County of Santa Clara Capital Programs Division Architect-Engineer Guide for Design Services Purpose: Capital Programs has many construction protocols and standards that are unique to the way we do business. This Guide assists the A-E in: Understanding the design services agreement (PSA- Professional Services Agreement); Understanding the Capital Programs’ construction contract “front end” Division 0/1 specification sections, so that the A-E can readily incorporate the protocols and standards of these sections in to their Construction Document technical specifications; and Identifies the County’s “technical standards” that must be incorporated in to the A-E’s construction design. There are numerous hyperlinks in the Guide. The narrative below is linked to various reference documents such as the Professional Services Agreement. Words and phrases underlined and in blue are hyperlinked to other documents. To access the hyper-linked documents, place your cursor over the link, press down on the Ctrl key, and click on your mouse. How to use this Guide: The information in this main document should be distributed to all subconsultants. The sub-Sections of this Guide that pertain to specific design disciplines should be distributed to the relevant sub-consultants. The checklists in the main Section of this Guide, and for each Sub-Section, such as HVAC, Fire Protection, etc, must be completed by the A-E and the appropriate sub-consultants, and submitted to the County Project Manager when making the 100% construction document submission. Page 1 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs Table of Contents: I. Contract and Project Management Information 1. Organization and Mission of Capital Programs Division 2. Contracting for Design and Consulting Services a) Project Agreements i) Developing Fees ii) Executing a Project Agreement b) County Travel and Expense Reimbursement Policy 3. Invoicing II. Design Phases 1. 2. 3. 4. III. Programming Schematic Design Design Development Construction Documents Design “Protocols” 1. Organization of Technical Specifications 2. “Front End” Documents a) Contractor Quality Control i) Special Inspection (CBC Chapter 17) b) Submittal Review Time c) Warranty Information d) Operation and Maintenance Manuals e) Training f) Commissioning g) Construction Administration 3. Brand Names; and “Or Equal” Specifications a) Issues b) Architectural Features c) Mechanical and Electrical d) “Or Equal” e) A-E Responsibilities 4. Permits from Regulatory Agencies 5. Deferred Submittals and Permits from the Building Department Page 2 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs 6. Citing outside references 7. Extended Warranties IV. Design Standards and Checklists 1. A-E 100% CD Checklist 2. Geotechnical Report, Excavation and Backfill 3. HVAC Design Guide 4. Fire Protection Systems 5. Plumbing 6. Electrical, Including Emergency Generators 7. Architectural 8. Landscaping and Pesticide use 9. Elevators 10. Building Automation System 11. Security Systems 12. Sustainable Design 13. Lighting Control 14. Site Civil—Storm Water Containment Page 3 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs Contracting and Project Management Organization and Mission of Capital Programs Division Capital Programs Division is part of the Facilities and Fleet Department, County of Santa Clara. The County is made up of Departments and Agencies including the Department of Corrections which operates the Jail and the Elmwood Correctional Facility; Probation Department which operates Juvenile Hall and the James Ranch and Muriel Wright Center, The Office of the District Attorney; Office of the Sheriff; Santa Clara County Health and Hospital System; and other agencies. The staff of Capital Programs manages the planning, design and construction of facilities infrastructure and buildings for the County. Separately, the County Roads and Airports Department oversees the maintenance and construction of County roads and bridges. Capital Programs has a staff of approximately 22 people. We are led by Ken Rado, the Manager, Capital Programs Division. The Chief of Design is Siva Darbhamulla, and the Chief of Construction is Alex Gallego. The two branch Chiefs supervise a total of 10 Project Managers. Although many of our Project Managers are Registered Architects and Engineers, we contract for nearly all design and engineering consulting services. Contracting Instruments Once selected through a qualification-based process A-E firms enter in to a Professional Services Agreement (PSA) with the County. A PSA is an “umbrella” Agreement that provides a menu of services and deliverables (S&D) that may be ordered by Capital Programs. PSA’s may be for a specific project, usually large in total project value (>$10M); or they be for a variety of smaller projects that are defined, or still yet-to-be-determined. PSA’s are approved by the Board of Supervisors. Each PSA has a maximum compensation limit (MCL), which sets a limit of the total value of fees for the A-E, and an expiration date (term limit). After initial execution of a PSA Capital Programs may subsequently seek Board approval to increase the MCL and/or extend the term limit, should circumstances dictate such action. The services and deliverables (S&D) of a PSA are ordered via a task-order, called a Project Agreement (PA). A PA is an actual contract between the A-E and Capital Programs for the provision of specific S&D, ordered from the “menu” of a PSA, with a timetable for delivery, and a set fee. A PA is signed by an Officer of the A-E firm, the Manager, Capital Programs Division, a representative from County Counsel, and the Deputy County Executive. Page 4 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs Contracting and Project Management For services of a