QC/WELDING INSPECTOR CSWIP 3.1 WELDING INSPECTOR CERTIFIED BY TWI –UK AWS / CERTIFIED WELDING INSPECTOR PERSONAL DETAILS: Name : S. ARUL GNANAKUMAR Sex / Date of birth : 25.07.1977 Nationality : Indian Language Proficiency : Tamil & English Passport No : G 221019 ADDRESS FOR COMMUNICATION: : S/O C. Selvaraj, 175 Salai Street, Vilangudi Post, Thiruvaiyaru Taluk, Thanjavur District, Tamilnadu 613 204. Contact : : +91- 99942 89522 Email ID:- : arulgktrichy@gmail.com ACADAMIC QUALIFICATION: Diploma in Mechanical Engineering . SOFT SKILLS: MS - Office ADDITIONAL SKILLS : Type Writing – English Driving – Light Motor Vehicle INTERNATIONAL CERTIFICATION: WELDING INSPECTOR TWI - CSWIP WELDING INSPECTOR CERT. NO. 58329 (Date of Expiry – 01 July 2016) AWS / CERTIFIED WELDING INSPECTOR (Date of Expiry – 01 November 2015) NON-DESTRUCTIVE TESTING AS PER SNT -TC- 1A OF ASNT Radiographic Testing Level- II (Date of Expiry – 30 November 2015) UT Level – II (Date of Expiry – 30 November 2015) Magnetic Particle Testing Level- II (Date of Expiry – 30 November 2015) Dye Penetrant Testing Level- II (Date of Expiry – 30 November 2015) RT FILM INTERPRETATION (Date of Expiry – 02 August 2017) WORK EXPERIENCE : NATIONAL INSPECTION SERVICES POSITION : NDT TECHNICIAN Client: : GB ENGINEERING, BHEL, ANAND ENGINEERING, Project: : NORTH CHENNAI, POWER PLANT PROJECT DURATION : JAN 2007 TO DEC 2008 Performing NDT activities like that Radiography Testing, Ultrasonic Testing, Magnetic Particle Testing, Liquid Penetrant Testing. RESPONSIBILITIES : Carried out MT, PT for all Boiler Components. NDT Inspection (MT, PT) methods on welded parts, Boiler drums as per Customer Quality Plan. Radiographic Testing the Pipelines, Spiral pipes, and Water wall shut down, Tube coils, Boiler tubes, Structural and flow line during construction maintenance. Liquid Penetrant Testing and Magnetic Particle Testing in fabrication parts. Prepared reports UT. Carried out PT on weld joints, water panels, bow nuts and nuclear components. Carried out UT on wind mill towers and water panel tubes. Ultrasonic, Radiography, Penetrant and Magnetic Particle Testing of vessels, Heat Exchangers and Pipelines. Radiography of tanks, vessels, pressure parts, prefabricated weld joint of pipes using gamma ray. Preparation and submission of reports & Co-Ordination with client. Carried out Ultrasonic Thickness measurement of pipelines. UT lamination check on raw materials. EQUIPMENT HANDLED : Ultrasonic Testing Modsonic, Einstein II TFT EEC EX 10, PI PX10, PI PX20 Radiographic Testing Roli SPEC – 2T Magnetic Particle Testing Range -0-1000a AC Yoke & Permanent Yoke method. Penetrant Testing Visible dye penetrated solvent method. MAJOR PROJECTS : GB Engineering Work (P) Ltd., Thuvakudi, Trichy. Bhaarat Inspection Services, Thuvakudi, Trichy. Ananth Engineering (UNIT 1), Thuvakudi, Trichy. Baby Engineering (P) Ltd., Thuvakudi, Trichy. WORK EXPERIENCE : PERFECT INTERNATIONAL FABRICATORS (P) LTD, POSITION : QC WELDING INSPECTOR Client: : GB ENGINEERING, BHEL, ANAND ENGINEERING, Project: : NORTH CHENNAI, POWER PLANT PROJECT DURATION : JAN 2009 TO JAN 2011 Roles and Responsibilities:Review Essential QA/QC Documents as below:Review and understanding the Scope Of Work and CLIENT Quality Requirements. Review and understanding the Drawings and note the essential factors as type of materials, size etc. Review the ITP and note various inspection requirements and stages. Review and verifying the Applicable Code, Standards, Specification and note the acceptance creteria Review Welding Procedure Specification and note the essential variables as type and size of electrode, preheat, Joint Type, Type Of Clamp, Fit-Up Requirements, Welding Process allowed etc. Review and verifying the Procedures such as Material Handling, Storage & Preservation, Welding Consumable Baking Procedures, NDT, PWHT, Leak Testing, Pressure Testing (Hydro Testing). Conducting, Witnessing and Inspecting the