TEC0004_Public

advertisement
OBJECTIVE:
Seeking a position in Engineering/Quality/Mechanical/Industrial/Manufacturing/Production.
SUMMARY OF QUALIFICATIONS:

12 years of solid design engineering and manufacturing engineering experience including large scale projects

Educational Credential Evaluation has been done by The Knowledge Company: Degree-diploma with the
qualification of Mechanical Engineer from the institute of Aviation Engineering in the former Soviet Union is
equivalent to bachelor’s degree in Mechanical Engineering, with some graduate transfer credit in Mechanical
Engineering, offered by an accredited university in the United States.

Proficient of engineering disciplines (Project, Design, Development, Manufacturing, Test and Evaluation, Support,
Cost and Schedule).

Proficient with Six Sigma/Lean principles and JIT/Toyota and Boeing Production Methods techniques, MRP

Proficient with MS Office platform, Excel, Word and Power Point, MS Project 2000
Expertise in AutoCad, Cadkey, Unigraphics, SmartCam, MasterCam, PLC, Catia, SolidWorks, Verisurf
Hands on experience with CNC and NC machining centers, CMM Inspection.
Proficient in Computerized Maintenance Management System (CMMS), Vantage 6.10, Enovia V5R17
Proficient in maintenance schedule software such as COGZ , Open Plan Professional and JobBOSS Sowtware
Ability to interpret complex drawings, specifications and other related documentation
Able to work independently and as part of a team
Fluent in Russian and English
Canadian citizenship since 1995








EMPLOYMENT EXPERIENCE:
Quality Engineer
01/07 – Present Time
XXXXXXXXXXXXXXXXXXXXXX

Develop First Article Planning, inspection and testing plans for Boeing, EMS, MDA.

Inspection Tooling design, Training for the transfer of programs to production and quality departments.

Conduct other quality functions as deemed necessary by the Quality Director.

Co-ordinations with customers such as Airbus, Bell, Boeing, Bombardier, EMS, Dassault, Eurocopter, Goodrich,
Lockheed Martin, Rolls Royce, Raytheon, Northrop Grumman, MDA, Augusta Westland, Spar, Hexcel, Mitsubishi.

Portable Coordinate Measurement Systems application CMM, To organize measurement downtimes between
production shops and available measurement personnel.

Analyze data using approved CATIA models, CAD/CAM/CAI applications, production drawings and dimensions,

Participate in process improvement teams; applied observations to recommend improvements to inspections, reports
and archive gathered results using all available 3-D portable computer aides.

Prepare Quality Assurance proposals and cost estimates, reviews contract documentation for quality-related
requirements. Through review of design and manufacturing/test documentation and development of inspection
plans. Evaluates the robustness and risk of process and recommends improvement actions where appropriate, and
leads cross-functional teams in non-conformance/failure investigations to establish definitive root cause and
effective corrective action.
Project Planner/Manufacturing Engineer
08/05 – 10/06
XXXXXXXXXXXXXXXXXXXXX

Incorporated Six Sigma/Lean principles and XXXXXX Production Methods techniques, MRP.

Review and evaluate customer requests for proposals and/or change proposals.

Coordinate preparation and review of engineering cost estimates.

Prepare monitor, and frequently update engineering program plans, task plans, schedules and action items.
2



















Plan programs from go-ahead to production, using
major milestone levels expending downward to finite
detailed schedules.
Lead assigned programs through effective utilization of matrix assigned personnel from all functional areas.
Monitor and control total program recurring and non-recurring engineering costs through complete transfer of the
program to manufacturing.
Conduct sufficient in-house design reviews per ISO work instructions.
Coordinate customer required reviews and manage their successful completion.
Coordinate and monitor development and qualification testing.
Supervise orderly/ complete transition from engineering development program to full-scale production program.
Prepare management information of assigned programs including periodic executive reviews.
Co-ordinations with customers such as Pratt & Whitney (Rocketdine), Alliance Space Systems, Inter Space, Aviation
Component Solutions, Boeing, Eaton, Honeywell, Fairchild Control, Goodrich, Columbia Helicopters, Conax,
Frisby, Parker Aerospace Group, Ace Surgical, Pacific Surgical, Precision Dental, Argo-Tech, Circle Seal.
Developed cost estimates and budgets, cost analysis, layouts & assembly/Bill of Material (BOM),
Provided troubleshooting and debugging in production environment ranges from providing technical guidance,
investigation, innovation, manufacturing optimization, process methods and tooling expertise.
Reviewed engineering definition and provided input for manufacturability.
Completed reject/scrap/failure analysis and troubleshooting activities.
Recommended and completed corrective action for complex non-conforming assemblies.
Recommended and create instructions to salvage of rework complex non-conforming assemblies.
Managed activities with CNC machining and PLC controlled and server driven equipment.
Applied engineering principles, theories, concepts and techniques to reduce scrap, reduce inventory and proper
follow manufacturing processes in accordance with specifications.
Technical support for advanced composite fabrications
Design/Modification Components and Sub Assembly use AutoCAD , Mechanical Desktop 5, and Solid Works 3D
Production Planner/ Master Scheduler
XXXXXXXXXXXXXXXXXX
11/1999 – 11/2004

Scheduled production for repair and overhaul components for Fixed wing and Rotary wing.