more informal nature, for which the County does not have an appropriate PSA, a Service Agreement (SA) contract may be used by Capital Programs. A SA is valued at less than $100K. It is signed by an officer of the A-E firm, the Manager of Capital Programs, and the County’s Procurement Director. Link back to Table of Contents. Project Agreements (PA) A PA consists of The Recitals section, along with four Attachments: The Recitals section. This section identifies the total value of the PA; identifies the title of the PA; indicates an expiration date of the PA, and contains other legal provisions. This is the document that is signed by the various parties. A template Recitals section is provided here. There are four Attachments to the Recitals: Attachment 1; Scope of Work. The specific S&D are defined in this Attachment. A sample is provided here. Attachment 2; Schedule. The timetable for accomplishing the S&D of Attachment 1 are defined in this Attachment. Attachment 3; Compensation summary. The fees to be paid to the A-E are captured in Attachment 3. A template Attachment 3 is provided here. Fees are in three categories: Fees for Basic Services. Basic Services follow the format in the PSA, usually Part 5. Fees for Supplemental Services. Allowance for Additional Services . When completing Attachment 3 the County Project Manager may include “contingency” funds in the PA to expeditiously order services related to the scope of work of the PA, but not identified as being needed at the time the PA was executed. The Capital Programs’ Project Manager may order additional services by executing an AS Order. An ASO need only be signed by an Officer of the A-E firm and the Manager, Capital Programs Division. A sample ASO is provided here. Fees are of two types: Fixed or Hourly. Fixed for specific S&D for which fees can be quantified at the time of entering in to the Project Agreement; Hourly for the provision of those services for which the A-E effort cannot be quantified up-front. Page 5 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs Contracting and Project Management This distinction is important for the purposes of billing. See the Invoicing section of this Guide for more details. A sample Attachment 3 is provided here. Attachment 4; List of Sub-Consultants. This is used to provide a list of subconsultants, not previously identified in the PSA, who will be used by the A-E in the execution of the Project Agreement. Developing Fees Scope of Work Consultant’s Fee(s) is directly related to the Scope of Work agreed upon and captured in Attachment 1 of the Project Agreement. Developing the Scope of Work is usually an iterative process. The Capital Programs Project Manager will prepare a draft scope of work and send to the A-E for comment. The A-E may edit and refine the Scope and submit back to the Project Manager. Task-fee breakdown Once the Scope of Work is agreed upon the A-E is expected to develop a taskfee breakdown. The Task-fee breakdown should indicate: Specific tasks; The planned hours of effort by the A-E and each sub-consultant; The category of Professional (Project Architect, Job Captain, Draftsman, etc.); and Associated hourly rates. For the A-E that has entered in to the PSA with the County, the hourly rates are established in the PSA and must be used for each Project Agreement. For subconsultants, hourly rates must be consistent with “industry standards.” A sample task-fee breakdown is provided here. The Capital Programs Project Manager will review the task-fee breakdown in order to ensure that all tasks described in the Scope of Work have been captured. The PM will also review the “reasonableness” of the fees. Negotiations may ensue. On “larger” projects development of a task-fee breakdown may not be practical. In such a situation the A-E fee may be based on a percentage-of-construction cost basis. Capital Programs prefers that a fixed price be obtained for performing A-E services. Page 6 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs Contracting and Project Management The Consultant is required to identify, as a separate line item in their fee proposal, the fee for performing quality control and coordination checks. Executing a Project Agreement In order for a Project Agreement to be finalized, the Consultant must sign and then it is signed by the Manager, Capital Programs Division, County Counsel, and the Assistant County Executive. County Travel Policy and Reimbursable Expenses Consultants may be reimbursed for certain travel expenses, particularly if they are visiting the project site from out of the Bay area, and hotel accommodation and rental cars must be used. In these circumstances, the Consultants should familiarize themselves with the County Travel Policy. In all instances in which the Consultant intends to claim reimbursement for travel-related costs, the Consultant must produce detailed, itemized receipts for all items. For example, a credit card receipt for meals is not adequate. The itemized bill must be provided. See also the County’s “Quick Reference Guide” for information about travel expenses. All Reimbursable Expenses must be supported by a receipt. Invoicing Part 11 of the PSA describes, in general terms, the County’s Invoicing policy. Consultant’s fees for a Project Agreement (PA) are captured in Attachment 3 of the PA, the Compensation Summary. A sample is provided here. A sample is provided here. The particular Project Agreement referenced in this sample is for Construction Administration Services. The Compensation Summary is divided into Basic Services, which coincide with Part 5.04 of the PSA; Supplemental Services, which coincides with Part 5.05, and Reimbursable Services, Part 11.02 of the PSA. Fees for specific line items of the PA are either: “Fixed,” meaning