Pay attention! All materials and items to be purchased and used on the site must meet due sanitary and fire protection requirements, and should be supplied with due certificates allowing their application in facilities for children. At dispensation of floating ceilings, walls, floors and special works do not use materials, products and components of dubious production, give advantage to quality products of domestic manufacturers that meet the European standards. Terms of reference for repairs and construction works in: “Hero of the Soviet Union Dubrivniy Zoryanska Specialised School” Village of Zorya, Kostantiniskiy district Council of Donetska oblast This task includes the technical description for conduction of general construction and specialized works in the School General construction parameters of the building of the School: Foundations - precast reinforced concrete blocks. Walls - brickwork. Floors - precast reinforced concrete plates. Roof coatings - rolled materials (tar roofing paper). Windows - reinforced plastic window units (RP). Doors - timber units. Floor coatings - timber plank floors, ceramic tiles. Indoor wall finish - limewashing, dispersion paint coatings, oil paint coatings in WC rooms, ceramic tile coatings. Engineering installation in the object: Heating - a centralised water heating system. Ventilation - natural. Water supply - from the municipal network. Sanitation - with discharge to the municipal sewer. Power supply - from the municipal grid. Communication - with connection to the municipal cable network. A brief description of the object: In general, premises need repairs, there are fractures in walls, plastered areas are damaged, floor coatings need replacement, electric appliances are obsolete, WC room are not functional, etc. The list of premises and construction works as stipulated by the ToR: General construction works: 1. The wardrobe room (5,6x3.0x2.95 m). Installation of 12.5 mm thick plasterboard plates on walls and jambs - 46 m². Priming, filling up, smoothing and painting walls by textured acrylic paints (double painting) - 46 m². Installation of 18 mm thick OSB plates on existing timber plank floors and sealing joints 17 m². Installation of office grade linoleum coatings with a protective layer (0.4 mm) on the floor, gluing them to the support plates - 167 m². Installation of Armstrong type (or similar) false ceiling plates (dimensions 600 х 600 x 12 mm) on the ceiling - 16.7 m². Laying ceramic tile coatings on the wall near the washstand up to the height of 1.5 m - 1.5 m². Replacement of skirtboards (timber or rubberplastic ones) - 18 m. Painting heating radiators by PF type paints - 3 m². Painting the metal doors by PF type paints - 7 m². Replacement of timber door units by reinforced plastic ones, (dimensions (2.05 х 1.65 m, 3,4 m²) - 1 item. Installation of embedded spotlight lighting appliances (600 х 600) - 2 items. Installation of embedded electric switches (VIKO or similar) - 1 item. Installation of embedded 2-plugs electric sockets (VIKO or similar) - 2 items. Dismantling and installation of the existing washstand - 1 item. 2. The school assembly hall (11.9x5.6x2.95 m). Installation of 12.5 mm thick plasterboard plates on walls and jambs - 93 m². Priming, filling up, smoothing and painting walls by textured acrylic paints (double painting) - 93 m². Installation of 18 mm thick OSB plates on existing timber plank floors and sealing joints 67 m². Installation of office grade linoleum coatings with a protective layer (0.4 mm) on the floor, gluing them to the support plates - 67 m². Installation of Armstrong type (or similar) false ceiling plates (dimensions 600 х 600 x 12 mm) on the ceiling - 66.7 m². Replacement of skirtboards (timber or rubberplastic ones) - 36 m. Painting heating radiators by PF type paints - 6 m². Replacement of timber door units by reinforced plastic ones (dimensions 2.1 х 0.8 m -1 item, dimensions 1.13 х 2.0 m - 1 item) 3.94 m². Installation of embedded spotlight lighting appliances (600 х 600) - 8 items. Installation of embedded electric switches (VIKO or similar) - 1 item. Installation of embedded 2-plugs electric sockets (VIKO or similar) - 4 item. 3. The WC room for women (2.04x3.3.x3.05 m), ( 2.04x1.5x3.05 m). Replacement of ceramic tile coatings on the floor - 11.0 m². Removal of old plaster and ceramic tile coatings from walls - 49 m². Covering sanitation pipes by a casing (plasterboard plates up to the height of 3 m) 1.8 m². Laying new ceramic tile coatings on brickwork walls and jambs after preliminary plastering 49 m². Replacement of timber door units by reinforced plastic ones (dimensions 2.1 х 0.9 m - 2 items) - 3.78 m². Dismantling and installation of a washstand sink - 1 item. Installation of water tanks and their connection to existing water pipes and squat toilets - 2 items. Installation of 4-section heating radiator and connecting it to the existing system - 1 item. Installation of plastic plankboard plates on the ceiling - 11 m². Installation of spotlight lighting appliances on the ceiling - 3 items. Installation of embedded electric switches (VIKO or similar) - 2 items. Installation of electric sockets for hard driers (VIKO or similar) - 1 item. Installation of ventilators (Domovent type or similar) - 2 items. Installation of reinforced plastic partition walls of toilet cabins (1.1 х 1.5 m) - 2 items. 