Curriculum Vitae BHUPINDER SINGH Email:- bpanesar.singh@gmail.com Cell No.-09915567001, 09900053373. Work Experience:- Total about Sixteen Years of work experience. Out of which……… At present working with M/s A2Z Maintenance & Engineering Services Limited from the past approx. 06 Years under following responsibilities: Present Job:- Working as “Deputy General Manager” for R-APDRP Trunkey project at Karnataka to installation of New Distribution Transformers, re-conductering of HT and LT lines at Chitradurga, Hiriyur and Challakere cities. Approx.1Year & 8Months:- Working as “Deputy General Manager” for operation and maintenance of Bio-mass power plants at Co-Operative Sugar Mill Nakodar, Morinda and Fazilka. 1 Year & 05 Months :– Worked as “Sr. Manager” for Turnkey based Agriculture HVDS (High Voltage Distribution System) at Utter Haryana Bijli Vitran Nigam Karnal (Haryana). 04 Months :– Worked as “Sr. Manager” for Turnkey based NTPC project 11kV underground cabling and switching sub-station at international container terminal of Cochin Port Trust/Dubai port trust Ernakulum, Cochin (Kerala). 10 Months :– Worked as “Sr. Manager” for Turnkey based load segregation and 33kV/11kV underground cabling and installation of package Sub-Stations at Utter Haryana Bijli Vitran Nigam Ltd., Rohtak (Haryana). 2 Year : – Worked as “Site Manager” for Turnkey based single phase cluster electrification and three phase HVDS (High Voltage Distribution System) at Punjab State Electricity Board Amritsar, Tarn-Tarn, Kapurthala, Jalandhar (Punjab). Worked with M/s ABB Limited for 7 Months as “Site Manager” for Turnkey based project erection, testing & commissioning of 11kv Lines, transformers and LT lines of urban pattern supply at Punjab State Electricity Board Gurdaspur (Punjab). Worked with M/s Utility Power tech Ltd. (A Joint Venture of Reliance & NTPC) for approx.4 year and 4 months for following responsibilities: 1Year and 4 Months:- worked as “Sr. Engineer” for Turnkey base Reliance project erection, testing & commissioning of HVDS (High Voltage Distribution System) at south Delhi. 3Years:– Worked as “Maintenance Incharge” for operation & routine maintenance of mini hydro power plant (4x1.5 MW) established by Punjab Genco Ltd. at villages Dalla, Tuggal, Narangwal & Chuppki near Ludhiana (Punjab) on Abohar branch canal under M/s Utility Power tech Ltd. (A Joint Venture of Reliance & NTPC). Worked with M/s ARC (India) Engineers Private Limited approx. 5 Years for following responsibilities: 2Years:- Worked as “Site Incharge” for operation of (4x1.5MW) Mini Hydro Power Plant (4x1.5 MW) establish by Punjab Genco Ltd. At Villages Dalla, Tuggal, Narangwal & Chuppki near Ludhiana (Punjab) on Abohar Branch Canal. 3Years:- Worked as “Site Engineer” for Erection, Testing and Commissioning & Routine Maintenance of Steam Turbine & Generator (2x210MW) at Guru Hargobind Thermal Power Plant Lehra Mohabat near Bathinda (Punjab). Achievements :- (a) In the Year2007, received ‘Outstanding Performance Award’ from M/s A2Z Maintenance & Engg. Services Ltd during company annual function on company foundation day. (b) In the Year2008, honored with ‘CMD Award’ by M/s A2Z Maintenance & Engg. Services Ltd. (c) In the Year 2009, received ‘Team best Performance Award’ from M/s A2Z Maintenance & Engg. Services Ltd. Inventions :- (a) Making a crane for installation of Transformers during Agriculture HVDS in Punjab. With this crane, installed more than 25Nos. of Transformers in a day. (b) Made a modification in China made Harvester to collect paddy straw as Bio-Fuel during same time of harvesting to control Environmental pollution by firing of waste paddy straw. The cost of fuel (Paddy straw) collection with this Harvester became economical for the company as compared to other fuel collection methods. Description of Jobs:- (D)Fourth Company: -A2Z Maintenance & Engineering Services Ltd., Gurgaon, E-5/5, First Floor, Shopping Mall, Arjun Marg, DLF City, Phase-I, Gurgaon-122002, which undertakes the Turnkey base projects of 11 KV to 220 KV Lines and 33 KV to 220 KV Sub-Stations in all over India. Job Profile 5:- (From May, 2011 to Till Date) 1 Year and 08 Months worked as Deputy General Manager for operation and maintenance of 3 nos. biomass operated power plants established at Co-operative sugar mill Nakodar, Co-operative sugar mill Fazilka and Co-operative sugar mill Morinda each of capacity 15MW. 1 2 3 Administration of all over Plants. Procurement of Biomass as per seasons. Treble shouting during the operation of plants. 