the Consultant is performing that specific service for a fixed (set) fee; or “Hourly,” meaning the specific effort, in terms of man-hours, to accomplish a Service is not known at the time of execution of the PA. So the Page 7 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs Contracting and Project Management Consultant will perform the service, track their time, and invoice based on the hourly rates established in the PSA. The sample Compensation Summary provides more information. When the County Project Manager issues a Notice to Proceed for a particular Project Agreement, the PM will send an Excel spreadsheet that is the County’s Invoice form. The form is in two pages. Page 2 of the form is essentially the Compensation Summary of the Project Agreement, in Excel format. Attached is a sample. For the initial invoice the Consultant will complete the yellow portion of the invoice form. The first page of the invoice form will then automatically be populated. The Consultant must sign and date the invoice, provide The Consultant should then use the same spreadsheet for subsequent invoices. When the yellow sections are filled in, the sections in green will automatically be populated. For invoices that contain “hourly” charges (as opposed to “fixed fee” charges) the Consultant must also submit a task-fee breakdown, documenting the hourly charges. Additionally, for all invoices, the Consultant must submit a narrative “report” describing work accomplished during the period covered by the invoice. Link back to Table of Contents Page 8 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs Phases of Design Design Phases This section of the A-E Guide provides a brief overview of Capital Programs’ management of the design process. Architectural Programming This phase of the design process establishes the benchmarks by which the project will be evaluated. Capital Programs has adopted the guidelines of ASHRAE Guideline 0-2005 for the preparation of the Programming document. Click on the Architectural Programming to reference the PSA. Schematic Design Key decisions about the specifics of the project design are made during the SD phase. As part of the SD fee proposal it is incumbent on the A-E to identify specific site investigations that need to be made in order to commence the DD phase of the design. Additionally, during this phase of design the A-E should be establishing the design parameters for the mechanical and electrical systems. Design development During this phase the A-E not only crystallizes the design but also communicates to the County the decisions that have been made to satisfy the design intent requirements, through the submission of the Basis of Design. These design decisions and accompanying calculations provide the County information on not only mechanical and electrical systems, but structural design as well. Construction Documents General: “No Guess” bidding. We want the Contractor to be able to provide a bid on the plans and specifications and not have to guess or gamble on quantity of items or site conditions. For the purposes of developing Construction Documents, this philosophy has two impacts for the A-E: 1. The use of exculpatory language in the CD’s is not acceptable. An example of exculpatory language: “…access panels are required wherever a piece of equipment or operator is inaccessible and requires access for maintenance, repair or adjustment, whether or not shown on drawings..." Page 9 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs Phases of Design There is no way for a Contractor to provide an accurate bid, in a typical 30-day bidding period, for access panels based, on this statement. a. We don’t want A-E’s to have to rely upon, or use, statements such as the one given, or any kind of exculpatory language in the CD’s. b. The A-E, to the best of their ability and reasonable design time, should identify quantities of items to be provided. c. There may be quantities of items that cannot be determined, either because the Contractor actually provides some portion of the design (for example Coordination Drawings), or there may be site conditions that cannot be fully explored. Then the A-E, in conjunction with the County project manager, should identify known quantities and state, in the CD’s, words to the effect of: “Base bid on providing XX widgets, access panels, etc. The County will issue a change order, with appropriate compensation, to adjust this number up or down.” 2. We must provide site condition information to the bidders through one of two ways: (1) Define the site conditions through surveys, borings or selective demolition during design; or (2) Tell the Contractor the expected site conditions he should base his bid, and indicate that if site conditions differ a change order will be issued. Compatibility of Technical Specifications with County Administrative Requirements In addition to representing completing the last 20% of design, the A-E will also be completing the technical specification Sections. These Sections must complement the County’s Division 0 and 1 Sections. Capital Programs has invested significant effort in developing the Div 0/1 sections, and their contents incorporate significant lessons-learned regarding administrative protocols. It is not expected that the A-E read all these Sections (there are over 300 pages). This Guide highlights key elements of the Div 0/1 documents and instructs the AE how to incorporate the County’s requirements in to the technical specifications. As part of the CD phase the A-E must also provide information to the County in several areas, including: sole-source items; permits; equipment to be commissioned ; (If formal commissioning is part of the project) equipment needing operation and maintenance information Tests to