WillowWood Homeowners’ Association, Inc. Financial Report Strategic Planning & 2015 Budget Presentation September 16, 2014 Presented By: Treasurer And Finance Committee Presentation Outline • Balance Sheet • Historical Perspective of Assessments • Current and Future Plans – Fundamental HOA Needs: Current and Long Range – Capital, Repairs, Enhancements, Contingency – Strategies • 2015 Budget – Highlights and Details • Recap – Conclusions and Recommendation 2 Treasurer’s Financial Report Balance Sheet 3 Current Balance Sheet WWHOA Balance Sheet Standard As of September 16, 2014 09/16/14 Sep 16, '14 ASSETS Current Assets Checking/Savings 1001 — FCB Savings Account 1000 — FCB Checking Total Checking/Savings Accounts Receivable 1200 — Accounts Receivable Total Accounts Receivable Total Current Assets TOTAL ASSETS LIABILITIES & EQUITY Equity 3000 — Opening Balance Equity Net Income Total Equity TOTAL LIABILITIES & EQUITY 21,640.32 18,925.88 40,566.20 (67.50) (67.50) 40,498.70 40,498.70 47,068.22 (6,569.52) 40,498.70 40,498.70 4 Finance Committee A Five-Year Strategic Plan: Common Area Master Plan “The CAMP” 5 Finance Committee Report September 16, 2014 WWHOA Annual Meeting Finance Committee Report—Sep 2014 1. August cumulative expenditures total $37,131 • 2. 73% of yearly Base Revenue The 2014 Year-end forecast indicates a near-neutral position • • • Emergency repairs required totaled $7,742 Main Park Well failed – was replaced Esplanade irrigation system required extensive repairs – • New Heads, Repaired Lines, Replaced Timer, Replaced valves Certain CAMP Items deferred to next year – – – Sidewalk Repairs Main Park Irrigation head replacement Esplanade Lighting Upgrade $52,658 2014 Expenses Versus Base Revenue With Recurring Plus NonRecurring from August $56,230 $60,000 Total Planed Expenses with Modified CAMP $54,632 Aug YTD Total Revenue $50,000 Cumulative Dollars $54,405 Total Planned Base Revenue $40,000 $42,097 $30,000 $37,131 August YTD Expenses Aug YTD Expenses $20,000 Actual Expenses Normalized Spend Line 2014 Revenue $10,000 $0 Jan Feb Mar Apr May Jun Jul Month Aug Sep Oct Nov Dec Major Changes in 2014 1. 2. Don Asher & Associates dropped as Management Company WWHOA Established Self-Management • • • • • 3. 4. 5. Competitively Selected New Landscape Contractor Competitively Selected Legal Representation Successfully Closed Orange County Pond Planting Permit • • 6. Finance Committee – track and forecast expenditures Treasurer – new bank account, bill processing, assessment collection Architectural Review Board – restart inspections, standardize violations Homeowner Interface – active communications, new website Established Public Storage Facility for WWHOA Materials Coordination with Orange County Pond Revitalization Program Termination of Pond Maintenance Contract Obtained Proper Insurance Coverage Major Common Area Projects 1. Landscape Contract negotiated with 11 additional cuttings • • 2. Neighborhood Pride Grant Awarded • • • 3. 5. 6. WWHOA matching funds of $625 Esplanade and Flagpole Area received upgraded Plantings More than 45 community volunteers totaled 640 hours Pressure Washed Sidewalks & Tennis Courts • 4. Implementation effective 1 October 2014 $808 savings from proposed price Installed new Tennis Courts Nets and Basketball Net Stabilized Washed-out Tennis Court Drainage Control System at SW Corner and Western Culverts Performed extensive Tree Pruning of Esplanade Area Mulched the Picnic Area, new plantings, flagpole area, benches, tables, selective trees (with no grass) Major Common Area Projects 7. Orange County Pond Revitalization • • • • • • • Part of the Lake Butler Chain of Lakes Nutrient Project No Cost to WWHOA Pond water quality was measured as excellent Algic growth occurred this year throughout