Nov 2011 doc.: IEEE 802.11-11/1561r1 802.11 Nov 2011 Closing Plenary Reports Date: 2011-11-11 Authors: Name Company Adrian Stephens Intel Corporation Report Address Phone email +44 792 008 4900 (mobile) adrian.p.stephens@intel.com Slide 1 Adrian Stephens, Intel Corporation Nov 2011 doc.: IEEE 802.11-11/1561r1 Abstract • This document is a digest of the closing reports of all 802.11 sub-groups for presentation at the November 2011 closing plenary meeting. Report Slide 2 Adrian Stephens, Intel Corporation Nov 2011 doc.: IEEE 802.11-11/1561r1 Attendance Summary by Group Breakout Avg Attendance Meetings Sum Attendance Min Attendance Max Attendance 802.11 MID-SESSION PLENARY 1 201 802.11 Newcomer Training 1 15 802.11 OPENING PLENARY 1 188 ARC 1 18 Editors Meeting 1 9 JTC1 3 6 20 7 6 Monday Tutorials 2 85 170 137 33 PAR Comments 3 7 22 9 4 Reg SC 1 38 TGaa 6 9 57 15 4 TGac 10 65 658 127 15 TGad 2 36 73 39 34 TGae 2 13 26 18 8 TGaf 7 51 357 131 16 TGah 8 90 723 140 39 TGai 8 43 345 67 24 TGmb 1 15 WG CAC 2 13 27 15 12 WNG 2 84 168 107 61 Report Slide 3 Adrian Stephens, Intel Corporation Nov 2011 doc.: IEEE 802.11-11/1561r1 Attendance Histogram Report Slide 4 Adrian Stephens, Intel Corporation Nov 2011 doc.: IEEE 802.11-11/1561r1 802.11 WG Editor’s Meeting (Nov ‘11) Date: 2011-11-06 Authors: Name Affiliation Address Phone email Peter Ecclesine Cisco Systems 170 W. Tasman Dr., MS SJ-14-4, San Jose, CA 951341706 +1-408-527-0815 petere@cisco.com Report Slide 5 Adrian Stephens, Intel Corporation from slide 1/5 of 11-11/1497r2 by Peter Ecclesine (Cisco) November 2011 Nov 2011 doc.: IEEE 802.11-11/1561r1 Volunteer Editor Contacts • • • • • • • • • Report TGmb – Adrian Stephens – adrian.p.stephens@intel.com TGaa – Alex Ashley – alex.ashley@hotmail.co.uk TGac – Robert Stacey – rjstacey@gmail.com TGad – Carlos Cordeiro – carlos.cordeiro@intel.com TGae – Henry Ptasinski – henry@logout.com TGaf – Peter Ecclesine – pecclesi@cisco.com TGah – Minyoung Park – minyoung.park@intel.com TGai – Tom Siep – tom.siep@csr.com Editors Emeritus: – TGk – Joe Kwak– joekwak@sbcglobal.net – TGp – Wayne Fisher – – TGr – Bill Marshall – wtm@research.att.com – TGs – Kazuyuki Sakoda – KazuyukiA.Sakoda@jp.sony.com – TGu – Necati Canpolat – necati.canpolat@intel.com – TGv – Emily Qi – emily.h.qi@intel.com – TGw – Nancy Cam-Winget – ncamwing@cisco.com – TGz – Menzo Wentink – mwentink@qualcomm.com Slide 6 Adrian Stephens, Intel Corporation from slide 2/5 of 11-11/1497r2 by Peter Ecclesine (Cisco) Nov 2011 doc.: IEEE 802.11-11/1561r1 802.11 Style Guide • See 11-09-1034-03-0000-wg11-style-guide.doc • Editor’s responsibility includes checking the 2009 IEEE Standards Style Manual when creating or updating drafts. • Submissions with draft text should conform to both the WG11 Style Guide and IEEE Standards Style Manual • Note that the Style Guide evolves with our practice Report Slide 7 Adrian Stephens, Intel Corporation from slide 3/5 of 11-11/1497r2 by Peter Ecclesine (Cisco) Nov 2011 doc.: IEEE 802.11-11/1561r1 Amendment Editor Amendment Ordering numbering is • Data as of Nov 2011 • See http://grouper.ieee.org/groups/802/11/Reports/802.11_Timelines.htm editorial! No need Amendment Number Task Group REVCOM Dateto make 802.11 Amendment 8 TGv Feb 2011 ballot 802.11 Amendment 9 TGu Feb 2011 comments on 802.11 Amendment 10 TGs Sept 2011 these 802.11 Revision 802.11mb Mar 2012*est. dynamic 802.11-2011 Amendment 1 TGae Jun 2012 numbers! 802.11-2011 Amendment 2 TGaa Jun 2012 802.11-2011 Amendment 3 TGad Dec 2012 802.11-2011 Amendment 4 TGaf Sept 2013 802.11-2011 Amendment 5 TGac Dec 2013 802.11-2011 Amendment 6 TGah July 2013 802.11-2011 Amendment 7 TGai Sept 2013 Report Slide 8 Adrian Stephens, Intel Corporation from slide 4/5 of 11-11/1497r2 by Peter Ecclesine (Cisco) November 2011 Nov 2011 Nov 2011 doc.: IEEE 802.11-11/1561r1 Draft Development Snapshot Most Changes TG Published or Draft Baseline Documents Style Snapshot current Source MEC Guide Editor Date fromPublilast mb ae aa ad af ac ah ai shed doc report mb Y 12.0 Frame 9.0 Yes 2009 Adrian Stephens 8-Nov shaded shown in11.0 6.0 ae Y libreoffice Yes 2009 Henry Ptasinski 10-Nov 3.3 green. red.aa Y 12.0 6.0 7.0 Word Yes 2009 Alex Ashley 9-Nov ad Y 10.0 5.0 6.0 5.0 af Y 12.0 5.0 6.0 5.0 1.0 4 ac Y 9.0 4.0 5.0 3.0 1.0 1.0 ac Y 12.0 9.0 4.0 5.0 3.0 1.0 ah Report Word Yes 2009 Carlos Cordero 10-Nov Frame 9.0 No 2009 Peter Ecclesine 6-Nov Frame 9.0 No 2009 Robert Stacey 19-Jul No 2009 Minyoung Park 19-Jul No 2009 Tom Siep 22-Sep 1.0 Frame 10.0 Slide 9 Adrian Stephens, Intel Corporation Slide 9from slide 5/5 of 11-11/1497r2 by Peter Ecclesine (Cisco) Nov 2011 doc.: IEEE 802.11-11/1561r1 Closing Report Date: 11-11-11 Authors: Name Company Clint Chaplin Samsung Electronics Report Address 3000 Orchard Parkway San Jose, Ca 95134 Phone email +1 408 544 2740 firstname dot lastname at gmail dot com Slide 10 Adrian Stephens, Intel Corporation from slide 1/3 of 11-11/1581r0 by Clint Chaplin, Chair (Samsung) Nov 2011 doc.: IEEE 802.11-11/1561r1 Abstract Closing report for WNG SC for November 2011, Atlanta, Georgia, USA Report Slide 11 Adrian Stephens, Intel Corporation from slide 2/3 of 11-11/1581r0 by Clint Chaplin, Chair (Samsung) Nov 2011 doc.: IEEE 802.11-11/1561r1 • Presentations at November 