Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Niigataken Chuetsu-oki Earthquake and its Influences on the Kashiwazaki-Kariwa NPP 1 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Summary of the Earthquake and Situation of the Kashiwazaki-Kariwa NPP • Summary of the Earthquake – Occurrence: July 16, 2007 at 10:13 am JST – Earthquake Source: • 17km below the seabed off Jo-chuetsu area in Niigata prefecture (37°33.4′North、138°36.5′East) • Epicenter Distance: 16km from the NPP – Magnitude: 6.8 • Situation of the NPP – When the earthquake occurred: Niigata city Kashiwazaki-Kariwa NPP • Unit 2 was in start-up • Unit 3, 4 and 7 were in normal operation • Unit 1, 5 and 6 were out of operation for the periodic inspections Epicenter – Units 2, 3, 4 and 7 were automatically shut down following the high seismic acceleration trip signals 2 Incorporated Administrative Agency Unit 1 Unit 2 Unit 3 Rx. Coolant Temp. Unit 2 Unit 4 Unit 7 Japan Nuclear Energy Safety Organization Unit 6 Unit 5 Rx. Water Level 19:40 <100℃ under Stat up Unit 3 23:07 <100℃ 100% Power Unit 4 100% Power Unit 7 7/17 6:54 <100℃ 7/17 1:15 <100℃ 100% Power 4 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Unit 1 RPV Inspection Schedule August September Phase 1 8/21 Phase 2 October November December Phase 3 8/23 Visual inspection using under water TV camera 5 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Unit 1 : Phase 1 Inspection Flange Guide Rod Feed Water Sparger Upper Grid Core Shroud Core Spray Pipe Core Spray Sparger As a result of phase 1 inspection, the abnormality such as the damage / transformation / the falling off was not confirmed. 6 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Unit 1 : Flange Guide Rod Flange 7 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Unit 1 :Guide Rod Guide Rod FW Sparger Core Spray Pipe 8 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Unit 1 :Feed Water Sparger 9 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Unit 1 :Core Spray Pipe 10 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Unit 1 :Core Spray Sparger Core Shroud(upper ring) Core Spray Sparger 11 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Unit 1 :Upper Grid LPRM 12 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Unit 1 : RPV base bolts(A,As) 13 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Unit 1 : Leakage of water into B5 floor Break of Fire Extinguishing Pipe (B,C) Reactor Combination Building Pene Duct B1 Floor Water Flow-in B2 Floor B3 Floor B4 Floor B5 Floor Sump Leakage of water into B5 floor of the reactor combination building (Unit 1) 14 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Unit 1 : Oil Tank (B,C) Land Subsidence 15 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Unit 3 :Fire of House Transformer(1/3) (B,C) As for the duct, 16 - 18cm dropped 16 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Unit 3 :Fire of House Transformer(2/3) House Transformer Bus Duct 1 – 3 cm dropped 20 – 25 cm dropped Bedrock 17 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Unit 3 :Fire of House Transformer(3/3) Start-up Transformer Unit 7 6 5 4 2 1 Unit 3 Main Transformer House Transformer Unit 3 Main Generator Normal Bus Fire of House Trans. was not safety related problem Emergency Bus 18 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Unit 3 : DG(A,As) Upside Downside 19 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Unit 3 : HCU (A,As)( Hydraulic Control System (CRD)) 20 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Unit 3 : MSIV (A,As) 21 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Unit 3 : PLR Pump (A,As) 22 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Unit 3 : RHR Pump (A,As) 23 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Unit 3 : Blow-out Panel came off (B,C) 24 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Unit 3 : Displacement of the main exhaust duct (B,C) 25 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Unit 6 : Leakage of water including radioactive materials (B,C) Leakage of water including radioactive materials into non-controlled area in the reactor building 26 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Unit 6 : Leakage of water including radioactive materials Leakage of water including radioactive materials into non-controlled area in the reactor building 27 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Unit 6 : Damage of the reactor building overhead crane Motor Motor Damaged Damage found on the coupling of the drive axis of the reactor building overhead crane 28 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Unit 7 : Detection of radioactive materials in the main exhaust duct Reactor Building Building Ventilation Still Working after Plant Shutdown Reactor Filter Turbine Condenser Turbine Gland Steam Exhauster Filter Main Exhaust Duct Turbine Building Main Exhaust Duct Monitoring House Rare Gas Hold -up Equipment Detection of radioactive materials in the main exhaust duct resulting from loss of the steam seal inside the turbine 29 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Other (B,C) 30 Incorporated Administrative Agency Japan Nuclear Energy Safety Organization Solid waste storage warehouse 31