ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) APPENDIX 4: METHANE MONITORING DATA PROVIDED BY LANDFILL OPERATORS The following appendix to EPA’s assessment report provides the methane monitoring data provided by landfill operators during Stage 3 of EPA’s landfill assessment process. CONTENTS 1 Sites with Possible Natural Methane Gas Detected................................................................ 2 Landfill address: 274 Hallam Road, Hampton Park......................................................... 2 2 Sites with Landfill Methane Detected .................................................................................. 42 2.1 Landfill address: 890 Taylors Road, Lyndhurst............................................................ 42 2.2 Landfill address: TPI sites Fraser Road and Heatherton Road Clayton South............... 56 2.3 Landfill address: 654-718 Clayton Road, Clayton South............................................... 72 2.4 Landfill address: Springvalley Park, Clarke Road, Springvale South............................. 74 1.1 1 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 1 1.1 SITES WITH POSSIBLE NATURAL METHANE GAS DETECTED Landfill address: 274 Hallam Road, Hampton Park Landfill licence: ES33144 Licence holder: SITA Environmental Solutions N Figure: Hallam Road Monitoring Bore Location Plan (bores constructed by SITA). 2 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) N Figure: Hallam Road Monitoring Bore Location Plan — close-up of western boundary bordering Hallam Road (bores constructed by SITA). 3 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) Table: Hallam Road methane monitoring data supplied by SITA (field data) Date Mar 1999 Sept 1999 Jan 2000 Apr 2000 May 2000 June 2000 Aug 2000 4 GAS (%) v/v 1.52.5m LFG 1 4.55.5m 7.58.5m 1.52.5m LFG 2 4.55.5m 7.58.5m CH4 44.0 39.0 25.0 6.0 6.6 0.0 CO2 53.0 45.0 20.0 26.0 25.0 2.2 O2 1.7 3.6 3.9 0.6 0.4 18.0 CH4 63.0 0.0 0.0 0.6 0.0 0.0 CO2 25.0 0.1 0.1 0.1 0.1 0.1 O2 0.4 21.0 20.0 21.0 21.0 21.0 CH4 - - - 14.0 0.1 0.1 CO2 - - - 24.0 8.1 8.5 O2 - - - 0.1 10.0 10.0 CH4 - 16.0 17.0 0.8 0.0 0.0 CO2 - 1.0 0.0 0.2 9.9 8.3 O2 - 17.0 16.0 21.0 8.6 9.6 CH4 0.8 16.0 17.0 29.0 0.0 0.0 CO2 0.7 19.0 18.0 20.0 7.3 11.0 O2 21.0 1.3 0.2 0.0 12.0 5.4 CH4 6.5 0.0 0.0 0.4 17.0 18.0 CO2 3.4 7.4 12.0 11.0 0.0 0.0 O2 17.3 13.2 4.7 5.6 20.0 18.0 CH4 - 16.9 16.9 67.0 20.0 0.1 CO2 - 17.3 16.5 11.0 7.7 9.0 O2 - 3.0 0.1 0.1 9.6 6.1 1.52.5m LFG 1B 4.55.5m 7.58.5m LFG 3 1.52.5m 4.55.5m 7.5-8.5m 1.52.5m LFG 4 4.55.5m 7.58.5m 1.52.5m LFG 5 4.55.5m 7.58.5m 1.52.5m LFG 6 4.55.5m 7.58.5m 1.52.5m LFG 7 4.55.5m 7.58.5m ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) Dec 2000 Mar 2001 June 2001 October 2001 January 2002 Mar 2002 June 2002 Sept 2002 CH4 0.0 1.4 1.5 2.8 0.0 0.0 CO2 0.1 0.6 0.7 1.0 11.0 9.6 O2 20.5 20.2 20.0 19.4 3.5 5.8 CH4 12.5 15.5 19.5 0.3 0.2 0.2 CO2 25.0 19.0 17.0 15.0 11.0 3.9 O2 0.2 1.0 0.3 0.4 1.6 17.3 CH4 - 5.3 20.5 70.0 0.0 0.0 CO2 - 3.5 17.0 27.0 9.1 9.3 O2 - 15.1 0.0 0.0 11.6 5.7 CH4 - 0.2 0.2 63.0 0.0 0.0 CO2 - 0.5 0.5 36.0 12.0 0.4 O2 - 20.4 20.4 0.5 10.1 10.0 CH4 - 30.3 28.1 47.8 0.0 0.0 CO2 - 18.5 18.4 36.0 9.1 4.8 O2 - 0.0 0.4 0.3 10.3 15.5 CH4 - 0.1 31.5 56.0 0.0 0.0 CO2 - 0.0 16.0 35.0 8.3 3.6 O2 - 20.7 3.0 0.0 10.3 16.4 CH4 - 7.3 41.5 65.0 7.7 0.0 CO2 - 3.9 19.0 31.0 15.0 9.3 O2 - 16.9 0.9 0.6 2.4 4.1 CH4 - 34.5 48.5 66.0 25.0 0.5 CO2 - 17.0 20.0 34.0 16.0 12.0 O2 - 3.5 0.0 0.0 0.6 0.7 5 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) Dec 2002 March 2003 June 2003 Sept 2003 Dec 2003 March 2004 June 2004 Sept 2004 6 CH4 1.2 47.7 1.2 0.6 0.0 0.0 CO2 1.1 24.9 1.2 0.6 0.0 0.0 O2 19.7 1.0 19.7 20.3 20.7 20.7 CH4 24.5 19.0 0.3 21.5 51.0 52.0 CO2 23.0 19.0 10.0 22.0 21.0 19.0 O2 0.0 0.0 3.2 0.0 0.0 0.0 CH4 - 43.5 44.0 55.0 12.5 1.4 CO2 - 27.0 24.0 38.0 20.0 12.0 O2 - 0.1 0.0 0.0 0.2 0.4 CH4 - 54.7 52.5 65.1 33.3 4.7 CO2 - 28.8 28.8 34.3 23.6 13.0 O2 - 0.2 0.2 0.6 0.2 0.2 CH4 - 57.7 55.7 46.9 40.9 