Home Affairs Portfolio Committee PROVINCIAL MANAGER’S PRESENTATION MR ALBERT MATSAUNG GAUTENG 01 SEPTEMBER 2015 1 Table of Contents CONTENT SLIDE NO. Update on the recommendation by the portfolio committee visit on 26 November 2014 Introduction and Background • Foot Print Expansion 3-4 6-19 SERVICES Civic Services Birth registration ID School Project /ID Smart Card Passport Applications Late Registration of Birth 20-27 Immigration Services Deportation Asylum / Refugees 2 Table of Contents Continue CONTENT SLIDE NO. Finance and Support: • Capacity Information • Provincial Fleet • Budget • Revenue Management • Assets Register 33=51 PROJECTS 53=54 • LRB • Operation Feila Achievement 55-56 Challenges 3 UPDATE ON THE RECOMMENDATION BY THE PORTFOLIO COMMIITTEE VISIT ON 26 NOVEMBER 2014 The Committee visited the two Refugee Reception Offices in Pretoria; namely Marabastad Refugee Reception office and the Tshwane Interim Refugee Reception Office (TIRRO) The visit was shortened due to members called back to Parliament. The planned visit to cover Byron Place (PTA), Harrison Street Office (JHB) and Provincial Managers Office did not take place as a result. The committee made the following recommendations in regard to the Tshwane Interim Refugee Reception Office (TIRRO) RECOMMENDATIONS UPDATE ON THE RECOMMENDATIONS The DHA should consider the continued use of TIRRO given the current demands and if so invest in improving the working conditions and consider renovating the facility. Influx of clients at Marabastad is being mitigated by sending 150-200 clients a day to TIRRO. The DG Moetapele team has identified renovations that need to take place at TIRRO and they are engaging with Property Management on the matter The DHA should ensure that the old and irrelevant posters are removed The posters on the walls have been removed and only the relevant ones remain. Those that are high up on the ceiling and cannot be removed have been referred to Property Management to secure a service provider to take them down The DHA should consider upgrading the computers as a matter of urgency - Funding was secured for the procurement of NIIS equipment Approval was received from ISTEC for the procurement thereof In the process of procuring the NIIS equipment 4 The committee made the following recommendations at 8.2 The Marabastad Refugee Reception Centre RECOMMENDATIONS UPDATE ON THE RECOMMENDATIONS The DHA should make sure that the Centre has adequate working air-conditioning. • • The current air-conditioners are being maintained on a day to day basis. A DG Moetapele Project team established to turn around Marabastad is tasked with the procurement of all renovation-related materials including airconditioners, terminal seating, etc The DHA should ensure that there is sufficient security to manage crowds at the Marabastad Refugee Reception Centre • SAPS, CPFs and the migrant community organisations are assisting with queue management in the outside space. Community organisations were brought in later to assist the police so that we all own the process. The statistics for robberies and muggings around the area have decreased as a result of strengthened stakeholder relations The private security is monitored on a daily basis by DHA security from Head Office The budget has been made available for the perimeter fence, cameras and necessary technology in the control room. Procurement processes are under way to install these. SSA are also on board dealing with issues of fraud and corruption inside and outside the office The electronic booking system is being developed and will be implemented before the end of the financial year to manage influx • • • • • The DHA should make sure that the Centre has adequate working air-conditioning. • • The current air-conditioners are being maintained on a day