Atlanta Demolition is a unique provider of large-scale commercial and municipal demolition, facilities
decommissioning, site development, and environmental site remediation and abatement services. Our
highly skilled staff and specialized equipment deliver safe and cost-effective solutions for all structural
demolition, site development and remediation needs. Our management team’s background has over 40
years’ experience in commercial demolition, construction, site development remediation, and
environmental law.
Atlanta Demolition has become a market leader in safely and successfully demolishing, abating,
recycling and grading a wide range of structures including high-rises, large shopping malls, office and
apartment complexes, multi-building mixed-use complexes, industrial manufacturing facilities, and
subsurface piping and pump complexes. We pride ourselves in meeting all the needs of our clients in a
timely, flexible and professional manner. Our goal is to meet or exceed all scheduling and cost
performance goals while ensuring strict compliance with all applicable health and safety regulations.
GOVERNMENT CONTRACTING
Atlanta Demolition has executed numerous government contracts, working as a prime as well as a
subcontractor for local governments and federal agencies. Classified as a Small Business in all
categories and as an Emerging Small Business in some, Atlanta Demolition is fully adept at performing
with full federal, state and local compliance and reporting. Registered with the SAM System for Awards
Management (formerly the Central Contractor Registry / CCR and the Federal Online Representations
and Certifications Registry / ORCA) as well as with the Small Business Association / SBA, Atlanta
Demolition’s Cage Code is 615M4 and the company is registered to bid projects within the following
NAICS Codes:
235940 Wrecking and Demolition Contractors
236220 Commercial and Institutional Building Construction
237110 Water and Sewer Line and Related Structures Construction
238110 Poured Concrete Foundation and Structure Contractors
238910 Site Preparation Contractors
238990 All Other Specialty Trade Contractors
423390 Other Construction Material Merchant Wholesalers
423930 Recyclable Material Merchant Wholesalers
562219 Other Nonhazardous Waste Treatment and Disposal
562910 Remediation Services
562920 Materials Recovery Facilities
562998 All Other Miscellaneous Waste Management Services
624230 Emergency and Other Relief Services
SERVICES PROVIDED
Structural Demolition and Equipment Dismantling – Atlanta Demolition provides a complete range of
demolition services from small-scale residential and commercial demolition to complex structural
demolition and the dismantling of industrial equipment. We design and perform all our services to meet
the time and cost needs of our clients while complying within all OSHA Health and Safety Regulations.
Similarly, we pride ourselves in taking advantage of all opportunities in material recycling while
maintaining minimal impacts to the job-site, the environment, and ongoing operations surrounding the jobsite area.
COPYRIGHT ©, 2007-2014
ATLANTA DEMOLITION
UPDATED: MARCH 2014
PAGE 2 OF 13
Environmental Remediation and Abatement – Atlanta Demolition self performs all aspects of
remediation encountered on large industrial and commercial demolition projects. Our experience
includes, but is not limited to, removal of PCB contaminated soils and structural elements,
characterization, removal and management of chemical and heavy metal contaminated soils, and
abatement of asbestos. The environmental background of our experienced management team affords us
the capability to perform the remediation and abatement aspects of large commercial and municipal
demolition projects. Our goal is to provide the seamless coordination of abatement and demolition
activities for all of our clients.
Site Development and Utilities – As part of our effort to provide our clients with a “hands-free” yet,
turnkey solution to their site transitioning and transformation needs, Atlanta Demolition is a licensed
underground utility contractor and has the ability to use its fleet of company-owned equipment to provide
earth moving, pipe installation and attendant site preparation services for its clients.
Material Recycling – Atlanta Demolition is an industry leader in the
ability to identify and professionally perform recycling of concrete,
aggregates, metals and other reusable building materials for
reintroduction to the project site or for resale. On certain projects with
high amounts of recyclable materials, we have been able to reach
recycling goals as high as 95% of the demolished structure.
Additional Capabilities – As an added service, our clients can receive the benefit of the senior
management’s background and expertise in construction management and environmental law. This
experience has proven invaluable to our clients in circumstances where regulatory and environmental
issues arise that may have not been originally anticipated in the project’s specifications or cost models.
HEALTH AND SAFETY
At Atlanta Demolition, we strongly believe that the safety of our staff, subcontractors, clients and site
surroundings is our most important goal. We promote an accident-free workplace and “safety first”
philosophy through utilizing our On-Site Health and Safety Plan manual and enforcing our comprehensive
health and safety policies and practices. We hold all our staff accountable for this program and require
participation at all levels. Our health and safety program is designed in accordance with the National
Demolition Association and OSHA. Occupational health and safety for all on-site personnel and safety to
the environment are always one of the most important aspects of the success of any project.
REPRESENTATIVE CLIENT PROJECTS AND REFERENCE LISTINGS
1.
Georgia Power Company / Plant Bowen – Asset recover and demolition of multiple buildings at
Georgia Power’s Plant Bowen, including five outlying buildings, a two-story main service building
and its three-story connector to the main plant. Project Schedule – 60 days; Customer Contact –
Greg Schuchmann – (770) 606-6887 ghschuch@southernco.com; Contract Value - $566,628;
Euharlee, GA March – May 2013.
