Michel RAYMOND – December 2 nd , 2014

advertisement
Technical Support Activities
in PH-ADO-PO
Summary of 2014 activities
Michel RAYMOND – December 2nd, 2014
Manpower assigned to the Technical Support (2014)
Supervision/operations
Michel Raymond (≈ 50%)
PH-ADO-PO
Gevorg Akhperjanyan
Christian Leboube
Francisco Limia-Conde
Louis Rose-Dulcina
Frédéric Rosset
Charles Scalisi
Cédric Sordé
Armen Yandyan
PH-DT
Alain Bode
(≈ 70%)
Institutes
Manuel Alves (LAL)
Oleg Lykov (DUBNA)
Mikhail Kuznetsov (DUBNA)
Sergei Yukhimchuk (DUBNA)
(≈ 1.4 FTE)
6 full time (FTE)
2 persons on a part time base
(≈ 0.5 FTE)
Resources on Technical Support are about 9 FTE
M. Raymond – December 2nd, 2014
Summary of activities on 2014
ADO-PO Technical Support has been involved in:
 IBL installation
 BME installation on both sides
 Many scaffolding modifications and access platforms
Calorimeters, Pixels/IBL, SW, Magnets, Muons, etc.
 Shielding installation (Design done by our design office)
 Upgrade of the movement system
New movement machine (all functions integrated)
New position measurement (ADEPO)




Big Wheels separation (to replace TGC muon chambers)
Support to Infrastructure and Safety
Closing operation – Detector movements
Timely support to various sub-systems
M. Raymond – December 2nd, 2014
Status versus Objectives 2014
Completion of IBL preparation and mechanical insertion
 Practice on IBL mock-up, machining of last parts
 Configure UX15 for IBL installation (end of April)
 IBL installation and positioning (beg. of May)
 Inner End Plates closing (beg. of August)
Effort < 0.5 Tech.
Platforms and access
 Complete fabrication of 4 remaining platforms (access to BW and top of
forward platforms)
Effort ≈ 1.2 Tech.
 Installation in UX15 (S3 & S7) (May-June)
 Scaffolding installation and modification to access detectors
Shielding
 USA15 shielding
 Frame installed from February to May
 Pipes installation  planned by end of 2014,
 ECT and JD shielding :
 Manufacturing  private companies
 Installation completed on time on JD and ECT
Legend : Done, On going, Not yet done
Effort < 0.5 Tech.
M. Raymond – December 2nd, 2014
Status versus Objectives 2014
BME Muon chambers
 Preparatory work for BME
 BME installation : April 2014
 BME replacement : Sept. 2014 (not foreseen)
Small Wheel
 Support to the replacement of 2 CSC chambers
Effort ≈ 0.8 Tech.
(Beg of March 2014)
Big Wheels
 Support to TGC chamber replacement on both sides
BWs movement, disconnection, load transfer…
Maintenance and upgrade of the existing movement system
 Improvement of accuracy of detector positioning
 Software (however has been used during closing)
 Cabling and hardware installation
 Development of a new movement machine (1/2)
Effort ≈ 1.7 Tech.
 Consolidation / repair of the system
M. Raymond – December 2nd, 2014
Status versus Objectives 2014
Infrastructure and safety system
 Support to sniffers maintenance
 Improvement of plastic cover on top of PX16
 Maintenance of Gate monitors
 Support to DSS
Support to various detectors
 Tile calorimeter (Cesium system)
 Lucid
 Alpha
 Roman pots
 Magnet
Effort ≈ 1 Tech.
Effort < 0.5 Tech.
M. Raymond – December 2nd, 2014
Status versus Objectives 2014
EBC movement to Large Opening (beg. of April) : to allow IBL insertion
Closing process : foreseen from June 20th to November 20th
: actual dates = June 19th to December 18th
19/06 – 03/07 : Back to Standard Opening
 EBC movement
(as expected)
 SW-C lowering and movement
 ECT-C back to beam axis
05/08 – 09/10 : Heavy detectors move to Run position
 Barrel height adjustment : cancelled
(2 weeks delay)
 End cap calorimeters
ECC grounding
issue
 Small Wheels
 ECTs
 Cylindrical shielding (up to JFC2)
Overall effort
≈ 1.2 Tech.
08/10 – 21/11 : BW-A chamber replacement
09/10 – 14/11 : BW-C chamber replacement
08/12 – 18/12 : Completion of shielding installation
UX15 fully closed on December 18th
M. Raymond – December 2nd, 2014
Distribution of 2014 activities
Infrastructure &
Safety
9%
Opening
18%
Muons
20%
Movement system
22%
Magnets
8%
Detector access
14%
Technical support ac vi es 2014
IBL/nSQP
9%
Shielding
7%
2013
Opening
17%
Infrastructure & Safety
14%
Muons
12%
Movement system
25%
Detector access
18%
IBL/nSQP
7%
Plot is based on affected time
(82% of total time)
M. Raymond – December 2nd, 2014
Activities on forthcoming weeks
ATLAS baseline is to get UX15 closed before Xmas break, BUT, because of a
grounding problem on Liquid Argon calorimeter, the option of re-opening side C is
being investigated.
Final decision must be taken this week (Friday ?)