Lake Butler chain Extensive cypress, shrub & grass plantings provided around the pond 23 Storm Drains upgraded with leaf & debris filters Runoff to Wetlands area cleared of shrubs, – – – Almost ½ Acre cleared west of the large concrete weir Planting 60-80 cypress, magnolia, and other trees Planting grasses along edge of runoff from pond 2015 Budget September 16, 2014 12 Historical Considerations • HOA Purpose: Promote the recreation, health, safety, and welfare of the residents (per By Laws)—a positive effect on property values • 2013 and 2014 Board of Directors and Committees established a solid framework for long term sustainment – Requires additional incremental assessment increases to build up proper deferred maintenance account (reserves) • Common Area Master Plan (CAMP) established – Defines projects (by priority) and time-phased funding requirements – Five-year rolling wave for future budget planning – Flexible tool for current and future Boards • Assessments increased, but still remain below level of inflation • Grants have and will continue to help offset income limits Results: Common Area Improvements! 13 Why a Comprehensive Plan? • Common property amenities are key to long-standing neighborhood quality, desirability and property values • Picturesque Hidden Pond Park and Nature Park are unique to WillowWood • Common areas showing age after 30 years—progress made in 2014 to address key issues • Infrastructure deterioration causing maintenance issues and safety concerns Continued Funding of extensive refurbishment and upgrades are required to maintain quality of WillowWood September 16, 2014 14 Strategic Planning Process • A Roadmap with a 5 year focus – Establish mission, vision and goals – Develop integrated plans to achieve goals • Common Area Master Plan (CAMP)—integrates specific projects and programs to achieve overall Association objectives – – – – Infrastructure (Irrigation, Sidewalks, Lighting) Landscape Pond Capital (Tennis Court, Benches, Entry…) Planning supports Budget development September 16, 2014 15 CAMP Details 1 Averag e Deferred Maintenance Rankin g New Repair SW Drainage Control at Tennis Courts & Stabilize the Water culvert to the West New Raise the height of the Tennis Court Drainage culvert 1.0 Park Sidewalk Repair New Replace Tennis Court Entry Platform 1.3 New 1.4 Cost Comments & Notes The SW corner of the tennis court drainage control has become washed out, causing some collapse and damage to the court surface. $3,500 Additionally, the culvert structure is inadequate to control the water flow and the base has become washed out and in danger o Raise the height of the Tennis Court Drainage culvert to adequately hold and divert the storm $1,200 level water into the drainage pipe with minimal overflow Numerous broken sections from Beech to Tennis Courts, then around main park: $4,625 Estimated 9/03 as 37each (2x2x0.25) @ $125 => NOT eligible for Grant $2,500 Entire slab (10 x 20?) is cracked - need quote for Excavation/ Replacement 2014 2016 2017 2018 2019 $3,400 Quoted $1,200 Estimat ed Defer $4,625 Defer Pressure Wash Actual by Rich Tutolo Pressure Washing Entrance Sidewalks $800 Done Completed (1300 feet) Replace Vehicle Barrier Replace with Concrete 4 x 4 posts, 6 foot long (4 Posts @ NE Corner of $1,050 feet above ground) - Estimate 8 @ $100+ $250 Defer Tennis Court Install Pressure Wash Park Sidewalks, HM Commercial Proposal 2012 @5% escalation per $2,200 Done Sidewalks & Tennis year Courts September 16, 2014 2015 Estimat ed Defer $2,500 Estimat ed Defer $1,050 Estimat ed $2,500 $2,756 16 CAMP Details 2 Averag e Deferred Maintenance Cost Comments & Notes Rankin g Upgrade Esplanade Estimated Upgrade: 25 @ $80; 3 New 1.6 & Flagpole Area $3,450 XFR/Timer @ $300; Cable 3 @ $100 and Lighting