4 5 Submitting the Supply and Labor bills to UHBVNL, Vidyut Sadan, Sector-6, Panchkula, (Haryana). Designing and Amendments of Steel Structure as per site requirements. Job Profile 4:- (From Dec, 2009 to April, 2011) 1 Year and 05 Months worked as Sr. Manager Projects for Turnkey based Agriculture HVDS(High Voltage Distribution System) under Operation Circle, Karnal city (Haryana). 1. 2. 3. 4. 5. Co-ordination with UHBVNL (Uttar Haryana Bijli Vitran Nigam Limited) officers for attending the Project Execution Problems. Attending Progress Review Meetings held at Punchkula with UHBVN, M.D. and Chief Engineer. Procurement of Materials (T/Fs, Poles, Steel Structures, Insulators) for Projects. Submitting the Supply and Labor bills to UHBVNL, Vidyut Sadan, Sector-6, Panchkula, (Haryana). Designing and Amendments of Steel Structure as per site requirements. Job Profile 3:- (From Aug.2009 to Nov.2009) 04 Months worked as Sr. Manager Projects for Turnkey based 11kV underground cabling and Switching Sub-Station for expanding the International Container Terminal of Cochin Port Trust/Dubai Port Trust at Vallarpadam (Kerala). 1. Taking the permissions from PWD, Railway and Kerala State Electricity Board for laying the underground cables. 2. Survey the route of cable lying and take up the approval of drawings. 3. Sub-Contacting the work as per requirement. 4. Procurement of material as per work order and site requirement. Job Profile 2:-(From Oct.2008 to July2009) 10 Months working as Sr. Manager Projects for Turnkey based Load segregation and 33kV/11kV underground cabling under Operation Circle, Rohtak city (Haryana). 1. Buildup the Co-ordination with UHBVNL (Uttar Haryana Bijli Vitran Nigam Limited) for smooth execution of project. 2. Attending the progress review meetings with UHBVNL M.D. and Chief Engineer, PD&C. 3. Procurement of materials (T/Fs, Poles, Steel Structures, Insulators) for projects. 4. Preparing the bills of material supply and labour for submission to UHBVNL, Vidyut Sadan, Sector-6, Panchkula, (Haryana). 5. Designing and amendments of steel structure as per site requirements. 6. Giving the proper guidance to project engineers and site engineers regarding safety and quality of work. 7. Successful completion of installation of 11kV package Sub-Station and laying of HT/LT underground cabling during the development of CM city Rohtak (Haryana). Job Profile 1:- (From Oct.2006 to Sep.2008) 2 Years working as Project Manager for Turnkey based single phase and three phase HVDS projects of Punjab State Electricity Boards Amritsar, Tarn-Taran, Kapurthala & Jalandhar (Punjab). 1. 2. 3. 4. 5. Making Co-ordination with PSEB Officers for smooth execution of work. Attending progress review meetings with PSEB, Chairman and members. Procurement of materials (T/Fs, Poles, Steel Structures, Insulators) for projects. Preparing the Supply & labour bills for submission to PSEB Head Office, Patiala. Designing and amendments of steel structure as per site requirements. 6. 7. Control the production and quality of steel structure fabrication in own company fabrication units installed at Talwandi Choudharian and Mandi Gobindgarh (Punjab). Issue instructions and giving the guidance to project engineers and site engineers regarding safety and quality of work. (C)Third Company: - ABB Limited: 3 Floor Krishana Complex, Sector-31, Noida. It manufactures motors, generators, HT Panels, LT Panels, substation equipments & also undertakes the erection, testing & commissioning of Turnkey base projects 11KV to 220KV from state boards and other organizations in all over world. rd Job Profile:- (From March.2006 to Sep.2006) 7 months, worked as Site Manager and looking after erection, testing and commissioning of 11 KV urban pattern supply lines, transformers and LT lines in 417 Nos. villages in Gurdaspur district from Dera Baba Nanak to Narot Jaimal Singh at Punjab. 1. 2. 3. 4. Co-ordination of erection activities as per schedule. Making Co-ordination with client (PSEB) officers and attending the progress review meetings chaired by Hon’ble Chairman & member distribution on monthly basis. Co-ordination with Head Office & Venders for erection material supply to sites. Close monitoring of progress, quality and safety at site. (B)Second Company: - Utility Power tech Limited (A Joint Venture of REL & NTPC), REL Tower, Sector – 24, NOIDA (Utter Pradesh), which undertakes the erection, testing & commissioning of HVDS/LVDS for NTPC projects & other Organization in all over India. Job Profile 2: - (From Oct. 2004 to Feb. 2006) 1 Year and 4 Months worked as Site Engineer and looking after the HVDS (High Voltage Distribution System) and LVDS (Low voltage distribution system) in south Delhi (Parladpur, Sangam Vihar, Devli Village, Khanpur, Krishna Park, Shive Park, Jwahar Park) etc. 1. Supervision of HVDS work in south Delhi. 