4. The WC room for men (1,95х3,3х3,05 m), (2,35х1,5Х3,05 m). Replacement of ceramic tile coatings on the floor - 11.0 m². Removal of old plaster and ceramic tile coatings from walls - 50 m². Laying new ceramic tile coatings on brickwork walls and jambs after preliminary plastering 50 m². Replacement of timber door units by reinforced plastic ones (dimensions 2.1 х 0.9 m - 2 items) - 3.78 m ². Dismantling and installation of a washstand sink - 1 item. Installation of squat toilets and water tanks, their connection to existing systems - 2 items. Installation of urinals and their connection to existing systems - 2 items. Installation of 4-section heating radiator and connecting it to the existing system - 1 item. Installation of plastic plankboard plates on the ceiling - 11 m². Installation of a casing (plastic plankboard) over the ventilation chute - 4 m²/5 m. Installation of spotlight lighting appliances on the ceiling - 3 items. Installation of embedded electric switches (VIKO or similar) - 2 items. Installation of electric sockets for hard driers (VIKO or similar) - 1 item. Installation of ventilators (Domovent type or similar) - 2 items. Installation of reinforced plastic partition walls of toilet cabins (1.1 х 1.5 m) - 2 items. 5. The sport hall (20,0х8,6х5,5 m). Dismantling old timber plank floors - 173 m². Laying up to 60 mm thick floor support level (cement and sand mortar M100 grade) - 173 m². Installation of a continuous water-proof insulation (150 µm thick PE) over the cement support level - 173 mm². Installation of new dealboard (45 mm thick planks) on timber joists (150 х 45 mm), installed with 600 mm intervals - 173 m². Installation of a timber casing over existing heating pipes (400(200) х 200 mm) - 15 m². Priming and triple painting of timber floors by PF type paints - 188 m². Installation and painting of timber skirtboards - 60 m. Replacement of timber door units by reinforced plastic ones: in external walls (dimensions 2.1 х 1.1 m - 2 items, dimensions 2.1 х 1.0 m - 2 items) - 8.82 m². in internal walls (2-leaf doors, dimensions 2.23 х 1.45 m - 1 item) - 3.23 m². Repairs of jambs with subsequent painting - 7 m². 6. The roof over the wardrobe room Dismantling and installation of the existing galvanized steel cover on the parapet - 6.5 m. Dismantling and installation of the existing galvanized steel mould along the line of roofwall connection with 300 mm intervals - 5 m. Replacement of the existing tar paper roofing by "Technikol" type (or similar) rolled materials (2 layers, 6.5 х 4.5 m²) - 30 m². Specialised works: Installation of roof-wall junctions (600 mm high) of "Technikol" type (or similar) rolled materials - 10m²/ 15 m. Manufacturing and installation of a galvanised steel cover (0.4 mm thick) over the existing ventilation stack - 1.5 m². 1. Specialized and plumbing works. The ToR stipulates purchase and replacement of 2 squat toilets, 2 urinals and 4 water tanks, and 2 urinals in existing WC rooms, purchase and replacement of 2 washstands, purchase and replacement of 2 Domovent type (or similar) ventilators (d = 100 mm). PVC sanitation pipes and associated shapes should be used (manufactured by "Wavin" or similar). Polypropylene pipes, shapes and fittings should be used for the water supply system. Two 4-section heating radiators (bimetal type ones) should be purchased and connected to the existing system by PE pipes. Sanitary ware items of "Cersanit" Co. or similar should be used. Tapware items of "Kludi" Co. or similar should be used. Sanitary ware items should be supplied with fittings, syphons, flexible connection lines, etc. All the works should comply with requirements of applicable construction standards and rules (DBN; SNiP); after installation of pipes and other items, the systems should be tested for tightness, and relevant test protocols should be compiled. 