be performed by the Contractor; Quality Control Special Inspectors; Page 10 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs Phases of Design List of Confined Spaces; List of Outside References; List of Extended Warranties Submittal review times; CEQA Mitigation Measures; and Document Coordination Check Link back to Table of Contents Page 11 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs Design Protocols Design “Protocols” Capital Programs recognizes the A-E as the technical expert in the design effort. However, based on extensive construction management experience, we have developed certain protocols with respect to development of the contract specifications (also referred to as the Project Manual). These protocols greatly facilitate management of the project. By familiarizing themselves with these protocols the A-E will be able to develop the technical specifications in a way that aligns with Capital Programs’ construction management procedures. Organization of Technical Specifications Most A-E’s will organize the technical specification sections pursuant to AIA and CSI formats and protocols. Within these formats there are three areas of editing requirements relative to County “standards:” 1. The Submittals paragraph of a technical Section must identify all submittals required. Obvious? Well, not so much. a. Qualifications of sub-contractors. Frequently A-E’s will include a paragraph entitled “Quality Assurance.” Identified in this paragraph are the qualifications of a sub-contractor to perform the work. An example is, “Sub-contractor must have five years experience performing XX work.” Or, “Subcontractor must be certified by the product manufacturer to install XX product.” This information should be more appropriately captured in a submittal. The Submittals paragraph should read: “provide documentation that sub-contractor has XX years experience in installing product.” Or, “Provide documentation that sub-contractor is certified by the product manufacturer to install XX product.” b. Operation and Maintenance Manuals The County has a very “robust” O&M specification, Section 01782. The contents of this section are the result of many lessons-learned. The Architect and the sub-consultants should not identity separate O&M requirements in the technical sections. Instead, in the Submittals paragraph, for those products/equipment that normally Page 12 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs Design Protocols would require an O&M manual, instead indicate: “Submit Operation and Maintenance information pursuant to Section 01782.” 2. Quality Control. In the Execution section of a Technical Specification Section, there is normally a paragraph entitled Quality Control. The contents of this paragraph must indicate all the tests that must be performed to achieve quality control. Pursuant to the PSA, A-E must identify in the contract documents all specific tests to be performed by the Contractor; Link back to Table of Contents “Front End” Documents The County has very comprehensive “front end” (Division 0/1) documents. These sections of the specifications are prepared/edited by the County Project Manager and then submitted to the A-E for inclusion in to the overall bid documents. So as to not duplicate or conflict with the Division 0/1 documents the narrative below, and subsequent checklists, are provided to aid in the preparation of the technical specifications. As part of the 100% construction document submission the A-E must complete the checklists at the end of each Section of this Guide and submit to the County Project Manager. Contractor Quality Control The county of Santa Clara employs the Contractor Quality Control (CQC) system of implementing quality workmanship on our construction projects. CQC is a process for improving the quality of construction performed by the Contractor. The A-E-developed plans and specifications define the expected results or outcome for quality. The CQC Program defines specific processes and controls the Contractor must implement to plan for quality, test for quality, and document efforts to achieve quality The employment of the CQC Program is defined in Section 01450 of the contract documents. The A-E is encouraged to read Section 01450 to gain an understanding of the QC program. For the purposes of this Guide the following are key elements of CQC: The Contractor employs a QC organization that is “independent” of the production organization; The QC organization is headed by a QC Manager who has overall responsibility for implementing Quality Control of the Work; Page 13 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs Design Protocols The QC Manager is assisted by “Special Inspectors” who perform inspections in key, specialized areas, such as water-proofing, structural steel and concrete, etc.** (see comments below on OSHPD projects) On larger projects, the QC Manager will be a separate individual. On smaller projects the on-site Superintendent may perform as the QC Manager; The Contractor must contract with an independent Testing Laboratory to perform all tests, such as concrete testing, welding tests, etc. The Contractor performs Quality Control. The County performs Quality Assurance (QA). QC is achieved through continuous inspection and testing, holding 3-phases of inspection meetings, and by thoroughly documenting tests and inspection results. QA is achieved through random testing and inspection, and through continuous review of the Contractor’s QC program. The Checklist below will assist the A-E to incorporate the elements of the QC program in to the technical specifications, and to ensure that the technical sections, and the plans, are consistent with the requirements of Section 01450. ** For OSHPD-related projects, including County Health