DATE ISSUED: September 26, 2014
BID DATE October 22, 2014
PROJECT: 44517 Fleming Logging Rd. Hinckley, MN 55037
TO: Qualified General Contractors
THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN.
The Mille Lacs Band of Ojibwe, Community Development office will be accepting sealed lump sum
bids for renovation work at 44517 Fleming Logging Rd. Hinckley, MN Bids will be due Wednesday
October 22, 2014 at 3:00 PM. Bids received will be opened and qualified by the Mille Lacs Band of
Ojibwe on Thursday October 23, 2014 at 8:30 AM.
A mandatory pre-bid site visit will be held on: October 7, 2014 at 2:00 PM: 44517
Fleming Logging Rd. Hinckley, MN 55037. Directions to the site: from Hinckley Hwy 48
East 15 miles to Flemming Logging Road. Flemming Logging North 2.8 miles to the
site.
General Notes:
1. It is the Contractors responsibility to identify any and all discrepancies in the scope of
work, not meeting Industry Standards or that which is inconsistent with the International
Residential Code (IRC), and Mille Lacs Band of Ojibwe 2014 MLB Project Specification
Book.
2. All electrical wiring, apparatus and equipment for electric light, heat and power,
technology circuits or systems shall comply with the rules of the Department of Commerce
or the Department of Labor and Industry, as applicable, and be installed in conformity with
accepted standards of construction for safety to life and property.
3. Contractor must reconnect all utilities, service panel or service feed. Also includes gas,
propane. Include such equipment or materials identified in the pre-bid conference.
4. Contractor will secure all permits and fees.
5. Contractor is responsible for a thorough investigation of the scope of work.
6. Contractor will repair any damage to the property or structure created by the scope of
work.
7. Contractor shall be responsible for all debris removal related to all work performed under
this work scope.
8. NO WORK SHALL BE PERFORMED UNTIL ALL REQUIRED PERMITS HAVE BEEN
ISSUED AND COPIES IN THE POSSESSION OF THE PROJECT COORDINATOR AND
/OR MILLE LACS BAND BUILDING OFFICIAL.
COMMUNITY DEVELOPMENT WILL, TO THE GREATEST EXTENT FEASIBLE, GIVE
PREFERENCE IN THE AWARD OF CONTRACT TO INDIAN ORGANIZATIONS AND
INDIAN-OWNED ECONOMIC ENTERPRISES.
Work Scope: 44517 Fleming Logging Rd. Hinckley, MN
Exterior
1. Demo old wood deck and wood steps at rear side of home.
2. Re-grade patio area and prep for installation of new 4” thick concrete slab.
3. Install new concrete patio. Provide integrated concrete splash pad at North end for gutter
downspout. Cut down septic inspection cleanout pvc pipe and install brass cleanout
cover cap. Cap to be installed flush with new patio.
4. Install new free standing treated wood steps with top landing at patio door. Anchor to
concrete slab only.
5. Demo existing gutters and install new seamless gutters, downspouts and splashpads
(Include 2 splash pads at each end of rear patio). New gutters shall protect all sides of
the home. All materials will be attached with brackets per manufacturer’s
recommendations. Install leaf guards
6. Repair damaged soffit and replace missing soffit pieces.
7. Clean and prep exterior siding and trim for new stain. Re-stain house exterior with
Sherwin Williams Woodscapes exterior wood finish. Homeowner to select solid or semitransparent finish from manufacturer’s full range of colors. Contractor shall provide two
coats minimum, prep and install per manufacturer’s installation instructions. Contractor
shall apply a third coat if needed for a professional appearance. Include removal of
existing exterior caulking. Install new caulking to windows, doors, trim and penetrations.
8. Replace any damaged window glazing.
9. Demo patio door unit. Install (Owner Provided) new patio door.
10. Supply homeowner with storage pod two weeks prior to start of remodel and two weeks
after completion of project.
11. Supply homeowner with a 20 yard dumpster two weeks prior to start of project for
household trash.
Interior
1. Clean, Sand and Re-finish all window wood surfaces: sashes, frames, and extension
jambs including skylights. Homeowner to select stain color. Contractor to stain and apply
two coats semi-gloss spar ureathane.
