Unified Development Ordinance Morrisville, North Carolina Assessment Report / Outline May 2011 CLARION ASSOCIATES Setting the Stage for a New Unified Development Ordinance • Do current regulations effectively implement the Land Use Plan and other adopted plans and policies? • Zoning districts and land uses • Development standards • Procedures for approval Project Initiation, Research, & Analysis • Background document review • Initial project meeting • Stakeholder interviews and survey Work Plan and Schedule Feb Mar TASK 1: Project Initiation, Research, and Analysis 1. Initial Review of Background Documents 2. Initial Project Meeting 3. Interviews and Survey TASK 2: Assessment Report & Annotated Outline of New UDO 1. Staff Review Draft 2. Public Review Draft Apr May Contents of Assessment Report • Introduction • Assessment of Current Regulations • Annotated Outline of the New Unified Development Ordinance • Analysis of Current Development Regulations Assessment Report: Major Themes 1. Streamline the Development Review Process 2. Strike a Better Balance Between Flexibility and Creativity 3. Modify Zoning Districts to Implement the New Land Use Plan 4. Improve Development Quality 5. Increase User-Friendliness Theme 1: Streamline the Development Review Process • Differentiate between different types of development review • Issues: • Confusion between site plan approval and construction drawings • Uncertainty and delays in bringing small and straightforward projects without delay • Proposal: Offer two separate tracks • One-step: combined site plan and construction drawings (less cost for all parties) • Two-step: general sketch plan followed by detailed construction drawings (less up-front cost for developer) Two-Step Review of Sketch Plan & Construction Drawings Submittal of Sketch Plan One-Step Review of Development Plan Submittal of Development Plan Staff Review and Recommendation/Action Staff Review and Recommendation/Action Planning & Zoning Board Review and Recommendation Town Council Review and Decision Planning & Zoning Board Review and Recommendation Town Council Review and Decision Submittal of Construction Drawings Staff Review and Decision Theme 1: Streamline the Development Review Process • Delegate some review authority to staff or Planning and Zoning Board • Reduce reliance on special use permits and conditional rezonings • Formalize a staff development review committee • Provide a master plan option Theme 1: Streamline the Development Review Process Standard Review Procedures Pre-Application Conference • Establish standard review procedures Application Submittal and Acceptance On-Site Posting of Application Notice Staff Review and Action (Decision or Recommendation) Public Hearing Scheduling and Notice (only for some uses) Advisory Body Review and Recommendation Decision-Making Body Review and Decision Theme 2: Strike a Better Balance Between Flexibility and Creativity • Add an Administrative Adjustment Procedure STANDARD Minimum lot width, minimum lot coverage, and minimum setbacks Maximum height MAXIMUM ALLOWABLE EXTENT OF ADJUSTMENT 20% Maximum setback encroachment 20% Minimum required number of off-street parking spaces, loading, or stacking spaces 20% Maximum number of off-street parking spaces 20% Minimum planting rate 20% Minimum perimeter landscaping strip width 20% Minimum perimeter buffer width 20% Minimum streetscape planting rate 20% Minimum screening height 1 ft Maximum fence height 1 ft Maximum lighting height 10% Maximum light levels 10% • Add an Alternative Equivalent Compliance Procedure Theme 3: Modify Zoning Districts to Implement the Land Use Plan • Establish new activity center districts • • • • Neighborhood Activity Center Business Activity Center Regional Activity Center Community Activity Center Theme 3: Modify Zoning Districts to Implement the Land Use Plan Example Image Only – Not Morrisville Specific Theme 3: Modify Zoning Districts to Implement the Land Use Plan • New transit-oriented development planned development district • Convert current Agricultural district into verylow residential district • Add new multi-family residential district and consolidate single-family residential districts • Modify the corridor commercial district • Eliminate the neighborhood and general business districts Theme 4: Improve Development Quality • Add tree protection and canopy preservation standards Theme 4: Improve Development Quality • Broaden open space protections Theme 4: Improve Development Quality TABLE 19.7.12-1: MENU OF SITE AND BUILDING DESIGN OPTIONS FOR SUSTAINABILITY • Encourage sustainable development practices • Mandatory code requirements • Menu of optional sustainability features SITE OR BUILDING DESIGN FEATURE POINT S DISTRICTS IN WHICH OPTION IS AVAILABLE NONRES / MIXED USE MULTIFAMILY RESIDTL OTHER RESIDTL 1. ENERGY Intent: Encourage on-site renewable energy production; promote the design and construction of energy efficient buildings; reduce air, water, and land pollution from energy consumption; and, reduce the heat island effect 1.1 Renewable Energy Sources Design and incorporate on-site renewable energy generation technologies such as solar, wind, geothermal, and biomass with production capacity of at least 5% of the project’s annual electrical energy demand, with an additional point granted for every additional 5% of renewable energy generated. 