Session 3: Extractive companies’ perspective on local value creation Methodology To Cost Effectively Accelerate Local Value Creation World Bank Conference on Reconciling Trade and Local Content Development Mexico City, January 27-28, 2016 Jim Walton Fluor Director, Corporate Strategy and Local Content Company Confidential and Proprietary. Do Not Distribute or Copy. 1 AV20140358-004.pptx Agenda A How Do You Create the Optimal Balance Between Local Content and Project Cost? B What Kind of “Team Work” Will Be Required Between Key Stakeholders To Be Successful? C How Do You Perform A “Transparent Evaluation” of a Project in Multiple Areas? D How Do You Evaluate The Local Content Impact On A Project vs Cost? Botswana - Mining Kazakhstan – Oil & Gas Company Confidential and Proprietary. Do Not Distribute or Copy. 2 Fluor Overview One of the world’s largest Engineering, Procurement, Fabrication, Construction & Maintenance companies Oil, gas, chemicals, mining, metals, power, infrastructure, industrial and government Over 1,000 projects annually Workforce of over 40,000 Operates in 81 Countries for 600 Clients Revenues: $21.5 B New awards: $28.8 B Backlog: $42.5 B December 31, 2014 103 78 Company Confidential and Proprietary. Do Not Distribute or Copy. 67 55 68 64 65 3 Fluor’s Local Content Activities Mexico Mexico JV with ICA started in 1993. 3,300 personnel in Office 99.7% Local, Construction 7,000 persons 100% Local, Equip & Material 40% Local Poland Began in 1995 400 personnel and 96%+Local. FEED and EPCM Kazakhstan Russia Began in 1982. JV with 2 Kazakh Design Institutes, 400 person office. office. Qualified person Qualified 100’s 100’s Kazakh suppliers & contractors. Univ’s contractors. Work Work w/ w/ Univ’s Began in 1980. Achieved 80% Russian Personnel for Sakhalin- 1 construction. Russian JV for EPCM and O&M. Training Center China Trinidad & Tobago Started in 1978 600 persons. About 85% Local Began In 2003. FEED and EPCM 120 personnel 80% Local Thailand Chile Began in 1979. Team with local firm Began In 1978. Local Content. Mining Projects Philippines Began in 1987. 2,400 in Manila Manila 2400 in and Cebu. 97%+ Local. FEED, EPCM and JV for Fab Yard Brazil CFPS JV with Construcap 75 personnel in Sao Paulo Legend Other Local Content activities Argentina Began in 1993. Trained 3,000 craft. Have 110 personnel in Buenos Aires South Africa Saudi Arabia Began in 1960. 600 Began in 1947. personnel. Trained 600 personnel in 35,000 craft. About 95% Kingdom. FEED Local. FEED,Company EPCM & Confidential and Proprietary. and EPCM Do Not Distribute or Copy. Self Perform Construct India Began in 1995. 2,100 personnel 3,000 98% local. Performing FEED and EPCM Indonesia Began in 1973. Trained 10,000+ craft. Own 20% of 500 person firm 4 Many People Benefit from Projects Optimized for Local Content Governments NOCs / Mining Co’s Local Engineering Local Mat’l Supply Local Equip. Fab Project Optimized for Local Content Local Construction Local Oper. & Maint. Training Centers Universities Small & Med. Enterprises Community Development IOCs / Mining Co’s EPC Firms Company Confidential and Proprietary. Do Not Distribute or Copy. 5 AV20150349-001.pptx Project Must Also Be Cost and Schedule Optimized Governments NOCs / Mining Co’s Technology Selection Local Engineering Process Configuration Local Mat’l Supply Industry Standard Equipment & Specs Low Cost Country Sourcing of Equipment Modular Fabrication Project Optimized for Cost and Schedule Optimal Balance Local Equip. Fab Project Optimized for Local Content Local Construction Local Oper. & Maint. Training Centers Integrated EPFC Universities Constructability in Design Small & Med. Enterprises Community Development Advanced Workface Planning IOCs / Mining Co’s EPC Firms Company Confidential and Proprietary. Do Not Distribute or Copy. 6 AV20150349-001.pptx Strong Team Work Required to be Successful Owners: Government and Regulators NOCs, IOCs or Mining Companies Project Optimized for Cost and Schedule Optimal Balance Project Optimized for Local Content Local Engineering, Equip., Materials & Construction EPC Firms