2.
Power Plants 401-1 & 401-2 / Indiana Army Munitions Arsenal / River Ridge Development
Authority– Decommissioning, asset recovery, abatement and demolition of two 1940’s era coal
burning power plants including the removal of eleven 225 foot smokestacks. The two 11-Story
plants contained eleven 95 foot standing boilers and eleven generating units inside the borders of
the Indiana Armory. Project Schedule – 270 days; Customer Contact – Tom Vittitow – (812) 2858979 tom@riverridgecc.com; Project Value: $7,000,000; Jeffersonville, IN; 2011 – 2012.
COPYRIGHT ©, 2007-2014
ATLANTA DEMOLITION
UPDATED: MARCH 2014
PAGE 3 OF 13
3.
The Southern Company / Georgia Power Company – Asset recovery, abatement and demolition
of equipment storage and repair facilities at Plant Bowen. Project Schedule – 90 days; Customer
Contact – Greg Schuchmann – (770) 606-6887 ghschuch@southernco.com; Contract Value $484,000; Euharlee, GA August – December 2013.
4.
Former IBM Complex / Atlanta Public Schools –
Abatement and demolition in preparation for the New North
Atlanta High School; including separating 9 levels of
connecting sky bridges and the implosion of one 500,000
square foot structure (eleven stories) while abating and
performing significant interior demolition on the other;
Project Schedule – 180 days; Contract value - $5,813,000;
Customer Contact – Danny Gutlay, APS Project Manager
(404 802-3721; dgutlay@atlanta.k12.ga.us; June –
December 2012
5.
Daehan Solution Georgia / Integra Construction –
Emergency mobilization to recover critical assets after catastrophic fire destroyed 800,000 s/f auto
parts manufacturing facility; Accelerated Demolition Project Schedule of 24 hours per day for 22
days; Contract Value $1,187,635; Customer Contact – Brad Hornor (678) 702-5901
b.hornor@integraconstruction.com; West Point, GA; March – April
2012.
6.
Roosevelt House / Atlanta Housing Authority / The Integral Group
– Interior and Exterior Abatement and Demolition by Implosion of
nineteen-story high rise apartment building; Project Schedule 180
days; Contract Value $1,927,000; Customer Contact – Channing
Henderson (404) 526-1887 chenderson@integral-online.com; Atlanta,
GA; 2010 – 2011.
7.
Jamestown Ponce City Market / Gay Construction / Southern Site Development – Interior
demolition of approximately 114,000 s/f of the main building under renovation after completion of
the related projects described in numbers 13 & 15 below; Project Schedule – 90 days; Contract
value
$900,000;
Customer
Contact
–
Joe
Thompson
(404)
597-6106
jthompson@gayconstruction.com; Atlanta, GA; July – September 2013.
8.
Neely Nuclear Research Center / Georgia Institute of Technology / Manhattan Construction
Company – Demolition, remediation, and asbestos abatement of nuclear reactor facility, including
demolition of research laboratories, reactor structure and hot cell area; Project Schedule 120 days;
Project Cost – confidential; Customer Contact – Manhattan Construction Company, Don
Pickelsimer (404) 351-0007 Don.Pickelsimer@manhattanconstruction.com; Atlanta, GA; 2012 –
2013.
9.
Palmer House / Atlanta Housing Authority / The Integral Group
– Abatement and Demolition of nineteen-story high rise apartment
building; Project Schedule 145 days; Contract Value $2,400,000;
Customer Contact – Channing Henderson (404) 526-1887
chenderson@integral-online.com; Atlanta, GA; 2010 – 2011.
10.
West Paces Hospital / Hospital Corporation of America –
Demolition and Abatement of former West Paces Ferry Hospital totaling approximately 475,000
square feet of structures; Recycling of approximately 2500 tons of steel and 9,500 tons of concrete;
Project Schedule -180 days; Contract Value - $1,900,000; Customer Contact – Ron Woods – (615)
344-5605 Ron.Woods@HCAHealthcare.com; Atlanta, GA; 2009.
COPYRIGHT ©, 2007-2014
ATLANTA DEMOLITION
UPDATED: MARCH 2014
PAGE 4 OF 13
11.
Coors Molson Corporation / Raython Corporation / Atlanta Land Group – Demolition,
Abatement and complete Recycling of former Oxford Chemical industrial facility, five buildings
totaling 360,000 square feet; Project Schedule – 90 days; Contract Value - $700,000; Customer
Contact – Jay Leslie (404) 277-9191 jleslie@atlantalandgroup.com; Chamblee, GA, 2008 or local
Contact Jay Leslie (404) 277-9191; Chamblee, GA; 2009
12.
