California Citrus Pre-clearance Program • Program Benefit – Expedited Clearance in Australia – Rapid Pest Identification – Reduced Fumigations – Options/Control • Redirect • Re-inspect California Citrus Pre-clearance Program • What the Work Plan is Not – Easy – Inexpensive – More forgiving than an inspection in Australia California Citrus Pre-clearance Program • Obligations – The Work Plan is negotiated between USDA and AQIS – Rules, requirements to give AQIS Confidence in sample, integrity of the load – AQIS is demanding on • Process • Paperwork • Sanitation California Citrus Pre-clearance Program • Process – Understand the Work Plan – Have procedures in place to comply – Have safeguards to maintain integrity of the load • Paperwork – Attention to detail – Clean accurate NOIs – NOIs and Phytos must match exactly on arrival • Sanitation – In the operation; fruit path – In the inspection area – Inspection area safe from external infestation California Citrus Pre-clearance Program • Volume History 2005-06 2006-07 2007-08 2008-09 Total Volume - 12/31 124,788 310,058 222,123 196,541 Total Volume - EOY 477,925 400,681 929,674 496,780 California Citrus Pre-clearance Program • Volume by Variety Volume By Variety Navels Lemons Mandarins Grapefruit Clementines Minneola Tangelo Blood Orange Tangelos Moro 2007-08 727,420 74,254 77,167 22,423 26,272 576 1,274 288 929,674 2008-09 Change 328,123 -55% 88,372 19% 53,603 -31% 12,978 -42% 9,888 -62% 1,260 119% 936 -27% 864 200% 756 496,780 -47% California Citrus Pre-clearance Program • 2007 – 08 Volume Inspections by County Kern 2008-09 93 Tulare 53 Riverside 23 Arizona 7 176 California Citrus Pre-clearance Program • Program Expenses - AQIS expenses are paid by the importers - Scheduling and number of inspectors is determined by importers - Coordination, data reporting and logistics paid by the shippers - Inspection Reciepts - For cash flow reasons, CCQC will issue a mid year invoice California Citrus Pre-clearance Program • Registration Packet – Work Plan – RFI Procedure – Tips and suggestions – Excel Files • RFI Form • NOI Form • Sign Kit and Labels California Citrus Pre-clearance Program • Requesting an Inspection – Request must be received no later than 12:00 noon the day before you need the inspection – Requests must be emailed to citrusexports@sbcglobal.net – We can accept a fax RFI, but… – We will not schedule an inspection without a fax or email request California Citrus Pre-clearance Program • Requesting an Inspection – RFI Form must be fully completed – Importer information must be provided – Day and Time of Inspections – Shipping Date – Inspections are on a first come basis – Most efficient routing will be used California Citrus Pre-clearance Program • Submit an RFI for each inspection you want. • For efficient scheduling we will not be able to schedule multiple inspections for each shipper. • Multiple orders can be combined into one NOI and one inspection. • A phyto certificate is written for each order or consignment. • Make a copy of the NOI to go with the phyto for each individual order. California Citrus Pre-clearance Program • Issues for Riverside Program - Diaphorina citri (Asian citrus psyllid) Additional Declaration - Scheduling and Logistics - Logjam on shipping dates - Communications - Pest Identification - Holiday Break California Citrus Pre-clearance Program November Week Beginning (Monday) 11/2 Demember 11/9 11/16 11/23 11/30 January 12/7 12/14 12/21 12/28 February 1/4 1/11 1/18 1/25 2/1 March 2/8 2/15 2/22 April 3/1 3/8 3/15 3/22 3/29 4/5 4/12 Inspector 1 - Desert 11/1 12/22 Inspector 2 11/2 Inspector 3 11/22 12/22 12/22 Inspector 4 1/3 Inspector 5 1/3 2/13 2/13 Inspector 6 2/11 Inspector 7 2/11 3/25 3/25 Inspector 8 3/22 Number of Inspectors on duty 1 1 2 3 3 3 3 0 0 2 2 2 2 2 2 2 2 2 2 2 1 4/16 1 1 1 California Citrus Pre-clearance Program • Re-inspections – If an load fails inspection or is held for pest identification – The NOI submitted is failed; The Packer must present a new NOI – The grower lot with the offending pest find must be removed from the inspection lot – A new 600 fruit sample is taken – Re-inspection may be done before the AQIS goes on to next job California Citrus Pre-clearance Program • Typical Problems – Understanding the Work Plan – Shipping personnel informed about Work Plan – Scheduling and Readiness, Staging – Lot numbers and pallet tags – NOIs completed accurately • Accurate and Complete at time of inspection • No Cross-outs or scribbles California Citrus Pre-clearance Program In Summary • Process, Paperwork, Sanitation • Pallet Tags, Lot Numbers, Phytos • RFI Procedures • Communications • Patience and Cooperation