Technical Support Activities in PH-ADO-PO Summary of 2014 activities Michel RAYMOND – December 2nd, 2014 Manpower assigned to the Technical Support (2014) Supervision/operations Michel Raymond (≈ 50%) PH-ADO-PO Gevorg Akhperjanyan Christian Leboube Francisco Limia-Conde Louis Rose-Dulcina Frédéric Rosset Charles Scalisi Cédric Sordé Armen Yandyan PH-DT Alain Bode (≈ 70%) Institutes Manuel Alves (LAL) Oleg Lykov (DUBNA) Mikhail Kuznetsov (DUBNA) Sergei Yukhimchuk (DUBNA) (≈ 1.4 FTE) 6 full time (FTE) 2 persons on a part time base (≈ 0.5 FTE) Resources on Technical Support are about 9 FTE M. Raymond – December 2nd, 2014 Summary of activities on 2014 ADO-PO Technical Support has been involved in: IBL installation BME installation on both sides Many scaffolding modifications and access platforms Calorimeters, Pixels/IBL, SW, Magnets, Muons, etc. Shielding installation (Design done by our design office) Upgrade of the movement system New movement machine (all functions integrated) New position measurement (ADEPO) Big Wheels separation (to replace TGC muon chambers) Support to Infrastructure and Safety Closing operation – Detector movements Timely support to various sub-systems M. Raymond – December 2nd, 2014 Status versus Objectives 2014 Completion of IBL preparation and mechanical insertion Practice on IBL mock-up, machining of last parts Configure UX15 for IBL installation (end of April) IBL installation and positioning (beg. of May) Inner End Plates closing (beg. of August) Effort < 0.5 Tech. Platforms and access Complete fabrication of 4 remaining platforms (access to BW and top of forward platforms) Effort ≈ 1.2 Tech. Installation in UX15 (S3 & S7) (May-June) Scaffolding installation and modification to access detectors Shielding USA15 shielding Frame installed from February to May Pipes installation planned by end of 2014, ECT and JD shielding : Manufacturing private companies Installation completed on time on JD and ECT Legend : Done, On going, Not yet done Effort < 0.5 Tech. M. Raymond – December 2nd, 2014 Status versus Objectives 2014 BME Muon chambers Preparatory work for BME BME installation : April 2014 BME replacement : Sept. 2014 (not foreseen) Small Wheel Support to the replacement of 2 CSC chambers Effort ≈ 0.8 Tech. (Beg of March 2014) Big Wheels Support to TGC chamber replacement on both sides BWs movement, disconnection, load transfer… Maintenance and upgrade of the existing movement system Improvement of accuracy of detector positioning Software (however has been used during closing) Cabling and hardware installation Development of a new movement machine (1/2) Effort ≈ 1.7 Tech. Consolidation / repair of the system M. Raymond – December 2nd, 2014 Status versus Objectives 2014 Infrastructure and safety system Support to sniffers maintenance Improvement of plastic cover on top of PX16 Maintenance of Gate monitors Support to DSS Support to various detectors Tile calorimeter (Cesium system) Lucid Alpha Roman pots Magnet Effort ≈ 1 Tech. Effort < 0.5 Tech. M. Raymond – December 2nd, 2014 Status versus Objectives 2014 EBC movement to Large Opening (beg. of April) : to allow IBL insertion Closing process : foreseen from June 20th to November 20th : actual dates = June 19th to December 18th 19/06 – 03/07 : Back to Standard Opening EBC movement (as expected) SW-C lowering and movement ECT-C back to beam axis 05/08 – 09/10 : Heavy detectors move to Run position Barrel height adjustment : cancelled (2 weeks delay) End cap calorimeters ECC grounding issue Small Wheels ECTs Cylindrical shielding (up to JFC2) Overall effort ≈ 1.2 Tech. 08/10 – 21/11 : BW-A chamber replacement 09/10 – 14/11 : BW-C chamber replacement 08/12 – 18/12 : Completion of shielding installation UX15 fully closed on December 18th M. Raymond – December 2nd, 2014 Distribution of 2014 activities Infrastructure & Safety 9% Opening 18% Muons 20% Movement system 22% Magnets 8% Detector access 14% Technical support ac vi es 2014 IBL/nSQP 9% Shielding 7% 2013 Opening 17% Infrastructure & Safety 14% Muons 12% Movement system 25% Detector access 18% IBL/nSQP 7% Plot is based on affected time (82% of total time) M. Raymond – December 2nd, 2014 Activities on forthcoming weeks ATLAS baseline is to get UX15 closed before Xmas break, BUT, because of a grounding problem on Liquid Argon calorimeter, the option of re-opening side C is being investigated. Final decision must be taken this week (Friday ?) 