2011 meeting – Flexibility on Channel Access Allocations (11-11-1485-00-0wng Flexibility on Channel Access Allocations.pptx) – Antonio de la Oliva – 802.11s Issues with Adhoc Mode in Mesh Networking (11-11-1492-00-0wng 802.11s Issues with Adhoc Mode in Mesh Networking.ppt) – Romana Challans – Update to Improving the Case for Wireless LAN Transmit Power Control Including to better service Mobile Telephones? () – Lawrence Zuckerman – The better spectrum utilization for the future WLAN standardization (11-111464-00-0wng-the-better-spectrum-utilization-for-the-future-wlanstandardization.pptx) - Yasuhiko Inoue – Discovery of ESS Services (11-11-1507-00-0wng-discovery-of-ess-services) Stephen McCann – Efficient Device and Service Discovery for Peer-to-Peer (P2P) scenarios (1111-1517-00-0wng-efficient-device-and-service-discovery-for-peer-to-peerp2p-scenarios.pptx) - Santosh Abraham • Minutes – 11-11-1580-00-0wng • Plans for January 2012 – 1 2 hour session Report Slide 12 Adrian Stephens, Intel Corporation from slide 3/3 of 11-11/1581r0 by Clint Chaplin, Chair (Samsung) Nov 2011 doc.: IEEE 802.11-11/1561r1 ARC Closing Report Date: 2011-11-11 Authors: Name Affiliations Address Phone email Mark Hamilton Polycom, Inc. 1765 W 121st Ave, Westminster, CO, 80234 720-872-7445 mark.hamilton@polycom. com Report Slide 13 Adrian Stephens, Intel Corporation from slide 1/6 of 11-11/1569r1 by Mark Hamilton, Polycom, Inc. Nov 2011 doc.: IEEE 802.11-11/1561r1 Abstract This document is the closing report for ARC SC, November 2011, Atlanta meeting Report Slide 14 Adrian Stephens, Intel Corporation from slide 2/6 of 11-11/1569r1 by Mark Hamilton, Polycom, Inc. Nov 2011 doc.: IEEE 802.11-11/1561r1 Work Completed • 802 Overview and Architecture Draft 1.2 letter ballot – Discussed status of comment resolutions – Two items of interest to 802.11: • Bit error rate and Packet error rate • OUI-36 per 802.11p usage – Will likely need 802.11 WG consolidated comments for next letter ballot in next couple of months – probably will schedule a teleconference once dates are known. • P1905.1 – Intent is to ‘glue’ together technologies for in-home networks – Make request to EC to request a formal liaison with P1905, explicitly to include document sharing. • Minutes are in 11-11/1537 Report Slide 15 Adrian Stephens, Intel Corporation from slide 3/6 of 11-11/1569r1 by Mark Hamilton, Polycom, Inc. Nov 2011 doc.: IEEE 802.11-11/1561r1 Teleconferences • No specific plan, will schedule with 10 days notice • Topic(s): – Next letter ballot on 802 Overview and Architecture – P1905.1 liaison comments Report Slide 16 Adrian Stephens, Intel Corporation from slide 4/6 of 11-11/1569r1 by Mark Hamilton, Polycom, Inc. Nov 2011 doc.: IEEE 802.11-11/1561r1 January 2012 Goals • One 802.11 meeting slot planned to discuss 802 O&A comments Report Slide 17 Adrian Stephens, Intel Corporation from slide 5/6 of 11-11/1569r1 by Mark Hamilton, Polycom, Inc. Nov 2011 doc.: IEEE 802.11-11/1561r1 802.1AVB “Packet preemption”/ ultra-low latency • Presentations to 802.3 – http://www.ieee802.org/1/files/public/docs2011/new-avb-boiger-joint-AVB-802-31111.pdf – http://www.ieee802.org/1/files/public/docs2011/new-avb-nfinn-real-timenetworks-1111-v04.pdf – General theme is “customer requirement” for ultra-low latency (< 3 to 20 us – on wired networks(?)) and/or highly predictable traffic – Requirements from Automotive and Industrial Control uses – Looked at Qav queue shapers and time-gated queues, insufficient to meet requirements • Also discussed this topic with 802.11aa this week – Did not bring clear requirements for wireless networks – 802.11 should monitor, be aware of this general push, and prepare to start considering an 802.11 response • No action at this time – awareness only Report Slide 18 Adrian Stephens, Intel Corporation from slide 6/6 of 11-11/1569r1 by Mark Hamilton, Polycom, Inc. Nov 2011 doc.: IEEE 802.11-11/1561r1 JTC1 ad hoc closing report (Nov 11) Date: 2011-11-11 Authors: Name Andrew Myles Report Company Address Phone Cisco email andrew.myles@cisco.con Slide 19 Adrian Stephens, Intel Corporation from slide 1/7 of 11-11/1586r0 by Andrew Myles, Cisco Nov 2011 doc.: IEEE 802.11-11/1561r1 Abstract Closing report for JTC1 ad hoc for Nov 2011, Atlanta Report Slide 20 Adrian Stephens, Intel Corporation from slide 2/7 of 11-11/1586r0 by Andrew Myles, Cisco Nov 2011 doc.: IEEE 802.11-11/1561r1 JTC1 ad hoc focused on preparation for upcoming SC6 meeting • Progress in Atlanta (Nov 2011) – Review liaisons to SC6 • Recently 11ae, 11aa, 11mb were liaised – Review status of WAPI in SC6 (802.11i replacement) • • • • Currently in NP comment resolution IEEE 802 focused on removing claims about 802.11i security Reviewed proposals from US & Swiss NBs Next CRM on 21 Nov – Review status of 802.1X/AE and 802.16 security replacements • No progress • IEEE 802 focused on incorrect claims about 802.1X/AE and 802.16 • Unknown if NP proposals will be made at next SC6 meeting Report Slide 21 Adrian Stephens, Intel Corporation from slide 3/7 of 11-11/1586r0 by Andrew Myles, Cisco Nov 2011 doc.: IEEE 802.11-11/1561r1 JTC1 ad hoc focused on preparation for upcoming SC6 meetong • Progress in Atlanta (Nov 2011) – Review status of N-UHT (802.11ac replacement) • Currently