Dealing with both internal and external customers, as Sikorsky Helicopters, CH-124, Lockheed CP-140.
Planned and prioritized manufacturing processes and assembling sequences of production work.
Developed cost estimates and budgets, cost analysis, layouts & assembly/Bill of Material (BOM),
Helicopter Landing gear, Main gearbox, Transmissions, Structural airframe components and selection for
manufacturing.
Timely, cost effective support to the development/recommendations of processes/equipment.
Worked closely with other departments, particularly Engineering, Quality, Production Control and
Customers in following key areas, Meeting schedule requirements and deadlines, Complete training of
Product and processes, Recommending and incorporating process improvements, Support/
Conduct failure analysis.
Provided technical support with the goal of meeting production schedules and deadlines, while maintaining product
quality and reliability.
Provided hardware administration and expediting as necessary..
Incorporated Six Sigma/Lean principles and JIT/Toyota and Boeing Production Methods techniques, MRP
Ensured timely completion of production work
Applied appropriate Engineering tools to identify and resolve vendor component related problems and issues.
Researched and reviewed technical data for accuracy and completeness














3





Prepared status reports of production components and
produced shop schedule report for other
departments
Determined source of delayed production and notified management
Processed all technical documentation required to provide support for the planning department
Assisted management with interpretation of technical data
Liaised with engineering department to resolve components problems
Manufacturing/Design Engineer
XXXXXXXXXXXXXXXXXXXXXXXXXXXXX
02/98 – 04/99

Provided technical support requirements to the tooling and manufacturing operation team.

Dealing with customers: as Bell, Agusta Helicopters, Boeing, Canadair, de Havilland, Lockheed Martin.

Developed cost estimates and budgets, cost analysis, layouts & assembly/Bill of Material (BOM),

Helicopter rotor hubs, landing gear, structural airframe components and selection for manufacturing.

Provided troubleshooting and debugging in production environment ranges from providing technical guidance,
investigation, innovation, manufacturing optimization, process methods and tooling expertise.

Reviewed engineering definition and provided input for manufacturability.

Completed reject/scrap/failure analysis and troubleshooting activities.

Recommended and completed corrective action for complex non-conforming assemblies.

Recommended and create instructions to salvage of rework complex non-conforming assemblies.

Managed activities with CNC machining and PLC controlled and server driven equipment.

Applied engineering principles, theories, concepts and techniques to reduce scrap, reduce inventory and proper
follow manufacturing processes in accordance with specifications.

Disposition of non-conforming report and assist in root-cause analysis, preventive/corrective action.

Technical support for advanced composite fabrications.

Design/Modification Components and Crates for Transportation Aileron use AutoCad, Cadkey, Catia.

Incorporate Six Sigma/Lean principles and JIT/Toyota and Boeing Production Methods techniques, MRP.
CNC Programmer / Operator / Set-up
XXXXXXXXXXXXXXXXXXX
07/97 – 02/98

Set-up, programmed and operated CNC Mori Seiki, Siemens, Lathes using the MasterCam, SmartCam, Mazatrol,
Fanuc system
Merchandiser
XXXXXXXXXXXXXXXXXXXXXXXXXXXX

Restocked shelves to ensure replacement of merchandise
Mechanical Engineering Supervisor
XXXXXXXXXXXXXXXXXXXXXXXXXX


10/92 – 10/94
1989 - 1991
Provided technical guidance and support for all mechanical equipment in the on-board ship factory, including
the sorting, freezing and canning equipment.
Provided management and direction for welders, fitters and machinists.
Mechanical Engineer Designer
4
XXXXXXXXXXXXXXXXXXXXXXXXXXXX
1988 – 1989

Involved in a team designing engine parts and other mechanical parts for the aerospace and automobile industries
EDUCATION:
Mechanical Engineeing Degree, UFA State Aviation Technical University, Russia
1982 – 1988
Manufacturing Technology Diploma, Nova Scotia Institute of Technology, Halifax, NS
1996 - 1997
Numerical Control Operator Program, Nova Scotia Institute of Technology, Halifax, NS
1995 - 1996
TRAINING / PROFESSIONAL DEVELOPMENT
Solid Modeling Design using SolidWorks 2006, Professional Development Center, Los Angeles CA , USA
2006
AutoCad 2005, Professional Development Center, Los Angeles CA , USA
2006
MS Project 2000, Halifax, NS
2001
Working in Quality Team, Pratt & Whitney, Halifax, NS
1996
AutoCad, Nova Scotia Institute of Technology, Halifax, NS
1995
Aircraft Maintenance Training, Air Force Base, Russia
1985
Aircraft Manufacturing Technology, Aeroflot Assembly Plant, Ukraine
1984
Automobile Manufacturing Training, Lada Assembly Plant, Russia
1983
ACHIEVEMENTS:
Athletic Scholarship, UFA State Aviation Technical University, Russia
1981 – 1984
Member of Russian Bobsled Team
1984 – 1987
Competitive University Gymnast
1981 - 1984
VOLUNTEER / COMMUNITY INVOLVEMENT:
Gymnastics Coach, Halifax Alta Gymnastics Club, Halifax, NS
09/94 – 03/95
Download