2. Indoor lighting. The ToR stipulates replacements of existing obsolete lighting appliances and cabling in the premises to be repaired. All the works should comply with requirements of applicable operation rules (PE, PUE), rules and regulations (DNB; SNiP) and fire protection requirements. All items must comply with relevant electric safety requirements and be certified for quality and conformity. General considerations: Plasterboard plates should be secured on wall on metal lattices (0.4 mm thick) or - if application of metal lattices is impossible with application of Perlfix coat plaster (or similar). Joints must be secured by fibreglass bands. Knauf type (or similar) gypsum materials should be used for wall plastering operations. Walls should be primed two or three times, with application of SF 17 primer of a similar one. All timber constructions should be impregnated by fungicides and fire retardants. Connections to sanitary ware items should be installed as concealed. "Kludi-standard" tapware or similar should be used. VIKO Karmen type (or similar) electric sockets and switches should be used. Armstrong (or similar) false ceiling plasterboard plates of Baikal or Skala types and Armstrong-Javelin type (24 mm) shapes should be used. Kolorit type (or similar) textured acrylic paints should be used for decorative paint coatings on walls. Reflector type (Kharkiv or similar) embedded spotlight lighting appliances should be used. Lighting appliances should be grouped and connected to VVGng (3 х 1.5 mm²) cables, electric sockets should be grouped and connected to VVGng (3 х 2.5 mm²) cables. Ceramic tiles of Ukrainian manufacture and SM-11 glues or similar should be used. Glues should be selected based on their compatibility with types of linoleum applied, joints should be sealed by relevant cords. Colours of construction materials should be agreed with the owner (user) of premises prior to their purchase. Costs of disposal of construction waste should be estimated additionally. Terms of reference for repairs and construction works in: “The Center for Children and Youth Arts” 150, Lomonosova ave., Kostyantinivka, Donetska oblast This task includes the technical description for conduction of general construction and specialized works in the Center General construction parameters of the building of the Center: Engineering installation in the object: Foundations - precast reinforced concrete blocks. Walls - brickwork. Floors - precast reinforced concrete plates. Roof coatings - rolled materials, membrane roof. Windows - reinforced plastic window units (RP). Doors - timber units. Floor coatings - timber plank floors, ceramic tiles, mosaic. Indoor wall finish - limewashing, dispersion paint coatings, wallpaper, oil paint coatings in WC rooms, ceramic tiles. Heating - a centralized water heating system. A brief description of the object: Ventilation - natural. Water supply - from the municipal network. Sanitation - with discharge to the municipal sewer. Power supply - from the municipal grid. Communication - with connection to the municipal cable network. In general, some premises need repairs, there are fractures in walls, plastered areas are damaged, floor coatings need replacement, electric appliances are obsolete, WC room are not functional, etc. The list of premises and construction works as stipulated by the ToR: General construction works: 1. Room #31 - The dance hall (7,0х6,0х2,95 m) Dismantling old skirtboards (cement and sand mortar) - 26 m. Dismantling old linoleum coatings (at least than grade 33) - 42.6 m². Laying 18 mm thick OSB plates on the floor and sealing joints - 42.6 m². Installation of laminate floor coatings (at least grade 32 laminate with a base layer) - 42.6 m². Installation of rubber-plastic skirtboards (or similar) - 26 m. As another option, estimates may be made for complete replacement of the existing plank floor by a new larch timber floor - similarly to the option stipulated for the folk dance halls. Installation of Armstrong type (or similar) false ceiling plates on the ceiling - 42 m². Installation of embedded spotlight lighting appliances (600 х 600) - 4 items. Installation of 2-keys electric switches (VIKO or similar) - 1 item. Installation of 2-plugs electric sockets (VIKO or similar) - 2 items. Repairing wall plaster coatings by cement and sand mortar - 5.5 m². Removal of old decorative coatings from walls and jambs, priming, filling up, smoothing and painting by textured acrylic paints - 59 m². Painting timber doors by PF type paints -10 m². Painting heating radiators - 5 m². 2. Room #37 - The dance hall (16,0х6,0х2,95 m). Installation of laminate floor coating (at least grade 32 laminate with a base layer) -96.6 m². Installation of rubber-plastic skirtboards (or similar) - 45 m. As another option, estimates may be made for complete replacement of the existing plank floor by a new larch timber floor - similarly to the option stipulated for the folk dance halls. Installation of Armstrong type (or similar) false ceiling plates on the ceiling - 96.6 m². Installation of embedded spotlight lighting appliances (600 х 600) - 8 items. Installation of 2-keys electric switches (VIKO or similar) - 2 items. Installation of 2-plugs electric sockets (VIKO or