2. Insulate and install extension jambs and casing at all exterior entry doors.
3. Update smokes and Co2 detectors throughout the house.
4. Provide and install new window treatments on all windows.
5. Prep and install 2” minimum closed cell spray foam insulation to rim joist in lower level.
6. Demo and replace propane water heater (AO Smith 40 gallon power vent unit). Abandon
flue connection.
7. Demo existing hydronic boiler. Replace with Lennox GWB8-IE boiler system sized
appropriately for the home’s heating demands. Include new circulation pump, expansion
tank, air bleeder, and re-pipe water supply for fill with new valves, vacuum breaker, etc.
Provide new digital thermostat. Contractor shall be responsible for a fully functional
system. Include any electrical supply connections and modify vent stack as needed to
meet code. Flush existing hydronic lines prior to boiler installation. Contractor shall also
be responsible to provide homeowner basic operation and maintenance instruction.
8. Repair / Replace any damaged or missing hydronic radiator heat covers and accessories.
9. Kitchen: Demo and replace sink base cabinet. Provide sink base liner. Install new
cabinet skin panels to all exposed and semi-exposed cabinet sides. Install new toe-kick
material and base shoe. Provide and install 2 upper cabinets and new range hood.
Provide electrical connection. Demo existing flooring and prep concrete substrate. Install
new vinyl flooring in kitchen. Trim as needed and secure all countertops. Replace
kitchen light fixture, 1x4 2 bulb florescent fixture.
10. Install trim in hallway and closet cased opening.
11. Lower bedroom: complete drywall taping, texture and paint bedroom.
12. Patch and paint drywall surfaces in living room and office areas.
13. Patch and paint drywall damaged area by front door. Install backer and wall stop to
prevent future damage.
14. Replace living room ceiling fan, and replace hanging chandelier with a second ceiling fan.
15. Upper bath: Install new light and switch, refinish skylight, and replace missing door trim.
16. Lower bath: Scrape drywall texture, patch, re-texture, and paint. Replace vanity, top and
faucet. Supply and install new bathroom exhaust fan, including electrical.
17. North Addition Area: Patch texture and paint drywall. Install trim throughout area.
Provide and install Mini-split heat pump system: Lennox MS8H series, sized for the nonheated addition space.
Bid Alternate #1: Added lump sum cost to delete refinishing of existing windows and replace
with Thermo-Tech Low-E vinyl windows (Same Configuration). Include insulation, new prefinished extension jambs and casing. (Existing skylight units to remain)
Bid Alternate #2: Added lump sum cost to provide and install 3 new Lennox MS8H Mini-Split
Heat pump systems for the other living areas of the home. Include electrical system
connections and wiring to complete the system.
Bid Alternate #3: Added lump sum cost to provide and install new water softener system.
Bid Alternate #4: Exterior Item #3: Added cost or Credit to change from concrete rear patio to
wood platform similar to existing layout. Please indicate on the bid form if this is an add or
credit amount.
Specified Product Substitutions: All proposed product substitutions must be
approved by the Project Coordinator 5 days prior to bid. Any approved
substitutions will be made available to all bidders.
Contacts:
Interested bidders shall contact Ryan Jendro Project Manager at (320)532-7857 office or via email at: ryan.jendro@millelacsband.com to be
included on the bidder’s list in the event that any addendums are issued
for this project.
Mobilization:
1. The Contractor shall be capable of mobilizing his equipment and crews within seven days of
the receipt of Notice to Proceed.
2. Contractor shall provide means and methods for all building phases of construction.
COMMUNITY DEVELOPMENT/PROJECT MANAGEMENT RESERVES THE RIGHT TO
REJECT ANY AND ALL BIDS FOR ANY REASON.
Bidding notes:
1. Submit proposal in lump sum (supply and install), not to exceed amount
2. All Contractors (including subcontractors) must comply with Davis Bacon wage requirements.
3. All Contractors must provide the following along with their bid submittal:
a. Completed and signed MLB Community Development Construction Bid Form
b. A copy of Current MLB Vendor’s License (or a copy of the submitted application)
c. A copy of Current Insurance Certificate
d. A copy of Subcontractor/Material Supplier list
e. A copy of valid State of Minnesota Contractor’s License (if applicable)
f. A copy of Authorized Signature Sheet (submitted with first bid submittal)
4. All Contractors must comply with all Mille Lacs Band of Ojibwe American Indian Employment
requirements (see 18 MLBSA § 5). Contact Craig Hansen at (320) 532-4778.