5.8 CO2 - 28.7 28.1 33.2 26.6 12.4 O2 - 0.1 0.0 0.0 0.1 0.2 CH4 - 54.3 54.3 0.0 4.2 3.1 CO2 - 28.6 26.7 12.2 20.4 12.5 O2 - 0.0 0.1 4.1 0.1 0.8 CH4 - 51.0 52.5 0.0 10.0 7.4 CO2 - 28.5 29.3 19.0 22.0 13.2 O2 - 0.0 0.0 0.0 0.0 0.2 CH4 - 54.6 52.3 0 17.8 10.6 CO2 - 24.6 27.3 19.3 20 13.1 O2 - 0.0 0.0 0.4 0.0 0.0 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) Dec 2004 June 2005 Dec 2005 June 2006 CH4 - 50.3 50.8 0.0 9 10.4 1.5 51.6 33.5 0.1 0.1 0.0 CO2 - 25.4 26.4 12.8 19.1 12.9 1.2 30 21.6 1.1 4.8 3.7 O2 - 0.0 16.7 8.2 0.1 0 19.9 15 6.7 19.4 14.6 15.4 CH4 4.1 7.5 8 0.22 - - - - - - 0.21 - CO2 - 4.5 6.1 3.6 3.4 0.61 0.71 0.53 0.55 1.1 0.76 0.61 O2 20.9 20.2 7.2 22.1 22.1 20.9 19 22.2 22.2 22.5 22.5 22.4 CH4 - 14.7 29.3 - - - - 5.7 44.3 - - - CO2 - 9.7 17.7 2.0 1.5 0.4 - 16.2 35.3 - 6 8.6 O2 - 14.3 8.8 20.2 20.3 20 20.3 7.6 0.5 20.2 11 11.3 CH4 - 19.9 22.3 - - - 17.6 0.1 no pipe - - - CO2 3 11.2 10.2 0.8 1.1 0.7 - 16.2 no pipe - 1.8 - O2 15.4 12.6 12.4 19.5 19.2 19.7 20.3 7.6 - 20.4 18.8 20.1 5.3 no pipe no pipe - - - 1.5 no pipe no pipe 4.8 - 0.5 19.4 no pipe no pipe 16.8 20.9 20.8 - - - 0.7 8.9 8.6 19 8.5 9.5 - - - 0.1 9.5 6.2 20.1 10.3 12.4 - - - 0.9 14.7 11 CH4 Dec 2006 CO2 O2 2.4 19 1.7 2 19.9 June 2007 June 2008 Sept 2008 0.6 20.7 21.2 21.2 21.2 Round missed due to staff changeover - letter received from MGT confirming will not happen again CH4 Dec 2007 0.5 - - - - 31.4 22.2 CO2 18 15 12.5 11.8 8.1 3.1 O2 2.2 7.2 11.2 8.4 12.2 15.5 CH4 - 24.1 18 - - - CO2 18.8 5.7 3.1 103 7.6 4.7 O2 1.3 15.8 17.1 9.9 13.1 14.9 CH4 - 26.8 28.3 - - - CO2 17.9 3.9 17.1 15.4 1.8 14.4 destroyed destroyed destroyed - Replacement bore to be drilled in October 2008 7 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 25th Sept 2008 LMS sampling O2 4 17.2 11.3 CH4 - 2.2 - 7.6 18.1 7.6 19.2 8.1 7 CO2 O2 Testing of condiuts at weighbridge, drain near cell 1, under old Outlook gatehouse 0% methane 29th Sept 2008 MGT extra sampling 30th Sept 2008 LMS sampling CH4 - 58.3 49.1 CO2 0.9 26.3 29.5 O2 19.8 1.3 3.7 CH4 - - - - 5 - - - - CH4 2.9 0.1 CO2 6 2.8 O2 12.4 18.7 CO2 O2 1st October 2008 LMS sampling CH4 CO2 LMS gas analyser is an Anri 410. Measurements were taken in-situ using tubing attached to the pump end. These measurements will continue on a monthly basis in conjunction with the meetings held between SITA and LMS O2 3rd October 2008 LMS sampling CH4 CO2 O2 10th Oct 2008 MGT extra sampling 20th & 21st October 2008 21st Oct 2008 URS gas meter (PM) 8 New bore drilled New bore drilled New bore drilled CH4 0 0 0 0 0 0 CO2 0.4 0 9.3 4 5.4 1 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) O2 22nd Oct 2008 URS gas meter (AM) LFG 7 drilled 23rd Oct 2008 LMS gas meter (PM) 24th Oct 2008 EDL gas meter (AM) 27th Oct 2008 EDL Gas meter 20.9 21.5 8.7 17.5 14.5 20.7 H2S ppm 0 0 0 0 0 0 CO ppm 0 0 0 13 539 475 CH4 0 14 0.6 0 60.2 34.9 0 0 0 0 0 0 0 0 0 0 0 CO2 6 9.7 3.4 13.4 33.1 17.9 7.2 9.8 4.2 2.6 4.3 6.6 13.7 5 1.6 3 4.7 20.1 19.5 17.9 O2 14.8 12.8 17.8 4.5 0 4.4 14.3 11.9 16.9 19.6 16 13.2 4.6 14.2 LEL 0 >100 12 0 >100 >100 0 0 0 0 0 0 0 0 H2S ppm 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CO ppm 0 0 0 0 2 163 0 0 0 0 158 435 58 285 0 466 175 CH4 0 0 0 0 0 0 CO2 4.1 4 2.8 6.8 3.9 4.8 O2 16.6 12.6 18.4 11.4 17.4 15.8 CH4 0 11.6 0.4 0 60.9 60.4 0 0 0 0 0 0 0 0 0 CO2 8.2 12.1 0.4 13.5 31.8 26.9 10.6 4.8 4.4 4.5 8.9 8.9 5.4 8.6 13.9 O2 11.7 6.2 18.4 4.2 0 0.1 9.8 15.8 15.9 4.5 9.2 8.8 12.5 9.4 3.4 CH4 0 61.3 61.8 CO2 13.1 32.9 29.7 O2 6.5 0 0 CH4 0 54.4 55.4 0 0 0 CO2 13 29.7 29.1 7.9 7 3.5 CO2 28th Oct 2008 SITA QRAE O2 LEL H2S ppm CO ppm 29th October LMS gas meter 9 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) O2 12.6 13.7 16 Positive pressure measured in bores. Gas well 7 orifice plate changed to increase flow and influence negative pressure on bore. 29th October LMS pressure meter CH4 30th October EDL gas meter 0 0 0 Pulling up water 0 0 0 7.3 2.7 3.2 6.5 8.3 14 4.4 3.9 O2 19.7 10.9 8.1 3.3 16.4 