I. SELECTED ACTIVE PROJECTS
NOTE ALL SCHEDULES ARE TENTATIVE
1.
Student Wellness & Sports Education Center: This project entails the programming,
design and construction of a Student Wellness and Sports Education Center (Est. 116,000
GSF).
Tentative Schedule:
Consultant Selection
Complete
Programming
Complete
RFQ for Design
Complete
Consultant Selection
Complete
Program Verification Complete
Schematic Design
Complete
Design Development Complete
Select CM
Complete
Const. Documents
June 2010
Construction
January 2011
Changes from last month:
No Changes from Last Month.
2.
Campus-wide Master Planning: Project to re-visit the 2005 Master Plan, update it for
the period 2010-2015, and add any new visions for the campus.
Tentative Schedule:
Consultant Selection
Complete
First Kick-Off Meeting Complete
Focus Groups
Complete
Changes from last month:
No Changes from Last Month.
3.
Science and Humanities Building (Biology): It is anticipated that the building will be
roughly 118,000 GSF on three levels. The building will be located adjacent to the Social
Sciences Building (51).
Tentative Schedule:
Consultant Selection
Complete
Programming
Complete
Program Verification Complete
Schematic Design
Complete
Design Development Complete
Const. Documents
March 2010
Select CM
Complete
Construction
August 2010 to February 2012
Changes from last month:
No Changes from Last Month.
Zak Ovadia
1
4.
Relocation of Communication Dept: This project entails the relocation of the
Communication Department from the Fines Arts Center to Bldg 14-E Second Floor.
Consultant is TTV Architects.
Tentative Schedule:
Consultant Selection
Complete
Programming
Complete
Program Verification Complete
Schematic Design
Complete
Design Development Complete
Select CM
Complete
Const. Documents
May 2009
Construction
Dec. 2009 to August 2010
Changes from last month:
Project Complete. Will be
removed from List.
5.
JJ Daniel Hall Renovations: Programming of entire building after the decision was
made on who will relocate to UNF Hall. This project will be phased over a period of
about one year to accommodate occupant schedule.
Tentative Schedule:
Consultant Selection
Complete
Programming
Complete
Program Verification N/A
Schematic Design
Complete
Design Development January 2009
Const. Documents
Complete
Select CM
Complete
Construction
Jan 2010 to September 2010
Changes from last month:
No Changes from Last Month.
6.
DRC Expansion in Building 10: Provide estimate for connecting DRC space to the
space to be vacated by CIRT.
Project Complete. Will be removed.
7.
Education Building: DRC, VCS, VCL and OCT Offices:
Project to build a 2 story addition to the College of Education & Human Services of
approximately 15,000 GSF.
Tentative Schedule:
Consultant Selection
Complete
Programming
underway
Program Verification underway
Schematic Design
underway
Design Development August 2010
Const. Documents
September 2010
Select CM
August 2010
Construction
December 2010 to August 2011
Changes from last month:
Consultant started Construction
Documents. Advertise for CM
Services will be underway in 2
weeks.
Zak Ovadia
2
8.
Science & Engineering Building Remedial Work:
Corrective measures to mitigate building envelope deficiencies.
Tentative Schedule:
Consultant Selection
Complete
Programming
N/A
Program Verification N/A
Schematic Design
TBD
Design Development TBD
Const. Documents
TBD
Select CM
Complete
Construction
TBD
Changes from last month:
Gale Consulting has completed
investigative work. Draft report
received and is being evaluated.
Order of Magnitude Cost
currently exceeds available
funds of $3 Million.
9.
Building 9 Restacking of Building to Accommodate Arts & Sciences needs:
Programming, design and construction of the entire building 8 to accommodate identified
needs for the expansion of the College of Arts & Sciences.
Tentative Schedule:
Consultant Selection
Complete
Programming
Complete
Program Verification Complete
Schematic Design
Complete
Design Development N/A
Construction Docs.
In Progress
Construction
September 2010 – May 2011
Changes from last month:
No changes from last month.
Design started for renovating
portion of the second floor for
History. Combined with
renovating the first floor
classrooms. Construction
Documents underway.
10. Sanctuary and Meditation Center: Design and Construction of sanctuary building of
approximately 3,500 square feet to serve as a venue for group meditation or events.
Tentative Schedule:
Programming
Complete
Conceptual Permitting Complete
RFQ for Consultants Complete
Short-listing & Interv. Complete
Program Verification Complete
Schematic Design
Complete
Design Development TBD
Construction Docs.
TBD
Construction
TBD
Changes from last month:
No Change
Zak Ovadia
3
11. New Food Service Facility and General Purpose Building: Design and Construction
of a replacement food service facility to replace Osprey Café. Preliminary needs call for
a three or four-storey building.
Tentative Schedule:
Programming
August 2010
Conceptual Permitting TBD
RFQ for Consultants October 2010
Short-listing & Interv. November 2010
Program Verification December 2010
Schematic Design
December 2010
Design Development February 2011
Select CM
February 2011
Construction Docs.
February 2011
Construction
April 2011 to April 2012
Changes from last month:
Baker Barrios was selected to
program facility.
12. New Fine Arts Buildings and Art Gallery: Programming for a new fine arts
building to supplement the existing. Order of magnitude of project is yet to be
determined. \
Tentative Schedule:
Programming August 2010
Conceptual Permitting TBD
RFQ for Consultants October 2010
Short-listing & Interv. November 2010
Program Verification December 2010
Schematic Design
December 2010
Design Development February 2011
Select CM
February 2011
Construction Docs.
February 2011
Construction
April 2011 to April 2012
Changes from last month:
Baker Barrios was selected to
program facility.
Completed Projects:
















Zak Ovadia
Brooks College of Health Addition
Hodges Stadium Running Track
IPTM Storage Building
College of Education & Human Services
UPD Storage Building
Osprey Fountains Housing
Student Union
English Language Program (ELP)
Library Shuttle Bus Shelter
Building 8 Renovations for Auxiliary Services
Relocation of TV Studio
Outside Storage for CCEC
Installation of Campus-Wide Speakers
UNF Hall Renovations
Founders Hall Renovations
ROTC Storage Building
4