Hotel Management System With Online Environment For Hotel Riviera FHA.SHIBLY SEU/IS/03/MG/031 Outline • • • • • • • • Background of The Company Introduction to Hotel Management System Technology Used in the HMS System Analysis and My Approach to the System Design Implementation Testing and Evaluation Future of the OHMS Background of the hotel Riviera • The Riviera resort is a Tourist Resort. It is located in the charming fishing town of Batticaloa, in the eastern coastal district of Sri Lanka. This resort was established in 2000. • This resort has 38 rooms with all the Facilities. • There are double single and family rooms with attached bathrooms. There are in door and out door games facilities with swimming pool. Air-conditioned rooms too are available. Introduction of current system • • • • Guest registration Room reservation Food order payment calculation Problems identified • • • It takes more time to reserve the room. So performance of the current system is slow. Now the current system is running manually. So they are facing the following problems. Difficult to handle data accurately and security because of the data lost, viewing by unauthorized people, can’t collect the data at the time. • Day to day current system is very costly • So security wise is not guarantee to all information and data’s. • If customer wants search their details it very difficult • Processing delay • Not easy to handle room details • Storage problems • Unable to analyze past data • (Update, Search, Delete, Edit), these types of methods are not accessible and not carry with the manual method Introduction to Online Hotel Management System (OHMS) • To resolve the current problems the Hotel decided to do in Fashionable way so that they no their situation. So Hotel agreed to do in computerized method to resolve the reservations problems. The Hotel believes that advantages of doing in a computerized system. • The system will help the Hotel Riviera to operate efficiently by eliminating all the time consuming procedures and provide a better service to their customers as well as for the employees in the company. • Two Main Parts – Web Based Reservation System (Customer’s Perspective) – Hotel Reservation System (Administration Perspective) Features of the New System • • • • • • Handling Customer Details Reservations Cancellations Handling Rooms Details Making Payments Features like Update, Searching, Deleting, Editing Record etc... • Generating different kinds of report. • Customers can view videos of hotel rooms with audio explanations. • Customers Make reservations, enquiries and cancellations via online. Waterfall Development-based Methodology Method of Analysis • E-R Diagrams • Relations/Tables • Data Flow Diagram – Context Diagram (0 Level DFD) – Level 1 DFD – Level 1 DFD • Flow Charts Data Flow Diagram (DFD) • Data Flow diagrams are a network representation of a system. • Four entities that must be represented are: – Data flows: movement of data in the system – Data stores: data repositories for data that is not moving – Processes: transforms of incoming data flows to out going data flows – External entities: sources or destinations outside the specified system boundary ty ili R ec pt ei Co nfi r m m Ro om srv es a ti on ils a ti on D e ta erv tio nD Re rva or R se the the Co nfi r Re qf e ta ils rm Fo n tio va rm o er F es n ls ai tio rR et fo va q tD er Re es es u R ls ai rG et fo ls q tD ai t Re es De s Gu m il om oo eta o D rR R t fo e m q th en oo Re m m R ay fir P on t n or C f en tio eq n ella ym R tio c Pa lla an ce t C ity an jec acil e F rC fo or R ble q a s l ie ils t Re m ai lit en fir r av eta ci D on o Fa aym C q f lity e P ci Re th y t Fa m ili t fir ac en on r F ym fo Pa eq C R c Fa lla t an ce fo rC R eq r fo ls ai et D ls st ai s et ue tail D G e t r fo s t D en t m eq ue ils or ay a R G P ep et r R fo tD rt n en po io eq e m R at R ay erv ils n P ta io es de at R y nt rv e e rl t m es ea en Y R ay P ly ym th ity Pa l y on ci lit Fa ci Fa M ent agem Ma n t io n Re po po rt r Re io n lla t nc e Ca q Re Hotel Reservation System pti on ist ce rs me s to Cu Re t es Gu Re Context Level for Proposed System First Level for Proposed System t tails n De vatio eser R r fo tails Req n De rvatio ation Rese serv e Re rm th fi n o om C e Ro rm th Confi Req for Room Details Room Details R Process eq m Re fir on t en m ay t P t r en en