being considered as National Standards by MIIT • IEEE 802 focused on incorrect claims about 802.11n/ac and the threat to access to 5GHz spectrum in China • Unknown if NP proposal will be made at next SC6 meeting – Review plan for ISO/IEC 8802 • Agreed to send IEEE 802 standards to ISO/IEC as long as IEEE 802 retains responsibility to maintain and extend • Letter in preparation for consideration by EC – Select delegation for SC6 meeting • Will have prep meeting next week • See motion Report Slide 22 Adrian Stephens, Intel Corporation from slide 4/7 of 11-11/1586r0 by Andrew Myles, Cisco Adrian Stephens, Intel Corporation Nov 2011 doc.: IEEE 802.11-11/1561r1 IEEE 802 members are encouraged to participate in their SC6 NBs • SC6 P-Members – Korea - KATS – Spain – AENOR – France – AFNOR – USA – ANSI – UK – BSI – Germany – DIN – Greece – ELOT – Russia - GOST R – Luxemburg – ILNAS – Tunisia – INNORPI Report – Japan - JISC – Kazakhstan – KAZMEMST – Kenya – KEBS – Belgium - NBN – Netherlands – NEN – China – SAC – Canada – SCC – Finland – SFS – Switzerland – SNV – Czech Republic - UNMZ Slide 23 from slide 5/7 of 11-11/1586r0 by Andrew Myles, Cisco Nov 2011 doc.: IEEE 802.11-11/1561r1 JTC1 ad hoc will prepare for next SC6 meeting in Jacksonville • Plans for Jacksonville (Nov 2011) – Review results of WAPI comments resolution meetings – Prepare for next SC6 meeting (Feb 2012 in China) – ... Report Slide 24 Adrian Stephens, Intel Corporation from slide 6/7 of 11-11/1586r0 by Andrew Myles, Cisco Nov 2011 doc.: IEEE 802.11-11/1561r1 Motion to empower HoD • Motion – The JTC1 ad hoc recommends that Bruce Kraemer be appointed as HoD to the SC6 meeting in Feb 2012 and the WAPI CRMs and be authorised to: • Appoint the IEEE 802 delegation • Approve any necessary submissions • Call any necessary preparation teleconferences • Note: equivalent motion in ad hoc passed 8/0/0 • Moved: • Seconded: Report Slide 25 Adrian Stephens, Intel Corporation from slide 7/7 of 11-11/1586r0 by Andrew Myles, Cisco Nov 2011 doc.: IEEE 802.11-11/1561r1 IEEE 802.11 Regulatory SC Atlanta Closing Report Date: 2011-11-11 Authors: Name Rich Kennedy Report Affiliations Address Phone email Research In Motion 7305 Napier Trail Austin, TX 78729 +1-972-207-3554 rikennedy@rim.com Slide 26 Adrian Stephens, Intel Corporation from slide 1/6 of 11-11/1574r0 by Rich Kennedy, Research In Motion Nov 2011 doc.: IEEE 802.11-11/1561r1 Abstract This presentation is the closing report for the November 8, 2011 IEEE 802.11 Regulatory Standing Committee meeting in Atlanta. Report Slide 27 Adrian Stephens, Intel Corporation from slide 2/6 of 11-11/1574r0 by Rich Kennedy, Research In Motion Nov 2011 doc.: IEEE 802.11-11/1561r1 Regulatory Summary – North America • US – FCC 5 GHz rules changes update; NPRM due in December – Discussed FCC rules and multi-band operation planned in TGad, TGaf, TGai – John Notor discussed the waiver requested by Progeny for LMS in the 902 – 928 MHz band • Canada – TVWS Consultation update closed November 4th Report Slide 28 Adrian Stephens, Intel Corporation from slide 3/6 of 11-11/1574r0 by Rich Kennedy, Research In Motion Nov 2011 doc.: IEEE 802.11-11/1561r1 Regulatory Summary – European Union • Ofcom – Completing first round of TVWS trials – Meeting December 12th to discuss results, the day before the start of the next SE43 ( ) meeting • ETSI ERM TG11 meeting December 6 – 10 to review responses from PE on EN 300 328 revision to complete the work item • ETSI BRAN bringing sharing mechanisms adopted in EN 300 328 to EN 301 893 (5 GHz bands) Report Slide 29 Adrian Stephens, Intel Corporation from slide 4/6 of 11-11/1574r0 by Rich Kennedy, Research In Motion Nov 2011 doc.: IEEE 802.11-11/1561r1 Regulatory Summary - Asia • UHT and EUHT – China CCSA approved and passed the standards to MIIT – MIIT studying the responses from industry – USITO meeting Nov 14, 15 attended by FCC chair Report Slide 30 Adrian Stephens, Intel Corporation from slide 5/6 of 11-11/1574r0 by Rich Kennedy, Research In Motion Nov 2011 doc.: IEEE 802.11-11/1561r1 Critical Action Issues • We had an extensive discussion of the impact of FCC regulations, specifically Parts 15.15 and 15.202, on planned multi-band operations that are part of TGad, TGaf and TGai Report Slide 31 Adrian Stephens, Intel Corporation from slide 6/6 of 11-11/1574r0 by Rich Kennedy, Research In Motion November 2011 Nov 2011 doc.: IEEE 802.11-11/1561r1 Smart Grid SC Closing Report– November 2011 Name Company Address Phone email Bruce Kraemer Marvell 5488 Marvell Lane, Santa Clara, CA, 95054 +1-321-751-3988 bkraemer@marvell.com Date: 10 November 2011 Discussion topics during November Atlanta Session Tuesday Abstract: 1 – Tutorial https://mentor.ieee.org/802.15/dcn/11/15-11-0802-00-0000-802november-2011-sg-tutorial-composite-r0.pptx 2 - NIST PAP2 3 – NIST Framework Report Slide 32 Adrian Stephens, Intel Corporation from slide 1/7 of 11-11/1582r0 by Bruce Kraemer, Marvell November 2011 Nov 2011 doc.: IEEE 802.11-11/1561r1 Atlanta Agenda High level • PAP02 GOALS, Work plan, Schedule, – Rewrite of Section 4, 5, 6 • Procedure to apply for Catalog of Standards NIST Framework document – comment period open Report Slide 33 Adrian Stephens, Intel Corporation from slide 2/7 of 11-11/1582r0 by Bruce