10.2 9.2 11.8 10.8 0 0 0 7.9 2.6 3.8 7.4 11.3 9.4 0.3 0.8 0 0 54.5 58.5 0 0 0 11 2.3 0.4 12.2 29.9 30 9.4 8.2 4.3 9.2 18.6 20.4 8.1 1.3 0.6 11.1 12.3 15 H2S ppm 0 0 0 0 0 0 0 0 0 CO ppm 2 3 2 6 8 11 3 2 2 0 11 10.7 57 38 0 56 30 0 O2 CH4 CO2 O2 Refer to adjacent bore LFG 1B. Regular monitoring of LFG 1 has been reduced in favour of the more accurate implant type installation in LFG 1B 6th November Negative pressure on bores due to influence from extraction wells in cell 1. Gas well drilling in cell 1 11th November 12th November LMS CH4 13th November EDL Meter CH4 10 0 1.1 CO2 6th November LMS 0 CO2 CH4 31st October MGT 0 0 0.2 0 0 0 0 0 0 0 0 0 3.8 0 0 6.5 8 10.1 4.2 3.8 Pulling up water 17.3 20.9 21 11 8.5 8 17.2 10.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 124 4 0 9 3 4 48 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) CO2 O2 17th November 21st November SITA meter 28th November SITA Meter CH4 0 0.2 0 0 1.6 0 0 0 0 0 0 0 0 0 0 0 0 Pulling up water 0 0 0 10.4 3.5 3.1 7.4 5.6 5 CO2 8.3 1.6 1 0.1 0.5 0.2 10.2 7.7 6 6.3 7 6.6 8.8 10.2 14.2 4.3 6.5 O2 13.3 19.4 20.1 20.7 20.2 21.2 10.1 12.8 13 15.6 12.6 12.1 13.3 7.9 4.5 17.7 7.7 CH4 0 0 0 CO2 0 0 0 O2 20.3 20.4 20.4 CH4 0 0.1 0.4 0 0 0 0 0 0 CO2 0 0.1 0.1 3 4.3 2 9 5 2.4 O2 21 21 20.8 18.1 15.8 15.1 7 4.1 3.5 5th December 5th December SITA Meter with Meinhardt QA/QC CH4 6th December SITA Meter CO2 O2 CH4 7th December SITA Meter CO2 O2 Date GAS (%) v/v LFG 8 1.5-2.5m 4.5-5.5m LFG 8A LFG 8B LFG 8C LFG 8D LFG 8E LFG 8F LFG 8G LFG 8H 7.5-8.5m CH4 Mar 1999 CO2 O2 11 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) CH4 Sept 1999 CO2 O2 CH4 Jan 2000 CO2 O2 CH4 Apr 2000 CO2 O2 CH4 May 2000 CO2 O2 CH4 June 2000 CO2 O2 CH4 Aug 2000 CO2 O2 CH4 Dec 2000 CO2 O2 CH4 Mar 2001 CO2 O2 12 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) CH4 June 2001 CO2 O2 CH4 October 2001 CO2 O2 CH4 January 2002 CO2 O2 CH4 Mar 2002 CO2 O2 CH4 June 2002 CO2 O2 CH4 Sept 2002 CO2 O2 CH4 Dec 2002 CO2 O2 CH4 March 2003 CO2 O2 13 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) CH4 June 2003 CO2 O2 CH4 Sept 2003 CO2 O2 CH4 Dec 2003 CO2 O2 CH4 March 2004 CO2 O2 CH4 June 2004 CO2 O2 CH4 Sept 2004 CO2 O2 CH4 Dec 2004 CO2 O2 CH4 June 2005 CO2 O2 14 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) CH4 Dec 2005 CO2 O2 CH4 June 2006 CO2 O2 CH4 Dec 2006 CO2 O2 June 2007 CH4 Dec 2007 CO2 O2 CH4 June 2008 CO2 O2 CH4 Sept 2008 CO2 O2 CH4 25th Sept 2008 LMS sampling CO2 O2 29th Sept 2008 MGT extra sampling CH4 15 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) CO2 O2 CH4 30th Sept 2008 LMS sampling CO2 O2 CH4 1st October 2008 LMS sampling CO2 O2 CH4 3rd October 2008 LMS sampling CO2 O2 CH4 10th Oct 2008 MGT extra sampling CO2 O2 20th & 21st October 2008 21st Oct 2008 URS gas meter (PM) 22nd Oct 2008 URS gas meter (AM) LFG 7 drilled 16 New bore drilled CH4 0 0 2.3 CO2 2.8 6.5 12.5 O2 19.7 12.4 2.3 H2S ppm 0 0 0 CO ppm 27 118 549 CH4 0 0 2.2 CO2 2.5 7.5 11.9 O2 19.3 8.9 1.8 LEL 0 0 44 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 23rd Oct 2008 LMS gas meter (PM) H2S ppm 0 0 0 CO ppm 26 49 316 CH4 0 0 1.2 CO2 1.8 6.9 9.4 O2 18.3 5.4 1.4 CH4 0 0 2.4 CO2 1.4 7.2 7.4 O2 17.7 2.5 1 CH4 0 0 2.3 CO2 1 6.9 4.3 CH4 0 0.1 2.3 CO2 1.3 7.7 5.5 CH4 24th Oct 2008 EDL gas meter (AM) CO2 O2 27th Oct 2008 EDL Gas meter CO2 28th Oct 2008 SITA QRAE O2 LEL H2S ppm CO ppm 29th October LMS gas meter O2 29th October LMS pressure meter CH4 30th October EDL gas meter CO2 O2 31st October MGT 17 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) O2 16.4 1.3 0.2 0 0 0 17 18 42 CH4 0 0.1 2.2 CO2 0.7 17.7 1.2 O2 10 7.6 0 21st November CH4 0 0.2 2.6 SITA meter CO2 1.7 10.3 5.4 O2 12.3 0.4 0.6 CH4 0 0.2 2.5 CO2 1.9 10.7 5.8 O2 15.7 0.5 0.7 CH4 0 0.1 1.8 0 0 0 0 0 0 0 0 CO2 2 6.7 6.4 0.1 0.1 0.2 0.1 0.1 0.2 0.2 0.3 O2 15.1 8.7 1.3 CH4 0 0.2 1.8 H2S ppm CO ppm CH4 6th November LMS CO2 O2 6th November 11th November 12th November LMS 13th November EDL Meter CH4 17th November 28th