Georgian Hills Apartments / Atlantic Realty Partners / Fortune-Johnson General Contractors
– Abatement and Demolition of thirty-three apartment buildings, totaling 250,000 sq/ft of structures;
Project Schedule 60 days; Contract Value $750,000; Customer Contact – Lee Horner (678) 3991214 lhorner@fortune-johnson.com; Atlanta, GA; October – November 2012.
13.
Jamestown Ponce City Market / Gay Construction – Underground tunnel asbestos abatement
and demolition; and site demolition and preparation after abatement and demolition described in
project listing number 9 below; Project Schedule – 60 days; Contract Value $303,000; Customer
Contact – Joe Thompson (404) 597-6106 jthompson@gayconstruction.com; Atlanta, GA; August –
December 2012.
14.
Columbia Mill Apartments / Columbia Residential Development – Abatement and Demolition of
twelve 2-story apartment buildings totaling 125,000 sq/ft of structures; Project Schedule 30 days;
Contract Value $340,000; Customer Contact – Robert Barfield (404) 419-1438
RBarfield@Columbiares.com; Atlanta, GA; August – September 2012.
15.
Jamestown Ponce City Market / Gay Construction – Abatement and Demolition of three-story
parking deck connected to City Hall East; Project Schedule – 80 days; Contract Value $536,665;
Customer Contact – Joe Thompson (404) 597-6106 jthompson@gayconstruction.com; Atlanta, GA;
March – April 2012.
16.
Smyrna Commons / Cobb County School District / City of Smyrna, GA – Demolition of thirteen
apartment buildings to make way for the new Smyrna Elementary School; Project Schedule – 30
days; Contract Value $330,000; Customer Contact – Scott Stokes (678) 631-5337
sstokes@ci.smyrna.ga.us; Smyrna, GA; April 2012.
17.
City of Smyrna, Georgia / Hickory Lake Apartments – Demolition of 32 Apartment Buildings on a
30 acre site; Project Schedule 145 days; Contract Value: $1,290,000; Customer Contact – Scott
Stokes (678) 631-5337 sstokes@ci.smyrna.ga.us; Smyrna, GA; 2011 – 2012.
18.
Turner Construction Company / DeKalb (Georgia) County Schools / Chamblee Charter High
School – Demolition of a major portion of an existing and occupied school building; Project
Schedule – 60 days ; Project Cost – $580,000; Method of Deconstruction – mechanical demolition;
Customer Contact – Turner Construction, Keith Werre (404) 504-2750; kwerre@tcco.com; Atlanta,
GA.
19.
Grady Hospital HLF / Grady Health System / Doster Construction – Abatement and Demolition
of three auxiliary buildings in the Grady Complex without disruption of adjacent activity; Project
Schedule: 45 days; Contract Value: $367,180; Customer Contact – Allen Fuller (770) 780-8209
afuller@dosterconstruction.com; Atlanta, GA; 2011.
20.
Fulton County, Georgia / Summertree Condominiums – Abatement and Demolition of
apartment complex ; Method of Deconstruction – mechanical demolition; Project Schedule – 30
days; Project Cost – $400,000; Customer Contact – James Jones (404) 612-5818
james.jones@fultoncountyga.gov; Atlanta, GA; 2012.
21.
Emory University / Briarcliff Cottages – Abatement and Demolition of 75,000 s/f of structures;
Project Schedule 45 days; Contract Value: $424,728; Customer Contact – Charles Rossignol (404)
712-9447 Charles.Rossignol@Emory.edu; Atlanta, GA; 2011.
COPYRIGHT ©, 2007-2014
ATLANTA DEMOLITION
UPDATED: MARCH 2014
PAGE 5 OF 13
22.
Hospital Corporation of America / Dunwoody Hospital – Abatement and Demolition of 100,000 s/f
of structures; Project Schedule 90 days; Contract Value: $652,650; Customer Contact – Ron
Woods (615) 344-5605 Ron.Woods@HCAHealthcare.com; Dunwoody, Georgia; 2011.
23.
1627 Peachtree Street (The John Hunsinger & Co. Building) / CM Companies – Abatement &
Demolition of a three-story office building, totaling 55,000 s/f and situated between an on ramp and
a highway in Midtown Atlanta; Contract Value: $200,000; Customer Contact – Vivian Cushman –
(770)-886-8688 vchusman@cmbusiness.com; Atlanta, GA; 2011.
24.
General Shale Brick Plant / Pollack Shores Real Estate Group – Demolition, Abatement and
recycling, 2142 James Jackson Parkway, Atlanta. Project Outline – Demolition, abatement,
decommissioning, equipment dismantling and recycling of Industrial facilities totaling 439,000 Sq.
Ft.; Abatement of 350,000 Sq. Ft. of ACM and crushing of 45,000 tons of recycled concrete, recycling
of 500 tons of various metals of which 80% of total project materials recycled. Method of
Deconstruction – mechanical demolition; Project Cost - $875,000; Schedule 60 calendar days; Bill
Moyer (770) 480-4476 bmoyer@pollackshores.com; Atlanta, GA 2011.
25.
