Florida Department of TRANSPORTATION FLORIDA’S TURNPIKE ENTERPRISE TENTATIVE WORK PROGRAM SUMMARY (FY 17-21) Paul Satchfield Program Manager Administrator December 10, 2015 Florida Department of TRANSPORTATION Tentative Construction Fiscal Years 2016/17 – 2020/21 (in Millions) Capacity Improvement 16/17 17/18 18/19 19/20 20/21 Total 401.7 477.9 603.9 431.0 435.3 $2,349.8 37.2 62.7 43.9 19.4 19.4 $182.6 Bridge 6.6 63.7 2.0 11.8 3.2 $87.3 Safety 0.0 0.0 0.0 0.0 0.0 $0.0 Public Private Partnerships 0.0 0.0 0.0 0.0 10.9 $10.9 Resurfacing Total $445.5 $604.3 $649.8 $462.1 $468.8 $2,630.6 Resurfacing $182.6 6.9% Capacity Improvement $2,349.8 89.3% Bridge Program $87.3 3.3% Public Private Partnerships $10.9 0.4% Capacity Improvement Resurfacing Bridge Program Public Private Partnerships Florida Department of TRANSPORTATION Tentative Product Support Fiscal Years 2016/17 – 2020/21 (in Millions) Preliminary Engineering 16/17 17/18 18/19 19/20 20/21 Total 122.4 105.5 87.7 84.0 79.7 $479.2 54.0 66.5 71.3 56.0 54.4 $302.3 Right of Way Support 5.6 0.1 0.1 0.1 0.1 $6.1 Other 0.4 1.0 1.0 0.0 0.2 $2.6 Const. Eng. Inspection Total $182.4 $173.1 $160.1 $140.1 $134.4 $790.2 Construction Engineering Inspection $302.3 38.3% Preliminary Engineering $479.2 60.6% Right of Way Support $6.1 0.8% Other $2.6 0.3% Preliminary Engineering Construction Engineering Inspection Florida Department of Transportation Right of Way Support Other Florida Department of TRANSPORTATION FY 17 Consultant Acquisition Plan PM Planned Ad Formal Ad Shortlist Date Final Selection Date STATEWIDE Bolan 12/7/2015 1/25/2016 3/15/2016 5/10/2016 DESIGN STL Soldati 1/25/2016 2/22/2016 4/8/2016 6/13/2016 DESIGN LAKE Hinson 4/18/2016 5/2/2016 6/13/2016 8/8/2016 RESURFACE POLK PKWY, MP 0.00 - 8.00 DESIGN POLK Soldati 3/7/2016 4/4/2016 5/23/2016 7/18/2016 423374-1 PD&E MAINLINE WIDENING JUPITER TO FT PIERCE (MP 116 to 152) PD&E MARTIN/STL Zornek 5/2/2016 5/30/2016 7/18/2016 9/19/2016 17804 437952-1 WIDEN SEMINOLE XWAY, SR434 TO N OF CR427 (MP44-49.4) (4TO8 LNS W EXP) PD&E/ DESIGN SEMINOLE Ambare 5/23/2016 6/20/2016 8/8/2016 10/10/2016 7 17809 415748-1 TBD 6/6/2016 7/5/2016 8/22/2016 10/24/2016 8 17802 Nagot 7/5/2016 8/1/2016 9/19/2016 11/21/2016 9 17812 TBD 7/18/2016 8/15/2016 10/3/2016 12/12/2016 10 17803 Bolan 4/18/2016 5/2/2016 6/13/2016 11 17806 Hinson 7/25/2016 8/22/2016 10/10/2016 12/19/2016 BDI (Y / N) County Ad # Project # 1 17810 437371-1 2 17807 436517-1 Y 3 17811 437988-1 Y 4 17808 436520-1 Y 5 17801 6 Description Project Type ALTERNATIVE CORRIDOR EVALUATION (ACE) DESIGN CONSULTANT ACQUISITION RESURFACE TPK MAINLINE IN ST. LUCIE COUNTY, MP 153.23-169.32 RESURFACE MAINLINE LAKE COUNTY MP 287.761 TO 288.748 (NB AND SB) AND 288.748 TO 297.870 (NB ONLY) WIDEN TPK FROM SR710 (MP 106.1) TO MP PD&E PALM BEACH 117 (4 TO 8 LNS) ORLANDO SOUTH ULTIMATE INTERCHANGE PD&E/ 438547-1 ORANGE IMPROVEMENTS DESIGN RESURFACE MAINLINE MARTIN COUNTY (MP 437992-1 Y DESIGN MARTIN 117.8 TO 138.10) HEFT US1 EXIT RAMP MODIFICATION LOOP 437206-1 DESIGN MIAMI-DADE RAMP TO THE NW (MP 0) 435786-1 WIDEN TPK- MINNEOLA INTCHG TO DESIGN LEESBURG NORTH INTCHG (MP 279 - 289.3) LAKE Florida Department of Transportation 8/8/2016 Florida Department of TRANSPORTATION Additional FY 17 Consultant Acquisitions District-Wide Design Services Continuing Services Contracts: • Materials Testing and Geotechnical Services • Landscape Design • Design Build Request for Proposal (RFP) Development Miscellaneous Design Contracts: • One advertisement, two (2) consultants selected Florida Department of Transportation Florida Department of TRANSPORTATION TENTATIVE FY 18 Design (PH 32) Projects FPID AD # / CONTRACT # DESCRIPTION PH 431737-1 AET PHASE 8 TICKET SYSTEM (MP 88 -MP 236) 32 