Approved Investment Company Confidential and Proprietary. Do Not Distribute or Copy. 7 AV20150349-001.pptx Build Trust By Performing A Transparent Evaluation of Local Content and Project Cost STEP #1 Determine the Project’s Design, Material & Construction Requirements Company Confidential and Proprietary. Do Not Distribute or Copy. 8 Determine the Project’s “Demand vs Local Supply” and Develop Growth Plan Demand Demand for Equipment and Materials Local Supply Profile Local Equipment & Material Suppliers Benchmark The Local Firms Growth Plan Inspect & PreQualify Stronger Local Firms Match Some Local Firms with Global Firms Project Detailed Facility Evaluation & Enhancement Plan Infrastructure Country Power Oil Production Company Confidential and Proprietary. Do Not Distribute or Copy. 9 Modify Design To Include More "Local Equipment” and Use Local Firms Material & Equipment Piping Valves Vessels and Internals Pumps Drivers Heat Exchangers Structural Materials Instrumentation Electrical Storage Tanks Insulation/Refractories Paints/Coatings Must Not Compromise Plant Operations Company Confidential and Proprietary. Do Not Distribute or Copy. Increased Local Equipment & Material 10 Strengthen Local Suppliers in Areas of Greatest Spend Material & Equipment Requirements For Next 5 Years Type of Equip. & Material Existing Local Suppliers Enhanced Local Suppliers Cost $Millions Supplier 1 Piping $440 Supplier 2 Valves $200 Supplier 3 Vessels and Internals $240 Supplier 4 Supplier 4 Pumps $200 Supplier 5 Supplier 5 Compressors $ 160 Mixers/Agitators $ 40 Drivers $240 Heat Exchangers $440 Structurals $120 Instrumentation $760 Electrical $360 Furnaces/Boilers $240 Storage Tanks $ 160 Insulation/Refractories $ 160 Paints/Coatings $40 Buildings $40 Other Equipment Total Increase # of Qualified Suppliers Supplier 1 Supplier 2 Supplier 3 Supplier 2 = Qualified Supplier Supplier 3 = Unqualified Supplier Increased Local Equipment & Material $160 $4,000 Company Confidential and Proprietary. Do Not Distribute or Copy. 11 Identify Roles for Small and Medium Enterprises (SMEs) Identify SME Opportunities Advertise Project Opportunities for SMEs on Website or in Newspaper Provide Training for SMEs Company Confidential and Proprietary. Do Not Distribute or Copy. Increased Local Content 12 Evaluate Modular Construction Options Oil & Gas Processing Unit Fabricate Smaller Modules In Country with Local Firms Large Modular Units for Cost & Schedule 3rd Gen Modular Units Confidential and Proprietary. forCompany Local Content Do Not Distribute or Copy. Evaluate Each Piece of the Local Content Plan Based on LC Impact vs Cost Impact Company Confidential and Proprietary. Do Not Distribute or Copy. 14 Estimate The Cost and Schedule Impact of Achieving Higher Local Content Levels 80% 70% 60% Enhanced Local Content Current Local Content 46% 50% 40% 40% 30% 20% 10% 0% Home office Services Engineering Mechanical Equipment Electrical Equipment Instruments and Controls Piping Structural Steel Procurement Company Confidential and Proprietary. Do Not Distribute or Copy. Electrical bulks Construction TOTAL Construction 15 Start Local Content Planning Earlier In The Project Modular Fabrication? JV with Local Firm Benchmark Local Engineers Work with Universities Benchmark Local Firms Pre-qualify Suppliers Use Local Equipment? Supplier Forums & Match Making Benchmark Local Firms JV with Local Firm Evaluate Local Training Craft Training & Mod Fabrication Benchmark Local Firms Develop SME Enterprise Center Company Confidential and Proprietary. Do Not Distribute or Copy. 16 Conclusion: You Can Cost Effectively Accelerate Local Content Implementation Everyone benefits if Local Content and project costs are optimized. Key stakeholders need to work as a team A “transparent evaluation” of a project should be performed Local Content actions can be prioritized Local Content planning must start earlier in the project lifecycle Optimized Local Content and project costs can be achieved Copper Mine in Mongolia Company Confidential and Proprietary. Do Not Distribute or Copy. 17 AV20150349-001.pptx