MLK Tower at McDaniel Glenn / Atlanta Housing Authority / Columbia Residential
Development – Abatement and Demolition by Implosion of thirteen-story high rise apartment
building; Project Schedule 90 days; Contract Value $1,500,000; Customer Contact – Robert
Barfield (404) 419-1438 RBarfield@columbiares.com; Atlanta, GA; 2009 – 2010.
26.
Children’s Healthcare of Atlanta at Hughes Spalding / DeKalb Atlanta Hospital Authority /
Gilbane – Demolition of five-story structure totaling 65,000 square feet in dense urban setting
connected to a functioning hospital; Project Schedule 45 days; Contract Value - $400,000;
Customer Contact – Chris Brown (478) 952-5417; Atlanta, GA; 2010.
27.
Thomasville Heights / Atlanta Housing Authority / IMS Management Services – Abatement,
Demolition and Recycling of 56 two-story apartment buildings totaling 430,000 square feet of
structures; Project Schedule – 145 days; Contract Value – $1,367,000; Customer Contact –
Channing Henderson (404) 223-0588 chenderson@integral-online.com; Atlanta, GA; 2009 – 2010.
28.
Bankhead Courts Apartments / Atlanta Housing Authority / The Habitat Company –
Abatement and Demolition of 55 buildings totaling 480,000 square feet; Project Schedule – 145
days; Contract Value – $2,675,000; Customer Contact – Mark Kyles (678) 752-7016
mkyles@habitat.com; Atlanta, GA; 2010 – 2011.
29.
Collier Heights Elementary School / Atlanta Public Schools / Kellogg Brown & Root –
Abatement and Demolition of school building; Project Schedule 45 days; Contract Value $200,000; Customer Contact – Josh Knauf (404) 377-6440 joshua.knauf@kbr.com; Atlanta, GA;
2010 - 2011.
30.
Hollywood Courts Apartments / Atlanta Housing Authority / The Habitat Company –
Abatement and Demolition of 25 buildings totaling 190,000 square feet; Project Schedule 90 days;
Contract Value $996,000; Customer Contact – Mark Kyles (678) 702-7016 mkyles@habitat.com;
Atlanta, GA; 2010.
31.
Cook School / Atlanta Public Schools / Kellogg Brown & Root – Abatement and Demolition of
elementary school; Project Schedule 30 days; Contract Value $33,000; Customer Contact – Mark
McKay (404) 377-6440 mark.mckay@kbr.com; Atlanta, GA; 2010.
32.
Housing Authority of DeKalb County, Georgia / Johnson Ferry East Phase II – Demolition of
18 apartment buildings totaling 160,000 square feet and removal of 25,000 cubic yards of
unsuitable soils, 4,000 linear feet of underground utilities, and re-grading and compacting site;
Project Schedule - 120 days; Contract Value - $1,000,000; Customer Contact – Ken Yount (404)
374-9574 key@dekalbhousing.org; Atlanta, GA; 2008.
COPYRIGHT ©, 2007-2014
ATLANTA DEMOLITION
UPDATED: MARCH 2014
PAGE 6 OF 13
33.
Ft. Bragg Facilities Reduction / U.S. Army Corps of Engineers / Trinity Industrial Services –
Abatement and Demolition of 13 barracks structures totaling 425,000 square feet; Project Schedule
– 180 days; Contract Value - $2,458,000; Customer Contact – Wade Jones, (910) 443-0200;
Fayetteville, NC; 2009.
34.
University Homes / Atlanta Housing Authority / IBG Construction Services – Abatement and
Demolition of 38 two-story buildings totaling 300,000 square feet of structures; Project Schedule –
days 120; Contract Value - $1,250,000; Customer Contact – Robert Fain – (404) 224-1870; Atlanta,
GA; 2009.
35.
Riverdale Civic Center Development / City of Riverdale – Clearing, Grading, Demolition, Site
Work, Storm and Sanitary Sewer and Utilities for 10.5 acre site; Project Schedule - 90; Contract
Value
Confidential;
Customer
Contact
–
Doug
Manning
(770)
996-3397
dmanning@riverdalega.gov; Riverdale, GA; 2009.
36.
The Zeist Foundation / Edgewood Duplexes – Demolition and Abatement of 104 duplexes
totaling 150,000 square feet; Project Schedule – 90 days; Contract Value - $550,000; Customer
Contact – Kappy deButts (404) 949-3160 kdebutts@zfo.net; Atlanta, GA; 2008.
37.
White-Spunner General Contractors / Wal-Mart / Avondale Mall - Demolition and Abatement of
multi-story shopping mall totaling approximately 400,000 square feet. Accelerated project schedule
of 45 (30 days for demolition and 15 days for abatement); Contract Value $750,000; Customer
Contact – Jeff Carrico (251) 656-2350 jeff.carrico@white-spunner.com; Decatur, GA; 2009.
38.