Centers, CBC-Chapter 17 inspections are performed by an inspection firm hired by the County. The Checklist below indicates wording to be used in the project specifications when CBC-Chapter 17 inspections are performed by the County. CBC Chapter 17 Special Inspections Special Inspections that comply with CBC Chapter 17 also fall under the Contractor’s CQC program. In Section 01450 of the contract documents the County identifies the Special Inspectors that are to be employed by the Contractor, and the frequency of inspections that are to perform. The County Project Manager will prepare the Division 0/1 documents, the A-E will provide assistance in editing the list of Special Inspectors. Submittal Review Time Section 01330 of the Project Manual provides for a 21-day Owner review time for all submittals. For some submittals, such as structural steel for a large project, 21-days is not enough time to review the submittal. The PSA requires that the AE identify all submittals which the A-E feels will require a longer review time than 21-days. The A-E should be prudent in preparing this list, since extended submittal review times can impact the contractor’s schedule and cause his bid price to go up. Page 14 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs Design Protocols Warranties and Guaranties The Contractor must warrant all Work for one year from date of the County Board of Supervisors Acceptance of the Work of the Project. Capital Programs does not recognize terms such as “Beneficial Occupancy” or “Substantial Completion.” The A-E should not include these terms in the technical specifications. Operation and Maintenance Manuals The County has a very comprehensive Operation and Maintenance manuals specification, Section 01782. The A-E should not duplicate the requirements, or conflict with the requirements, of Section 01782 in the Contract documents. The County Project Manager will prepare the Division 0/1 documents; pursuant to the PSA the A-E will provide assistance in editing the list of O&M manuals. Training The County has a very comprehensive Training specification, Section 01820. The A-E should not duplicate the requirements, or conflict with the requirements, of Section 01820 in the Contract documents. The County Project Manager will prepare the Division 0/1 documents; the A-E will provide assistance in editing the list of training requirements. Commissioning For those projects that include equipment or systems that should be formally commissioned (usually with the assistance of an outside Commissioning Consultant) the County has a very comprehensive Commissioning specification, Section 01810 that should be included in the Project Manual. The A-E should not duplicate the requirements, or conflict with the requirements, of Section 01810 in the Contract documents. The County Project Manager will prepare Section 01810; pursuant to the PSA the A-E will provide assistance in editing Section 01810. Describing Construction Administration in the Design The A-E’s role during construction is to advise the Owner. The A-E does not: 1. “Approve” submittals; 2. Approve/accept stages of work before the Contractor can proceed to the next stage; 3. Inspect/accept the Work performed by the Contractor; or 4. Directly communicate “direction” to the Contractor. Page 15 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs Design Protocols These are all Owner responsibilities, since the Owner (the County) holds the contract with the Contractor. Many A-E’s frequently insert these provisions in the contract documents. Sole-Sourcing of Products; Brand Names; and “Or Equal” Specifications Public Contract code 3400 limits the use of sole-source specifications. Additionally, sole-source requirements give the Supplier monopoly power and result in higher bids. Per the A-E PSA, the A-E, when identifying products, must either list two acceptable products if specifying by brand name, or, if preparing a performance specification, must certify that at least two vendors can meet the performance specification. Issues regarding designation by brand name Most A-E’s are used to specifying one product, particularly for architectural features such as carpeting or flooring, or for Mechanical Systems. For Architectural features, the argument for sole-source is often that the client likes a certain pattern made by a specific manufacturer. Or that a particular carpet/floor pattern is a “best fit” for an interior design. For Mechanical systems the argument for sole-source is that other systems, including structural and electrical, cannot be designed unless the “specifics” of the mechanical systems are known. Our experience in Capital Programs is that indicating sole-source for anything, including carpet, floor covering, light fixtures, etc. often “backfires” for the following reasons: o The vendor of that product is given monopoly power and no incentive to provide a competitive price; or delivery date. o During the very-often long time delay between when the technical specifications are prepared, and when a construction contract is awarded and the material actually ordered, the specific product identified as sole-source is no longer made. The County is then put in to the mode of scrambling to identify another product and then negotiating a change order with the Contractor. Page 16 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs Design Protocols o Finally, for Architectural features such as carpet, since the product is not designed to last forever, and carpet patterns go out of style quickly, the argument for sole-source is not a very practical one. Often, in an attempt to get around the Public Contract Code sole-source restrictions, specifications are written around one product, or a particular brand name is specified, and then