Kraemer, Marvell November 2011 Nov 2011 doc.: IEEE 802.11-11/1561r1 Guideline Sections • • • • • • • • • Sect 2 Acronyms and Definitions Sect 3 SG Conceptual Model & Business Requirements Sect 4 Wireless Technology Sect 5 Modeling & Evaluation Approach Sect 6 Factors to Consider Sect 7 Conclusions Sect 8 References Sect 9 Bibliography Annex (e.g. A, B, C, D, E) Report Slide 34 Adrian Stephens, Intel Corporation from slide 3/7 of 11-11/1582r0 by Bruce Kraemer, Marvell November 2011 Nov 2011 doc.: IEEE 802.11-11/1561r1 PAP02 Guideline - Schedule Overview • Wireless Guideline 1 published – Jan 13, 2011 • • • • • • Finalize wireless model – Oct 7, 2011 Revise Sections 2,3,4,5,6,7,8,9,Annex - March 16, 2012 Collect all details on modeling scenarios – Nov 4, 2011 Exercise, refine, output model results – Feb 3, 2012 PAP02 vote on Guideline 2 Submit Guideline 2 to CoS process – April 16, 2012 • Wireless Guideline 2 published – Aug 10, 2012 Report Slide 35 Adrian Stephens, Intel Corporation from slide 4/7 of 11-11/1582r0 by Bruce Kraemer, Marvell November 2011 Nov 2011 doc.: IEEE 802.11-11/1561r1 Wireless Guideline Version 1 Attribute Identifier of the standard Title of the standard Name of owner organization Latest versions, stages, dates URL(s) for the standard Standard Information NIST IR 7761 Guidelines for Assessing Wireless Standards for Smart Grid Applications NIST 1 http://collaborate.nist.gov/twikisggrid/pub/SmartGrid/PAP02Objective3/NIST_PAP2_Guidelines_for_Assessi ng_Wireless_Standards_for_Smart_Grid_Applications_1.0.pdf http://collaborate.nist.gov/twiki-sggrid/bin/view/SmartGrid/SGIPCosSIFNISTIR7761 Report Slide 36 Adrian Stephens, Intel Corporation from slide 5/7 of 11-11/1582r0 by Bruce Kraemer, Marvell November 2011 Nov 2011 doc.: IEEE 802.11-11/1561r1 Goals of Guideline 1 to 2 Changes • Provide a significantly better method for analyzing/comparing the performance of a wireless technology in a representative physical environment with a specified data load scenario – Utilize realistic data loading (developed by OpenSG) – Significantly extend the technology modeling (SDO sub com) – Correct definitions contained in Section 4 Report Slide 37 Adrian Stephens, Intel Corporation from slide 6/7 of 11-11/1582r0 by Bruce Kraemer, Marvell November 2011 Nov 2011 doc.: IEEE 802.11-11/1561r1 Framework Release 2.0 • SGIP calls for Comments on Draft NIST Framework and Roadmap for Smart Grid Interoperability Standards, Release 2.0 • Released for public comments via Federal Register Notice on October 25, 2011 • Click HERE for the NIST Framework and Comments page. Click HERE for the Draft Release 2.0 [PDF, 5.3 MB]. • The deadline for public comments is November 25, 2011 at 5:00 PM Eastern Time. http://collaborate.nist.gov/twiki-sggrid/bin/view/SmartGrid/IKBFramework#Draft_NIST_Framework_and_Roadmap Report from slide 7/7 of 11-11/1582r0 Nov 2011 doc.: IEEE 802.11-11/1561r1 November 2011 Closing Report -TGmb Date: 2011-11-09 Authors: Name Dorothy Stanley Report Affiliations Address Phone Aruba Networks 1322 Crossman Ave +1 630-363Sunnyvale, CA 1389 94089 email dstanley@arubanetworks. com Slide 39 Adrian Stephens, Intel Corporation from slide 1/6 of 11-11/1567r0 by Dorothy Stanley (Aruba Networks) Nov 2011 doc.: IEEE 802.11-11/1561r1 Abstract This document contains the TGmb closing report for November 2011. Report Slide 40 Adrian Stephens, Intel Corporation from slide 2/6 of 11-11/1567r0 by Dorothy Stanley (Aruba Networks) Nov 2011 doc.: IEEE 802.11-11/1561r1 Accomplishments • Developed and approved report to EC requesting conditional approval to proceed to RevCom • Recirculation on D12.0 currently underway – Closes November 13th • Teleconference calls – November 15, 18, December 2 – 10am Eastern (7am Pacific), 1 hour Report Slide 41 Adrian Stephens, Intel Corporation from slide 3/6 of 11-11/1567r0 by Dorothy Stanley (Aruba Networks) Nov 2011 doc.: IEEE 802.11-11/1561r1 Current TGmb Plan of Record May 2008 – Issue Call for Comment/Input July 2008 – begin process input and old Interpretation requests Acknowledge previous Task Group referrals • • Report Sept 2008 – PAR revision process started Nov 2008 – close receipt of new input Nov 2008 – WG/EC approval of PAR Revision Dec 2008 – NesCom/SASB approval PAR Revision May 2009 – First WG Letter ballot Nov 2009 – Recirc start July 2010 – Conditional Sponsor Ballot Approval from EC August 2010 – Form Sponsor Pool (45 days) – Closes Sept 14 November 2010 – Initial Sponsor Ballot completion Jan 2011 – Sponsor Recirc. Start Nov 2011 – WG/EC Final Approval March 2012 – RevCom/SASB Approval Slide 42 Adrian Stephens, Intel Corporation from slide 4/6 of 11-11/1567r0 by Dorothy Stanley (Aruba Networks) Nov 2011 doc.: IEEE 802.11-11/1561r1 Goals for Nov - Jan 2011 • Recirculation Sponsor Ballot on D12.0 • Comment resolution on any comments received on D12.0 • Recirculation SB on D12.0 (unchanged) or D13.0 (if needed) • Submit draft to RevCom, via continuous process • January meeting – Standards Board continuous process follow-up Report Slide 43 Adrian Stephens, Intel Corporation from slide 5/6 of 11-11/1567r0 by Dorothy Stanley (Aruba Networks) Nov 2011 doc.: IEEE 802.11-11/1561r1 References Report Slide 44 Adrian Stephens, Intel Corporation from slide 6/6 of 