Document

advertisement
Subsurface
Presenter / date if required
www.xodusgroup.com
1
Subsurface
Key Strengths
>
>
>
>
>
Independent
Operator, consultancy and service company
experience
Diverse global client base, asset types and
terrains
Integrated solutions focusing on maximising
value
Access to other value-adding, valueprotecting or compliance assuring services
2
Subsurface
What we do
Providing integrated field development planning, execution and production optimisation services that
address transactional and asset lifecycle challenges
Acquisition
and Divestment
Exploration
Appraisal
Development
Production
Decommissioning
3
Subsurface
What we do
Providing integrated field development planning, execution and production optimisation services that
address transactional and asset lifecycle challenges
Acquisition
and Divestment
>
>
>
>
>
>
Exploration
Appraisal
Data room – hosting, visiting and data
structuring
Portfolio review
Technical evaluation
Notional and firm development plans
Asset valuation / high grading
Asset competence persons reporting
Development
>
>
>
>
Production
Decommissioning
Reserves audits
Environmental impact assessments / audits
Support for asset handover and operational
readiness assurance
Production optimisation
4
Subsurface
What we do
Providing integrated field development planning, execution and production optimisation services that
address transactional and asset lifecycle challenges
Acquisition
and Divestment
>
>
>
>
>
Exploration
Regional studies
Basin modelling
Acreage evaluations
Prospect evaluations
Seismic acquisition design
Appraisal
>
>
>
>
Development
Production
Decommissioning
Generation of notional development plans
Appraisal planning
Data acquisition planning and support
Well design
5
Subsurface
What we do
Providing integrated field development planning, execution and production optimisation services that
address transactional and asset lifecycle challenges
Acquisition
and Divestment
>
>
>
>
>
>
>
Exploration
Appraisal
Development
Production
Decommissioning
Generation of risk and uncertainty management plans
Value of Information (VoI) analysis
Data acquisition planning and support
Well design
Feasibility studies
Generation of notional development plans
Asset valuations
6
Subsurface
What we do
Providing integrated field development planning, execution and production optimisation services that
address transactional and asset lifecycle challenges
Acquisition
and Divestment
>
>
>
>
>
>
>
Exploration
Appraisal
Development
Production
Decommissioning
Feasibility studies
Concept identification
Concept selection
Field development planning
Data acquisition and operations support
Gas utilisation feasibility, concept identification and selection
Waterflood design and management
7
Subsurface
What we do
Providing integrated field development planning, execution and production optimisation services that
address transactional and asset lifecycle challenges
Acquisition
and Divestment
>
>
>
>
>
Exploration
Appraisal
Production system optimisation
Surveillance and reservoir management planning
Integrated operations planning
Generation of asset reference plans
Operations and maintenance planning and support
Development
>
>
>
>
Production
Decommissioning
Asset integrity management
Debottlenecking studies
EOR design, plotting and implementation
Waterflood design and management
8
Subsurface
What we do
Providing integrated field development planning, execution and production optimisation services that
address transactional and asset lifecycle challenges
Acquisition
and Divestment
>
Exploration
Appraisal
Development
Production
Decommissioning
Well decommissioning status evaluation and definition
9
Subsurface
Key People
Andrew Sewell
Global Subsurface Lead
Jon Rodd
Subsurface Director
>
>
>
>
>
>
>
Based in London
23+ years’ experience
Ex Senergy – 3 years (Head of
Subsurface – Europe and Africa)
Ex Schlumberger – 7 years
(Geophysicist / Manager – UK,
ME, USA)
>
>
Based in Dubai
30+ years’ experience
Ex Shell (UK, The Hague, Syria
and Oman)
Former PD Manager and
Operations GM at Dragon Plc
Former E&P Director at Prime
Energy
10
Subsurface
Team
1
5
Reservoir Engineering
Geology
Commercial
Geophysics
Petrophysics
Production Technology
29 team members
22 years average experience
5
12
1
5
11
Subsurface
Our Processes
>
>
>
Established workflows for different
services
A structured QA / QC process and
milestones involving client personnel
Strong project management including
progress and cost reporting
12
Subsurface
Global Experience
Subsurface experience in
The Americas . Europe
FSU . Middle-East
Africa . Asia
13
Subsurface
Global Experience
Middle range operators
Non operating equity holders
Utility companies
Oil and gas majors
National Oil Companies (NOCs)
Start-up and smaller companies
Financial institutions/investment funds
14
Subsurface
Kurdistan Region
>
>
>
>
>
>
>
Active in Kurdistan for 5 years
Executed over 25 projects
80,000 hours on Kurdish projects
40,000+ hours have been executed in
Kurdistan
MNR registration completed
Erbil office in progress
Personnel on the ground in Kurdistan
Xodus experience
15
Subsurface
Africa
>
>
>
>
>
Due diligence (buyer)
Due diligence (seller)
Marginal field / onshore / offshore (shallow
and deep) development concepts
Field development plans
Data room visits and asset evaluation
Xodus experience
16
Subsurface
North Sea
Extensive subsurface experience
>
>
>
>
>
>
>
Seismic interpretation / geo-modelling
License applications
Tight (micro Darcy) HPHT chalk
Reserve audits
Asset high grading and hosting data-room
Audits of production forecasts
Due diligence / peer reviews
17
Subsurface
Global Experience
Lamu Oil and Gas Ltd., Kenya, block L1
Frontier Exploration
Our experienced and knowledgeable team reacts quickly and advises on
appropriate strategies for exploring a frontier block in a timely fashion
Project scope
> Play concepts to be targeted for exploration
> Review of regional geology and analogues
> Interpret legacy seismic data and tie with gravity, magnetics and wells
> Identify contractors for seismic operations
> Create ITT documents