to LED Labor @450 CS Verbal $2,810 Esplanade) Estimated 165 heads @ $25+ $25 labor per Replace all Main Park 1.7 $8,250 head => must map head locations by Zones Irrigation Heads Defer to out years as needed only Pressure Wash Actual by Rich Tutolo Pressure Washing 2.0 $450 Tennis Courts Completed Replace Tennis Installation Price by Varsity Courts New $461 Court Nets Completed Resurface Tennis New $8,000 Quoted by Varsity Courts August 2014 Courts Trim, Shape & Clean Forrest Stump Tree Service for 5 days work 2.0 Main Park Trees $7,000 crew with lift - Annual Trimming - Defer to (annual) 2015 @ 5% Escalation Install Shut-off Timer Requested to limit usage to 11:00 PM park 2.3 on Tennis Court $400 usage curfew - Estimated Power Weatherproof Waste Requested by HLS Landscape due to mess 2.4 $225 Barrels in rain - Completed HD Pricing: Scotts Turf Builder, Sun & Shade, WaterSmart Plus @ $30 @ 2,800 SF Re-seed Main Park New $5,500 coverage => 15 bags per acre @ $450 plus with Bahia $100 installation => 10 acres => Investigate if Bahai Seed will take on sand September 16, 2014 2014 2015 2016 2017 2018 2019 $3,450 Defer $1,000 $1,000 $1,000 $1,000 $1,000 Done Done $8,000 Done $7,350 $7,718 $8,103 $8,509 $8,934 $400 Done $5,500 17 CAMP Details 3 & Totals Deferred Maintenance 2.6 Park Tables and Bench Platforms 2.7 Dog Waste Stations 2.7 Gazebo/Pergola Replacement 2.9 Mulched play/meeting Area with Landscape Timbers 2.9 Additional Park Tables and Benches 2.9 "Memory Garden", West Side of Gazebo Platform Additional Irrigation Line & 2.9 Heads to support Garden, West Side of gazebo platform Sitting Wall Area + Sidewalk 3.1 Extension September 16, 2014Total Cost Comments & Notes 4 Inch thick Concrete Platforms: Benches @ 10' Wide x 7' Deep; $4,100 Price = 8 Each @ $250; Tables @ 12' Wide x 10' Deep, Price = 7 Each @ $300 Purchase (Amazon) 3 @ $70; $510 Estimated installation 3 @ $100 each Need Plan & Proposal - Defer $6,500 until 2017 Potential Grant? Estimate log perimeter of 300 $500 linear feet @ $150 plus Labor @ $350 Plus Connectors Add QTY 5 BarcoBoard benches @ $490 and QTY 3 new/replacement BarcoBoard $6,785 tables @ $845, plus $1,000 shipping; Online pricing, Plus installation (anchorage) @ $100 each Estimated: Bench @ $250; Shrubs 25 @ $15; Wall Pavers $1,075 @ $300; Soil @ $150; HOA Volunteer Labor Grant Contribution Estimated: Add 200' extension $350 from Bubblers @$200 and 3 Heads @ 150 Estimated $4500 hardscape + $7,000 $2500 Sidewalk Deferred $71,731 Maintenance $107,815 2014 2015 2016 2017 2018 2019 $4,100 $510 $6,500 $500 $6,785 $1,075 $350 $7,000 18 $4,600 $13,375 $34,828 $17,603 $27,475 $9,934 CAMP Notes NOTE 1: Possibly Part of 2016 Grant Scope of Work NOTE 2: Possibly Part of 2018 Grant Scope of Work Planned Expenses: Well pump: Esplanade in 3 yrs @ $3,600; Park in 7 years New MTC Item added => Re-seeding Main Park Tennis Court resurfacing - Need estimated timeframe Assumptions 2015 => 15% Assessment Increase 5% escalation on yearly recurring expenses (REC & NR) No additional Tree Work in 2014 Split Irrigation Head Replacements 2015/2016 Only as Needed Conclusion Deferred Maintenance Items staged by priority and affordability 2015 Assessment 15% increase adds $8K per year September 16, 2014 19 Planning Considerations • Draft 5-Year Plan used to support 2015 Budget recommendations – Critical near term maintenance needs funded • Current revenues do not support all common area refurbishments or upgrades—must time phase • Master planning to continue as key tool for Board decisions – County Grants have leveraged HOA funds—more coming • 5-Year Plan funding will require additional annual assessment increases – Securing Grants to fund projects offset costs to HOA – Special Assessments may be required—Homeowners’ approval