similar) - 2 items. Repairing wall plaster coatings by cement and sand mortar - 10 m². Covering the door opening by plasterboard plates (2.3 х 1.3 m) - 3 m². Replacement of timber door units by reinforced plastic ones (2-leaf doors, dimensions 2.34 х 1.35 m, 3.16 m²) - 1 item. Removal of old decorative coatings from walls and jambs, priming, filling up, smoothing and painting by textured acrylic paints - 92 m². Painting heating radiators with PF painting - 7 m². 3. Room #23 - The folk dance hall (16,0х6,0х2,96 m). Dismantling old skirtboards (cement and sand mortar) - 45 m. Dismantling old timber plank floor coatings 97.0 m². Installation of new larch timber floors on timber joists (AV larch planks, 35 mm thick, 150 x 45 mm timber joists installed with 600 mm intervals).Triple painting of new floor coatings by oil paints of OSMO type or similar. Installation of timber skirtboards (or similar) 45 m. Installation of Armstrong type (or similar) false ceiling plates on the ceiling - 96 m². Installation of embedded spotlight lighting appliances (600 х 600) - 8 items. Installation of 2-keys electric switches (VIKO or similar) - 1 item. Installation of 2-plugs electric sockets (VIKO or similar) - 2 items. Repairing wall plaster coatings by cement and sand mortar - 12 m². Removal of old decorative coatings from walls and jambs, priming, filling up, smoothing and painting by textured acrylic paints - 110 m². Replacement of timber door units by reinforced plastic ones (2-leaf doors, dimensions 2.71 х 1.3 m, 3.52 m²) - 1 item. Painting heating radiators with PF painting - 7 m². 4. Room #27 - The folk dance hall (16,0х6,0х2,96 m). Dismantling old skirtboards (cement and sand mortar) - 45 m. Dismantling old timber plank floor coatings 97.0 m². Installation of new larch timber floors on timber joists (AV larch planks, 35 mm thick, 150 x 45 mm timber joists installed with 600 mm intervals). Triple painting of new floor coatings by oil paints of OSMO type or similar. Installation of timber skirtboards (or similar) 45 m. Installation of Armstrong type (or similar) false ceiling plates on the ceiling - 96 m². Installation of embedded spotlight lighting appliances (600 х 600) - 8 items. Installation of 2-keys electric switches (VIKO or similar) - 1 item. Installation of electric sockets (VIKO or similar) - 2 items. Repairing wall plaster coatings by cement and sand mortar - 14 m². Removal of old decorative coatings from walls and jambs, priming, filling up, smoothing and painting by textured acrylic paints - 112 m². Replacement of timber door units by reinforced plastic ones (2-leaf doors, dimensions 2.46 х 1.34 m, 3.37 m²) - 1 item. Painting heating radiators with PF painting - 7 m². 5. The WC room for women (5,1х2,95Х2,76 m). Replacement of ceramic tile coatings on the floor - 16.5 m². Removal of old plaster and ceramic tile coatings from walls - 37 m². Covering sanitation pipes by a casing (plasterboard plates up to the height of 3 m) 1.8 m². Laying new ceramic tile coatings on brickwork walls and jambs after preliminary plastering 37 m². Replacement of timber door units by MDF ones (dimensions 2.1 х 0.7 m - 1 item, dimensions 2.4 х 0.9 m - 1 item, 3.66 m²). Dismantling and installation of squat toilets - 3 items. Dismantling and installation of a washstand sink - 1 item. Dismantling and installation of a floor drain - 1 item. Dismantling and laying concrete floors - 0.5 m³. Installation of water tanks and their connection to water pipes and squat toilets - 3 items. Installation of plastic plankboard plates on the ceiling - 15 m². Installation of spotlight lighting appliances on the ceiling - 3 items. Installation of embedded electric switches (VIKO or similar) - 1 item. Installation of electric sockets for hard driers (VIKO or similar) - 1 item. Installation of ventilators (Domovent type or similar) - 1 item. Installation of reinforced plastic partition walls of toilet cabins (1.1 х 1.5 m) -3 items. Painting heating radiators - 3 m². 6. The WC room for men (5,08х2,88х2,76 m). Replacement of ceramic tile coatings on the floor - 16.0 m². Removal of old plaster and ceramic tile coatings from walls - 36 m². Covering sanitation pipes by a casing (plasterboard plates up to the height of 3 m) 1.8 m². Laying new ceramic tile coatings on brickwork walls and jambs after preliminary plastering 36 m². Replacement of timber door units by MDF ones (dimensions 2.4 х 0.9 m, 2.16 m²) - 1 item. Dismantling and installation of squat toilets - 2 items. Dismantling and installation of a washstand sink - 1 item. Dismantling and installation of a floor drain - 1 item. Dismantling and laying concrete floors - 0.5 m³. Installation of urinals and their connection to existing networks - 2 items. Installation of a PE water reserve tank (V = 1 m³) - 1 item. Installation of water tanks and their