to day basis. A DG Moetapele Project team established to turn around Marabastad is tasked with the procurement of all renovation-related materials including airconditioners, terminal seating, etc 5 INTRODUCTION & BACKGROUND • • • • • • • • The Gauteng Province is the smallest in size with the largest population estimated to be above all the other Provinces in RSA It accounts for an estimated 12,728,400 million which is 23.7% of RSA population as released by Stats SA in 2011. Has 3 Metropolitan Municipalities (Metro) namely Tshwane; Johannesburg and Ekhuruleni and 2 District Municipality (District) West Rand and Sedibeng and 7 Local Municipalities (LM). The Province has a footprint of 145 servicing offices being 61 offices, 10 mobile offices and 67 health facilities for birth registration, 3 Ports of Entry (ORTambo; Lanseria and Waterkloof Airforce base and 1 Refugee Reception Centre with one Satellite office. Have a well established fora at Provincial, Metro, District and Local Municipalities to improve service delivery. Have well established Cadreship and Youth Forum which are actively involved in ensuring entrenchment of leadership, professionalism, development and maintenance of appropriate standards in the province. The Province has launched Moetapele Project which is aimed at capacitating leadership in the Edenvale local office medium. The Province has 24 Smart ID Card producing offices with one dedicated for ID Smart Card and Passport processes only. 6 OVERVIEW ANALYSIS: Executive Summary PROGRESS TOWARDS ACHIEVING STRATEGIC OBJECTIVES End of Year 2014/2015 1. The Provinces achieved 4 out of the 10 targets (40%) for end of financial • • • • Employers Charged Fraudulent Marriages High Impact Outreach Campaigns Smart ID card issued to citizens 16 years and above 1.1. Six (6) Targets were not achieved (60%): •Birth registration within 30 calendar days •Payment of invoices within 30 days •ASM: First Instance Determination •Direct Deportation within 30 Days •Transfers to Lindela within 20 days •Transgressors charged 7 OVERVIEW ANALYSIS: Executive Summary PROGRESS TOWARDS ACHIEVING STRATEGIC OBJECTIVES DURING Q1 2015 1. The Province achieved 6 out of the 12 targets (38%) • Payment of invoices within 30 days • Direct Deportation within 30 Days • Absentee Management 100% • Vacant Post at 8 % or lower • Revenue bank vs bas • LRB outreach 1.1. 6 out 12 Targets were not achieved (62 %): • Birth registration within 30 calendar days • Employers Charged • Transgressors charged • Fraudulent Marriages • Smart ID card issued to citizens 16 years and above • Transfers to Lindela within 20 days 8 Quick wins Finance Managed to ensure payment of suppliers within 30 days during the 1st quarter of 2015/16. Human Resource Filled vacant funded post within the stipulated time frame of three months. Maintained a vacancy rate at less than 6 % which is even less than 10 %t as stipulated by DPSA Launch of Moetapele Managed to support and launch Moetapele Project aimed at capacitating leadership capabilities within the Department Improve stakeholder engagement with Department of Health Managed to implement a LRB cleanup campaign project throughout the Province during the month of July 15 Detected, detained and deported a sizeable number of illegal immigrants under Operation Fiela umbrella Footprint Expansion Managed to support ID Smart Card Rollout to the banks (FNB and Standard bank) Operations Management Implemented the new operating hours model that seeks to ensure operations six days a week with no overtime and time off and therefore improving services to the people . 