1. Atlas closing = 2 weeks of operations, including on both sides:
 JFC3 installation
 Compressed trucks installation
 Octagonal shielding lowering and positioning
 TAS position measurement and adjustment
 Shaft closing
Done by end of 2014
2. Side C re-opening = much more intensive operation
 2 weeks to re-open
 3 weeks to repair ECC + closing completion on side A
 4 weeks to close side C
Done by February 18th
M. Raymond – December 2nd, 2014
Time schedule of re-opening option
2 weeks re-opening
weeks
Full TC tech. support
3 weeks maxi on ECC
TC tech. support shared with
closing completion on A side
4 weeks for closing and
detector positioning
Full TC tech. support
2 weeks available for
field ON before Beam
M. Raymond – December 2nd, 2014
Goals for 2015
With the end of LS1 we enter a second phase : Run 2 and LS2 preparation.
For Tech. Support, 2015 is a transition period
 I don’t expect many fabrications yet
 USA15 shielding must be installed as soon as possible
 2nd Atlas Movement Machine (AMM) must be completed
 Machine + Truck piping
 A big effort of arrangement and material organization needs to be done
 Preparation of BMG chamber installation planed on 2017
 Test bench for movement system (B180)
Later on (before LS2)
 Support to JD fabrication and equipment
 JD+SW lifting and transport frame
 Mock-up for ITK
 Tooling for BIS
 Prototyping,…
M. Raymond – December 2nd, 2014
LHC schedule 2015
M. Raymond – December 2nd, 2014
LHC schedule beyond LS1
New LHC schedule beyond LS1
Only EYETS (19 weeks) (no Linac4 connection during Run2)
LS2
starting in 2018 (July)
18 months + 3months BC (Beam Commissioning)
LS3
LHC: starting in 2023 =>
30 months + 3 BC
injectors: in 2024
=> 13 months + 3 BC
2
0
1
5
2
0
1
6
2
0
1
7
2
0
1
8
2
0
1
9
2
0
2
0
2
0
2
1
Q
1Q
2Q
3Q
4Q
1Q
2Q
3Q
4Q
1Q
2Q
3Q
4Q
1Q
2Q
3Q
4Q
1Q
2Q
3Q
4Q
1Q
2Q
3Q
4Q
1Q
2Q
3Q
4
L
H
C
In
je
c
to
rs
Run 2
bbbbbbbbbbbbb ooooooooooo oooooooooooo ooooooooo
ooooooooo ooooooooo ooooooooo ooooooooo
ooooo ooooooooo ooooooooo ooooooo
ooooooooo ooooooo
ooooooooooooo ooooooooooo oooooooooooo ooooooooo
oooooooooo ooooooooo ooooooooo ooooooooo
oooooo ooooooooo ooooooooo ooooooo
oooooooooo ooooooo
LS 2
bbbbbbbbbbbboooo oooooooooo ooooooooo ooooooooo
bbbbbbbbbbbboooo oooooooooo ooooooooo ooooooooo
Run 3
ooooooooo ooooooooo ooooooooo ooooooooo
oooooooooo ooooooooo ooooooooo ooooooooo
t
2
0
2
2
2
0
2
3
2
0
2
4
2
0
2
5
2
0
2
6
2
0
2
7
2
0
2
8
Q
1Q
2Q
3Q
4Q
1Q
2Q
3Q
4Q
1Q
2Q
3Q
4Q
1Q
2Q
3Q
4Q
1Q
2Q
3Q
4Q
1Q
2Q
3Q
4Q
1Q
2Q
3Q
4
L
H
C
In
je
c
to
rs
LS 3
ooooooooo ooooooooo ooooooooo ooooooooo
oooooooooo ooooooooo ooooooooo ooooooooo
2
0
2
9
oooooooooo ooooooooo ooooooooo ooooooooo
2
0
3
0
2
0
3
1
bbbbbbbbbbbb ooooooooo
ooooooooo ooooooooo ooooooooo ooooooooo
bbbbbbbbbbbbooooo ooooooooo ooooooooo ooooooooo
oooooooooo ooooooooo ooooooooo ooooooooo
2
0
3
2
2
0
3
3
Run 4
ooooooooo ooooooooo ooooooooo ooooooooo
ooooooooo ooooooooo ooooooooo ooooooooo
oooooooooo ooooooooo ooooooooo ooooooooo
oooooooooo ooooooooo ooooooooo ooooooooo
2
0
3
4
2
0
3
5
Q
1Q
2Q
3Q
4Q
1Q
2Q
3Q
4Q
1Q
2Q
3Q
4Q
1Q
2Q
3Q
4Q
1Q
2Q
3Q
4Q
1Q
2Q
3Q
4Q
1Q
2Q
3Q
4
L
H
C
In
je
c
to
rs
LS 4
Run 5
bbbbbbbbbbbboooooo ooooooooo ooooooooo ooooooooo
oooooooooo ooooooooo ooooooooo ooooooooo
ooooooooo ooooooooo ooooooooo ooooooooo
bbbbbbbbbbbboooooo ooooooooo ooooooooo ooooooooo
ooooooooooo ooooooooo ooooooooo ooooooooo
oooooooooo ooooooooo ooooooooo ooooooooo
LS 5
bbbbbbbbbbbboooooo ooooooooo ooooooooo ooooooooo
ooooooooo ooooooooo ooooooooo ooooooooo
bbbbbbbbbbbboooooo ooooooooo ooooooooo ooooooooo
oooooooooo ooooooooo ooooooooo ooooooooo
LHC schedule approved by CERN management and LHC experiments spokespersons and technical coordinators
Monday 2nd December 2013
7
M. Raymond – December 2nd, 2014
M. Raymond – December 2nd, 2014