All proposals MUST be mailed and labeled as follows:
Mille Lacs Band of Ojibwe
Commissioner of Community Development
Sealed bid: 44517 Fleming Logging Rd. Hinckley, MN
P.O. Box 509
Onamia, MN 56359
**Please note that the bids must be submitted via mail to the P.O. Box. FedEx and UPS will
not deliver to a P.O. Box and the Onamia post office will not accept hand delivered items.
Please plan accordingly to ensure the timely receipt of your bid submittal. **
PROPOSALS NOT SUBMITTED IN THIS MANNER WILL BE REJECTED.
Licensing:
1. Firms must be licensed with the Mille Lacs Band of Ojibwe. A copy of this license (or the
license application) must accompany each bid. Licensing process can take several weeks. If
you are not currently licensed with the MLBO, please submit a copy of your license application
along with your proposal. Contact Linda Dunkley at the Business Regulations Office at
(320)532-8859 with questions regarding licensing and for the license application.
Permit and Contractor Requirements:
Permits: Contractors are responsible to attain all necessary permits for all work, including
Mille Lacs Band of Ojibwe (MLBO) Permits.
Bonding Requirements: In accordance with 2014 MLB Project Specification Book.
MLBSA Section 17 Procurement Statue Ordinance 03-06 states the following:
Section 17. Bonding
A. For all Band funded residential construction projects, a performance bond is required for contracts in
excess of $50,000.00. The performance bond shall be at a minimum twenty (20%) percent of the
contract price, but not in excess of $500,000.00.
SECTION II – BIDDING FORMS
Bidding Requirements and Contract Forms
COMMUNITY DEVELOPMENT
PROJECT MANAGEMENT
FY 2014 CONSTRUCTION BID FORM
REQUIRED FOR ALL BIDS
FIRM NAME: __________________________________________________________________________
JOB/PROJECT: 44517
Fleming Logging Rd Hinckley, MN 55037
LUMP SUM PRICE:
__________________________________________________________________$____________________
(Written Value)
(Dollar Amount)
ALTERNATE #1:
(Add to delete window re-finishing and replace with new windows)
__________________________________________________________________$____________________
(Written Value)
(Dollar Amount)
ALTERNATE #2:
(Add to install 3 additional mini-split heat pump systems)
__________________________________________________________________$____________________
(Written Value)
(Dollar Amount)
ALTERNATE #3:
(Add to install new water softener.)
__________________________________________________________________$____________________
(Written Value)
(Dollar Amount)
ALTERNATE #4:
(Add or Credit to delete rear concrete patio and install wood deck platform)
__________________________________________________________________$____________________
(Written Value)
(Dollar Amount)
Acknowledgement of Addendum(s): 1) __________ date
2) ___________date 3) ___________date
BID GUARANTEE PERIOD:
I agree to hold this bid open for a period of 90 days after the bid opening. If this bid is accepted I agree to execute a Contract and/or a
Purchase Order with the Mille Lacs Band of Ojibwe along with furnishing all required bonding (if required) and insurances.
TERO COMPLIANCE:
I understand that this company, its subcontractors and all employees performing work on this project will be expected to comply with all Mille
Lacs Band TERO Compliance Regulations. Upon being informed that I will be awarded a contract for this project, I will submit all required
TERO Compliance Plans directly to the MLB TERO Office for review and approval.
Acknowledgement of TERO Compliance: _________________________
ATTACHMENTS REQUIRED: Failure to provide any of these attachments will result in bid disqualification.
o
MLB BID FORM (MUST BE SIGNED)
o
MLBO VENDOR LICENSE
o
COPY OF CURRENT INSURANCES
o
LETTER FROM BONDING SURETY (If required)
o
COPY OF MINNESOTA CONTRACTOR’S LICENSE (if applicable)
o
SUB-CONTRACTOR LISTS (Include values)
NAME: ________________________________________TITLE:________________________
SIGNATURE: _______________________________________DATE:____________________
FIRM NAME: ________________________________TELEPHONE:_____________________
ADDRESS: ____________________________________________________________________
EMAIL ADDRESS: ____________________________________________________________
Download