November SITA Meter 5th December 5th December SITA Meter with Meinhardt QA/QC 6th December SITA Meter 18 19.6 0 19.6 0 19.6 0 19.7 0 19.8 0 19.8 0 20 0 20 0 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 7th December SITA Meter Date CO2 1.9 8.9 6.5 0.1 0.1 0.2 0 0 0.1 0.2 0.4 O2 15.3 5 1.5 20.7 20.6 20.7 20.8 20.8 20.4 20.1 20 CH4 0 0.2 1.6 0 0 0 0 0 0 0 0 CO2 2.1 9.4 6.6 0.1 0 0.1 0 0 0.2 0.1 0.3 O2 15.2 4.1 1.4 20.8 20.8 20.9 21.3 21.1 20.2 20.2 20.3 GAS (%) v/v LFG 9 1.5-2.5m 4.5-5.5m Temp bore along drive 7.5-8.5m GW bore 11 GW bore 5a GW bore 5b GW bore 5c 2.0m CH4 Mar 1999 CO2 O2 CH4 Sept 1999 CO2 O2 CH4 Jan 2000 CO2 O2 CH4 Apr 2000 CO2 O2 CH4 May 2000 CO2 O2 June 2000 CH4 19 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) CO2 O2 CH4 Aug 2000 CO2 O2 CH4 Dec 2000 CO2 O2 CH4 Mar 2001 CO2 O2 CH4 June 2001 CO2 O2 CH4 October 2001 CO2 O2 CH4 January 2002 CO2 O2 CH4 Mar 2002 CO2 O2 June 2002 20 CH4 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) CO2 O2 CH4 Sept 2002 CO2 O2 CH4 Dec 2002 CO2 O2 CH4 March 2003 CO2 O2 CH4 June 2003 CO2 O2 CH4 Sept 2003 CO2 O2 CH4 Dec 2003 CO2 O2 CH4 March 2004 CO2 O2 June 2004 CH4 21 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) CO2 O2 CH4 Sept 2004 CO2 O2 CH4 Dec 2004 CO2 O2 CH4 June 2005 CO2 O2 CH4 Dec 2005 CO2 O2 CH4 June 2006 CO2 O2 CH4 Dec 2006 CO2 O2 June 2007 CH4 Dec 2007 CO2 O2 22 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) CH4 June 2008 CO2 O2 CH4 Sept 2008 CO2 O2 CH4 25th Sept 2008 LMS sampling CO2 O2 CH4 29th Sept 2008 MGT extra sampling CO2 O2 CH4 30th Sept 2008 LMS sampling CO2 O2 CH4 1st October 2008 LMS sampling CO2 O2 CH4 3rd October 2008 LMS sampling CO2 O2 10th Oct 2008 MGT extra sampling CH4 CO2 23 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) O2 20th & 21st October 2008 21st Oct 2008 URS gas meter (PM) New bore drilled CH4 0 0 0 CO2 0.4 2.3 4.9 O2 17.1 16.9 15.6 H2S ppm 0 0 0 CO ppm 196 170 0 CH4 0 0 0 CO2 0.7 3.2 5.2 O2 16.4 15.3 13.9 CH4 CO2 22nd Oct 2008 URS gas meter (AM) LFG 7 drilled O2 LEL H2S ppm CO ppm 23rd Oct 2008 LMS gas meter (PM) CH4 24th Oct 2008 EDL gas meter (AM) CO2 O2 27th Oct 2008 EDL Gas meter 28th Oct 2008 SITA QRAE 24 CH4 0 CO2 0 O2 20.7 CO2 n/a O2 17.1 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) LEL 29th October LMS gas meter 0 H2S ppm 0 CO ppm 17 CH4 0 0 0 CO2 0 0.4 0.4 O2 29th October LMS pressure meter 30th October EDL gas meter 31st October MGT CH4 0 0 0 0 0 CO2 0.2 4.2 5.5 0.1 1.4 O2 18.7 15.6 14.6 17.9 16.7 CH4 0 0 0 0 0 0 0 CO2 1.8 4.8 4.4 0.5 0.3 1.4 1 O2 15.2 14.9 16 20.1 20.8 20 20.1 0 0 0 0 0 0 0 535 50 3 2 2 0 0 H2S ppm CO ppm CH4 6th November LMS CO2 O2 6th November 11th November 12th November LMS 13th November EDL Meter CH4 CH4 0 CO2 0 O2 17.4 25 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 17th November 21st November CH4 0 0 0 SITA meter CO2 3.7 5 6.1 O2 9.8 14.9 13.9 CH4 28th November SITA Meter CO2 O2 5th December CH4 5th December SITA Meter with Meinhardt QA/QC CO2 O2 CH4 6th December SITA Meter CO2 O2 CH4 7th December SITA Meter CO2 O2 26 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) Table: Hallam Road methane monitoring data supplied by SITA (laboratory data) Date GAS (%) v/v CH4 June2005 1.52.5m LFG 1 4.55.5m 7.58.5m 1.52.5m LFG 1B 4.55.5m 5.7 0 8.2 0 7.58.5m 1.52.5m LFG 2 4.55.5m 7.58.5m 1.52.5m LFG 3 4.55.5m 7.58.5m 1.52.5m LFG 4 4.55.5m 7.58.5m 1.52.5m LFG 5 4.55.5m 7.58.5m 1.52.5m LFG 6 4.55.5m 7.58.5m 1.52.5m LFG 7 4.55.5m 7.58.5m 1.52.5m LFG 8 4.55.5m 7.58.5m CO2 O2 CH4 Dec 2005 CO2 O2 June 2006 Dec 2006 CH4 10.2 CO2 2 O2 20.5 CH4 0.27 0 CO2 0.55 0 O2 20.4 20.8 CH4 Dec 2007 CO2 0 0 0 0 0 0 O2 CH4 June 2008 CO2 O2 CH4 Sept 2008 1.9 CO2 O2 29th Sept CH4 8.5 27 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) extra sampling CO2 O2 CH4 10th Oct extra sampling CO2 21st Oct MGT CH4 0.26 0 O2 28 0.014 51 0 0 0 0.02 0 2.6 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) Date GAS (%) v/v 1.52.5m LFG 9 4.55.5m Temp bore