needed. None planned in current CAMP September 16, 2014 20 2015 Budget Assumptions • Expenses projected from ten-year history and 2014 actual outlays • Achieve Year-End Neutral Position • Manage to Base Revenues • Revert to Self-Managed HOA—Management Company contract terminated effective April 2014 • Price All Support (No Volunteer Effort) in case volunteers not available Requires $69 Annual Assessment Increase to Achieve Operating Account Balance September 16, 2014 21 2015 Budget Focal Points • Landscape Maintenance Plan – Modified (increased) servicing schedule to keep up with growth • Landscape Plan – Continue maintenance of Plant-a-Palooza plantings (County Grant) – Continue Irrigation repairs/replacement/extensions to dry areas – Monitor well pumps for performance (replaced 5HP main pump in 2014) • Pond Plan – Orange County to maintain newly planted shoreline. – HOA has no financial obligation for coming year (we just enjoy!) • Safety – Tree pruning started. Sidewalk cleaning done, repairs in 2015 budget. • Self-Managed HOA returns ~$6,000 to support operations and CAMP Continue Implementation of CAMP September 16, 2014 22 Budget Summary Cost Category 2014 Projected Year End 2015 Budget Change Grounds Maintenance $ 39,506 $ 35,034 $ (4,472) Management & Admin $ 10,535 $ 12,595 $ 2,060 Utilities $ 6,621 $ 6,500 $ (121) Deferred Maintenance $ - $ 7,800 $ 61,929 $ 5,267 $61,944 $ 5,684 Total Expenses Total Income September 16, 2014 $ 56,662 $56,260 $ 7,800 23 Income 2013 ACTUAL YEAR-END Individual Assessment INCOME SOURCES Annual Assessment Assessmenrts - Other Interest/Late Fee Initiation Fees Tennis Court-Keys Interest Income Misc Income Grant Carry-Over Un-Paid Assessements $405 2014 2015 APPROVED 2014 PROPOSED BUDGET FORECAST BUDGET With With <15% YEAR-END <15% Increase Increase $465 $46,575 $54,405 $534 $54,405 Increase Assessment $69 per household $62,478 $1,043 $305 $264 $1,500 $1,000 $45 $- $66 $14 $61 $1,600 $(465) $(534) TOTAL INCOME $50,152 $53,905 $56,260 $61,944 September 16, 2014 COMMENTS $- $(500) Risk Managament for two semi-annual PMTS 24 Expense: Grounds Maintenance 2013 2014 ACTUAL APPROVED YEAR- BUDGET With END <15% Increase 2014 FORECAST YEAR-END 2015 PROPOSED BUDGET With <15% Increase COMMENTS $17,428 $15,905 $20,659 Negotiated based on 2014- Includes 2014 Full Service scope increasing cuttings for Ot, Nov, Jan, Feb (2x Month) for 38 Total Cuttings, plus hard edging all beds, front & back - pond perimeter NOT edged. New Contract Period of Performance Oc-Sep Landscaping Contract - Additional Scope $2,150 $- $- Optional Services Deleted for 2015 Contract Landscaping Contract - Nature Park $1,645 $- $- Landscaping - Other, Tree Trimming $4,700 $7,105 $7,350 $1,000 $500 $500 $2,200 $365 $- Landscaping Contract Landscaping - Other, Storm Damage $18,982 $2,123 Pressure Washing of Sidewalks Sidewalk Repairs $375 $4,625 Covered within Landscape Servces Contract (N/C) Trim & Lift Park Oaks = 11 @ $250;Pines (dead branches) = 10 @ $ 75; Esplanade (Dead Branches) = 12 @ $100 Risk Management - Projected Storm Damage Park Sidewalks Done in 2014 =>Defer to 2016 CAMP => Not eligible for Matching Grant (8/29 update) CAMP => Forecast $1,200 overhaul and 20 replacement heads @ $25 each => As needed only NE Corner Vehicle Barrier Posts - Defer to 2016 Plantings under Orange County Maintenance for 2015 Irrigation Repairs $1,049 $1,700 $8,286 $1,000 Signs / Wall / Trash Can $3,809 $290 $33 $- Pond Maintenance $3,116 $2,100 $525 $- $- $300 $850 $500 Normal Repairs $2,458 $950 $5,312 $400 CAMP => Installation of Shutoff Timer $- $- $625 $- $1,800 $- $- $- $34,838 $39,506 $35,034 Lighting / Electrical Repairs Tennis Court Repairs/ Stabilization of Drainage Grant Matching Funds Security TOTAL September 16, 2014 GROUNDS