Housing Authority of New Orleans / Broadmoor LLC / Columbia Residential Development /
St. Bernard Housing Redevelopment – Demolition of 67 apartment buildings totaling 945,000
square feet; Project Schedule - 90 days; Contract Value -$2,200,000; Customer Contact - Robert
Barfield (404) 419-1438 rbarfield@columbiares.com; New Orleans, LA; 2008.
39.
Sembler Development / Brookhaven Town Center – Demolition, Remediation, Abatement and
Recycling of 71 structures totaling 450,000 square feet; Recycling of 21,000 tons of concrete, block
and brick; Project Schedule – 120 days; Contract Value - $2,400,000; Customer Contact – Jeff
Fuqua (404) 847-1800 jeff.fuqua@fuquadev.com; Atlanta, GA; 2007.
40.
Emory University / Cousins Real Estate Corporation / Turner Village - Demolition, Abatement
and Recycling of 105,000 square feet of structures and 70,500 square feet of asphalt; Project
Schedule 60 days; Contract Value - $330,000; Customer Contact – John Goff (404) 407-1000;
Atlanta, GA; 2008.
41.
Grant Development Corporation / Seaboard Industries Petroleum Processing Facility –
Demolition, Decommissioning and cleanup of petroleum manufacturing facility: Removal of 55
above and below ground storage and processing tanks and pumping and mixing facility; Project
Schedule – 90 days; Contract Value - Confidential: Customer Contact – Lee Katz – (404) 307-6150;
Doraville, GA; 2008.
42.
Emory University / Holder Construction – Demolition and Recycling of 60,000 square feet of
structures, including removing and storing for re-use 20,000 square feet of roof tiles. Project
schedule of 60 days; Contract Value of $260,000; Customer Contact Brad Hutto, Holder
Construction (770) 988-3314; Atlanta, GA; 2007.
43.
Industrial Metals / Perennial Properties – Demolition, Decommissioning and Recycling of former
industrial facility; Project Outline – Demolition of an industrial building totaling 275,000 Sq. Ft.,
crushing and recycling of 20,000 tons of concrete and 550 tons of various metals. Abatement of
approximately 35,000 Sq. Ft. of Asbestos Containing Material (“ACM”); of which 75% of total project
materials recycled; Removal of approximately 11,000 cubic yards of contaminated soils; Contract
Value – $790,000; Schedule – 90 calendar days; Customer Contact: Aaron Goldman (404) 8810766 aaron@perennialproperties.net; Atlanta, GA; 2005.
COPYRIGHT ©, 2007-2014
ATLANTA DEMOLITION
UPDATED: MARCH 2014
PAGE 7 OF 13
44.
Trellis Companies / Clark Howell Partners / Mount Zion Retail – Demolition, Abatement and
Site Development of industrial facility totaling 350,000 square feet; Site Preparation for
redevelopment; Project Schedule – 120 days; Contract Value - $500,000; Customer Contact –
Todd Bender (678) 480-7234; Atlanta, GA; 2008.
45.
Cambridge Builders & Contractors / Peachwood Circle Apartments – Abatement, Demolition &
Recycling of a 22 building apartment complex totaling 200,000 square feet; Project Schedule - 45
days; Contract Value - $610,000; Customer Contact – Mike Ruskin (404) 252-3142; Atlanta, GA;
2008.
46.
Wood Partners / Perry Village Retail – Demolition of retail shopping center and adjacent buildings
totaling 125,000 square feet; Project Schedule - 45
days; Contract Value - $200,000; Customer
Contact – Matt Haynes; Atlanta, GA; 2008.
47.
Hospital Corporation of America / Paces Medical Center Skywalk Bridge – Structural
Dismantling and removal of 400 linear foot, enclosed, elevated concrete “Skywalk” bridging two
buildings across roadway; Project Schedule;10 days; Contract Value - $280,000; Customer Contact
Ron Woods (HCA) (615) 344-5605; Atlanta, GA 2008.
48.
Squire Inn Inc. / Days Inn – Demolition and Abatement of 65,000 square feet of one, two and
three story hotel structures; Project Schedule - 30 days; Contract Value - $200,000; Customer
Contact – Mike Aldridge – (404) 281-1060; Atlanta, GA; 2008.
49.
Hartsfield Jackson International Airport Air Traffic Control Tower / CADM – Implosion of 12
story control tower and demolition of base buildings totaling approximately 65,000 square feet;
Recycled metals, concrete and wiring totaling 86% of the project by volume; Project Schedule – 30
days; Customer Contact – Mel Mitchell (770) 328-0931; Atlanta, GA; 2006.
50.
Skyline III, LLC / Morosgo Drive Apartments – Demolition of 12 building apartment complex
totaling 200,000 square feet; Project Schedule - 45
days; Contract Value - $250,000; Customer
Contact – John Emory; Atlanta, GA; 2008.
51.
DLC Management Corp / Sprayberry Square Redevelopment – Demolition of 117,000 sq/ft
structure attached to existing shopping facility, and site preparation for redevelopment: Project
Schedule - 60 days; Contract Value - $590,000; Customer Contact – Steve Whyte (914) 631-3131;
Atlanta, GA; 2008.