along drive 7.58.5m GW bore 11 GW bore 5a GW bore 5b GW bore 5c 2.0m CH4 June2005 CO2 O2 CH4 Dec 2005 CO2 O2 CH4 June 2006 CO2 O2 CH4 Dec 2006 CO2 O2 CH4 Dec 2007 CO2 O2 CH4 June 2008 CO2 O2 CH4 Sept 2008 CO2 O2 29th Sept extra sampling CH4 CO2 O2 CH4 10th Oct extra sampling CO2 21st Oct MGT CH4 O2 0 29 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) mgt gas chromatography report: Hallam Road (Supplied SITA 9 January 2009) 30 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 31 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 32 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 33 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 34 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 35 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 36 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 37 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 38 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 39 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 40 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 41 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 2 2.1 SITES WITH LANDFILL METHANE DETECTED Landfill address: 890 Taylors Road, Lyndhurst Landfill licence: ES511 Licence holder: SITA Environmental Solutions Figure: Taylors Road monitoring bore location plan and data (bores constructed by SITA) 42 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) Table: Taylors Road methane monitoring data supplied by SITA Bore and Sample Date GMP1 24-Oct-08 27-Oct-08 5-Nov-08 12-Nov-08 19-Nov-08 25-Nov-08 1-Dec-08 2-Dec-08 3-Dec-08 4-Dec-08 6-Dec-08 7-Dec-08 8-Dec-08 10-Dec-08 11-Dec-08 12-Dec-08 15-Dec-08 17-Dec-08 18-Dec-08 19-Dec-08 22-Dec-08 23-Dec-08 24-Dec-08 5-Jan-09 6-Jan-09 GMP1A 24-Oct-08 27-Oct-08 5-Nov-08 %CH4 %CO2 %O2 63.5 0 61.8 43.3 59.4 64.3 33.6 33.4 0.1 0 0 0.2 22.1 0 0 0 9.3 60.4 59.5 0 42.8 0 0 0.1 0 32.9 0 33 30.1 34.5 33.4 17.8 18.1 0.1 0.1 0 2.2 17.3 0 0 0 4.8 30.9 30.3 0 24.6 0 0 0.1 0.4 0.08 20.9 0.2 0.8 0.4 0 10.4 9.1 20.8 20.5 20.7 17.5 2.3 20.5 21.3 20 17.3 0.4 0.6 20.6 0.7 20.5 20.3 19.6 18.5 65.5 14 55.9 29.8 19.7 29.8 0 9.3 0.6 Comments Bore located in Melbourne Water Drain (south side) Results collected by Meinhardt Results collected by Meinhardt. NOTE: One gas blower not functioning Vacuum to cut-off trench throttled back. Vacuum to cut-off trench increased after sampling period. Bore located in Melbourne Water Drain (south side) adjacent to GMP1 43 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 44 12-Nov-08 19-Nov-08 25-Nov-08 1-Dec-08 2-Dec-08 3-Dec-08 4-Dec-08 6-Dec-08 7-Dec-08 8-Dec-08 10-Dec-08 11-Dec-08 12-Dec-08 17-Dec-08 18-Dec-08 19-Dec-08 22-Dec-08 23-Dec-08 24-Dec-08 5-Jan-09 6-Jan-09 25.6 24.1 30.6 9.7 7.8 7.7 0.6 0.7 1.4 5 1.6 0.3 0 N/A N/A N/A N/A N/A N/A N/A N/A 22.6 19 22.7 21.5 20.2 19.2 14.6 11.6 12.6 12.7 12.1 1.2 1 N/A N/A N/A N/A N/A N/A N/A N/A 4.2 6.9 1.7 4.6 5.9 6.3 13.6 13.6 13.8 12.4 13.4 19.8 19.4 N/A N/A N/A N/A N/A N/A N/A N/A GMP1B 5-Nov-08 12-Nov-08 19-Nov-08 25-Nov-08 1-Dec-08 2-Dec-08 3-Dec-08 4-Dec-08 6-Dec-08 7-Dec-08 8-Dec-08 1.9 9.8 43.7 28.8 41.7 41.3 36.7 38.4 36.9 33.4 40.5 0 2.9 27.5 15.3 27.5 27.2 26.8 27 27.1 26.8 27.3 16 16.7 0.5 8.6 0.4 0.4 0.4 0.2 0.3 0.6 0.5 Results collected by Meinhardt Results collected by Meinhardt. NOTE: One gas blower not functioning Bore inundated with water. Unable to obtain results. Bore inundated with water. Unable to obtain results. Bore inundated with water. Unable to obtain results. Bore inundated with water. Unable to obtain results. Bore inundated with water. Unable to obtain results. Bore inundated with water. Unable to obtain results. Bore inundated with water. Unable to obtain results. Bore inundated with water. Unable to obtain results. Bore located in Melbourne Water Drain (north side) directly opposite GMP1 Results collected by Meinhardt Results collected by Meinhardt ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 10-Dec-08 11-Dec-08 