the phrase “or equal” is inserted, essentially throwing the responsibility back on the Contractor to find an equivalent product, if he wants to provide a product other than that specified. This is problematic from a bidding perspective as well as a construction administration perspective. o The phrase “or equal” triggers the product substitution process, which is governed by Section 01630. Acceptance of a product substitution request is at the discretion of the Owner. So, if the Contractor bids on using the product he wants to substitute, he is essentially gambling that the Owner will accept the product. To the greatest degree possible, we do not want the Contractor to “gamble” when he bids. Another frequent argument for sole-source of products, particularly mechanical and electrical systems, is that these systems must interact with other products or systems. An example is roof-mounted Air Handling units, and in particular their weight and their power draw. AHU’s normally sit on roofs and must be supported by a steel or concrete framing system. If the structural designer does not know the weight of the AHU he will have “difficulty” completing the design of the structure. Similarly, if the power draw of the AHU is not known, the electrical designer may not be able to complete the electrical cabling design. However, similar to the narrative on Architectural features above, it is the experience of Capital Programs that specifying sole-source for mechanical and electrical products often “back-fires.” Well, I think you can surmise that Capital Programs strongly discourages solesourcing of products, unless: 1. The A-E can clearly demonstrate that only one product will serve the County’s needs, and the requirements of the Public Contracts Code are met; Or Page 17 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs Design Protocols 2. The various sections of this design guide specifically direct the A-E to sole-source a particular product. So, how does the County want the A-E to handle specific issues such as Architectural features, mechanical systems, etc.? Architectural Features In the case of finishes like carpet or wall paper, we will settle for “similar” patterns, not exact. In other words, if the client has selected a specific pattern or color during the design process (which may not even be available by the time the projects goes in to construction) the A-E should identify at least two vendors that make, or can make, similar patterns. When describing the technical features of carpet or flooring, the specification shall not be written around one particular product or manufacturer. The A-E is referred to the PSA requirements regarding sole-source items. Mechanical and Electrical Systems The County recognizes that the design of these systems represent a “special challenge,” since there is often significant accompanying electrical and plumbing infrastructure, such as wiring and connecting piping for boilers, HVAC units and the like. For these systems, the requirement to have at least two products (and preferably 3) that meet our needs is NOT relaxed. The A-E may design around one product, but is held responsible for ensuring that at least one other product can satisfy our requirements. The specifications may be performance specifications. Prescriptive specifications may also be used, as long as at least two products can meet the requirements of the specifications. To deal with the “support infrastructure” for this equipment, see Checklist below. “Or Equal” designation This term can also cause problems. We don’t want this term being used on a “throw-away” basis. That means it should not be used by the Design team as a means of avoiding PCC restrictions on sole-source items by requiring the Contractor to research product alternatives, in lieu of providing the single item specified. Page 18 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs Design Protocols As indicated previously, employment of the term “or equal” triggers the substitution process, and this can be a mine-field for the Contractor and the County. The phrase “or equal” may be used in the specifications, but only under one of the following two circumstances: a. At least two other acceptable products have already been specified by brand name, and we want to consider other potential products; or b. The County is not deliberately attempting to limit the number of acceptable products that may be used, so our Building Operations Division does not have to maintain, and stock spare parts for, multiple systems. For example, for Building Automation Systems, for maintenance and operation purposes, the County will only accept three BAS products (see the BAS narrative). If we are going to limit the number of acceptable products these are identified in this guide in the checklists below. Permits from Regulatory Agencies The PSA requires that the A-E identify all permits that will be required from regulatory agencies. We do not require the A-E to actually obtain the permits. The County Project Manager will decide whether to include the requirement to obtain a particular permit as part of the construction contractor’s scope of work, or for Capital Programs to obtain the permit. The A-E and the various sub-consultants are the “experts” in the field of design, and therefore should/must be familiar with permit requirements from regulatory agencies. Deferred Submittals and Permits from the Building Department “Deferred” submittals refer to construction items in which the actual design is performed by the Contractor pursuant to a performance specification in our Contract documents. Page 19 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs Design Protocols On those projects in which we are obtaining an overall permit from the Building Department (the A-E