IBM SYSTEM 370 Abdulmumin Ibrahim Ibrahim Musa Adam Saeed Malhooz Outline • • • • • • • • • • Introduction Evolution of the Project Project life cycle Project drivers Objectives of System 370 Project Selection Model Risk and Uncertainty The Project Manager Project Organization Integration MGMT 341 IBM System 370 2 Introduction • Project Management – Project management is the methodological approach. • Project Management and technology – Project Management implementation. • Benefits of Project Management – – – – Efficiency Customer satisfaction Improved growth Competitive edge MGMT 341 IBM System 370 3 Evolution of System 370 • Reusability of software – Mainframe hardware • Virtual Memory MGMT 341 IBM System 370 4 Project life cycle • Conception – Idea: system with extendable memory • Selection – Backward compatibility – Software reusability – Memory address storage • Planning – Peter Druke (plans) – Time factor – Project outcome meets parent organization outcome • Termination – Will be discussed latter MGMT 341 IBM System 370 5 Project drivers • Speed to market – Fore front in technology market • Cost effective – Features • Complexity an uniqueness of innovation – Reusability of software • Distribution of enterprise – Geographic location MGMT 341 IBM System 370 6 Objectives of System 370 • Price • Compatibility • Performance MGMT 341 IBM System 370 7 Project Selection Model • Sacred cow • Competitive necessity – Market domination in US and Europe – Fore front of technology • Product line extension – Chain of family line architecture MGMT 341 IBM System 370 8 Risk and Uncertainty • The most highly risk decision in computer industry. • “Classic case of all eggs in one basket” • Uncertainty MGMT 341 IBM System 370 9 The Project Manager • Mythical on-Month – “Adding man power to a late project make it later” • Brooks invented computer architecture – Aid in reusing software packages in new hardware MGMT 341 IBM System 370 10 Project Organization • Organizational structure – Manner in which an organization arrange itself • Functional – System 370 • Matrix – System 360 MGMT 341 IBM System 370 11 Integration • Program Managers • Hierarchy MGMT 341 IBM System 370 12 Project Control • Result regulation • Administration • Asset conservation – Physical asset – Financial asset – Human resource MGMT 341 IBM System 370 13 Termination • Termination by extinction – Name Replacement MGMT 341 IBM System 370 14 Thank you MGMT 341 IBM System 370 15