11-11/1567r0 by Dorothy Stanley (Aruba Networks) Nov 2011 doc.: IEEE 802.11-11/1561r1 802.11aa –Robust Audio Video Transport Streaming Atlanta Closing Report Date: 2011-11-10 Authors: Name Affiliation Address Graham Smith DSP Group Alex Ashley NDS Ltd 2941 Sunrise Blvd, #100 +1 916 379 8709 Rancho Cordova , CA One London Road, Staines, +44 1784 848770 Middlesex, TW18 4EX, England Report Phone email Graham.smith@dspg.com aashley@nds.com Slide 45 Adrian Stephens, Intel Corporation from slide 1/5 of 11-11/1578r0 by Graham Smith, DSP Group Nov 2011 doc.: IEEE 802.11-11/1561r1 Work Completed • Resolved all initial Sponsor Ballot comments (11/1382r3) • 147 comments • Discussed 11/1417r1, “Ping-Pang Handoff” • Consensus that subject was not in PAR for 11aa • Passed Motion to approve a 15-day Sponsor Group Recirculation Ballot of D 7.0 • Held a joint meeting with 801.AVB Report Slide 46 Adrian Stephens, Intel Corporation from slide 2/5 of 11-11/1578r0 by Graham Smith, DSP Group Nov 2011 doc.: IEEE 802.11-11/1561r1 Joint meeting with 802.1AVB • Provided 11aa update • New 802.1BA "Audio Video Bridging Systems" standard – Bridging and Metrics (latency/QoS) are the main topics of BA. • 802.1AVB have been very happy with the liaison with 11aa and are looking for a continuing similar relationship to assist with the AV streaming aspects on the wireless side once 11aa is completed. Report Slide 47 Adrian Stephens, Intel Corporation from slide 3/5 of 11-11/1578r0 by Graham Smith, DSP Group Nov 2011 doc.: IEEE 802.11-11/1561r1 Goal for January Meeting • Complete comment resolution of Sponsor Ballot recirculation comments • Start new recirculation Report Slide 48 Adrian Stephens, Intel Corporation from slide 4/5 of 11-11/1578r0 by Graham Smith, DSP Group Nov 2011 doc.: IEEE 802.11-11/1561r1 Timeline 11aa 1. 2. 3. 4. 5. 6. First Recirculation -- Sep 10, 2010 Form Sponsor pool –May 2011 MEC Done – Aug 2011 Start Sponsor Ballot – Sep 2011 First Sponsor Recirculation – Nov 2011 Sponsor Ballot done (final WG approval) – Mar 2012 7. Final or conditional 802 EC approval – Mar 2012 8. RevCom/SA approval -- June 2012 (need to line up with appropriate RevCom/SA meeting dates) Report Slide 49 Adrian Stephens, Intel Corporation from slide 5/5 of 11-11/1578r0 by Graham Smith, DSP Group Nov 2011 doc.: IEEE 802.11-11/1561r1 TGac November 2011 Closing Report Date: 2011-11-10 Authors: Name Affiliations Address Phone email Osama Aboul-Magd Huawei Technologies 303 Terry Fox Drive, Kanata, ONT, K2K-3J1 613-287-1405 Osama.aboulmagd@huaw ei.com Report Slide 50 Adrian Stephens, Intel Corporation from slide 1/5 of 11-11/1583r0 by Osama Aboul-Magd (Huawei Technologies) Nov 2011 doc.: IEEE 802.11-11/1561r1 Abstract This document is the closing report for the TGac for the November 2011 session. Report Slide 51 Adrian Stephens, Intel Corporation from slide 2/5 of 11-11/1583r0 by Osama Aboul-Magd (Huawei Technologies) Nov 2011 doc.: IEEE 802.11-11/1561r1 Work Completed • Complete resolutions of LB 178 comments on D1.0. • Approved a motion to proceed to a 30-day WG letter ballot • Approved a motion to have a TG ad hoc meeting, March 7-9, 2012 in the Bay area. Report Slide 52 Adrian Stephens, Intel Corporation from slide 3/5 of 11-11/1583r0 by Osama Aboul-Magd (Huawei Technologies) Nov 2011 doc.: IEEE 802.11-11/1561r1 January 2012 Goals • Comments resolution on Draft 2.0 Report Slide 53 Adrian Stephens, Intel Corporation from slide 4/5 of 11-11/1583r0 by Osama Aboul-Magd (Huawei Technologies) Nov 2011 doc.: IEEE 802.11-11/1561r1 Conference Call Times • Previously Approved – Nov 17, Dec. 8 • 10:00 - 12:00 ET – Dec 1, Dec 15 • 10:00-12:00 ET • January 12, Feb 2nd , 2012 – 10:00 – 12:00 ET • January 26, Feb 9, 2012 – 20:00 – 22:00 Report Slide 54 Adrian Stephens, Intel Corporation from slide 5/5 of 11-11/1583r0 by Osama Aboul-Magd (Huawei Technologies) Nov 2011 doc.: IEEE 802.11-11/1561r1 TGad November 2011 Closing Report Date: 2011-11-11 Authors: Name Eldad Perahia Report Company Address Phone email Intel Corporation 2111 NE 25th Ave Hillsboro, OR 97124 503-712-8081 eldad.perahia@intel.com Slide 55 Adrian Stephens, Intel Corporation from slide 1/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation Nov 2011 doc.: IEEE 802.11-11/1561r1 Abstract This document is the closing report for TGad for the November 2011 session. Report Slide 56 Adrian Stephens, Intel Corporation from slide 2/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation Nov 2011 doc.: IEEE 802.11-11/1561r1 Work Completed • Resolved all comments on LB 185 this week • TG and WG approved motion for recirculation letter ballot on D5.0 • LB186 started on Nov 9 • TG and WG approved Report to EC on Conditional Approval to go to Sponsor Ballot • Proposal for working relationship with CWPAN, Bruce Kraemer, 11/1570 Report Slide 57 Adrian Stephens, Intel Corporation from slide 3/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation Nov 2011 doc.: IEEE 802.11-11/1561r1 Proposal for working relationship with CWPAN (Summary of 11/1570) (1/2) • Background: CWPAN wishes to modify the 11ad specification in ways that were not known of by 11ad during its development including such items as China specific spectrum allocations and channelization • Summary of proposal: – Start a new project to amend 802.11+TGad, e.g. study group, new PAR, new Task Group – Mutual exchange of documentation between 802.11 and CWPAN – Initial ideas on Task Group meeting locations in Asia, attendance, voting rights – New task group led by CWPAN principle • Details regarding the operation of the Task Group require work during the study group Report Slide 58 Adrian Stephens, Intel Corporation from slide 4/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation Nov 2011 doc.: IEEE 802.11-11/1561r1 Proposal for working relationship with CWPAN (Summary of 11/1570) (2/2) • CWPAN response positive and supportive • The IEEE SA staff and officers are aware of the project proposal and support it • IEEE SA has recently signed an MOU with CCSA • Strawpoll in TGad: Do you support the formation of a study group to establish a forum for developing the procedural framework, clarifying the technical goals and developing a PAR and 5C documents focused on CWPAN extensions to 11ad ? – yes/no/abs: 31/0/2 Report Slide 59 Adrian Stephens, Intel Corporation from slide 5/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation Nov 2011 doc.: IEEE 802.11-11/1561r1 Motion to form China 60 GHz (C60G) Study Group • Request approval by IEEE 802 LMSC to form an 802.11 Study Group to establish a forum for developing the procedural framework, clarifying the technical goals, and developing a PAR and five criteria focused on CWPAN extensions to P802.11ad • [TGad strawpoll result: 31-0-2] Report Slide 60 Adrian Stephens, Intel Corporation from slide 6/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation Nov 2011 doc.: IEEE 802.11-11/1561r1 LB 186 ePoll • Read instructions on: http://www.ieee802.org/11/LetterBallots/LB186ad/LB186_instructi ons.html, then click on “Cast Your Vote Here” Click link: -“Add comment” for individual comment, -“Upload comments” for multiple comments Report Slide 61 Adrian Stephens, Intel Corporation from slide 7/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation Nov 2011 doc.: IEEE 802.11-11/1561r1 Upload Multiple Comments • New CVS template for comments; do not use old XLS file Click link to download new CVS template Report Slide 62 Adrian Stephens, Intel Corporation from slide 8/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation Nov 2011 doc.: IEEE 802.11-11/1561r1 Goals for January 2011 • Start Sponsor Ballot in December • Comment resolution on initial Sponsor Ballot Report Slide 63 Adrian Stephens, Intel Corporation from slide 9/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation Nov 2011 doc.: IEEE 802.11-11/1561r1 Conference call times • Previously approved conference calls – Oct 27, Nov 17, Dec 8 • 10:00 – 12:00 ET – Oct 20, Nov 3, Dec 1, Dec 15 • 20:00-22:00 ET Report • New conference calls – Not overlap with TGac – Dec 22, Jan 5, Jan 26, Feb 9 • 10:00 – 12:00 ET – Dec 29, Jan 12, Feb 2, Feb 16 • 20:00-22:00 ET Slide 64 Adrian Stephens, Intel Corporation from slide 10/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation Nov 2011 doc.: IEEE 802.11-11/1561r1 TGae Closing Report – November 2011 Date: 2011-11-08 Authors: Name Affiliations Address Phone email Michael Montemurro Research in Motion 4701 Tahoe Blvd. Mississauga, ON. Canada. L4W 0B4 +1-905-629-4746 mmontemurro@rim.com Report Slide 65 Adrian Stephens, Intel Corporation from slide 1/5 of 11-11/1546r0 by Michael Montemurro, Research In Motion Nov 2011 doc.: IEEE 802.11-11/1561r1 Abstract This document is the closing report for the TGae Task Group for the November 2011 session. Report Slide 66 Adrian Stephens, Intel Corporation from slide 2/5 of 11-11/1546r0 by Michael Montemurro, Research In Motion Nov 2011 doc.: IEEE 802.11-11/1561r1 Work Completed • Comment Resolution for Sponsor Ballot Recirculation on D6.0 – https://mentor.ieee.org/802.11/dcn/11/11-11-1442-03-00ae-tgae-sb-recirc-1comment-resolutions.xls – Approved resolutions to 17 comments. – Approved a revised resolution to 1 comment that was rejected on the initial SB – Approval rating increased to 97% (3 no voters) • Minutes: – https://mentor.ieee.org/802.11/dcn/11/11-11-1547-00-00ae-minutes-fromnovember-plenary.docx • Teleconferences: – Teleconferences on Wednesday Dec 14 and Jan 11 at 11am ET for 1 hour. Report Slide 67 Adrian Stephens, Intel Corporation from slide 3/5 of 11-11/1546r0 by Michael Montemurro, Research In Motion Nov 2011 doc.: IEEE 802.11-11/1561r1 TGae Timeline – November 2011 • Initial Working Group Letter Ballot: September ‘10 • Re-circulation Working Group Letter Ballot: January ‘11 • Form Sponsor Ballot Pool: May ’11 • Mandatory Editorial Check: May ’11 • Initial Sponsor Ballot: Aug ’11 • Sponsor Ballot Recirculation: Oct ‘11 • Final WG/EC Approval: Mar ‘12 • RevCom/Standards Board Approval: June ‘12 Report Slide 68 Adrian Stephens, Intel Corporation from slide 4/5 of 11-11/1546r0 by Michael Montemurro, Research In Motion Nov 2011 doc.: IEEE 802.11-11/1561r1 January 2012 Goals • Resolve comments from latest Sponsor Ballot recirculation • Prepare for a clean Sponsor Ballot recirculation Report Slide 69 Adrian Stephens, Intel Corporation from slide 5/5 of 11-11/1546r0 by Michael Montemurro, Research In Motion Nov 2011 doc.: IEEE 802.11-11/1561r1 TGaf Atlanta Closing Report Date: 2011-11-11 Authors: Name Affiliations Address Rich Kennedy Research In Motion Cisco 7305 Napier Trail +1-972-207-3554 Austin, TX 78729 170 W. Tasman Dr., +1-408-527-0815 San Jose, CA, 95134 Peter Ecclesine Report Phone email rikennedy@rim.com pecclesi@cisco.com Slide 70 Adrian Stephens, Intel Corporation from slide 1/7 of 11-11/1573r0 by Rich Kennedy, Research In Motion Nov 2011 doc.: IEEE 802.11-11/1561r1 Abstract This presentation is the closing report for the twelfth faceto-face meeting of IEEE 802.11 TGaf taking place the week of November 7, 2011 at the IEEE 802 Plenary in Atlanta. Report Slide 71 Adrian Stephens, Intel Corporation from slide 2/7 of 11-11/1573r0 by Rich Kennedy, Research In Motion Nov 2011 doc.: IEEE 802.11-11/1561r1 Agenda • Approve meeting and teleconference minutes • Approve the LB171 comment spreadsheet in 1111/277r20 • Approve draft P802.11af D1.04 as the working draft • Review of the progress since September • Comment resolution • PHY planning • Adjust the timeline as necessary • Plan for January meeting, Ad Hoc and teleconferences Report Slide 72 Adrian Stephens, Intel Corporation from slide 3/7 of 11-11/1573r0 by Rich Kennedy, Research In Motion Nov 2011 doc.: IEEE 802.11-11/1561r1 TGaf Accomplishments • Resolved 237 comments – 1168 of 1302 comments have Approved resolutions – New (old) PHY direction will bring back over 100 comments • Heard a PHY proposal from Ron Porat and Vinko Erceg • Group decided to adjust our PPV/O for PHY change – Changed: “In order to meet international requirements and facilitate the use of multiple contiguous or non-contiguous channels, use of TGac with changes for TGaf is our focus.” to “The starting point is to use the High Throughput PHY with scaling and modifications for the TV bands.” • Revised the P802.11af timeline • Planned for January meeting, and weekly teleconferences – Tuesdays at 21:00 ET Report Slide 73 Adrian Stephens, Intel Corporation from slide 4/7 of 11-11/1573r0 by Rich Kennedy, Research In Motion Nov 2011 doc.: IEEE 802.11-11/1561r1 Plans for January • Complete comment resolution • Incorporate PHY changes • Prepare draft 2.0 and ask the WG to begin our second Letter Ballot Report Slide 74 Adrian Stephens, Intel Corporation from slide 5/7 of 11-11/1573r0 by Rich Kennedy, Research In Motion Nov 2011 doc.: IEEE 802.11-11/1561r1 TGaf Timeline – Updated November 2011 • • • • • • • • • Report New Initial Working Group Letter Ballot: January 2011 Second Working Group Letter Ballot: January 2012 Recirculation Letter Ballot: May 2012 Form Sponsor Ballot Pool: October 2012 Initial Sponsor Ballot: November 2012 Recirculate Sponsor Ballot: January 2013 Final WG/EC Approval: July 2013 RevCom/Standards Board Approval: September 2013 Slide 75 Adrian Stephens, Intel Corporation from slide 6/7 of 11-11/1573r0 by Rich Kennedy, Research In Motion Nov 2011 doc.: IEEE 802.11-11/1561r1 Teleconferences • Weekly on Tuesdays: • Time: 21:00 ET for 120 minutes Report Slide 76 Adrian Stephens, Intel Corporation from slide 7/7 of 11-11/1573r0 by Rich Kennedy, Research In Motion Nov 2011 doc.: IEEE 802.11-11/1561r1 IEEE 802.11ah Closing Report for November 2011 Date: 2011-11-10 Authors: Name David Halasz Report Affiliations Aclara Address th 2315 W. 9 Street Austin, TX 78703 Phone email 330-283-2715 dave.halasz@oaktreewirel ess.com Slide 77 Adrian Stephens, Intel Corporation from slide 1/5 of 11-11/1577r0 by David Halasz, OakTree Wireless Nov 2011 doc.: IEEE 802.11-11/1561r1 Activity in TGah • Work continued on specification framework – 11-11-1137-03-00ah-specification-framework-for-tgah.docx – Modified South Korea channelization – Added support for a new frame format for a short beacon • Channel model document updated – 11-11-0968-02-00ah-channel-model-text.docx – Outdoor device to device path loss model added Report Slide 78 Adrian Stephens, Intel Corporation from slide 2/5 of 11-11/1577r0 by David Halasz, OakTree Wireless Nov 2011 doc.: IEEE 802.11-11/1561r1 Going forward • Update Specification Framework document, providing details on functional blocks Report Slide 79 Adrian Stephens, Intel Corporation from slide 3/5 of 11-11/1577r0 by David Halasz, OakTree Wireless Nov 2011 doc.: IEEE 802.11-11/1561r1 Teleconferences • • December 12th at 7 PM ET 1.5 hours January 9th at noon ET 1.5 hours • Desire to have rolling time of noon, 10 AM and 7 PM Report Slide 80 Adrian Stephens, Intel Corporation from slide 4/5 of 11-11/1577r0 by David Halasz, OakTree Wireless Nov 2011 doc.: IEEE 802.11-11/1561r1 Timeline • No update, see 11/285 for details – – – – – Report Internal Task Group Ballot : July 2012 Initial Letter Ballot : November 2012 Initial Sponsor Ballot : November 2013 EC Approval : September 2014 Revcom Approval : November 2014 Slide 81 Adrian Stephens, Intel Corporation from slide 5/5 of 11-11/1577r0 by David Halasz, OakTree Wireless Nov 2011 doc.: IEEE 802.11-11/1561r1 IEEE 802.11TGai Closing Report Date: 2011-11-09 Authors: Name Company Address Phone email Hiroshi MANO ROOT Inc. 8F TOC2 Bldg. 7-21-11 NishiGotanda, Shinagawa-ku, Tokyo 141-0031 JAPAN +81-3-5719-7630 hmano@root-hq.com Marc Emmelmann Fraunhofer FOKUS Fraunhofer FOKUS Kaiserin-Augusta-Alle 31 10589 Berlin Germany +49-30-3463 7268 emmelmann@ieee.org Report Slide 82 Adrian Stephens, Intel