12-Dec-08 17-Dec-08 18-Dec-08 19-Dec-08 22-Dec-08 23-Dec-08 24-Dec-08 5-Jan-09 6-Jan-09 26.2 13.5 18.8 35.2 35.8 5.8 33 6.6 9.5 7.5 6.8 25.7 17.6 20.4 23.2 24.9 9 23.1 11.5 14.3 17.3 17.1 0.2 7.8 4.5 1.4 0.3 12.5 1 10.7 7 5.1 4.4 GMP1C 6-Dec-08 7-Dec-08 8-Dec-08 10-Dec-08 11-Dec-08 12-Dec-08 17-Dec-08 18-Dec-08 19-Dec-08 22-Dec-08 23-Dec-08 24-Dec-08 5-Jan-09 6-Jan-09 0 0 0 0 0 0 0 0 0 0 0 0 0.1 0 0.2 1.9 2.2 2.2 0.3 0.6 0 3.5 2.8 3 3.1 2.7 3.2 3 20.9 19.3 19.5 18.7 20.1 19.4 20.2 16.7 18.1 15.9 17.7 17.6 17 16.4 Results collected by Meinhardt GMP1D 6-Dec-08 7-Dec-08 8-Dec-08 10-Dec-08 0 0 0 0 0.2 0.7 1.4 1.6 20.8 20.3 20.4 19.5 Results collected by Meinhardt Vacuum to cut-off trench throttled back. Vacuum to cut-off trench increased after sampling period. Results collected by Meinhardt Results collected by Meinhardt 45 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 46 11-Dec-08 12-Dec-08 17-Dec-08 18-Dec-08 19-Dec-08 22-Dec-08 23-Dec-08 24-Dec-08 5-Jan-09 6-Jan-09 0 0 0 0 0 0 0 0 0 0 0.1 0.9 1.7 2.4 1.9 2 3.1 2 2.1 2.5 20.2 19.4 18.3 17.6 18.9 16.8 17.4 18 18.3 17 GMP1E 6-Dec-08 7-Dec-08 8-Dec-08 10-Dec-08 11-Dec-08 12-Dec-08 17-Dec-08 18-Dec-08 19-Dec-08 22-Dec-08 23-Dec-08 24-Dec-08 5-Jan-09 6-Jan-09 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2 0.4 0.6 0.2 0 0.3 0.3 0.2 0.2 0 0.2 0.1 0.4 1.7 20.8 20.6 21 20.6 20.4 19.4 19.8 19.9 20.4 18.3 20 19.9 19.5 17.2 EPA BORE LTBH2 05.11.08 12.11.08 19.11.08 25.11.08 0 1.4 N/A N/A 2.8 0.6 N/A N/A 16.4 19.2 N/A N/A Results collected by Meinhardt Results collected by Meinhardt EPA installed bore to 1.5m within roadside drain on southern side of Entry Drive Bore destroyed due to installation of gas cut-off trench ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) EPA Bore LTBH1 24-Oct-08 27-Oct-08 5-Nov-08 12-Nov-08 19-Nov-08 25-Nov-08 1-Dec-08 2-Dec-08 3-Dec-08 4-Dec-08 6-Dec-08 7-Dec-08 8-Dec-08 10-Dec-08 11-Dec-08 12-Dec-08 17-Dec-08 18-Dec-08 19-Dec-08 22-Dec-08 23-Dec-08 24-Dec-08 5-Jan-09 6-Jan-09 0 0 0 0.4 1.3 2.8 1.6 1 0.9 0.4 0.6 0.5 0.6 0.3 0.6 0.3 0 0 0 0 0 0 0.2 0 2 0.8 0.6 0.8 2.7 3.6 7.8 6.9 6.3 4.8 4.2 3.2 3.1 2.7 2.5 2.2 0.5 0.7 0.6 0.9 0.8 0.6 1.4 1.9 0 17.2 19.2 19.2 18.9 15.8 15.4 15.6 16.8 18.3 17.9 19.6 19.7 19 19.9 18.8 19.7 19.4 20.2 18.4 19.7 20 19.3 17.8 Gas Trench (Lower) 6-Dec-08 7-Dec-08 8-Dec-08 10-Dec-08 11-Dec-08 12-Dec-08 18-Dec-08 0 0 0 0 0.3 0 0 0.2 0.1 0.1 0 0.1 0 0 20.5 20.8 20.6 20.3 19.5 19.7 20.1 EPA installed bore to 1.5m located at Melbourne Water Drain Results collected by Meinhardt Results collected by Meinhardt. NOTE: One gas blower not functioning Results collected by Meinhardt Results collected by Meinhardt 47 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 48 19-Dec-08 22-Dec-08 23-Dec-08 24-Dec-08 5-Jan-09 6-Jan-09 0 0 0 0 0 0 0 0 0 0 0.1 0.1 19.8 18.5 19.9 19.8 19.5 18.8 Gas Trench (Upper) 6-Dec-08 7-Dec-08 8-Dec-08 10-Dec-08 11-Dec-08 12-Dec-08 18-Dec-08 19-Dec-08 22-Dec-08 23-Dec-08 24-Dec-08 5-Jan-09 6-Jan-09 0 0 0.1 0 61.6 0 0 0 0 0 0 0 0 0 0.1 0.1 0.1 37.3 0 0 0 0 0 0 0.1 0.1 20.5 20.8 20.5 20.5 0.2 19.7 19.5 20.2 18.3 20.9 20.5 19.5 18.2 GMP2 24-Oct-08 27-Oct-08 5-Nov-08 12-Nov-08 19-Nov-08 25-Nov-08 2-Dec-08 15-Dec-08 22-Dec-08 6-Jan-09 0.9 3.1 0 0 0 0 0 0 0 0 2.8 4.5 2.4 1.5 1.6 0.7 0.8 0.2 0.1 1.1 18.6 16.3 18.7 18.3 18.7 18 19.9 20.2 19.5 18.3 Results collected by Meinhardt Results collected by Meinhardt Note: EDL power plant shutdown. Gas being flared Bore located within site boundary and perimeter 'fill' embankment (2-5m from waste boundary) ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) GMP2A 24-Oct-08 27-Oct-08 5-Nov-08 12-Nov-08 19-Nov-08 25-Nov-08 2-Dec-08 15-Dec-08 22-Dec-08 6-Jan-09 0 0 0 0 0 0 0 0 0 0 1.4 3.5 3.3 3.6 3.5 3.7 3.9 3.6 7.7 11.3 19.2 17.7 17.1 16.7 18.3 17.1 18.3 19.6 12.6 8.5 GMP3 5-Nov-08 12-Nov-08 19-Nov-08 25-Nov-08 2-Dec-08 15-Dec-08 22-Dec-08 6-Jan-09 0 0 0 0 0 0 0 0 0 0 0 0.1 0.3 0.4 2 0.4 20 19.4 20.5 19.4 20.4 19.9 18.3 19.9 GMP4 5-Nov-08 