fo ym m Pa ay P e th C Update 3 Room 2 Reservation ce t ip Update tion erva Res etails D 1 qf Det ails Pa ym en nt td de e ta ta i ls ils or Fa ci Fa lity P cil ity aym e Pa ym nt en t 3 s tails ilt ie C C R on fir eq fo an r ce Ca lla nc tio ell at n de ion ta d ils et a s ili tie Fa c th e m ils Reservation De Fa c ila bl e et Facility details Facility Details 5 firm Con or R on ellati n atio cell Can t c eje Cancellation Process Update Cancellation Report Process Re Fa c ili ty D fo ra va ai ls qf Re eq 6 rt po Re on a ti rt ell po e nc s Ca nR tail or latio De qf el est Re nc Gu r Ca q fo ls Re e ta i ils e ta st D Gue nt D me s Pay tail for e D Req rt ent po ym Re t Pa r o on p a ti Re erv ls n es ta i tio e yR d va arl er nt s e Ye Re t ym en Pa hly ym ty nt i Pa cil Mo Fa ity cil or Fa qf R Update 7 st Gue 4 Req for available Facility Facility Process ils e ta nD tio ils e ta ent ilit y rva ils me ese y De ta Pay m Pa y D ion Facil it Payment vat 5 or Fa c R or Update qf ilit y ser ls Re ai et D s st ail ue et r G st D fo ue G Re Fa c eq Facility Payment R 4 Update Payment Process Guest Re 2 anc for C Req st ni tio ep G ue s ec for Res erv atio Res nF Req erv orm atio for nF Gu orm est Det Gu ails est Req De tail for s Ro om Det 1 Ro ails om Co nfi D e ta rm ils the Ro om Reservation R ` Req M em ag an t en Second Level for Proposed System Req for G u es t Roo mD e ta i Roo ls mD e ta i Co ls nfir mt he Ro om 1.2 Req for Room Details R Inquiry Process eq r fo Room Details Room 3 R es R er n o ti e ta rm o F tD rm o F ils va e ta n o ti tD or Gu es va qf er Gu es es Re ils 1.1 Reservation Process 1 ils e ta atio nD erv erv nD atio Reservation Update ls e ta i ation serv e Re h t irm oom Conf he R irm t f n o C Res Receptionist n rvatio 2 Re se rva tio nD e ta ils Guest 2 Res ese for R Req Update 5 Cancellation Process Payment Process Mapping ER Diagram for Reservation System M Room M Customer Room: room_ID, room_No, room_Date, reservation_Date Roomcustomer: room_ID, cust_ID Customer: cust_ID, cust_name, cust_address, cust_tpno, cust_email Payment M 1 Customer Payment: Pay_ID, amount, date, cust_ID Customer: cust_ID, cust_name, cust_address, cust_tpno, cust_email M Banquet M Customer Banquet: banq_ID, date_reserved, time_start, time_end, time_served, function BanquetCustomer: banq_ID, cust_ID Customer: cust_ID, cust_name, cust_address, cust_tpno, cust_email Pool 1 M Customer Pool: pool_No, description, price Customer: cust_ID, cust_name, cust_address, cust_tpno, cust_email, pool_No Restaurant 1 M Customer Restaurant: rest_ID, food_ID, description, price, total_Amount Customer: cust_ID, cust_name, cust_address, cust_tpno, cust_email, rest_ID Booking M 1 Customer Booking: booking_ID, date, cust_ID Customer: cust_ID, cust_name, cust_address, cust_tpno, cust_email Bar 1 M Customer Bar: bar_ID, Liquor_No, description, quantity, selling_Price, expiry_date Customer: cust_ID, cust_name, cust_address, cust_tpno, cust_email, bar_ID Flow Charts Start Log In To the System Startup Screen Main Screen Data Process Guest update T Guest update Procedure F Make room reservation T Room Reservation Procedure F T Room selection F Room selction Procedure F Room reservataion T Reservation F Food order Procedure Food order T F Bar order T Bar order Procedure F Report Selection F Log Off From the System Stop T Report Procedure Technology Used in the SOSM System • The technologies that should be taken into consideration when implementing the system are as follows:– Re-usability – Efficiency and performance Tools to be used in developing the system • Graphic Editor Software • Adobe Photoshop will be used as a graphic editor. Since it is not complex to work and it has more sophisticated features. • Web Development Tool • Macromedia Dreamweaver version 8 will be used for web development tool. Development Language Requirements • • • • Familiarity Web Support Rapid Development Execution Speed and Efficiency • Database Software SQL Server 2000 and MS Access were selected as the database software for this project out of the available software in the market. • Operating System – Windows is selected as the operating system software since it works well or run well PHP and VB. • Programming Language – PHP – Hypertext Pre-processor:-PHP is a server-side scripting language. Although it was originally designed to run under Linux using the Apache