© 2011 Rift Valley Railways. All rights reserved. 0
• Mission
We transform lives in Africa with every move
• Vision
To be the best transport and logistics partner in Africa by 2020
IN 2006
GoK & GoU Conceded The State Owned Railway Assets
CONCESSION AGREEMENT OBLIGATIONS
Introduced a radical change in railway safety management
Fundamental shift from the traditional and historical accepted norms and practices
© 2011 Rift Valley Railways. All rights reserved. 2
HISTORY OF THE RVR CENTRAL WORKSHOPS
© 2011 Rift Valley Railways. All rights reserved. 3
Post-Concession Environmental Conditions – Early 2007
© 2011 Rift Valley Railways. All rights reserved. 4
Post-Concession Workplace Conditions – Early 2007
© 2011 Rift Valley Railways. All rights reserved. 5
• Resource Optimisation
Resources
Resources
Protection Operations
© 2011 Rift Valley Railways. All rights reserved. 6
NAIROBI CENTRAL WORKSHOPS IOD STATISTICS
© 2011 Rift Valley Railways. All rights reserved. 7
NCWS INCIDENT CAUSE ANALYSIS FY 2011
4
2
0
10
8
6
18
16
14
12
SLIPS TRIPS FALLING OBJECTS
CAUSAL FACTOR
OTHERS
© 2011 Rift Valley Railways. All rights reserved. 8
DIRECT CAUSES / IMMEDIATE CAUSES
© 2011 Rift Valley Railways. All rights reserved. 9
BASIC CAUSES / ROOT CAUSES / INDIRECT CAUSES
© 2011 Rift Valley Railways. All rights reserved. 10
PREVENTIVE ACTION – ADDRESSING PERSONAL FACTORS
HUMAN FACTORS TRAINING – KENYA 2011
Course Title Number trained
DOSHS H&S Induction 105
Control of Substances Hazardous to Health
Risk Management
Accident Investigation
Senior Manager’s Guide to H&S
TOTAL PARTICIPANTS TRAINED
113
50
54
46
368
Duration (days)
5
1
1
1
1
© 2011 Rift Valley Railways. All rights reserved. 11
PREVENTIVE ACTION – ADDRESSING PERSONAL FACTORS
Registration of the Workplace with the DOSH
Safety Representative Training
Development of Hazard identification Checklists
© 2011 Rift Valley Railways. All rights reserved. 12
PREVENTIVE ACTION – ADDRESSING JOB FACTORS
INTRODUCTION OF THE 5S PROGRAMME
© 2011 Rift Valley Railways. All rights reserved. 13
5S IN BRIEF
© 2011 Rift Valley Railways. All rights reserved. 14
Workplace Conditions – 2015
© 2011 Rift Valley Railways. All rights reserved. 15
Workplace Conditions – 2015
© 2011 Rift Valley Railways. All rights reserved. 16
Environmental conditions at present
© 2011 Rift Valley Railways. All rights reserved. 17
RESULTS FROM INTERVENTION MEASURES
SAFETY STATISTICS FY 2011 – FY 2015 YTD
No. of Injuries
DAFW
2011
37
207
2012
5
12
2013
9
33
2014
4
5
© 2011 Rift Valley Railways. All rights reserved.
2015 YTD
2
2
18
IOD statistics Board
© 2011 Rift Valley Railways. All rights reserved. 19