> Bid evaluations, negotiations and contractor management
> 2D seismic design and parameterisation
> Overall supervision of field operations
> Processing supervision and QA / QC
> Seismic interpretation and geological modelling
> High grading of basin areas (basin modelling)
> Lead and prospect generation
> Exploration well proposal
Key features
> Complicated rift and inversion geology
> Poor quality legacy data (seismic and wells)
> Sparse data and lack of well control
> Poorly understood petroleum system
> Logistically challenging area to acquire new data
> Time pressure from government as per PSC terms
18
Subsurface
Global Experience
YFP, Nigeria, Aje field
Field Development
Our multidisciplinary team recommends technically sound development
options and delivers a field development plan on a tight schedule
Project scope
> Data gathering and review of existing geophysical interpretation – focus
on depth conversion
> Review existing and build new of static model
> Well test analysis / other Res Eng and dynamic simulation
> Aje-5 well location proposal and application to drill
> Conceptual FDP for Cenomanian Oil
> Project economics
Key features
> Complex depth conversion resulting in volumetric uncertainty
> Building viable models with limited well and history data which reflected
the range of dynamic uncertainty
> Fast iteration between subsurface and economic models for screening
of development concepts
> Assistance with regulatory approval
> Delivering development plan on tight schedule to operator
19
Subsurface
Global Experience
Supernova Energy, Guinea Bissau, Block 7B
Seismic Interpretation and Prospect Identification
Our experienced and knowledgeable team provides seismic interpretation to
build a prospect inventory
Project scope
> Review of regional geology and analogues; tectonics, depositional
environments and petroleum systems
> Interpret newly acquired 3D seismic and merge with existing 2D project
> Lead identification and prospect inventory building
> Assist with farm out and data room
Key features
> Complex geology off the shelf
> Heavily faulted section with detailed structural interpretation
> Carbonate reef, structural and stratigraphic traps all identified
> Lack of well control of the shelf needed experienced regional
understanding of likely sedimentation and stratigraphy
20
Subsurface
Global Experience
Private Nigerian Oil and Gas Company, Nigeria onshore
Production Optimisation
Integrated geological, dynamic and surface systems modelling for 5 fields in
3 onshore Nigerian licenses for an independent operator
Project scope
> Project history review and identification of production optimisation work
scopes for assets rejuvenation
> Seismic re-interpretation, petrophysics, well correlations, static
modelling and conceptual reservoir simulation
> Wells modelling, review of sand control options, recommendations for
gas-lift optimisation and recompletion
> Review of drilling performance, mud types, casing design and well pads
items
> Drilling locations and wells design – preparation of drilling, completion
and data acquisition programs
> Surface facilities design optimisation including water treatment and
export pipelines options
> Economic evaluation of recommended development scenarios
> Certification of reserves based on Nigerian National Standards
> Environmental Impact Assessment and HSE plan
> Decommissioning and abandonment plan
> Field development plan preparation, submission and approval
21
Subsurface
Global Experience
Tullow, Banda Oil Rim, Mauritania
Field Development
An integrated Xodus surface engineering team worked for over 6000 hours
on the Banda development
Project scope
> Systems engineering
> Safety engineering
> Flow assurance
> Field layouts and routing
> Flow design
> Flow specifications
> Flexible riser specifications
> Umbilical specifications
> FPSO mods FEED support
> EPC support for subsea productions system
Key features
> Xodus is performing subsea tie backs on flowlines to the existing FPSO
> Since completing the oil rim development Xodus is now working on the
Pre-FEED and FEED for the gas development of Banda including a
subsea and onshore study
22
Subsurface
Global Experience
Genel, Miran Oilfield, Kurdistan Region, Iraq
Field Development
A fast-track development plan for Genel on the Miran Oil Rim
Project scope
> Identification of business drivers and development strategies
> Integrated subsurface realisations and options development
> Optimisation of gathering system and processing plant location
> Optimisation of capacity based on modular facilities
> Terrain based H2S dispersion analysis to determine injection
location/strategy
> Optimisation of H2S reinjection facilities
> Materials selection
> CAPEX & OPEX profiles for economics
Key features
> Small oil rim of larger gas field
> Fast track deliver to MNR – 3.5 months
> Identified key geological and production uncertainties, how to address
during appraisal
> Early production system, pilot wells and optimise appraisal and
production
> Development plan aligned to investment strategy (revenue/CAPEX)
23
Subsurface
Global Experience
KKR (private equity), Europe / North Africa
Technical Due Diligence
An integrated Xodus subsurface and surface team reviewed a large portfolio
of oil and gas assets
Project scope
> Identification of business drivers and development strategies
> Integrated subsurface realisations and options development
> Optimisation of gathering system and processing plant location
> Optimisation of capacity based on modular facilities
> Terrain based H2S dispersion analysis to determine injection
location/strategy
> Optimisation of H2S reinjection facilities
> Materials selection
> CAPEX & OPEX profiles for economics
Key features
> Small oil rim of larger gas field
> Fast track deliver to MNR – 3.5 months
> Identified key geological and production uncertainties, how to address
during appraisal
> Early production system, pilot wells and optimise appraisal and
production
> Development plan aligned to investment strategy (revenue/CAPEX)
24
Thank you
www.xodusgroup.com
25
Download