Web server. – VB (Visual Basic) language for Administrators perspective reservation system. • Apache as the Web Server The Apache Web Server, maintain by the Apache Software foundation, is currently the most popular Web server because its stability, efficiency, portability, security and small size and mainly it is Open Source. Design • • • • Software Architecture, Input and Output Design, Interface Design and Security Design VB Designs Menu and screen Form designs. Login User name Pass word Ok Cancel Create a login by administrator for administrator and user Admin user Date Time User name Add Save Main Exit Pass word Update Delete Guest New Old Guest Id Last name First name Mid init Address Age Tel no Sex Nationality Company Ok Show all Cancel Banquet reservation form Banquet reservation Date reserved Location Client Fax Address Engineering Contact no Meal type Time start Time end Time served Description Function Price Setup Backdrop Quantity Amount Time end Cancel Save This form shows Room reservation Room reservation Room no Room type Room rate Reservation no Guest id Room no Reservation date Checkout date Back Show all Save Room and banquet confirmation form design Room and banquet confirmation Room Banquet Reservation no view confirmation date Guest ID Room no view expire reservation Reservation date view confirmed Date reserved Show all Length of stay close Status Web based Design Web page designs • Main web page description Header of web page Page Links Welcome part Description on particular links. Client Access Footer Links • LINKS Manager’s link Introduction Rooms Video Clips Online Room reservation Banquet reservation Our Services Foods and Beverages Feedbacks Pool About Srilanka Further Information's Implementation Implementation Plan This plan describes how the developed system will be deployed. It contains an overview of the system, • The system to be implemented is an Online Hotel Management for Hotel Reveira. • It is a web-base and a Visual Basic developed to run on a PHP/MySQL/Apache server and in Visual Basic. • This is developed to assist the company in providing a better reservation service to their manages,and to the Customers also. Major task required for the implementation of the system • Providing overall planning and coordination for the implementation. • Providing appropriate training for personnel • Ensuring that the user manual is available for the implementation effort • Ensuring that all prerequisites are met. • Performing data conversion before loading the data into the developed system. Description of the implementation • Firstly, the web server software (Apache) and database software (Mysql) are checked if they are present, if unavailable, they are installed. • PHP and VB software is deployed • The System developed is then implemented. • Also instead of using above first three steps you can use the Xampp, which is consider a open source package that comes with the Apache server mysql database as a configured one. • Import a Database backup. • The system implemented is tested in the client PC’s. Implementation of Database • The database tables were successfully created using My SQL and MS Access. • All the tables mentioned were designed and implemented appropriately with the appropriate fields and their data types. Testing and Evaluation • Component Testing The program deals with database and some ActiveX controls and references some runtime libraries therefore it was essential to test if they are properly referenced or not. • installed Visual Basic 6.0 and Crystal Reports on the target test machine and run the system. All of them were successfully running without any problems Integration Testing • This test was mainly carried out to see the links between a forms and reports in the system. There are a number of different forms and reports linked together. So it was necessary to check the operability of the links found on the multiple document interface (MDI) form. • This testing mainly focused to check whether links between the forms and reports in the system work correctly. There are two kinds of test within this testing process. – Test links from the MDI form to other forms: when the user clicks on the menu, it will call respective form. – For example: when the user clicks on “Guest” menu, it will open Guest window. Future • Mobile Reservations • Virtual Reality • Adding ERP and BPR