9 PROVINCIAL OVERVIEW & FOOTPRINT 10 ORGANOGRAM: PROVINCIAL MANAGEMENT STRUCTURE PROVINCIAL MANAGER Mr AM Matsaung PROVINCIAL CO-ORDINATOR Mr DR Buthelezi FINANCE AND SUPPORT Ms PZ Ntshiba EKURHULENI METRO JOHANNESBURG METRO TSHWANE METRO MS MM Moeketsi Ms LM Mkhulise SEDIBENG DISTRICT Ms N Mlenzana WESTRAND DISTRICT Vacant Unfunded Ms L Afilaka OFFICES Large – 2 Medium – 7 Small -6 Hospitals –14 Mobiles - 3 OFFICES OFFICES OFFICES Large -2 Large - 1 Large - 2 Medium – 7 Medium - 4 Medium - 4 Small – 7 Local – 4 Small – 7 Port of Entry – 1 Hospitals - 7 Hospitals – 20 Hospitals –21 Mobile - 1 Mobile - 2 Mobile - 2 OFFICES Large - 1 Medium – 2 Local – 4 Hospitals – 5 Mobile - 2 11 GAUTENG PROVINCE: DISTRICTS GAUTENG PROVINCE 2,921,488 16 2 21 Region 3 City of Tshwane Metro 4.434.827 13 Region 1 City of Johannesburg Metro 20 8 5 820,995 2 Region 2 Westrand District unipality 3,178,470 2 15 14 3 Region 4 Ekurhuleni Metro 916,484 7 1 8 Region 5 Sedibeng District Municipality Number of offices Number of Hospital Population Mobiles SUMMARY OF THE CURRENT FOOTPRINT FOR THE GAUTENG PROVINCE TYPE OF OFFICE DHA current footprint Operational Local Office Large ( former RO) 8 8 Local Office Average ( former DO) 25 25 Local Office Small (former PSP) 19 15 Refugee Reception Centre 1 1 Health Facilities (HSP) 67 27 Ports of Entry (POE) 2 2 Thusong Service Centre (TSC) 7 7 Non Operational due to accommodation challenges 4 not operational due to the buildings vandalised by service protests 36 3G connectivity and 7 health facility work at a capacity of 30 % 13 DHA FOOTPRINT (Offices) TSHWANE METRO Tshwane Metro Modernised (Smart Cards) Thusong Centers Modernised Pretoria Yes Mamelodi Yes Akasia Yes Lebotloane No Temba Not yet Leretlhabetse No Ga-Rankuwa Yes Onverwacht(service point) No Mamelodi Yes Enkangala(service point) No Mabopane Not yet Atteridgeville No Centurion Not yet Cyferskuil(service point) No Cullinan Soshanguve Total Modernised Not Yet Modernised Not yet Yes 5 4 1 6 14 DHA FOOTPRINT (Offices) JHB METRO Office Modernised Thusong Modernised Johannesburg Yes Bara Mall Not Soweto Yes Ennerdale Not Randburg Yes Lenasia Not Alexandra Yes Eldorado Park Not Maponya Mall Yes Orange Farm Not Ivory Park No Yet Dobsonville Not Roodepoort Yes Total modernised 6 0 Total not Modernised 1 6 15 DHA FOOTPRINT (Offices) EKURHULENI METRO Ekurhuleni Metro Modernised PSP Alberton Yes N/A Benoni Not Yet N/A Boksburg Yes Vosloorus Not Yet Brakpan Yes Tsakane Not Yet Edenvale Yes N/A Germiston Yes N/A K/park Yes Tembisa Not yet Nigel Springs Total Modernised Total Not Modernised Yes Yes 8 Duduza Kwa-Thema Not yet Not Yet 0 1 Modernised THUSONG CENTER Modernised Katlehong 5 Not yet 01 16 DHA FOOTPRINT (Offices) WESTRAND DISTRICT Westrand large Modernised Medium Randfontei n Not yet Modernised Small office Modernised Krugersdorp Yes Kagiso Not yet Carletonville Not yet Khutsong Not Yet Mohlakeng (Currently not operational due to community unrest/ building vandalised by service delivery protests) Not Yet Bekkersdal (Currently not operational due to building vandalised by service delivery protests) Not Yet Brandvlei (Currently not operational due to building burnt) Not Yet 17 DHA FOOTPRINT (Offices) WESTRAND DISTRICT Sedibeng large Vereeniging Modernised Medium Yes Total not Modernised 1 Small Modernised Vanderbijpark Yes Devon Not Yet Sebokeng Yes Sharpville Note yet Evaton Not yet Bophelong Not Yet Heidleberg Total Modernised Modernised Not yet Ratanda (Currently not operational due to building Not yet burned) 2 2 4 18 DHA FOOTPRINT (HOSPITALS) Manual collection (From health facilities that was never connected but are serviced Functional NonFunctional(previously connected ) Johannesburg 7 7 working on a capacity of 30 % due to 3 G 4 Ekurhuleni 11 3 8 Tshwane 12 10 11 West Rand 4 1 Sedibeng 2 5 Mobile Offices 8 2 Total 44 28 Metro/District CIVIC TARGETS 20 Projected 174084 births registered in province within 30 calendar days of birth DHA Annual Target: Regions Baseline 2014/2015 Actuals 2014/2015 