should consult with the County Project Manager to determine if such a permit is being obtained) then some of these submittals such as curtain wall systems, structural support systems, etc. require a separate permit from the County Building department. If such a permit is being obtained, the Submittals paragraph of the specification Section must contain the statement: “The Contractor-supplied design submittals of this Section require a Building Department permit pursuant to Section 01830 Inspection by the Building Official. The Contractor shall make submittals pursuant to paragraph 1.04 .C of Section 01830.” Citing Outside References A-E’s frequently reference outside sources in the specifications such as ASTM, AWS, AISC, Code of Federal Regulations, etc. The intent is to put the onus on the Contractor to be aware of these regulations and to be responsible for compliance. The County recognizes this as a need and it is acceptable practice for the purposes of this Guide. However, if outside references are cited in the “Execution” Part of the specification Section, or the Testing paragraph, or the Quality Control paragraph, then the A-E must provide copies of these references to the Owner. Two examples are provided. In the first, a specification section for U/G storm drain, in paragraph H., an AASHTO test is cited. The A-E will need to provide a copy of this AASHTO reference. In the second, for Asphalt Concrete Paving, paragraph 3.4 D. cites an ASTM test, a CAL 304 test, and a CAL 308 test. Copies of these tests must be provided as part of the 100% design submittal. The reason for this is two-fold: 1. Often these references are out of date. If the A-E is required to provide copies then this search can result in the purging of out-of-date references and the identification of correct ones. 2. During the Construction phase of the project the Owner will need copies of these references in order to facilitate our Quality Assurance efforts over the Contractor’s work. As part of the Deliverables for the Construction Documents-phase Project Agreement, the A-E shall prepare a binder, divided by specification Section. Page 20 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs Design Protocols Each section shall contain copies of the outside references cited in the Execution Part of the specifications, or the Testing paragraph or the Quality Control paragraph. Extended Warranties It is important that the County Project Manager have an accounting of all products, identified in the technical sections, requiring extended warranties, so that at the conclusion of the project we actually receive these warranties. The AE shall provide, as part of the 100% CD submittal, a list of all such products, identified by technical Section and paragraph. Page 21 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs Design Checklists General Design Checklist Note to A-E: This Checklist must be completed and submitted as part of the 100% CD submittal to the County Incorporated in the design Not Applicable Item General Information ” There are no references to the terms “beneficial occupancy,” or “substantial completion.” The correct term is “Milestone Completion. The County Board of Supervisors Acceptance of the Work of the Project establishes the warranty period for the project and triggers the release of Retention. CEQA Mitigation Measures are identified Document Coordination Check certification provided List of Confined Spaces is provided Drawing “border” standards are provided here and here. (note, these are CAD files) Project Manual Cover page is provided here. Sustainable design features have been incorporated, to the greatest degree possible A-E has reviewed CD’s for use of exculpatory language Site condition information is properly described to the Contractor Organization of Specifications “Submittals” paragraph in each technical Section identifies any special Contractor qualifications that need to be verified through a submittal. The County does not “approve” submittals; we only “accept” them. “Execution” section identifies all Quality Control testing and inspection that must be performed Contractor Quality Control Unless this is an OSHPD project ** (including health centers) the technical specifications shall not reference the AE or Owner performing “inspections.” All inspections are performed by either the CQC Manager, CQC Special inspectors, or Contractor’s test lab. Page 22 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs Design Checklists Incorporated in the design Not Applicable Item ** For Health Center projects that require a Building Department permit CBC Chapter 17 inspections will be performed by an inspection firm hired by the County. For those specification Sections that require CBC Chapter 17 inspections (concrete and steel, mostly), the A-E shall insert the following wording in the Quality Control paragraph in the applicable Section. Specifications and Plans reflect that the Testing lab is hired by the Contractor, not the Owner (County). A-E has identified in the contract documents all specific tests to be performed by the Contractor; Specifications reference that only the Contractor performs Quality Control. ** (see above for exception) A-E has assisted the Project Manager in developing a list of Special Inspectors for the Special Inspector table in Section 01450. The specifications and plans indicate that the Contractor’s CQC organization performs all CBC Chapter 17 Special Inspection.