12-Nov-08 19-Nov-08 25-Nov-08 2-Dec-08 15-Dec-08 22-Dec-08 6-Jan-09 0 0 0 0 0 0 0 0 0 1.2 3.9 2.6 4.6 3.1 4.3 1.2 19.6 17.8 16.3 17.6 15.2 15.4 13.5 17.6 Bore located directly opposite GMP2 outside site boundary 49 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 50 GMP5 5-Nov-08 12-Nov-08 19-Nov-08 25-Nov-08 2-Dec-08 15-Dec-08 22-Dec-08 6-Jan-09 0 0 0 0 0 0 0 0 0.9 1.7 1.6 1.2 0 0.1 3.2 2.3 19.1 17.9 19.2 18.1 18.8 20.1 18.4 16.4 GMP6 5-Nov-08 12-Nov-08 19-Nov-08 25-Nov-08 2-Dec-08 11-Dec-08 22-Dec-08 6-Jan-09 0 0 0 0 0 0 0 0 4.8 5.9 4.3 2.7 5.6 1.8 2.2 1.6 15.6 13.9 17.2 16.3 15.5 18.1 17.1 17.9 GMP7 5-Nov-08 12-Nov-08 19-Nov-08 25-Nov-08 2-Dec-08 11-Dec-08 22-Dec-08 6-Jan-09 0 0 0 0 0 0 0 0 1.7 0 5.6 4.6 4.6 0 1.8 3.9 18.3 19.2 16.1 16.3 17.5 19.6 17.8 16.5 GMP8 24-Oct-08 27-Oct-08 9 24.7 6.6 28.6 16.1 0.97 Bore located within site boundary and perimeter 'fill' embankment (2-5m from waste boundary) ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 5-Nov-08 12-Nov-08 19-Nov-08 25-Nov-08 2-Dec-08 11-Dec-08 12-Dec-08 22-Dec-08 6-Jan-09 6.4 23.3 25.7 0 15.2 0.1 0 20.6 22.1 8.1 25.4 28 3.9 21.6 0.6 0 23.3 28.1 14.3 3.4 1.4 16.5 6.2 20.1 19.8 3.7 1 GMP8a 24-Oct-08 27-Oct-08 5-Nov-08 12-Nov-08 19-Nov-08 25-Nov-08 2-Dec-08 15-Dec-08 22-Dec-08 6-Jan-09 0 0 0 0 0 0 0 0 0 N/A 2.5 3.6 2.5 2.3 2.4 2.3 2.5 2.4 0.1 N/A 17.2 17.7 17.1 17.4 18.5 17.4 18.8 18.2 19.3 N/A GMP10 5-Nov-08 12-Nov-08 19-Nov-08 25-Nov-08 2-Dec-08 11-Dec-08 22-Dec-08 6-Jan-09 0 0 0 0 0 0 0 0.1 6.1 0.1 2.3 0 0 0 0 3.3 15.6 19.3 13.4 20.6 22.6 20.6 20.2 17.5 Bore located directly opposite GMP8 outside site boundary Bore inundated with water. Unable to obtain results. GMP11 51 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 52 5-Nov-08 12-Nov-08 19-Nov-08 25-Nov-08 2-Dec-08 11-Dec-08 22-Dec-08 6-Jan-09 0 0 0.1 0 0 0 0 0.1 0.4 0.7 1.4 0.2 1 0 1.2 1.2 18.9 18.4 19.3 19.1 19.7 19.2 18.6 19.3 GMP12 19-Nov-08 25-Nov-08 2-Dec-08 11-Dec-08 22-Dec-08 6-Jan-09 0 0 0 0 0 0 0 0 0 0 0 0.5 20.9 20.1 18.6 18.2 18.6 18.6 GMP13 5-Nov-08 12-Nov-08 19-Nov-08 25-Nov-08 2-Dec-08 15-Dec-08 22-Dec-08 6-Jan-09 0 0 0.2 0 0 0 0 0 2.1 1.4 1.8 1.4 5.8 1.3 9.8 9.2 17.1 18.3 19 18.1 16.3 18.2 7.6 11 GMP14 5-Nov-08 12-Nov-08 19-Nov-08 25-Nov-08 2-Dec-08 0 1.1 0.1 0 0 2.4 0.8 1.1 0.4 0.1 15.6 18.2 18.6 18.6 20.4 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 11-Dec-08 12-Dec-08 17-Dec-08 18-Dec-08 19-Dec-08 22-Dec-08 23-Dec-08 24-Dec-08 5-Jan-09 6-Jan-09 0 0 0 0 0 0 0 0 0 0 0.8 0 5.4 4.6 0 4.3 2.3 0.1 1.8 4.5 20.4 20.2 12.2 12.9 20.5 15.3 16.3 19.6 17.3 12.3 GMP15 5-Nov-08 12-Nov-08 19-Nov-08 25-Nov-08 2-Dec-08 11-Dec-08 12-Dec-08 17-Dec-08 18-Dec-08 19-Dec-08 22-Dec-08 23-Dec-08 24-Dec-08 5-Jan-09 6-Jan-09 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1 0 0 0 0 0 1.2 0 0 20.4 19.6 20.8 19.9 20.6 22.6 19.8 20.1 19.9 20.6 19.9 20.2 18.6 20.4 18.3 GMP19 24-Oct-08 27-Oct-08 5-Nov-08 12-Nov-08 0 0 0 0 0.2 8 7.9 7.8 20.9 14.2 13.7 12.9 53 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 54 19-Nov-08 25-Nov-08 2-Dec-08 15-Dec-08 22-Dec-08 6-Jan-09 0 0 0 0 0 0 8.2 8.1 8.4 1.4 8.2 8.8 13.9 13.2 14 19.2 12.7 12.3 GMP20 24-Oct-08 27-Oct-08 5-Nov-08 12-Nov-08 19-Nov-08 25-Nov-08 2-Dec-08 15-Dec-08 22-Dec-08 6-Jan-09 0 0 0 0 0 0 0 0 0 0 2 3.3 1.3 1.3 1.6 1.6 1.4 1.6 1.7 1.7 17 16.5 19.3 18.1 19.2 18.5 19.7 18.4 17.4 18 GMP21 24-Oct-08 27-Oct-08 5-Nov-08 12-Nov-08 19-Nov-08 25-Nov-08 2-Dec-08 15-Dec-08 22-Dec-08 6-Jan-09 0 0 0 0 0 0 0 0 0 0 0.5 1.5 4.9 5.3 6 6.2 6.3 5.2 5.8 7 20.8 19.7 15.4 14.9 15.5 15 15.3 19.6 12.5 9.2 EPA LTBH4 5-Nov-08 0 1.6 18 EPA monitoring bore installed to 1.5m directly adjacent to GMP8a ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 12-Nov-08 19-Nov-08 25-Nov-08 2-Dec-08 15-Dec-08 22-Dec-08 6-Jan-09 0 0 0 0 N/A 0 N/A 0.9 1.6 1.2 0.9 N/A 2.3 N/A 18.3 19.3 18.2 20.2 N/A 16.3 N/A EPA BAYLISS 5-Nov-08 12-Nov-08 19-Nov-08 25-Nov-08 2-Dec-08 15-Dec-08 22-Dec-08 6-Jan-09 0 0 0 0 0 N/A 0 0 0.5 0.6 0.3 0.4 1 N/A 0.2 0.7 19.2 18.6 20.2 