435787-1 WIDEN TPK- LEESBURG NORTH INTCHG TO LAKE/SUMT ER C/L (MP 289.3 - 297.9) 32 435788-1 WIDEN TPK FROM LAKE/ SUMTER C/L TO CR 468 INTCHG (MP 297.9 - 301.4) 32 437953-1 WIDEN SEMINOLE EXPRESSWAY FROM CR427 TO RINEHART ROAD (MP 49 TO MP 54) 32 437986-1 RESURFACING MAINLINE ST. LUCIE COUNTY MP 138.130 TO MP 153.230 32 437987-1 RESURFACING MAINLINE ORANGE COUNTY MP 255.499 TO MP 259.402 32 437991-1 Amendment RESURFACE TPK MAINLINE IN PALM BEACH CNTY,MP 81.4-83.822 & 86.5-90.183 32 438019-1 Misc Design HEFT BRIDGE PAINTING FOR SR 821 RAMP OVER US 1 & SR821 N/B OVER SR874 32 XXXXXX-X SPUR WIDENING 32 XXXXXX-X HEFT (NW 41ST ST 114TH AVE - TURN LANE) 32 Florida Department of Transportation Florida Department of TRANSPORTATION Major Projects: South Florida – Broward & Miami-Dade SR 821 (HEFT) Widening with Express Lanes • SR 836 to Miramar Toll Plaza (20 Miles) FYs 2017 & 2018 Sawgrass Expressway Widening with Express Lanes • Sunrise to Powerline Rd (21.5 Miles) FYs 2019, 2020 & 2021 Mainline Widening with Express Lanes • Atlantic Blvd to Wiles Rd (4 Miles) FY 2019 • Sawgrass to Palm Beach County Line (2 Miles) FY 2021* *Continues as projects in Palm Beach County Florida Department of Transportation Florida Department of TRANSPORTATION Major Projects: South Florida – Palm Beach Mainline Widening with Express Lanes • Palm Beach / Broward County Line to Lake Worth Road (17 Miles) FY 2018, 2020 & 2021* *Continuation of project in Broward County starting at Sawgrass Expressway 17 Miles of Express Lanes in Palm Beach County Florida Department of Transportation Florida Department of TRANSPORTATION Major Projects: Central Florida – Polk and Lake Mainline - Widening with Express Lanes • Lake/Orange County Line to Minneola (5 Miles) FY 2021* Test Facility Florida Polytech • Adjacent to Polk Parkway FY 2017 Polk Parkway Widening • Dixie Highway to South of Pace Road (4 Miles) FY 2018 *Continues as project in Lake County 5 Miles of Express Lanes in Lake County Florida Department of Transportation Florida Department of TRANSPORTATION Major Projects: Central Florida – Orange and Osceola Mainline Widening with Express Lanes • • US 192/441 to Beachline (SR 528) (13 Miles) FY 2017 & 2019 SR 50/Clermont to Orange/Lake County Line (1 Mile) FY 2021* Mainline Interchanges: • • New Interchange at Sand Lake Road (MP 257) FY 2021 Direct Connect Ramps to I-4 Express Lanes (MP 259) FY 2018 *Continuation of project in Lake County starting at Minneola 14 Miles of Express Lanes in Orange and Osceola Counties Florida Department of Transportation Florida Department of TRANSPORTATION Major Projects: PD&E and Design Mainline Widening with Express Lanes • PD&E Re-evaluation - SR 710 to Jupiter, 11 miles in Palm Beach County, FY 2017 • PD&E - Jupiter to Ft. Pierce, 36 miles in Martin County and St. Lucie County, FY 2017 • PD&E - Orlando South Ultimate Interchange Improvement (SR 528 at Mainline), Orange County, FY 2017 Seminole Expressway Widening with Express Lanes • PD&E and Design - SR 434 to CR 427, 5 Miles in Seminole County, FY 2017 SR 821 (HEFT) • Design - Improve Interchange at Hainlin Mills Road (SW 216th St - MP 11), FY 2017 • PD&E – Improve Interchange at US 1 (MP 0), FY 2017 Florida Department of Transportation Florida Department of TRANSPORTATION Useful Links: Florida’s Turnpike Enterprise (FTE): http://www.floridasturnpike.com/index.cfm FTE’s Consultant Acquisition Plan: http://www.dot.state.fl.us/procurement/CAP.shtm FTE’s Work Program Utility: http://www.floridasturnpike.com/workprogram/index.html Florida Department of Transportation Florida Department of TRANSPORTATION Paul Satchfield FTE Program Management Administrator Paul.Satchfield@dot.state.fl.us 407.264.3458 Florida Department of Transportation