52.
Alliance Residential / Broadstone Glenwood – Demolition, Abatement and Site Development of
24 building apartment complex, totaling 225,000 square feet; Project Schedule - 120 days ;
Contract Value - $1,200,000; Customer Contact – Joe Richardson (404) 923- 8115; Atlanta, GA;
2008.
53.
Inter Urban Development / 54 Perimeter Center – Demolition of two-story office building totaling
75,000sq/ft; Project Schedule – 30 days; Contract Value - $190,000; Atlanta, GA; 2007.
54.
DeKalb County, Georgia / MEBBC / Jackson Square Apartments – Demolition and Abatement
of four apartment buildings in flood plain; Project Schedule - 30 days; Contract Value - $125,000;
Customer Contact – Eugene Trapp (404) 992-5489; Atlanta, GA; 2007.
55. Atlanta Housing Authority / Lane Strategic Renovation / Leila Valley Apartments – Demolition of
14 Atlanta Housing Authority two-story apartment buildings totaling 225,000 square feet; Project
Schedule - 60 days; Contract Value $500,000; Atlanta, GA; 2007.
56.
Perennial Properties / Mayo Furniture – Demolition, Abatement and Site Development of
warehouse / distribution center totaling 150,000 sq/ft; Project Schedule – 90 days
Contract Value - $400,000; Customer Contact – Aaron Goldman (404) 881-0766; Atlanta, GA;
2008.
COPYRIGHT ©, 2007-2014
ATLANTA DEMOLITION
UPDATED: MARCH 2014
PAGE 8 OF 13
57.
Centex Homes / The Cliffs Apartments – Demolition and Recycling of 30 apartment buildings
totaling approximately 170,000 square feet of structures. Project schedule of 45 days; Contract
Value of $400,000; Customer Contact – Jeff Green (770) 665-1280; Atlanta, GA, 2006.
58.
Perennial Properties / Foster & Company General Contractors / Athens Mixed Use
Development – Demolition and Site Preparation for new 300 unit apartment project; Project
schedule – 15 days for demolition and 120 days for site work; Contract Value - $950,000; Customer
contact – Aaron Goldman, Perennial Properties (404) 881-0766; Athens, GA; 2007.
59.
BHC Property Group / Ryland Homes / Dunwoody Park Apartments – Demolition and
Recycling 42 apartment buildings totaling approximately 350,000 square. Project Schedule 45
days; Contract Value - $975,000; Customer Contact – Bill Moyer, BHC Property Group, (770) 2378333; Atlanta, GA; 2007.
60.
Worthing Development / Perimeter Center East – Demolition and Recycling of 8 commercial
structures totaling 275,000 square feet; Processing and crushing of approximately 20,000 tons of
concrete into screened aggregate; Project schedule 60 days; Contract Value - $600,000; Customer
Contact – Steve Ingram (770) 522-5775; Atlanta, GA; 2006.
61.
Lane Construction / Lindmont Plaza – Demolition of a 52 multi-unit, multi-building apartment
complex totaling approximately 400,000 Sq. Ft. Processing and crushing of approximately 40,000
Tons of concrete and block with 80% of the crushed debris recycled on-site. Contract Value $1,000,000; Project Schedule 120 calendar days; Customer Contact – Ronnie Strickland (678) 2497431; Atlanta, GA; 2006.
62.
Lane Realty Construction / Northwoods Apartments – Demolition and Recycling of 7 structures
totaling 41,000 square feet and 32,000 square feet of asphalt, sidewalk and curb. Project schedule
of 14 days; Contract Value $125,000; Customer Contact – Paul Seefried (770) 777-7500; Atlanta,
GA; 2006.
63.
Coro Development / Habersham Court Apartments - Demolition and Recycling of 52,000 square
feet of structures. Project schedule of 30 days; Contract Value of $160,000; Customer Contact –
Adam Gilmore (404) 846-4000 agilmore@cororealty.com; Atlanta, GA; 2007.
64.
Alliance Residential Builders / Perimeter Park – Demolition, Abatement, Recycling and site
development of approximately 80,000 square feet of offices and 60,000 square feet of asphalt.
Project schedule 30 days; Contract Value approximately $880,000; Customer Contact – Bill Scott
(404) 923-8330; Atlanta, GA; 2008.
65.
Perennial Properties / Foster & Company General Contractors / Pencil Factory – Demolition,
Abatement and Recycling of approximately 75,000 square feet of structures and 80,000 square feet
of concrete and asphalt; Contract Value $200,000; Customer Contact – Aaron Goldman (404) 8810759; Atlanta, GA; 2007.
66.
Wood Partners / National Linen Building – Demolition, Recycling, tank removal, and
Remediation of single story former linen factory totaling approximately 150,000 square feet. Project
schedule of 45 days; Contract Value $290,000; Customer Contact: Matt Haynes; Atlanta, GA; 2006.
67.