Corporation from slide 1/11 of 11-11/1585r0 by Hiroshi Mano (ATRD Root Lab) Nov 2011 doc.: IEEE 802.11-11/1561r1 Abstract This presentation is the closing report for the Atlanta meeting of the IEEE 802.11 TGai. Report Slide 83 Adrian Stephens, Intel Corporation from slide 2/11 of 11-11/1585r0 by Hiroshi Mano (ATRD Root Lab) Nov 2011 doc.: IEEE 802.11-11/1561r1 Plan for this week Atlanta, Nov 2011 • Official time slot – – – – Monday AM1 (Joint Adhoc with REG-SC),PM1 Tuesday PM1, Wednesday PM1,PM2 Thursday AM2,PM1,PM2 • Goals for the Meeting: – Joint Adhoc with REG-SC – Review and Approve the Okinawa and Teleconference meeting minutes – Presentation of submissions • Submission of Initial technical contribution • General submission – TIME line of task group – Plan for Jan & Teleconference Report Slide 84 Adrian Stephens, Intel Corporation from slide 3/11 of 11-11/1585r0 by Hiroshi Mano (ATRD Root Lab) Nov 2011 doc.: IEEE 802.11-11/1561r1 Accomplishments TGai 1/3 • Review and approve Okinawa and Teleconference meeting minutes. – September 2011 Okinawa Session Minutes – https://mentor.ieee.org/802.11/dcn/11/11-11-1350-00-00ai-september2011-okinawa-session-minutes.doc – Oct-Nov Teleconference Minutes – https://mentor.ieee.org/802.11/dcn/11/11-11-1389-02-00ai-oct-novteleconference-minutes.doc Report Slide 85 Adrian Stephens, Intel Corporation from slide 4/11 of 11-11/1585r0 by Hiroshi Mano (ATRD Root Lab) Nov 2011 Nov 2011 doc.: IEEE 802.11-11/1561r1 Accomplishments TGai 2/4 • Technical contribution – 1414r2 Probe Request and Response in Tgai / Katsuo Yunoki (KDDI R&D Laboratories) – 1413r0 Real air-time occupation by beacon and probe / Katsuo Yunoki (KDDI R&D Laboratories) – 1415r0 AP status broadcast / Katsuo Yunoki (KDDI R&D Laboratories) – 1436r0 Security requirements for TGai / Robert Sun (Huawei) – 1488r0/1429r0 fils-auth-with-a-ttp / Dan Harkins (Aruba Networks) – 1160r3 Fast Authentication for FILS / Cherian, Geroge (Qualcomm Inc.) – 1426r0 Fast Security Setup / Dezhi Zhang(ZTE Corporation) – 1453r0/1047r4 Using Upper Layer Message IE in TGai) / Ping Fang (HUAWEI TECHNOLOGIES CO.,LTD.) – 0977r6 TGai Upper Layer Setup Proposal / Hitoshi Morioka (ATRD Root Lab) Report Slide 86 Adrian Stephens, Intel Corporation from slide 5/11 of 11-11/1585r0 by Hiroshi Mano (ATRD Root Lab) Nov 2011 Nov 2011 doc.: IEEE 802.11-11/1561r1 Accomplishments TGai 3/4 • Technical contribution – – – – – – – – – – – – – 1548r0 Proposal discovery / Paul Lambert (Marvell ) 1525r0 IP address assignment indication / Cherian, George (Qualcomm) 1565r0 AP status broadcast / Katsuo Yunoki (KDDI R&D Laboratories) 1523r0 Access Enhancements for FILS: Network Discovery & Access congestion Improvements / Santosh Abraham (Qualcomm Inc.) 1498r1 GAS version control / Phillip Barber (Huawei) 1499r0 GAS query optimization / Phillip Barber (Huawei) 1500r0 Broadcast probe response / Phillip Barber (Huawei) 1559r0 scanning goals and challenges / Jarkko Kneckt (Nokia) 1521r0 network discovery enhancements AP / Marc Emmelmann (Fokus) 1572r0 sec-prop-poll /Dan Harkins (Aruba Networks) 11-1576r0 Scanning Enhancements for FILS – Normative Text /Marc Emmelmann (Fraunhofer FOKUS) 11-1014r2 IP address configuration during association / Gabor Bajko ( Nokia ) 11-1575r0 Editors_recommendations_for_Submissions Report Slide 87 Adrian Stephens, Intel Corporation from slide 6/11 of 11-11/1585r0 by Hiroshi Mano (ATRD Root Lab) Nov 2011 Nov 2011 doc.: IEEE 802.11-11/1561r1 Accomplishments TGai 4/4 • Editors Report – 11-11-1527-00-00ai_TGai_Editors_Report.pptx will be uploaded late tomorrow morning / Tom Siep (CSR)Approved Weekly Teleconference schedule • Approved Time Line • Approved Plan for January Report Slide 88 Adrian Stephens, Intel Corporation from slide 7/11 of 11-11/1585r0 by Hiroshi Mano (ATRD Root Lab) Nov 2011 doc.: IEEE 802.11-11/1561r1 Time line of TGai – – – – – – – – PAR Approved, Modified, or Extended WG Letter Ballots Initial / Recirc Form Sponsor Ballot Pool / Reform MEC Done IEEE-SA Sponsor Ballots Initial / Recirc Final 802.11 WG Approval final or Conditional 802 EC Approval RevCom & Standards Board Final or Continuous Process Approval – ANSI Approved Report 2010-12-08 Jul 12 / Nov 12 May 13 May 13 Jul 13/ Nov13 May 14 May14 Sep 14 N/A Slide 89 Adrian Stephens, Intel Corporation from slide 8/11 of 11-11/1585r0 by Hiroshi Mano (ATRD, Root, Lab) Nov 2011 Nov 2011 doc.: IEEE 802.11-11/1561r1 Teleconference Schedule • Motion: – Approve the following schedule of weekly teleconferences. – Monday 23:59 EST (NY Time) continue from 21st Nov. – Duration 1Hour – Using WEB-EX that will be provided by Task Group Chair • Moved: Marc Emmelmann , Seconded: Lei Wang • Result: 8 - 2 - 4 passes Report Slide 90 Adrian Stephens, Intel Corporation from slide 9/11 of 11-11/1585r0 by Hiroshi Mano (ATRD, Root, Lab) Nov 2011 Nov 2011 doc.: IEEE 802.11-11/1561r1 Plan for January • Plan for January – Goal • Close call for submissions • Drafting draft 0.1 Report Slide 91 Adrian Stephens, Intel Corporation from slide 10/11 of 11-11/1585r0 by Hiroshi Mano (ATRD, Root, Lab) Nov 2011 doc.: IEEE 802.11-11/1561r1 Thanks to all who participated! Report Slide 92 Adrian Stephens, Intel Corporation from slide 11/11 of 11-11/1585r0 by Hiroshi Mano (ATRD Root Lab)