MAINTENANCE $33,337 If 2015 major matching grant is available, the matching funds will be transferred from the Deferred Maintenance Pool 25 Expenses: Management 1 2013 ACTUAL YEAR-END Management Fee - DA&A 2014 2015 APPROVED 2014 PROPOSED BUDGET FORECAST BUDGET With With <15% YEAR-END <15% Increase Increase $6,312 $6,312 $2,692 $330 $500 $72 $1,048 $700 $(130) Office Supplies - DA&A $105 $250 $2 Storage - DA&A $120 $120 $87 Office Supplies - HOA $434 $150 $660 $650 Office Supplies - Bank Coupons $- $329 $375 Postage & Copies (HOA) $- $263 $350 $80 $78 $80 Postage DA&A Printing & Copying - DA&A PO Box Rental Website $358 $520 $140 $900 Newsletters Social Committee Storage Unit $224 $221 $479 $$$- $$247 $489 $$500 $780 Meeting Room $200 $740 $87 $100 $100 $- $350 Misc. Expense September 16, 2014 COMMENTS DA&A Contract buyout in April 2014 => No renewal DA&A Contract buyout in April 2014 => No renewal DA&A Contract buyout in April 2014 => No renewal DA&A Contract buyout in April 2014 => No renewal DA&A Contract buyout in April 2014 => No renewal Estimated based on 2014/ need QuickBooks Software Multiple License in 2014 2013 coupons paid in 2014 due to DA&A late processing/ Pay 2014 in January 2015 Estimated Actual 2014 Includes new website service @ $62/month, plus start-up Electronic Newsletters Budgeted HOA Public Storage Unit @ $65/month 2015 includes no cost monthly + $100 Annual MTG Estimated Quickbooks software 26 Expenses: Management 2 2014 2015 2013 APPROVED 2014 PROPOSED ACTUAL BUDGET FORECAST BUDGET YEAR-END With <15% YEAR-END With <15% Increase Increase Corporate Annual Report Taxes, Registration & Fees $61 $9 $65 $120 $65 $61 Legal Expense $1,100 $800 $2,424 Insurance - Liability (HIG) Insurance - Liability (Bouchard) $1,485 $1,430 $2,919 $48 $275 $- Insurance - Worker's Comp (Volunteers) $- $- Insurance - Property Damage $- $- Insurance - Crime (Board Bond) COMMENTS $65 Estimated based on 2013 $120 Estimated based on 2013 2014 August Actuals @$2,424. Defer $1,200 $5,700 estimated for Planning Criteria review; 2015 C&R review estimated @15 hours $3,000 2014 Actual Discountinued this carrier $Required by statute to carry $275 Bond on the directors - HIG Quote 10/16 Conflicting information for volunteer efforts - Never had $before - HIG Quote 10/16 @ $700 2014 Proposal @ $2,000. (Self-Insured for 2014, $continue in 2015) TOTAL MGMNT AND ADMIN $12,487 $12,162 $10,535 $12,595 September 16, 2014 27 Expenses: Utilities & Totals 2014 2013 ACTUAL APPROVED YEAR-END BUDGET With <15% Increase UTILITIES Electricity TOTAL UTILITIES TOTAL DEFERRED MAINTENANCE POOL 2014 FORECAST YEAR-END 2015 PROPOSED BUDGET With <15% Increase $5,629 $5,700 $6,621 $5,629 $5,700 $6,621 $6,500 $- $- $- $7,800 $52,700 $56,662 TOTAL EXPENSES $51,452 $6,500 Estimated based on 2014 - no escalation Deferred Maintenance Pool => Reserved for maximum amount of 2015 Matching Grant $61,929 NET PROFIT/LOSS ON BASE REVENUE $(1,301) $1,205 $(2,722) $15 YEAR-END BALANCE (TOTAL REVENUE) $(1,301) $1,205 $(402) $15 PRIOR YEAR CARRY-FORWARD AMOUNT OPERATING ACCOUNT YEAR-END BALANCE $4,197 $2,896 $2,495 $2,896 $2,495 $2,510 September 16, 2014 COMMENTS 28 Conclusions & Recommendations • 30 Years Old – a mature, sought-after neighborhood • Finances stabilized through team effort (fully understood finance position and go-forward path) • Financial Management processes in place – Key areas of need identified – Initial short and long term strategies outlined • 2015 Budget continues adjustments to support the next 30 years • 2015 expense projections require additional assessment of 14.9% • Common Area Master Planning process implemented to ensure Common Area quality and value for all WillowWood homeowners 2015 Budget Supports Continuing CAMP Strategy September 16, 2014 29