Service

advertisement
Mid and East Lothian Service Changes
Monday 27th March 2006
Service
Changes
129
Seton Sands – Silverknowes. Minor timetable changes. Evening journeys
terminus point changing from St Andrew Square to Hanover Street
X29
Seton Sands – Pennywell. The daytime service is withdrawn and will the
X29 service will only operate am and pm peaks Monday-Friday. The X29 will
be extended to service new Telford College Campus.
138
Wallyford – Kinnaird Park. Service withdrawn.
122
Dunbar – East Fortune Market .Service withdrawn.
X12
Elphinstone – Edinburgh. Terminus will move from Elphinstone to
Pencaitland and become an X13.
7N
Edinburgh – Polton. Service withdrawn.
X77/ 77
Polton – Haymarket. Service withdrawn. See service 79 below.
X81
Birkenside – Haymarket. Minor timetable changes.
X78
Cockpen – Haymarket . Terminus will move from Cockpen to Rosewell. 2
additional morning peak journeys and one pm peak journey being
introduced.
79
X8/ X6
44D
Rosewell – Haymarket.
New service being introduced replacing X77 service.
A 30 minute frequency operating Mon-Sat, hourly in the evenings and
Sunday, via Bonnyrigg, Dalkeith, Danderhall and NRIE.
Edinburgh – Haddington/ Dunbar. Minor timetable changes. Most X8
journeys now extended to Dunbar resulting improved frequency between
Haddington and Dunbar as part of Bus Route Development Grant
Edinburgh – Dunbar. This service will be renumbered service 6.
44/ 66
Balerno – Wallyford/ Seton Sands. Minor timetable changes.
86/X86
Birkenside – Mayfield – Clerwood.
Minor timetable changes, all 86 service journeys operate via NRIE.
140
Rosewell – New Royal Infirmary of Edinburgh
Evening and Sunday journey journeys between Dalkeith and Rosewell
replaced by new service 79.
90
Polton – Woodburn. Minor timetable changes.
Mid and East Lothian Service Changes
Monday 27th March 2006
For full timetable information contact customer services on 08708 72 72 71 or visit
www.firstgroup.com
Download