2. Erection, testing & commissioning of complete colony including survey, approval of drawing for erection work, material issuing, erection of transformers, neutral earthing, structure earthing & cabling etc. 3. Preparing documentation part such as drawings, billing, erection work handing over documents & testing reports etc. Job Profile 1:- (From Oct.2001 to Sep.2004) 3 Years Worked as Maintenance Incharge looking after the routine & schedule maintenance of 4 Nos. mini Hydro Power Plants having each 1.5MW capacity established at Abohar Branch Canal, Distt Ludhiana (PB). 1. 2. 3. 4. Daily checking of oil level, temperature & pressure of Gear oil & hydraulic power pack. Daily checking of flow & pressure of guide bearing cooling water system. Attend the breakdown of equipments immediately to minimize the generation loss. Daily checking the satisfactory operation of main & bypass canal gates & replacement of damaged bearing of gates wheels, if required. 5. Checking of abnormal noise & vibrations of various machines & auxiliary equipments. 6. Rectification of damaged parts of machines with the new/repaired ones. 7. At the time of canal closing period, de-salting the water inlet side of canal, repairing of damaged lining portion of canal & checking of underwater parts of Turbine. (A)First Company: - ARC India Engineers Pvt. Ltd. New Delhi:-It is a Power Plant erection company. It works in all over India for erection, testing, operation and maintenance of thermal and hydro power plants on contract basis. In the year 1995, this company undertook the work of erection testing & commissioning of 2x210MW Guru Hargobind Thermal power plant, Lehra Mohabat ,Distt. Bathinda (Punjab). Job Profile 2:- (From Sep, 1999 to Sep, 2001) 2 Years Worked as Site Incharge for the operation of mini Hydro power plants (4x1.5 MW), at Abohar Branch Canal, Distt. Ludhiana (PB). 1. Updating of daily generation report of all the Hydro power plants & forwarding to the Director of PUNJAB GENCO LTD., CHANDIGARH. 2. To find & analyze the reason for low generation & take the necessary action to rectify the problem. 3. Attend the problems occurring during the operation & rectify the same. 4. Give the awareness to staff regarding duty and responsibilities. Job Profile 1:- (From June, 1996 to Aug. 1999) 3 Years Worked as Junior Engineer for erection, testing, commissioning & routine maintenance of generator, turbine & auxiliary equipments at 2x210MW Guru Hargobind Thermal Power Plant, Lehra Mohabat, Bathinda (PB). 1. Complete supervision of erection work of steam Turbines (HP, IP & LP) and Generator and auxiliary control systems. 2. Making Co-ordination with Bhart Heavy Electrical Ltd. engineers and Punjab State Electricity Board officers for approval of alignment clearances of Turbine & Generator couplings and shafts. 3. Checking the required tightness, tension & locking of every nuts & bolts of turbine & generator during final fitment 4. Checking the IR value of generator winding & rotor winding. 5. Checking the gas leakage in generator body & checking the leakage of cooling water in stator winding. 6. Checking & adjusting the proper alignment of carbon brushes with slip rings. 7. Routine maintenance of turbine, generator & auxiliary equipments during operation. QUALIFICATION: MBA in project management from Sikkim Manipal University. B.Sc. in Information Technology from Sikkim Manipal University. Electrical Engineering (Diploma) from Mehar Chand Polytechnic, Jalandhar (PB) in 1995. 10+2th (Non Medical) from Guru Nanak National College, Nakodar (PB) in 1990. 10th from Govt. High School, Jalandhar (PB) in 1988. Personal Details:Name : BHUPINDER SINGH Father’s Name : S. Jarnail Singh Date of Birth : 30th May, 1972 Marital Status : Married Sex : Male Nationality : Indian Language Known : English, Hindi, Punjabi. Contact No. : 09915567001. Communicating address :- Village-Kakar Kalan P.O-Kang Kalan Tehsil-Shahkot District-Jalandhar State-Punjab Pin code-144629. I do hereby solemnly declare that all the statements made in this application are true and complete. Place: Date: (BHUPINDER SINGH)