:10 - 10:00 Section 502: MWF 11:30-12:20 Class Room: Rich Room 313 Pete 411 Well Drilling Slide 3 of 16 General Information Instructor: Dr. M. Amani Office: Room 401 K Office Hours: MWF 10:00 – 11:00 MW 12:30 - 2 p.m – 1. Introduction Phone: or by appointment 845-6164 amani@spindletop.tamu.edu Pete 411 Well Drilling Slide 4 of 16 Textbook Applied Drilling Engineering, by Adam T. Bourgoyne Jr., Martin E. Chenevert, Keith K. Millheim and F.S. Young Jr., Society of Petroleum Engineers, Richardson, TX, 1991. Available from the bookstore or directly from SPE 1. Introduction Pete 411 Well Drilling Slide 5 of 16 Basis for Grading Homework 10% Weekly Quizzes Quiz A Quiz B Design Project FINAL 10% 20% 20% 10% 30% 100% 1. Introduction Pete 411 Well Drilling Slide 6 of 16 Homework Assignment: Read: Applied Drilling Engineering, Ch.1, pp 1-12 HW #1, due Monday, Sept. 8 (internet) Class Lectures are on the Internet PETE 411 – Lessons 1 & 2 http://pumpjack.tamu.edu/~amani/ 1. Introduction Pete 411 Well Drilling Slide 7 of 16 PETE 411 Catalog Description 1. Introduction The design and evaluation of well drilling systems; identification and solution of drilling problems; wellbore hydraulics; casing design; well cementing; drilling of directional and horizontal wells; wellbore surveying. Pete 411 Well Drilling Slide 8 of 16 Schedule - Fall, 2002 WEEK NO. TOPICS 1. Introduction, the Rotary Drilling Process, The Rig, Drilling Equipment 2. Drilling Cost & Drilling Rate, Hole Problems, Drilling Structures 3. Drilling Bits, Drilling Hydraulics - Hydrostatics 4. Rheological Models, Pressure Losses in Laminar Flow, Slot Flow 1. Introduction Pete 411 Well Drilling Slide 9 of 16 Schedule - cont’d WEEK NO. TOPICS 5. Oct. 6 & 8: no classes; SPE Fall Mtng. Surge and Swab Pressures - cont’d 6. Pressure across Bit, Bit Nozzle Sizing, Surge and Swab Pressures 7. Lifting Capacity of Drilling Fluids, Casing Design Procedures, Burst, Collapse, Tension 1. Introduction Pete 411 Well Drilling Slide 10 of 16 Schedule - cont’d WEEK NO. TOPICS 8. Casing Design, API Performance Properties, Examples, Drilling Technology - Abnormal Pore Pressure Detection 9. Drilling Technology - Balanced and Overbalanced Drilling, Fracture Gradient Prediction, Gas Cut Mud, “dc-exponent” 1. Introduction Pete 411 Well Drilling Slide 11 of 16 Schedule - cont’d WEEK NO. TOPICS 10. Well Control Methods, Kick Detection and Procedures for Killing Wells, Wireline Logging, MWD 11. Cements and Cementing, Primary & Secondary Cementing Squeeze Operations 1. Introduction Pete 411 Well Drilling Slide 12 of 16 Schedule - cont’d WEEK NO. TOPICS 12. Cementing Equipment, Additives, Liner Cementing, Setting Cement Plugs 13. Directional Drilling, Well Trajectory Surveying, Horizontal Drilling 1. Introduction Pete 411 Well Drilling Slide 13 of 16 Schedule - cont’d WEEK NO. TOPICS 14. Torque & Drag Calculations, Coiled Tubing, Slimhole Drilling 15. Problem Solving, Review, Finals 1. Introduction Pete 411 Well Drilling Slide 14 of 16 Important Dates QUIZ A - Monday, Oct. 13, 7-9 p.m. QUIZ B - Monday, Nov. 10, 7-9 p.m QUIZ A & B: Rich 101 1. Introduction Design Projects Due: - Monday, Dec. 8, 5 p.m. (Rich 401K) FINALS Rich 313 - Sec. 501: Mon., Dec. 15, 8-10 a.m. - Sec. 502: Wed., Dec. 17, 10:30-12:30 Pete 411 Well Drilling Slide 15 of 16 PETE 411 - Texas A&M END Lesson 1 And now, the movie... 1. Introduction Pete 411 Well Drilling Slide 16 of 16