connection to water pipes and squat toilets - 2 items. Installation of plastic plankboard plates on the ceiling - 15 m². Installation of spotlight lighting appliances on the ceiling - 3 items. Installation of embedded electric switches (VIKO or similar) - 1 item. Installation of electric sockets for hard driers (VIKO or similar) - 1 item. Installation of ventilators (Domovent type or similar) - 1 item. Installation of reinforced plastic partition walls of toilet cabins (1.1 х 1.5 m) - 2 items. Painting heating radiators - 3 m². 7. The entrance lobby at the first storey. Dismantling the mosaic concrete floor - 45 m². Upfilling a compacted gravel layer under floors - 1 m³. Laying 30-40 mm thick floor support level (cement and sand mortar M100 grade) - 45 m². Laying ceramic granite tiles (or similar) coatings on the floor - 45 m². Laying tile coatings on concrete steps (steps 300 mm - 36 m, risers 160 mm - 36 m) - 17 m². Installation of 6 cm high tile skirtboards - 40 m. 8. Repairs of the roof. Installation of a concrete cover on the parapet in the fire escape ladder area (1.6 х 0.55 m) 0.9 m². Installation of 10 ventilation stacks for ventilation of the mineral thermal insulation layer. Repairs of the membrane roof (along the cornice with up to 25 cm width with discharge to the chute - 36 m, other 5 points - 2 m) - 11 m². Removal of constriction waste from the roof and examination of the existing rainwater discharge system. 9. Related works for repairs of the sanitation system in WC rooms. Excavation of soil in the course of opening the existing sanitation pipes - 5 m³. Backfilling the trenches by soil after repairs with soil compaction - 5 m³. Specialised works: 1. Specialized and plumbing works. The ToR stipulates purchase and replacement of 5 squat toilets and 5 water tanks for them, and 2 urinals in existing WC rooms, purchase and replacement of 2 washstands, purchase and installation of 2 floor drains, purchase and installation of 2 Domovent type (or similar) ventilators (d = 100 mm), as well as purchase and installation of a PE reserve water tank (V = 800 ÷ 1000 l). PVC sanitation pipes and associated shapes should be used (manufactured by "Wavin" or similar). Overall, in the building, up to 60 m of Ø 100 sanitation pipes need replacement (plus 20 shapes for the pipes) and up to 15 of Ø 50 pipes. Polypropylene pipes, shapes and fittings should be used for the water supply system. Sanitary ware items of "Cersanit" Co. or similar should be used. Tapware items of "Kludi" Co. or similar should be used. Sanitary ware items should be supplied with fittings, syphons, flexible connection lines, etc. All the works should comply with requirements of applicable construction standards and rules (DBN; SNiP); after installation of pipes and other items, the systems should be tested for tightness, and relevant test protocols should be compiled. 2. Indoor lighting. The ToR stipulates replacements of existing obsolete lighting appliances and cabling in the premises to be repaired. All the works should comply with requirements of applicable operation rules (PE, PUE), rules and regulations (DNB; SNiP) and fire protection requirements. All items must comply with relevant electric safety requirements and be certified for quality and conformity General considerations: Plasterboard plates should be secured on wall on metal lattices (0.4 mm thick) or - if application of metal lattices is impossible with application of Perlfix coat plaster (or similar). Joints must be secured by fibreglass bands. Knauf type (or similar) gypsum materials should be used for wall plastering operations. Walls should be primed two or three times, with application of SF 17 primer of a similar one. All timber constructions should be impregnated by fungicides and fire retardants. Connections to sanitary ware items should be installed concealed. "Kludi-standard" tapware or similar should be used. VIKO Karmen type (or similar) electric sockets and switches should be used. Lighting appliances should be grouped and connected to VVGng (3 х 1.5 mm²) cables, electric sockets should be grouped and connected to VVGng (3 х 2.5 mm²) cables. Armstrong (or similar) false ceiling plasterboard plates of Baikal or Skala types and Armstrong-Javelin type (24 mm) shapes should be used. Kolorit type (or similar) textured acrylic paints should be used for decorative paint coatings on walls. Reflector type (Kharkiv or similar) embedded spotlight lighting appliances should be used. Knob handles (Avers 6093-03 or similar) should be purchased for MDF doors. Ceramic tiles of Ukrainian manufacture and SM-11 (or similar) glues should be used. Colours of construction materials should be agreed with the owner (user) of premises prior to their purchase. Costs of disposal of construction waste should be estimated additionally.