Projected Annual Target per Province 2015/2016 Q1 Target Q1 Actuals Johannesburg 48318 49263 52050 12221 12463 Westrand 11882 10807 12800 2919 2835 Tshwane 49487 50311 53309 12990 12252 Ekurhuleni 40308 48342 43421 10768 10558 Sedibeng 11609 12252 12506 3059 3569 TOTAL 161604 170973 174086 41958 41677 21 DHA Annual Target: BASELINE for Province (14/15) 161604 ANNUAL TARGET for Province (15/16) 174086 Q1 PROGRESS: STATISTICS 41677 ANALYSIS -We under-achieved the target by 281 - QUARTER 1 TARGET for Province 41958 CHALLENGES: Out of 68 health facilities 36 are not working due to 3G connectivity and 7 are working at a capacity of 30 % Children not registered over weekends Out of 41677 birth register 260 are foreign births. 240 registered by informers 17455 birth registered at health facilities 23722 birth registered at Office 22 A projected 2.2 Million ID Smart Cards (GP ANNUAL TARGET 665280 ) DHA Annual Target: Regions Baseline 2014/2015 Annual Target Actuals 2014/2015 2015/16 Q1 Target Total Q1 Head TOTAL Issue Q1 office Application Office taken in Johannesburg 174350 144799 262080 65520 44435 45909 Westrand 17263 20549 20160 5040 5101 5368 Tshwane 81231 118076 134400 33600 34121 32729 Ekurhuleni 47113 102839 181440 45360 37255 36039 Sedibeng 22763 43547 67200 16800 13086 12336 Total 342720 429810 665280 166320 133998 132381 23 DHA Annual Target: A projected 178675 Identity Documents (first issue) issued to citizens 16 years of age and above Regions Baseline Actuals 2015/2016 Johannesburg 27714 7514 Westrand 4718 2670 Tshwane 32724 5614 Ekurhuleni 30373 3362 Sedibeng 7829 1550 103358 20710 Total 24 PROVINCIAL ID School Project /ID Smart Card Name of the Office Tshwane Soshanguve Akasia Mamelodi Ga -rankuwa LOL PRETORIA Ekurhuleni Boksburg GERMISTON Johannesburg LOM ALEXANDRA MO Randburg LO Johannesburg MO Roodepoort LO Soweto Westrand and Sedibeng Sebokeng Krugersdorp Vereeniging Vanderbijlpark Number of School invited Number of Learners Number of Smart Card Number of Outstanding smart Applied of SMART ID CARD Issued for Learners Id card for Schools 17 0 2 5 0 2 (1 will come in september) 1 23 0 0 12 18 4 81 584 1321 0 5708 0 not recorded 838 0 5577 0 not recorded 1163 0 0 42 60 39 0 2 60 76 0 0 439 1353 unkown 44 0 0 318 36(still in process) 0 0 121 1051 1098 166 272 928 903 0 0 unkown 123 195 0 0 NUMBER OF SMART ID CARDS ISSUED FOR LEARNERS CANNOT BE TRACED DUE TO THE FACT THAT THE LEARNERS VISIT OUR OFFICE INDIVIDUALLY FOR COLLECTION OF THEIR SMART ID CARDS, AND THAT POSE A CHALLENGE FOR OUR OFFICE TO TRACE THE NUMBER OF OUTSTANDING SMART ID CARDS AS WELL. DHA Annual Target: BASELINE for Province (14/15) 429810 Q1 PROGRESS: STATISTICS 133998 ANNUAL TARGET for Province (15/16) 665280 QUARTER 1 TARGET for Province 166320 CHALLENGES: Offline mode does not work ANALYSIS Not having mobile solution to take applications at schools -We under achieved the target by 32322 for the first quarter - We have 23 offices that are online in the Province Load shedding is one of the contributing factors - There is a significant decline in application for green barcode ID document 26 Passport applications Performance for 2014/2015 Regions Manual Passport Performance for 2015/2016 Q 1 Life Capture Manual Passport Life Capture Johannesburg 43646 75429 147 36164 Westrand 12122 4502 3029 3635 Tshwane 54882 24444 10646 11515 Ekhuruleni 33073 25948 3240 28610 Sedibeng 6970 7940 1435 3109 150693 138263 18497 83033 Total Since the inception of life capture of passport the manual application has declined 27 IMMIGRATION TARGETS 28 Annual Target: 100 % of undocumented foreigners deported within 30 calendar days (direct deportations) Regions Baseline Actuals 2014/2015 Q1 Target Actuals Q1 Johannesburg 100% 833/833 100% 215/215 Westrand 100% 368/368 100% 5/5 Tshwane 100% 344/344 100% 