19.1 20.1 N/A 19.4 18.5 Bore inundated with water. Unable to obtain reading. Bore inundated with water. Unable to obtain reading. EPA monitoring bore installed to 1.5m on south side of Bayliss Rd (south of site.) Unable to obtain reading as bore was inundated with water 55 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 2.2 Landfill address: TPI sites Fraser Road and Heatherton Road, Clayton South N Figure: Clayton South probe monitoring location plan (probes used by TPI). Baxter and Cleanaway landfills shown are owned by TPI. 56 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) Landfill address: Fraser Rd, Clayton South Landfill licence: EM28818 Licence holder: Transpacific Industries Group Ltd (TPI) N Methane concentrations in soil >1% vol / vol Figure: Fraser Road probe monitoring location plan (probes used by TPI). Baxter and Cleanaway landfills shown are owned by TPI. 57 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) Landfill address: corner Deals Road & Heatherton Road, Clayton South Landfill licence: ES49849 Licence holder: Transpacific Industries Group Ltd (TPI) Figure: Heatherton Road probe monitoring location plan (probes used by TPI). Baxter and Cleanaway landfills shown are owned by TPI. 58 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) Table: Fraser Road and Heatherton Road methane monitoring data supplied by TPI 59 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 60 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 61 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 62 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 63 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 64 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 65 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 66 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 67 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 68 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 69 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 70 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 71 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 2.3 Landfill address: 654–718 Clayton Road, Clayton South Landfill licence: ES20872 Licence holder: Clayton Road Landfill Joint Venture Table: Methane monitoring data supplied by Clayton Road Joint Venture (Bores were constructed by EPA and bore locations are shown in Appendix 3: GHD report) Date 26 December 2008 29 December 2008 31 December 2008 2 January 2009 5 January 2009 7 January 2009 9 January 2009 12 January 2009 14 January 2009 16 January 2009 72 Bore ID CL12 CL11 CLDH26 CL10 CL09 CL12 CL11 CLDH26 CL10 CL09 CL12 CL11 CLDH26 CL10 CL09 CL12 CL11 CLDH26 CL10 CL09 CL12 CL11 CLDH26 CL10 CL09 CL12 CL11 CLDH26 CL10 CL09 CL12 CL11 CLDH26 CL10 CL09 CL12 CL11 CLDH26 CL10 CL09 CH4 Not done due to christmas 61.3 0 0 65 0 60 17 0 61 0 60 16 0 61 0 60.3 15 0 61 0 59.7 16 0 61 0 60.1 15 0 61 0 60 13 0 60 0 CO2 O2 38.6 0.9 1.6 33 2.5 40 30 7.7 35 2.7 39 30 6.4 35 2.5 39 29 5.3 35 2 38 29 4.8 34 2 39 29 5.3 35 2 40 30 4.5 36 1.7 0 20 19 0 17 0 0 13 0 17.3 0 0 16.7 0 18 0 0 15.8 0.1 18.3 0 0 15.8 0.1 18 0 0 15.8 0.1 18.3 0 0 16.5 0 18 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) Bore location plan: Clayton area map (Supplied GHD) 73 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 2.4 Landfill address: Springvalley Park, Clarke Road, Springvale South Landfill licence: ES553 Licence holder: City of Greater Dandenong Figure: Springvale Park bore monitoring location plan (bores constructed by City of Greater Dandenong). 74 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) Table: Springvale Park methane monitoring data supplied by City of Greater Dandenong 75 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 76 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 77 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 78 ASSESSMENT OF THE POTENTIAL FOR METHANE GAS MOVEMENT FROM VICTORIAN LANDFILLS (APPENDIX 4) 79