Project Data Collection
Information Required for
Lighting Calculations
LED Lighting Calculation
The following information is required to complete a lighting calculation and determine what Bill of Material
and other equipment is needed to complete a floodlighting installation according to the indicated
requirements.
Complete the yellow highlighted fields in Table 1 with the required data to complete the calculations. Use
Table 2 as reference for an example of a completed data requirements table.

Location of Project
o

Input Voltage
o

Drawing should show a clear definition of the areas that have to be illuminated (either shown on
the drawing or provide dimensions of the area to light with a clear reference point or otherwise
defining the aircraft stand type according to ICAO).
Illumination Standards
o
o
o

Used to validate the product models required for the project. Main input voltage supported is
120-277V at 50/60 Hz.
AutoCAD .dwg or .dxf file of the area to be lite
o

This information is needed to analyze and define the applicable voltage and current feeds that
will be present for the project along with organizing the lighting calculations
This information will be used in the lighting calculations to determine equipment required and
validate pole/mast height and locations
Lux Level and Uniformity standards provide guidance on specific illumination requirements. If
compliance with a standard is required, indicate the standard (ICAO, FAA, IES Military etc.).
Use of the illuminated area affects the lighting calculations and material required. Aircraft stands
require higher illumination standards then general operations areas. Indicate the use in the
table.
Pole / Mast Information
o
Retrofitting existing installations: Indicate on the provided drawings the exact position of the
poles. Also required is the height of the existing poles and whether there position and heights
are already defined or can they be changed. If it can be changed, define the new location and
pole height options.
o
New installations: Indicate on the provided drawings the exact position of the new poles. Also
required is the height and type of poles and whether there position and heights are already
defined or can it be changed. If it can be changed, define the new location and pole height
options.
1|Page
Table 1. Data Requirements for Lighting Calculation
Project Information &
Drawings
Illumination Standards
Project location
Input Voltage
AutoCAD drawing
Lux Level and uniformity standard
Use of Lighted Area
Location of poles / masts
Indicate the exact location on existing
poles/masts on the provided drawing
Height / Type
Existing pole / mast
information
Can Pole / Mast Height be changed
(Yes / No)
If Yes, indicate maximum Height
Can Pole / Mast Location be moved
(Yes / No)
Location of any new poles / masts
If yes, indicate on the drawing the range
the pole locations can be moved
Indicate the location off any new
poles/masts on the provided drawing
Height / Type
New pole / mast
information
Can new Pole / Mast Height be
changed (Yes / No)
If Yes, indicate maximum Height
Can new Pole / Mast Location be
moved
Yes or No
If yes, indicate on the drawing the range
the pole locations can be moved
Table 2. Example of Completed Lighting Calculation Table
Project Information &
Drawings
Project location
Input Voltage
AutoCAD drawing
Lux Level and uniformity standard
Illumination Standards
Use of Lighted Area
Location of poles / masts
Height / Type
Existing pole / mast
information
Can Pole / Mast Height be changed
(Yes / No)
277V, 50Hz
Please see provided AutoCAD .dwg file
Follow ICAO Annex 14
Aircraft Stands and General Aircraft
Operations Areas
Shown on provided drawings
20m (60 feet), High Mast with mobile ring
No
If Yes, indicate maximum Height
Can Pole / Mast Location be moved
(Yes / No
Location of any new poles / masts
Height / Type
New pole / mast
information
Airport International, Newtown, City
Can new Pole / Mast Height be
changed (Yes / No)
If Yes, indicate maximum Height
Can new Pole / Mast Location be
moved
Yes
Yes, If required to meet ICAO specification
See new pole location on provided drawings
20m (60 feet), High Mast with mobile ring
Yes
30m (90 feet)
No
If yes, indicate on the drawing the range
the pole locations can be moved
2|Page
Table 3. Project Contact Information
If you would like the Project Manager to contact customers directly to help expedite resolution of questions
and if additional information is needed, please complete contact information table below.
Name
Contact Name
Title
Company
Email
Contact Information
Business Phone
Mobile Phone
Table 4. Freight Estimating
Deliveries of the LED Apron Lights are always FCA Cortaccia. Free Carrier means buyer is responsible for
transport and expenses from Exworks location.
If customer wants to also get estimates on freight costs, please complete the information below.
Ship to Location
Street Address
Ship to Address
City
State / Province
Country
ZIP
Air Freight
[1-2 week delivery estimate]
Shipping Preference
FCA Carrier Options
Ocean Freight
[2-4 weeks delivery estimate]
Other
[Please specify]