10 points maximum 1.2 District Heating and Cooling Design and incorporate into the project a district heating and/or cooling system for space conditioning and/or water heating of new buildings in the project (at least two buildings total must be connected). 1.3 Solar Orientation Design and orient the project such that 50% or more of the blocks have one axis within plus or minus 15 degrees of geographical east/west, and the east/west length of those blocks are at least as long, or longer, as the north/south length of the block. OR Design and orient the project such that 50% or more of the project total building square footage (excluding existing buildings) such that the longer axis is within 15 degrees of geographical east/west axis. 1.4 Shade Structures Where appropriate, provide shade structures over windows/doors to minimize glare and unwanted solar heat gain. Such structures shall provide shading to at least 50% of the glazing facing the sun on June 21. Structures may include awnings, screens, louvers, architectural features, or similar devices. 1.5 Heat Island Reduction Use any combination of the following strategies for 50% of the non-roof impervious site landscape (including roads, sidewalks, courtyards, parking lots, and driveways). Provide shade from open structures such as those supporting solar panels, canopied walkways, pergolas, all with a Solar Reflectance Index (SRI) of at least 29 (SRI is a measure of the roof’s ability to reject solar heat; a higher SRI yields a cooler roofing choice.). (1 point) Use paving materials with a Solar Reflectance Index (SRI) of at least 29. (1 point) Use an open grid pavement system (at least 50% pervious). (1 point) 1-10 * * * 4 * * 3 * * * 2 * * * 3 * * * Theme 4: Improve Development Quality • Other issues addressed: • Increase parking flexibility • Expand building standards to cover multi-family and mixed-use Theme 5: Increase User-Friendliness • Consolidate multiple ordinances into a new UDO • Reorganize development regulations more logically • Add and enhance graphics • Use supplemental administrative manuals Annotated Outline of New UDO 1. General Provisions 2. Administration 3. Zoning Districts 4. Use Standards 5. Intensity and Dimensional Standards 6. Development Standards 7. Performance and Maintenance 8. Nonconformities 9. Enforcement 10.Interpretation and Definitions Next Steps in Preparing UDO 1. Develop UDO Drafting Options • Time • 1 year - consultant • • • 3 to 5 years - staff Cost • 170k to have consultant draft (estimated) • 20k allocated in current fiscal year budget Staff capacity • 20 to 40 hours a month Next Steps in Preparing UDO 2. Town Council Workshop • • Present Options Set Priorities • • • • • Streamline development review process Strike balance between flexibility and certainty Modify zoning districts to implement Land Use Plan Improve development quality Increase user-friendliness Next Steps in Preparing UDO 2. Town Council Workshop • • Present Options Set Priorities • • • • • Streamline development review process Strike balance between flexibility and certainty Modify zoning districts to implement Land Use Plan Improve development quality Increase user-friendliness green = draft from start to finish yellow = draft in small sections Drafting from Start to Finish (bullets in green on the previous slide) Benefits • • • • • Addresses all themes in the same timeframe Most timely and efficient option (if consultant is hired) Decreases likelihood of conflicting regulations Allows staff to focus on core services (if consultant hired) Reduces inconsistencies between land use plan and current development entitlements Constraints • No funding to hire a consultant to write the UDO • Current staff capacity (if consultant is not hired) Preparing in Small Sections (bullets in yellow on the previous slide) Benefits • • Uses existing resources (budget and staff) Addresses specific issues: • Sign ordinance • Tree preservation (Theme 4) • Administrative Adjustment (Theme 2) • Alternative Equivalent of Compliance (Theme 2) Cons/Constraints • Does not adequately address Streamlining the development review process (Theme 1) • Adds another regulatory document which decreases user-friendliness (Theme 5) • Costs more money and staff time • Loss of revenue by delaying development, which increases the tax base • Increases the likelihood of conflicting requirements Unified Development Ordinance Morrisville, North Carolina Assessment Report / Outline May 2011 CLARION ASSOCIATES