13/13 Ekurhuleni 100% 641/978 100% 221/221 Sedibeng 100% 40/40 100% 0 TOTAL 100% 2226/2563 100% 454/454 Top 5 countries that are directly deported: Ghana Congo India Lesotho 29 DHA Annual Target: BASELINE for Province (14/15) 100% ANNUAL TARGET for Province (15/16) 100% Q1 PROGRESS: STATISTICS 454/454 QUARTER 1 TARGET for Province 100% CHALLENGES: ANALYSIS - There has been a significant improvement regarding direct deportations 30 Annual Target: 100 % of undocumented foreigners transferred to Lindela deported within 20 calendar days Regions Baseline 2014 /2015 Actuals 2014/2015 Q1 Target Actuals Q1 Johannesburg 100% 5193/5193 100% 1142/1142 West rand 100% 1078/1234 100% 294/394 Tshwane 100% 3544/3611 100% 1290/1322 Ekurhuleni 100% 5691/5743 100% 1727/1747 Sedibeng 100% 620/657 100% 59/86 TOTAL 100% 16126/16413 100% 4512/4691 Top 10 countries transferred to Lindela Zimbabwe Mozambique Lesotho Malawi Pakistan Nigeria DRC Bangladesh Swaziland China 31 DHA Annual Target: BASELINE for Province (14/15) 100% Q1 PROGRESS: STATISTICS 4512/4691 ANNUAL TARGET for Province (15/16) 100% QUARTER 1 TARGET for Province 100% CHALLENGES: ANALYSIS 32 IMMIGRATIONS STATISTICS – (APRIL – JUNE 2015) PORT CONTROL STATISTICS Arrival Departure PORT RSA Foreigner RSA Foreigner Lanseria Airport 4769 2158 4857 1920 Waterkloof Airbase 485 240 518 92 TOTAL ASYLUM SEEKER MANAGEMENT – PRETORIA REFUGEE RECEPTION CENTRE 100% FIRST INSTANCE STATUS DETERMINATION FINALISED WITHIN 3 MONTHS Province Pretoria Refugee Reception Office 100% First instance status determination finalized within 3 months 2014/15 April 2014-March 2015 (application received 46 257) Finalised (33 926) Annual Target 2014/15 100% First instance status determination finalized within 3 months 2015/2016 Received (16 250) Finalised (10 351) 2 DAYS TO PROCESS A REFUGEE ID APPLICATION FROM DATE OF RECEIPT Province Pretoria Refugee Reception Office 2 Days to process a refugee ID application from date of receipt to dispatch 2014/15 Annual Target 2014/15 2 Days to process a refugee ID application from date of receipt to dispatch 2015/16 Dispatched April 355 May 389 June 419 System crashed during the Month of March 2015 1 DAY TO RECEIVE REFUGEE ID AT OFFICE OF APPLICATION Province Pretoria Refugee Reception Office 1 Day to receive refugee ID at office of application 2014/15 System crashed during the Month of March 2015 Annual Target 2014/15 1 Day to receive refugee ID at office of application 2015/16 April IDs 249 May IDs 632 June IDs 1000 FIRST INSTANCE STATUS DETERMINATION FINALIZED WITHIN 3 MONTHS Province Pretoria Refugee Reception Office 100% Of first 100% Of first 2 Days to instance status instance status process a determination determination refugee ID finalized within 3 finalized within 3 application from months 2014/2015 months date of receipt to 2015/2016 dispatch 20142015 1 Day to receive refugee ID at office of application 2015/16 1 Day to receive refugee ID at office of application 2015/16 April 2014-March Received (16 Statistics April Received from HQ Issued to Issued to applicants 2015 (application April 249 applicants April 464 April 464 250) 355 received 46 257) Finalised (10 May 632 May 470 May 470 May 389 Finalised (33 926) June 1000 June 322 June 322 351) June 419 TOP 5 ASYLUM SEEKING COUNTRIES - 2 Days to process a refugee ID application from date of receipt to dispatch 2015/16 Zimbabwe Nigeria Asians (Bangladesh,Pakistan,India) Ethiopia Somalia TOP 3 ASYLUM APPROVALS -Ethiopia -DRC -Somalia FINANCE AND SUPPORT SERVICES 36 Annual Target: Months 100% of valid invoices settled within 30 days of receipt and approval Number of invoices received, Number of Number of Number of orders certified & invoices paid invoices not paid % compliance issued submitted for within 30 days within 30 days payment 2014/2015 835 1693 