following:Conducting, Witnessing and Inspecting Procedure Qualification Test. Conducting, Witnessing and Inspecting Welder Qualification Test. Conducting, Witnessing and Inspecting, Material Inspection, Dimensional inspection, Fit up inspection & Weld visual inspection during & after completing the weld. Ensure Pre-Heating & Inter-Pass temperatures by using the temperature crayons, ensure the type of electrodes/filler materials, Paying particular care at tie-in joints for NDT and Visial. Ensure RT/UT/MT/PT as applicable. Ensure repair of any joint and NDT. Line checkup & Issue of Punch list. Conducting, Witnessing and Inspecting Punch list inspection. Conducting, Witnessing and Inspecting Pressure Testing as applicable. Documentation: Ensuring the preparation of quality records for Material Receiving Report, Dimensional, Fit up Inspection report. Visual inspection Report, Procedure Qualification Report, Welder Performance Qualification Certificate and issue Welder ID Card, Leak Testing Report, Pressure Test Report, Release Report. QC WELDING INSPECTOR : RENERGY EQUIPMENTS INDIA (P) LTD DINDIGUL Client: : Various CLIENTS, Indian Oil Company, BHEL, ONGC, Indian Petrochemical Corporation Ltd etc Project: : Heavy Structural as Girders, built in beams, Pressure Piping etc. DURATION : FEB 2011 TO TILL DATE NATURE OF MY DUTIES AND RESPONSIBILITIES ARE AS BELOW:PROJECT WPS QUALIFICATION & WELDER APPROVAL:Involved in the Preparation and Conducting the Qualifications of Welding Procedure Procedures, based on Client Specifications and International Codes and Standards. After the approval of the AFC WPS, conducted Welder Qualification Test (WQT). Prepared the WQT Records and Welder ID cards and get them signed off by the CLIENT Inspector. Issued the copy of Welder ID to all Project Welders. WELDING EQUIPMENTS RECEIVING INSPECTION:Once the welding machines are arrived at site, then I used to obtain from the head QA office the calibration certificates when the validity still valid. When expired, we site calibrate the welding machine and develop the QC records/stickers as applicable. We also functional check all applicable Construction Equipments as Internal and external clamps, monitor the crane lifting functionality test on site prior to use on project, side booms, ensure pressure gauges are calibrated and certificate available on site. WELDING OVENS AND CONSUMABLES:Ensure prior to start of project that the baking, holding and portable ovens are calibrated. I ensure that the welding consumables/flux have the materials certificate. WELDING INSTRUMENTS CALIBRATION:I always ensure that the fit-up hi-lo gauge and Welding gauge is available. Also ensure that Clamp meter(to check ampre/volt), pyro-meter (to check temperature) are having valid calibration certificates and stickers on the instruments. REMOTE WELDING CONDITIONS:Ensure that QC procedures are provided to important construction personnel and the WPS is displayed at the site prior to welding. We brief to all welders the type of electrodes to be used to the welding and brief the when type of clamps to be used and when this is to be removed. We ensure that the ideal welding booth are set out so that un-due atmospheric air or dust/contamination would not interpret during the welding. We brief to the welder that pre-heat is getting cooled at remote areas and so we ask the welder to be sure of pre-heat maintenance during welding. BEFORE/DURING/AFTER WELDING INSPECTION:Carrying out Visual Welding Inspection on the Main Line, Tie-In & Repair Welds of both Automatic Welding and Manual Welding. Ensure all parameters and variables are followed during welding as per the approved WPS and ensure the current revision of WPS is displayed at the welding booth. Check the fit-up and hi-lo conditions that is accepted and released for welding. Any undue fit up conditions shall be hold and reported to the QC Supervisors. Pre-heat conditions must be accepted by me as well the