** (see above for exception) Submittal Review Time In the technical Sections A-E identifies all submittals that may require longer than a 21-day review time. This information is also communicated to the County Project Manager. Warranties and Guaranties The A-E has reviewed all technical sections to ensure any statement about warranty start date is consistent with our Division 0 requirements. Operation and Maintenance Manuals The A-E has provided assistance in identifying systems and system components that require O&M manuals, and this information is included in Section 01782. No additional/separate O&M requirements need be identified in the contract documents, beyond what is in Section 01782. Training The A-E has provided assistance in editing the list of training requirements that go in to Section 01820 . No additional/separate training requirements need be identified in the contract documents. Page 23 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs Design Checklists Incorporated in the design Not Applicable Item Commissioning The A-E has provided assistance in identifying systems and system components that require commissioning. The A-E may identify in the contract documents specific equipment tests that must be performed; however, the A-E must include the wording (in the appropriate specification paragraph) that the Contractor shall commission equipment pursuant to Section 01810. References to A-E role during Construction Administration The A-E must review the Contract documents and ensure these type references have been changed to Owner actions. Single-Sourcing of Products The A-E has discussed the inclusion of single-source/solesource products with the Capital Programs Project Manager before including in the contract documents. All sole source products must be identified in the Notice to Bidders. The A-E is responsible for identifying these to the Project Manager. Unless the A-E provides justification that meets the criteria established in PCC 3400, if specifying a product by brand name, at least two brand names must be identified. If preparing a performance specification, then the A-E certifies that at least two products meet the specification requirements. In the case of finishes like carpet or wall paper or flooring, we will settle for “similar” patterns, not exact. In other words, if the client has selected a specific pattern or color during the design process (which may not even be available by the time the projects goes in to construction) the A-E should identify at least two vendors that make similar patterns. The phrase “or equal” may only be used under the following circumstances: 1. At least two other acceptable products have already been specified by brand name, and we want to consider other potential products; or 2. The County is not deliberately attempting to limit the number of acceptable products that may be used. See the checklists in the various Sections of this Guide, such as HVAC. Page 24 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs Design Checklists Incorporated in the design Not Applicable Item The A-E shall not use the term “basis of design” in the Contract documents for any other purpose other than that described below in Mechanical and Electrical Systems—Sole Source Issues . Mechanical and Electrical Systems—Sole Source Issues In the event a product/equipment must “interact” with structural systems then the Structural Engineer has designed for the largest “practical, potential” weight of the product/equipment. If the structural “upgrade” costs to accommodate potential equipment are not “nominal,” then the Engineer must bring this information to the attention of the Project Manager. A solution will be provided by Capital Programs. For power-draw and connecting piping issues, AE should place the following note on the equipment schedule drawing(s): “Manufacturers make and model numbers shown on these drawings are the “basis of design” for this project. Contractor shall refer to specification sections for other manufacturers of acceptable alternate products. If a product that differs from the “basis of design” is proposed, Contractor is responsible for providing proper infrastructure, including electrical feeds and plumbing connections, etc., at no additional cost to the County. This information must also be provided to the Owner in the form of shop drawings and other appropriate submittals.” The A-E shall not use the term “basis of design” in the Contract documents for any other purpose other than that described above. Permits from Regulatory Agencies The A-E has provided to the Project Manager a list of permits associated with the construction Work required by Regulatory Agencies. Page 25 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs Design Checklists Incorporated in the design Not Applicable Item Deferred Submittals and Permits from the Building Official Contractor Design-build systems (structural) such as curtain walls, steel frames, etc. contain this statement in the Submittals paragraph: “The Contractor-supplied design submittals of this Section require a Building Department permit pursuant to Section 01830 Inspection by the Building Official. The Contractor shall make submittals pursuant to paragraph 1.04 .C of Section 01830.” Outside References A-E has provided a binder with outside references. Extended Warranties The A-E shall provide, as part of the 100% CD submittal, a list of all products, identified by technical Section and paragraph, requiring an extended warranty. ________________________________ Print name of A-E Project Manager ________________________________ Signature of A-E Project Manager ______________ Date Signed Page 26 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs Design Checklists Building Automation System Elevators Geotechnical Standards Heating, Ventilating and Air Conditioning Systems Fire Protection Systems Plumbing Systems Electrical Systems Architectural Sustainable Design Site Civil Engineering Design Landscaping Page 27 of 27 A-E Design Guide Written by Ken Rado, Deputy Director Facilities and Fleet, for Capital Programs