1667 23 98.65% Q1 2015/2016 263 308 308 0 100% 37 DHA Annual Target: Payment of invoices within 30 days BASELINE for Province (14/15) 100% ANNUAL TARGET for Province (15/16) 100% Q1 PROGRESS: STATISTICS QUARTER 1 TARGET for Province 100% CHALLENGES: 308/308 ANALYSIS - The target has been achieved during Q1 - There has been significant Improvement of payment of invoices 38 STAFF PROFILE LEVEL MALE DISABILITY FEMALE DISABILITY TOTAL 14 1 0 0 0 1 13 1 0 5 0 6 12 08 00 03 00 11 11 01 00 00 00 01 10 28 00 23 00 51 9 01 00 04 00 05 8 78 01 94 00 172 7 48 02 72 00 120 6 356 03 679 09 1035 5 11 00 15 00 26 4 00 00 1 00 01 3 23 00 60 00 83 Total 556 6 956 9 1512 EMPLOYMENT EQUITY NUMBER OF OFFICIALS TOTAL AGES 18 - 35 AGE OF EMPLOYEES MALE FEMALE 492 163 329 36-51 778 301 477 52- 55 135 48 87 56 and above 107 44 63 1512 556 956 40 PROVINCIAL CAPACITY – FILLED AND VACANT FUNDED POSTS Total Establishment Total Filled Vacant Funded 1575 1512 63 Capacity Rate 96% 4% 41 Filling of Vacancies: From April to June 2015 Region Total Posts Advertis ed Not Advertis ed Shortliste d Not Shortlist ed Intervi ewed Not Interviewe d Filled Posts April to June JHB Region 13 11 02 08 05 08 05 06 10 Tshwane 18 15 03 11 07 11 07 06 06 Westran d and Sediben g 16 13 03 12 04 12 04 08 08 Ekurhule ni 16 15 01 14 02 12 04 08 10 63 54 9 45 18 43 20 28 34 TOTAL S Filled posts from 01 July to date 42 Filling of Vacancies: Breakdown of posts as per advertisement: HRMCM 28/2015 HRMC 31/2015 Immigration Assistant Director : Office 17 IMS 01 Control Immigration 07 Assistant Director : IMS 01 HRMCM 34/2015 HRMC 44 /2015 HRMC 55/2015 Administration Clerk 03 Immigration Officer 02 Chief Administration Clerk 01 Control Immigration Officer 01 Senior Admin Officer Finance 01 Administration Clerk 04 Chief Administration Clerk 01 Immigration Office 02 Mobile Driver 01 Administration Clerk 01 Civic Services Supervisor 01 Grounds man 01 43 PERFORMANCE MANAGEMENT DEVELOPMENT SYSTEM DESCRIPTION PERFORMANCE AGREEMENT PERCENTATAGE% 2013/14 1536 100% 2014/15 1539 99% 1336 1st quarter (2015/2016) 90% NOTE PMDS for 2014/15 – the reason for 99% was due to 6 termination of contract and 3 resignations 44 MANAGEMENT OF LEAVE Regions Number of Leave certificates received from offices on monthly basis April 2015 Number of Leave certificates received from offices on monthly basis May 2015 Number of Leave certificates received from offices on monthly basis - June 2015 Johannesburg Westrand & Sedibeng 1 1 1 1 1 1 Tshwane 1 1 1 Ekurhuleni 1 1 1 Provincial Office 1 1 1 1 1 1 1 1 1 7 7 7 Lanseria Marabastad RRC Total 45 SUMMARY OF BUDGET 2014/2015 COMPENSATION OF EMPLOYEES AS AT 31 MARCH2015 OFFICE/REGION BUDGET PROVINCIAL MANAGER FINANCE&SUPPORT MARABASTAD LANSERIA ACTUAL AMOUNT SPENT 15,383,000.00 - 17,821,382.35 - 49,165,000.00 47,558,244.27 5,557,000.00 5,488,164.13 90,802,000.00 92,509,374.39 33,537,000.00 35,215,427.33 73,149,000.00 75,709,787.82 70,056,000.00 72,671,263.05 32,490,000.00 32,140,140.90 370,139,000.00 379,113,784.24 JOHANNESBURG REGION SEDIBENG DISTRICT TSHWANE METRO EKURHULENI METRO WEST RAND DISRICT TOTAL On compensation of employees the province overspent by 2.29% (R9,056,257.82), the cause of this is the salary adjustment of certain salary levels (9/10 & 11/12) as instructed by the DPSA. SUMMARY OF BUDGET 2014/2015 GOODS & SERVICES 2014/2015: AS AT 31 MARCH 2015 OFFICE/REGION BUDGET ACTUAL AMOUNT SPENT COMMITMENT TOTAL SPENDING AVAILABLE AMOUNT ACTUAL% SPENT% PROVINCIAL MANAGER 2,486,400.00 1,791,048.84 223,980.04 2,015,028.88 471,371.12 72.03% 81.04% FINANCE AND SUPPORT 13,773,000.00 12,725,935.41 174.49 12,726,109.90 1,046,890.10 92.40% 92.40% 2,488,000.00 2,516,687.74 1,519.11 2,518,206.85 -30,206.85 101.15% 101.21% 91,000.00 84,904.49 1,421.98 86,326.47 4,673.53 93.30% 94.86% 1,901,000.00 2,782,333.92 