ICAO Asia-Pacific AMHS Activities & Status ATS Message Handling System (AMHS ) Implementation Workshop Presentation to: Name: Date: Chennai, India December 15-16, 2008 Report From APANPIRG Aeronautical Telecommunication Network Implementation Co-Ordination Group (ATNICG) Our Vision: Service and Safety Presentation Overview ATNICG Background ATNICG Activities ATNICG Status Conclusions and Decisions Tasks Activities and Status AMHS WORKSHOP Chennai, India December 15-16, 2008 2 Our Vision: Service and Safety Presentation Overview Aeronautical Telecommunication Network (ATN) Task Force (TF) concluded its final meeting in 2005 adopting all recommendations of the TF and all of its AMHS implementation documents developed for the Asia/Pacific region to replace its aging AFTN infrastructure APANPIRG CNS/MET Sub-Group and APANPIRG adopted the TF recommendation APANPIRG also established the ATNICG in 2006 to facilitate the AMHS transition ATNICG held its first meeting in Seoul, Republic of Korea in 2006 and its second meeting in Hong Kong, China in 2007 AMHS WORKSHOP Chennai, India December 15-16, 2008 3 Asia/Pacific ICG Activities Coordinate AMHS implementation and transitional issues in the Asia and Pacific Region and address relevant system management, operational procedures and emerging issues. The Group is composed of experts nominated by: – Australia, China, Hong Kong, Fiji, India, Indonesia, Japan, New Zealand, Republic of Korea, Singapore, Thailand and United States. – The Group presented its report to APANPIRG through the CNS/MET Sub-group. AMHS WORKSHOP Chennai, India December 15-16, 2008 4 Our Vision:ATNICG Service Tasksand Safety 1. ATN Implementation Coordination 2. ATN Operational Procedures 3. ATN Certification & Validation Process 4. ATN Documentation 5. ATN Performance 6. ATN Service Enhancements 7. Security AMHS WORKSHOP Chennai, India December 15-16, 2008 5 Our Vision:ATNICG Service Tasksand Safety 1. ATN Implementation Coordination Review of implementation problems and develop coordinated solutions Review States’ ATN/AMHS Implementation/Operational activities and issues (member States are expected to provide their latest implementation status) ATN/AMHS Implementation Planning Status Importance of Specifying Design Capacity and Loading/Stress Testing of AMHS Use of Internet for ATN/AMHS Functional and Interoperability Testing AMHS WORKSHOP Chennai, India December 15-16, 2008 6 Our Vision:ATNICG Service Tasksand Safety 2. ATN Operational Procedures Develop Interim Database for Directory Services Develop operational database management procedures Pre-Operational Testing Procedures Update of EUR AMHS Manual related to AMHS Conformance Testing Draft Conclusion 2/1 - Guidance Document for AMHS Conformance Testing AMHS WORKSHOP Chennai, India December 15-16, 2008 7 Our Vision:ATNICG Service Tasksand Safety 3. ATN Certification & Validation Process Develop conformance procedures and checklist for AMHS and ATN routers Develop validation process document AMHS WORKSHOP Chennai, India December 15-16, 2008 8 Our Vision:ATNICG Service Tasksand Safety ATN CONFORMANCE DOCUMENT AND CHECKLIST – Describes the standard checklist required to ensure interconnectivity and interoperability. The document was adapted with a baseline from the Eurocontrol Conformance Document. The adaptation of the Eurocontrol Manual focuses on the use of AMHS with an additional ATN router testing procedure which was developed based on the router testing and trials conducted between Hong Kong China and Japan. – The ATN Conformance Document will cover the system level testing for AMHS and ATN router necessary for interoperability and interconnectivity as an initial step based on existing technical provisions. Technologies such as the adoption of Internet Protocol (IP) are proposed to be addressed in later revisions. The structure of the documenst would be as follows: • AMHS Conformance Document • Annex A - Guidelines on Quality of Service (QOS) • Annex B - AMHS Conformance Test and Checklist • Annex C – ATN Router Test and Checklist AMHS WORKSHOP Chennai, India December 15-16, 2008 9 Our Vision:ATNICG Service Tasksand Safety 4. ATN Documentation Study DIR objects/attributes proposed in ACP and follow development within other groups Develop AIDC documentation (including ICD) and follow development within other groups Update AMHS ICD to comply with SARPs AMHS WORKSHOP Chennai, India December 15-16, 2008 10 Our Vision:ATNICG Service Tasksand Safety 5. ATN Performance Develop/establish/adapt/monitor/identify/analyze performance indicators AMHS WORKSHOP Chennai, India December 15-16, 2008 11 Our Vision:ATNICG Service Tasksand Safety 6. ATN Service Enhancements Review the impact of the implementation of Directory Services in the Region Development of profiles for the directory access and exchange protocols (Ref. Decision 7/9) Study the use of IP Consider related ICAO standards (e.g. 9880) to compliment ICAO Doc. 9705 to adopt IP. Meanwhile, effort within major hubs in Asia/Pac region (e.g. Singapore, Thailand, Pakistan, India, etc) to interface with European and other regions using IP will be utilized. Study and analyze for transition to BUFR code Study and analyze for transition of AFTN-based AIDC to ATN environment AMHS WORKSHOP Chennai, India December 15-16, 2008 12 Our Vision:ATNICG Service Tasksand Safety Discuss issues related to Directory Service - AMHS Address Management AMC Coordination meeting ASIA/PAC Interim AMHS Address Management Database Using European AMC Database in the short term Decision 2/2 - Using European AMC service through focal point ATSMHS Coordination and Management Center AMHS WORKSHOP Chennai, India December 15-16, 2008 13 Our Vision:ATNICG Service Tasksand Safety 7. Security Task (1) Update System Integrity Policy as needed • Asia/Pacific ATN AMHS System Integrity Policy Document Task (2) Develop Information Security Checklist • Asia/Pacific ATN AMHS Develop Security Checklist Task (3) Develop Information Security Guidance • Asia/Pacific ATN AMHS System Integrity Guidance Task (4) Develop Information Security Solution for Initial and Enhanced Services • Asia/Pacific ATN AMHS Security Implementation Plan AMHS WORKSHOP Chennai, India December 15-16, 2008 14 Our Vision: Service and Safety Conclusions and Decisions Draft Conclusion 2/1 - Guidance Document for AMHS Conformance Testing Decision 2/2 - Use of European AMC service through focal point Decision 2/3 - Analyze common address prefix Draft Conclusion 2/4 - ATN/AMHS Implementation Workshop Draft Conclusion 2/5 - Amendment to AMHS ICD Draft Decision 2/6 - Revision to the Subject/Tasks List of ATNICG AMHS WORKSHOP Chennai, India December 15-16, 2008 15 Our Vision: ofService and Safety Establishment ATNICG Working Group The ATNICG WG has been established to address specific technical and operational issues with Subject Matter Expert (SME) The ATNICG WG has held two meetings since 2006 Most of its work is coordinated though email and the Web server hosted by Asia/Pac Regional Office AMHS WORKSHOP Chennai, India December 15-16, 2008 16 ATNICG Working Group Activities Seven tasks and tracking each tasks as follows: • PERFORMANCE OBJECTIVE • AIDC, BUFR, AMHS Routing ICD, Network Protocol Compatibility • Test Procedure, Operational Procedure • Tasks/Strategy • Benefits • Deliverables • Target Date • Lead and supporting Members for each assigned task • ATNICG WG Update AMHS WORKSHOP Chennai, India December 15-16, 2008 17