1. Atlas closing = 2 weeks of operations, including on both sides: JFC3 installation Compressed trucks installation Octagonal shielding lowering and positioning TAS position measurement and adjustment Shaft closing Done by end of 2014 2. Side C re-opening = much more intensive operation 2 weeks to re-open 3 weeks to repair ECC + closing completion on side A 4 weeks to close side C Done by February 18th M. Raymond – December 2nd, 2014 Time schedule of re-opening option 2 weeks re-opening weeks Full TC tech. support 3 weeks maxi on ECC TC tech. support shared with closing completion on A side 4 weeks for closing and detector positioning Full TC tech. support 2 weeks available for field ON before Beam M. Raymond – December 2nd, 2014 Goals for 2015 With the end of LS1 we enter a second phase : Run 2 and LS2 preparation. For Tech. Support, 2015 is a transition period I don’t expect many fabrications yet USA15 shielding must be installed as soon as possible 2nd Atlas Movement Machine (AMM) must be completed Machine + Truck piping A big effort of arrangement and material organization needs to be done Preparation of BMG chamber installation planed on 2017 Test bench for movement system (B180) Later on (before LS2) Support to JD fabrication and equipment JD+SW lifting and transport frame Mock-up for ITK Tooling for BIS Prototyping,… M. Raymond – December 2nd, 2014 LHC schedule 2015 M. Raymond – December 2nd, 2014 LHC schedule beyond LS1 New LHC schedule beyond LS1 Only EYETS (19 weeks) (no Linac4 connection during Run2) LS2 starting in 2018 (July) 18 months + 3months BC (Beam Commissioning) LS3 LHC: starting in 2023 => 30 months + 3 BC injectors: in 2024 => 13 months + 3 BC 2 0 1 5 2 0 1 6 2 0 1 7 2 0 1 8 2 0 1 9 2 0 2 0 2 0 2 1 Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4 L H C In je c to rs Run 2 bbbbbbbbbbbbb ooooooooooo oooooooooooo ooooooooo ooooooooo ooooooooo ooooooooo ooooooooo ooooo ooooooooo ooooooooo ooooooo ooooooooo ooooooo ooooooooooooo ooooooooooo oooooooooooo ooooooooo oooooooooo ooooooooo ooooooooo ooooooooo oooooo ooooooooo ooooooooo ooooooo oooooooooo ooooooo LS 2 bbbbbbbbbbbboooo oooooooooo ooooooooo ooooooooo bbbbbbbbbbbboooo oooooooooo ooooooooo ooooooooo Run 3 ooooooooo ooooooooo ooooooooo ooooooooo oooooooooo ooooooooo ooooooooo ooooooooo t 2 0 2 2 2 0 2 3 2 0 2 4 2 0 2 5 2 0 2 6 2 0 2 7 2 0 2 8 Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4 L H C In je c to rs LS 3 ooooooooo ooooooooo ooooooooo ooooooooo oooooooooo ooooooooo ooooooooo ooooooooo 2 0 2 9 oooooooooo ooooooooo ooooooooo ooooooooo 2 0 3 0 2 0 3 1 bbbbbbbbbbbb ooooooooo ooooooooo ooooooooo ooooooooo ooooooooo bbbbbbbbbbbbooooo ooooooooo ooooooooo ooooooooo oooooooooo ooooooooo ooooooooo ooooooooo 2 0 3 2 2 0 3 3 Run 4 ooooooooo ooooooooo ooooooooo ooooooooo ooooooooo ooooooooo ooooooooo ooooooooo oooooooooo ooooooooo ooooooooo ooooooooo oooooooooo ooooooooo ooooooooo ooooooooo 2 0 3 4 2 0 3 5 Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4 L H C In je c to rs LS 4 Run 5 bbbbbbbbbbbboooooo ooooooooo ooooooooo ooooooooo oooooooooo ooooooooo ooooooooo ooooooooo ooooooooo ooooooooo ooooooooo ooooooooo bbbbbbbbbbbboooooo ooooooooo ooooooooo ooooooooo ooooooooooo ooooooooo ooooooooo ooooooooo oooooooooo ooooooooo ooooooooo ooooooooo LS 5 bbbbbbbbbbbboooooo ooooooooo ooooooooo ooooooooo ooooooooo ooooooooo ooooooooo ooooooooo bbbbbbbbbbbboooooo ooooooooo ooooooooo ooooooooo oooooooooo ooooooooo ooooooooo ooooooooo LHC schedule approved by CERN management and LHC experiments spokespersons and technical coordinators Monday 2nd December 2013 7 M. Raymond – December 2nd, 2014 M. Raymond – December 2nd, 2014