32,495.74 2,814,829.66 -913,829.66 146.36% 148.07% 955,000.00 853,685.88 28,593.75 882,279.63 72,720.37 89.39% 92.39% TSHWANE METRO 1,798,000.00 2,176,416.10 45,025.94 2,221,442.04 -423,442.04 121.05% 123.55% EKURHULENI METRO 1,533,600.00 1,732,683.98 30,900.87 1,763,584.85 -229,984.85 112.98% 115.00% WEST RAND DISTRICT 946,000.00 978,475.19 47,190.11 1,025,665.30 -79,665.30 103.43% 108.42% 25,972,000.00 25,642,171.55 411,302.03 26,053,473.58 -81,473.58 98.73% 100.31% MARABASTAD LANSERIA JOHANNESBURG METRO SEDIBENG DISTRICT Total Overall the Province is in line with the spending of 100% on goods services and is within 2% for under or overspending guideline with an overspending of 0.31% (R 81,473.58) which is caused by household expenditure. Households includes leave gratuity which are payouts when employees resign 47 SUMMARY OF BUDGET 2015/2016 COMPENSATION OF EMPLOYEES 2015/2016 : AS AT 31 JULY 2015 OFFICE/REGION PROVINCIAL MANAGER FINANCE AND SUPPORT MARABASTAD BUDGET ACTUAL SPENDING 16,628,000.00 - 5,632,097.65 - 49,472,000.00 16,845,099.64 5,648,000.00 1,847,097.46 JOHANNESBURG METRO 93,820,000.00 31,843,943.91 SEDIBENG DISTRICT 35,126,000.00 11,789,326.38 TSHWANE METRO 75,923,000.00 27,415,452.72 EKURHULENI METRO 72,969,000.00 24,802,889.07 WEST RAND DISTRICT 34,543,000.00 10,970,477.42 384,129,000.00 131,146,384.25 LANSERIA Total 48 SUMMARY OF BUDGET 2015/2016 GOODS&SERVICES 2015/2016: AS AT 31 JULY 2015 OFFICE/REGION BUDGET ACTUAL SPENDING COMMITMENT TOTAL SPENDING AVAILABLE AMOUNT Actual % Spent PROVINCIAL MANAGER 1,913,000.00 486,748.87 118,559.23 605,308.10 1,307,691.90 25.44% 31.64% FINANCE AND SUPPORT 13,703,000.00 4,407,520.32 501,496.65 4,909,016.97 8,793,983.03 32.16% 35.82% 1,670,000.00 807,450.72 694,277.93 1,501,728.65 168,271.35 48.35% 89.92% 233,000.00 0.00 24,789.19 24,789.19 208,210.81 0.00% 10.64% MARABASTAD LANSERIA JOHANNESBURG METRO 2,023,000.00 926,823.16 569,875.66 1,496,698.82 526,301.18 45.81% 73.98% SEDIBENG DISTRICT 1,032,000.00 166,553.71 274,838.45 441,392.16 590,607.84 16.14% 42.77% TSHWANE METRO 2,043,000.00 283,010.87 477,630.92 760,641.79 1,282,358.21 13.85% 37.23% EKURHULENI METRO 1,686,000.00 1,381,422.67 257,349.87 1,638,772.54 47,227.46 81.93% 97.20% WEST RAND DISTRICT 1,044,000.00 567,693.62 252,938.67 820,632.29 223,367.71 54.38% 78.60% 3,171,756.57 12,198,980.51 13,148,019.49 35.61% 48.13% Total 25,347,000.00 9,027,223.94 The Province has committed funds to contractual obligations hence on goods and services. Overall the Province is in line with the spending of 33.33 % on goods services and is 49 within 2% for under or overspending guideline at 0.81%. REVENUE COLLECTION PER MUNICIPALITY 2014/2015: AS AT 31 MARCH 2015 REGION TOTAL COLLECTED JOHANNESBURG METRO 70,060,216.80 TSHWANE METRO 64,542,621.64 EKURHULENI METRO 58,816,180.90 WESTRAND DISTRICT 13,345,482.35 SEDIBENG DISTRICT 12,463,531.00 TOTAL 219,228,032.69 REVENUE COLLECTION PER MUNICIPALITY 2015/2016 AS AT 31 JULY 2015 REGION TOTAL COLLECTED JOHANNESBURG METRO 23,385,445.00 TSHWANE METRO 20,341,797.25 EKURHULENI METRO 16,137,151.00 WESTRAND DISTRICT 4,890,735.25 SEDIBENG DISTRICT 4,587,730.00 TOTAL 69,342,858.50 51 FLEET MANAGEMENT KEY AREA NUMBER PERCENTATAGE Vehicles Number of vehicles in the Province 184 100 176/184 95.65% 8/184 4.35% 13 of 131 9.92% 10 100% Number of dysfunctional mobile 0 0% Number of Functional mobiles 10 100% Number of Functional vehicles Number of vehicles involved in accidents New vehicles received (131 G-vehicles earmarked for replacement) Mobile offices Number of mobile offices 52 ASSET MANAGEMENT AND SCM FUNCTIONS: Nr of Assets on Province FAR Additional assets not on register 27532 Region/Office Ekurhuleni Johannesburg PM Lanseria Sedibeng Tirro Marabastad Tshwane Westrand 0 Verified Leased assets F/ L Assets 112 112 