Alliance Residential Builders / Ramada Inn Piedmont – Demolition, Abatement, Recycling and
Site Development of hotel property, including 140,000 square feet of structures and recycling of
40,000 square feet of asphalt, sidewalk and curb. Project schedule of 45 days; Contract Value
$489,000; Customer Contact – Joe Richardson (404) 923-8115; GA; 2007.
68.
Emory University / New South Construction / Eagle Row Realignment – Demolition and
Recycling of laundry structure totaling approximately 25,000 square feet; Project Schedule – 15
days; Contract Value - $100,000; Customer Contact – Rachel Martin, project manager, (404) 4434000; Atlanta, GA; 2008.
COPYRIGHT ©, 2007-2014
ATLANTA DEMOLITION
UPDATED: MARCH 2014
PAGE 9 OF 13
Equipment List
Atlanta Demolition owns and operates a full fleet of heavy and specialty equipment for commercial
demolition, material handling and earthwork activities. Any equipment that is not part of our inventory is
rented on an as-need basis. The following list is an overview of our equipment.
Equipment Description
Manufacturer / Model
Gross Weight
Purpose
Excavator
Hyundai 450
107,000 lbs
Demolition
Excavator
Case 9060B
105,000 lbs
Demolition
Excavator
Hitachi EX450 LC
105,000 lbs
Demolition
Excavator
Hitachi EX450 LC
105,000 lbs
Demolition
Excavator
Case CX460
101,000 lbs
Demolition
Excavator
Case 460
101,000 lbs
Demolition
Excavator
Case 460
101,000 lbs
Demolition
Excavator
Case 460
101,000 lbs
Demolition
Excavator
Kobelco SK400 LC
95,000 lbs
Demolition
Excavator
Kobelco SK400 LC
95,000 lbs
Demolition
Excavator
Kobelco SK330 LC
78,000 lbs
Demolition
Excavator
Case 330 XL
82,000 lbs
Site
Excavator
Kobelco SK330 LC
78,000 lbs
Demolition
Excavator
Kobelco SK300 LC
78,000 lbs
Demolition
Excavator
Kobelco SK290 LC
75,000 lbs
Demolition
Excavator
Kobelco SK290 LC
75,000 lbs
Demolition
Excavator
Kobelco SK220 LC
55,000 lbs
Demolition
Excavator
Kobelco SK210 LC
55,000 lbs
Demolition
Excavator
Case 330 XL
80,000 lbs
Demolition
Excavator
Case 330 XL
80,000 lbs
Demolition
Excavator
Case 240 XL
55,000 lbs
Demolition
Excavator
Case 240 XL
55,000 lbs
Demolition
Excavator
Case 240 XL
55,000 lbs
Demolition
Mini-Compact Excavator
Case CX 36B
8,000 lbs
Demolition
Mini-Compact Excavator
Case CX 36B
8,000 lbs
Demolition
Track Loader
CAT 973
70,000 lbs
Demolition
Dozer
Case 850
60,000 lbs
Site
Track Loader
CAT 973
70,000 lbs
Demolition
COPYRIGHT ©, 2007-2014
ATLANTA DEMOLITION
UPDATED: MARCH 2014
PAGE 10 OF 13
Track Loaders
CAT 963
60,000 lbs
Demolition
Track Loaders
CAT 963
60,000 lbs
Demolition
Track Loaders
CAT 963
60,000 lbs
Demolition
Track Loader
CAT 953
48,000 lbs
Demolition
Skid Steer Loaders
Bobcat 843
N/A
Demolition
Skid Steer Loaders
Bobcat 773
N/A
Demolition
Skid Steer Loader
Bobcat 773
N/A
Demolition
Skid Steer Loader
CASE Bobcat 445
N/A
Demolition
Skid Steer Loader
CASE Bobcat 445
N/A
Demolition
Skid Steer Loader
CASE Bobcat 445
N/A
Demolition
Skid Steer Loader
CASE Bobcat 445
N/A
Demolition
Skid Steer Loader
CASE Bobcat 445
N/A
Demolition
Skid Steer Loader
CASE Bobcat 445
N/A
Demolition
Skid Steer Loader
CASE Bobcat 445
N/A
Demolition
Skid Steer Loader
CASE Bobcat 445
N/A
Demolition
Off Road Truck
Deere 250 C
25 Ton
Rock Hauling
Off Road Truck
Deere 300 C
30 Ton
Rock Hauling
Off Road Truck
Case 330
30 Ton
Rock Hauling
Off Road Truck
Case 330
30 Ton
Rock Hauling
Labounty Concrete
Processor (Excavation)
Twin Ram 2nd Member
N/A
Demolition &
Debris Processing
Genesis Rebar Shear
(Excavation)
Twin Cut Rebar Shear
N/A
Rebar
Processing
Material Processors /
Metal Shears (Excavation)
NPK-M38 - Concrete
Processor / Shear
N/A
Concrete / Metal
Processing
Material Processors /
Metal Shears (Excavation)
NPK-M38 - Concrete
Processor / Shear
N/A
Concrete /Metal
Processing
Material Processors /
Metal Shears (Excavation)
NPK-M28 - Concrete
Processor / Shear
N/A
Debris
Processing