CLIENT/TPI. Check the root pass and ok, release to filling passes. Check inter-pass temperatures and finally check capping passes and weld profiles accepted to code API 1104. RADIOGRAPHY AND NDT:A NDT request shall be prepared and provided to the NDT Supervisor. Ensure the NDT is carried out in a daily basis. The NDT Coverage for pipeline 100%. Coordinating with the NDE Crew for carrying out the Tests as per the Approved ITP, Code and Specs. Interpretation and Evaluation of Test Results in coordination with the Client’s Inspectors. REPAIR THE REPAIRED JOINTS AND REPEAT NDT:Any repair is found in radiograph, it is marked on the joints through the tracing paper and get it repaired. Ensure that the repair is carried out prior to Field coating and before lowering and back filling. This is strictly monitored. WELDER PERFORMANCE MONITORING:Actively involved in Bringing down and Containing the Repair Rates in Both Automatic and Manual Welds. Each welder is monitored on the result of radiography/UT result. If any welder is exceeding 4% (My company weld reject objective) it is then reported to the Welding Engineer who will take appropriate action on the Welder. PUNCH LISTING CLEARANCE & HYDRO-TEST:Actively walking all along the constructed pipeline and punch listing any remaining activities prior to hydro-test. Punch list is reported to the Supervisor and a timely action is initiated prior to hydro-testting the line. Involved in the preparation of Hydro Test Packages documentation and submitted to CLIENT before the hydro-test. Take also active part along with Project Engineer in the hydro-test preparation. Once the CLIENT shall clear the hydro-test documentation package, the flooding and pressure increase carried out in increments as stated in the approved procedure. Monitor the line all along for any Leaks during the intermittent holding times. Once the maximum pressure is reached, it is held for the period as per procedure and monitor for any leaks or reduction in pressure. Once the HT is successful, the records are sigend off by the QC and CLIENT/TPI. FINAL DOCUMENTATION:The final documentation shall be prepared including all the QC relevant records, as built red marked drawing and issued to the CLIENT/TPI for final approval. The package is retained with our company also for a specified period. Ensure Project Materials and Equipments being received. Receiving Inspection & Report quality of the materials for physical damage, internal pitting, corrosion/severe rusting, out of dia/ovalitty/thickness reduction if any etc. Ensure Material Test Certificate) Monitor Welding Consumable Control (Ensure Consumable are to AFC WPS & baked at Oven) and review its test certificates confirms to AWS and ASTM and COMPANY Spec. Monitor Document and Record Control (Ensure all deliverables are registered & approved and available onsite as WPSs, ITP, Fabrication Procedures, Painting/Coating Procedures, Hydro-testing & Stress Relieving (PWHT) Procedures, NDT Procedures Materials and Consumable Control/Handling Procedure etc) Ensure WPS/PQR Qualification & Welder Qualification WQT and Approval Process etc Witness Hydro-testing being carried out to approved procedure and to the pressure requirements/hold time maintained and recorded at charts as applicable. Check Mechanical Completion, Supervise for Punch List Clearance and ensure/assist for as-built drawing/weld maps carried out. Ensure Welder Performance Monitoring and try to maintain at the KPI (Key point indicator Project Repair Rate 2-3% or strict to as stated at the Contract NCR,Close Out. Involve at corrective Action Process for the close out of NCRs. Approval of the final Quality Control Documentation etc. while strictly following all key fab/Construction & NDT procedures & AFC WPS, Quality Plans, ITPs, AFC Drawing and COMPANY Specifications and International codes & Standards for acceptance criteria’s from API 1104, ASME B31.3, ASME B31.8, ASME IX & V. END OF CV :