Verified Value-Verified 5421 31,539,351.68 7823 695 117 2611 1479 2082 4695 1996 32,731,344.96 4,325,380.32 4,325,380.32 12,782,069.76 5,868,921.89 5,831,407.60 21,276,116.40 7,572,504.37 Total 26,919 126,252,477.30 AG asset audit concluded at: (1) Awaiting final report Outcomes: Awaiting final report Not verified Audit information 613 None Unverified % Unverified Value-Unverified 99% 38 188,898.36 99% 96% 100% 100% 94% 88% 99% 99% 112 27 0 12 89 293 24 18 191,548.37 141,010.10 56,790.91 226,995.52 352,757.74 63,807.05 8,391.80 98% 613 1,230,199.85 % 1% 1% 4% 0% 0% 6% 12% 1% 1% 2% 53 EMPLOYEE RELATIONS CASES NUMBER OF CASES REPORTED KEY AREA OUTCOMES Fraud & Corruption 9 17 Improper Conduct 1 2 Abscondment 1 1 Financial Misconduct 1 1 Gross Negligence 6 7 Negligence 2 2 Cross Dishonesty 6 6 Assault 3 3 9 9 SANCTIONS Dismissals Warnings 7 54 COUNTER CORRUPTION AND SECURITY SERVICES • • • • Corruption Unit and Security (CCSS): Cases received = 18 Finalized - 6 Outcome = 14 • Challenges 55 CASH IN TRANSIT ARRANGEMENTS • The Department has contracted Fidelity for Cash-in-transit services in offices. • Collection and transfer to the bank is done on a daily basis. • There has been challenges on non returning of bank books from Fidelity. • Office managers are responsible for the management of the process. 56 PROJECTS 57 PROVINCE GAUTENG DHA OFF. DATE POLICE STATION ARRESTS 19 2015-07-04 SEBOKENG 59 30 2015-07-09 CARLTONVILLE 42 38 2015-07-10 HONEYDEW 231 39 2015-07-16/17 SUNNYSIDE 41 37 2015-07-18 DOBSONVILLE 38 29 2015-07-21 TEMBISA 180 07 2015-07-21 BENONI 30 14 2015-07-22 MEYERTON 63 46 2015-07-25 KAGISO 10 REMARKS 58 • PROVINCIAL OUT REACH PROGRAMMES DISTRICT DATES NUMBER OF VENUES BUDGET Johannesburg Metro 17-20 July 2015 27 60 Officials Ekurhuleni Metro 21-24 July 2015 37 85 Officials Westrand District 15-17 July 2015 20 70 Officials Sedibeng District 13-15 July 2015 26 64 Officials Tshwane Metro 25-27 July 2015 11 76 Officials STATISTICS GENERATED Births <30 16 ID: First 146 Re-issue: 32 LRB : 61 REVENUE : R 5745.00 Births <30 28 ID: First 567 Re-issue: 73 LRB : 213 REVENUE : R 12690.00 Births <30 ID: First Re-issue: LRB : REVENUE : Births <30 ID: First Re-issue: LRB : REVENUE : Births <30 ID: First Re-issue: LRB : REVENUE : 01 93 13 23 R 2210.00 07 239 23 89 R 3970.00 08 142 55 28 R598875.00 Issue Roll out of smart Card Achievements • Smart card is being piloted at 2 Banks namely First National and Standard bank Launch of Moetapele Launch of Moetapele at our Edenvale office . Late Registration of birth High impact outreach • Redeployment of Permitting • staff Maponya Mall as a ID Smart Card office All regions in the province had high impact on later registration of birtha Redeployment of permitting staff to other section . Online ID Smart Cards and Passports applications What has improved Client will have the option to apply for ID Smart Cards while banking and this will alleviate pressure at DHA offices. Access to services by clients will improve More effective and efficient client services are rendered . Cashless options make it more convenient for clients to pay for the service. High volume of clientele. Eradication of Late Registration of births building up to discontinuance. More staff capacity at civic servers and immigration . Service delivery Improvement 60 Challenges What needs to be been done Issue Challenges Unstable Hospital network Connectivity • up solution to Birth Registration that is supposed to happen Speed address poor network in Hospitals, is not happening connectivity • Affects operations and increases the waiting periods of clients in offices • New equipment such as queue management Additional budget for maintenance. system need to be maintained SITA down times Smart card equipment Exploring alternative solutions 61 Thank you Siyabonga