Material Processors / Concrete
(Excavation)
NYE Concrete Processor
N/A
Concrete
Processing
COPYRIGHT ©, 2007-2014
ATLANTA DEMOLITION
UPDATED: MARCH 2014
PAGE 11 OF 13
Hydraulic Hammer (Excavation)
NPK E216 5500 lbs
N/A
Debris
Processing
Aggregate Crusher
Pegson Jaw XR 400 Jaw Crusher
102,000 lbs
Aggregate
Crushing
Aggregate Crusher
Pegson Trakpactor 1412 Impact
Crusher
100,000 lbs
Aggregate
Crushing
Aggregate Screen
Chieftain Powerscreen 1800
72,000 lbs
Aggregate
Screening
Aggregate Screen
Chieftain Powerscreen 2100
95,000 lbs
Aggregate
Screening
Aggregate Screen
Warrior Powerscreen 1800
65,000 lbs
Aggregate
Screening
5036 Radial Stacking Conveyor
Chieftain Powerscreen Stacker
12,500 lbs
Aggregate
Processing
Rubber Tire Loader
Kawasaki 85Z
46,000 lbs
Aggregate
Process Loading
Rubber Tire Loader
Kawasaki 85Z
46,000 lbs
Aggregate
Process Loading
Rubber Tire Backhoe
CAT 416 B
14,000 lbs
Loading / Utility
Truck
2007 Mack Tractor
N/A
Debris Removal
Truck
2007 Mack Tractor
N/A
Debris Removal
Truck
2006 Mack Tractor
N/A
Debris Removal
Truck
2006 Mack Tractor
N/A
Debris Removal
Truck
2005 Mack Tractor
N/A
Debris Removal
Truck
2006 Mack Tri -Axle
N/A
Trailer
2005 Benson Dump
32 Ft
Equipment
Mobilization
Debris Hauling
Trailer
2005 Benson Dump
32 Ft
Debris Hauling
Trailer
2004 Benson Dump
32 Ft
Debris Hauling
Trailer
2003 Benson Dump
32 Ft
Debris Hauling
Trailer
2007 Clement Dump
37 ft / 62 yard
Debris Hauling
Trailer
2007 Clement Dump
37 ft / 62 yard
Debris Hauling
Trailer
2007 Clement Dump
37 ft / 62 yard
Debris Hauling
Trailer
2007 Clement Dump
37 ft / 62 yard
Debris Hauling
Trailer
2007 Clement Dump
37 ft / 62 yard
Debris Hauling
Trailer
EAST - 100 Cubic Yd Live Floor
80,000 lbs
Debris Hauling
Trailer
EAST - 100 Cubic Yd Live Floor
80,000 lbs
Debris Hauling
Trailer
Trailking 100 Cubic Yd Live Floor
80,000 lbs
Debris Hauling
COPYRIGHT ©, 2007-2014
ATLANTA DEMOLITION
UPDATED: MARCH 2014
PAGE 12 OF 13
Load King Lowboy Trailer
2006 Load King 60-Ton
60 Ton
Equipment
Mobilization
Equipment
Mobilization
Equipment
Mobilization
Misc.
Liddell Lowboy Trailer
2005 Liddell 50-Ton
55 Ton
Utility Trailer
Hardeebuilt Dual-Axle
N/A
Job-Site Utility Trailer
Horton 16Ft Dual-Axle
16 Ft
Debris Containers (20)
Roll Off Containers (20)
Debris Hauling
Fuel and Lube Truck
Chevrolet Kodiak
20-Yd, 30-Yd
and 40-Yd
30,000 lbs
Service Trucks
Ford F250, F350, Chev K2500
N/A
Equipment
Servicing
Fuel and Lube
INSURANCE AND BONDING
Atlanta Demolition is fully insured and maintains an $8,000,000 (single project) and a $12,000,000
(aggregate) bond line. Bonding at higher levels is available on a per-project needs basis. Our surety is
The Gray Casualty & Surety Company.
Environmental References
One Consulting Group – Robert Brawner, (404) 817-8809
Rex Bray – Planners and Engineers Collaborative – (678) 684-6209
CONCLUSION
Atlanta Demolition has grown rapidly by continuously providing professionally superior services to our
clients while always maximizing efficiency and safety on the job and minimizing costs. We have in-depth
experience and the financial stability to equip and staff any size project with the proper mix of professional
grade equipment and qualified personnel to complete a project on time, on budget and to your
satisfaction. Our services are provided by the most efficient, best trained, knowledgeable and safety
conscious personnel in the industry. Any requests / invitations for bid will be handled promptly and in a
professional manner. We will ensure our quotation will meet your desires according to the best possible
timeline, price and professional workmanship. We will strive to exceed your every expectation and it’s our
past success that is best measured by the opinions of our clients. We invite you to contact any of our
current or past references, and we look forward to working with your company.
COPYRIGHT ©, 2007-2014