DOCUMENT IMAGING IMPLEMENTATION AND CONTENT MANAGEMENT MIGRATION PR OJ EC T CHA R TER FOR CER TIFIC A TION EXECUTIVE SPONSOR – TOM CHURCH, CABINET SECRETARY BUSINESS OWNERS – DAVID CORIZ, NMDOT RECORDS MANAGEMENT AND BRUCE OAKELEY, NMDOT ISM BUREAU CHIEF ORIGINAL PLAN DATE: JULY 1, 2013 REVISION DATE: JANUARY 6, 2014 REVISION: 1.0 TABLE OF CONTENTS ABOUT THIS PROJECT CHARTER DOCUMENT ..................................................... ERROR! BOOKMARK NOT DEFINED. TABLE OF CONTENTS ............................................................................................................................................... I 1. PROJECT BACKGROUND ..................................................................................................................................... 1 1.1 EXECUTIVE SUMMARY -RATIONALE FOR THE PROJECT 1 1.2 SUMMARY OF THE FOUNDATION PLANNING AND DOCUMENTATION FOR THE PROJECT 1.3 PROJECT CERTIFICATION REQUIREMENTS 1 1 2.0 JUSTIFICATION, OBJECTIVES AND IMPACTS ...................................................................................................... 2 2.1 AGENCY JUSTIFICATION 2 2.2 BUSINESS OBJECTIVES 2 2.3 TECHNICAL OBJECTIVES 3 2.4 IMPACT ON ORGANIZATION 4 2.5 TRANSITION TO OPERATIONS 4 3.0 PROJECT/PRODUCT SCOPE OF WORK ............................................................................................................... 5 3.1 DELIVERABLES 5 3.1.1 Project Deliverables .....................................................................................................................................5 3.1.2 Product Deliverables......................................................................................Error! Bookmark not defined. 3.2 SUCCESS AND QUALITY METRICS 5 4.0 SCHEDULE ESTIMATE ........................................................................................................................................ 7 5.0 BUDGET ESTIMATE ........................................................................................................................................... 7 5.1 FUNDING SOURCE(S) 7 5.2. BUDGET BY MAJOR DELIVERABLE OR TYPE OF EXPENSE 5.3 BUDGET BY PROJECT PHASE OR CERTIFICATION PHASE 7 7 6.0 PROJECT AUTHORITY AND ORGANIZATIONAL STRUCTURE ............................................................................... 8 6.1 STAKEHOLDERS 8 6.2 PROJECT GOVERNANCE PLAN 9 6.3 PROJECT MANAGER 10 6.3.1 PROJECT MANAGER CONTACT INFORMATION ..........................................................................................10 6.3.2 PROJECT MANAGER BACKGROUND ..........................................................................................................10 6.4 PROJECT TEAM ROLES AND RESPONSIBILITIES 10 6.5 PROJECT MANAGEMENT METHODOLOGY 12 7.0 CONSTRAINTS ................................................................................................................................................ 12 8.0 DEPENDENCIES ............................................................................................................................................... 12 9.0 ASSUMPTIONS ............................................................................................................................................... 13 10.0 SIGNIFICANT RISKS AND MITIGATION STRATEGY ......................................................................................... 13 11.0 COMMUNICATION PLAN FOR EXECUTIVE REPORTING.................................................................................. 13 12.0 INDEPENDENT VERIFICATION AND VALIDATION - IV&V ................................................................................ 14 i 13.0 PROJECT CHARTER AGENCY APPROVAL SIGNATURES ................................................................................... 15 14.0 PROJECT CHARTER CERTIFICATION APPROVAL SIGNATURE .......................................................................... 15 Revision History REVISION NUMBER 1.0 DATE COMMENT July 1, 2013 Original NMDOT Document January 6, 2014 Revision for PCC Certification ii PROJECT CHARTER [PROJECT NAME] 1 1. PROJECT BACKGROUND NMDOT’s current document imaging system (IBM FileNet) is over 13 years old and the agency has been having major problems with the software. We have identified a modern document imaging technology (EMC Documentum) that will enable our staff to provide good customer service to the public and to our internal users. The current system has over 4 terabytes of vital electronic information and records that need to be preserved for many years to come. 1.1 EXECUTIVE SUMMARY - RATIONALE FOR THE PROJECT 1) Replace an obsolete document management solution with modern document imaging technology that NMDOT can expand on for many years. 2) Migrate the current data to a new repository. 1.2 SUMMARY OF THE FOUNDATION PLANNING AND DOCUMENTATION FOR THE PROJECT NMDOT performed a “needs assessment” evaluation using the agency’s current document imaging processes, which included onsite evaluations by multiple vendors of modern imaging systems. 1.3 PROJECT CERTIFICATION REQUIREMENTS CRITERIA YES/NO EXPLANATION Project is mission critical to the agency Yes Vital records & Info Project cost is equal to or in excess of $100,000.00 Yes Estimated cost of ownership is $1,336,091 Project impacts customer on-line access No N/A Project is one deemed appropriate by the Secretary of the DoIT Yes Meets NM IT Strategic Plan objectives sponsored by DoIT Will an IT Architecture Review be required? Yes Architecture review will be conducted after the site assessment and project plans are complete PAGE 1 PROJECT CHARTER [PROJECT NAME] 2 2.0 JUSTIFICATION, OBJECTIVES AND IMPACTS 2.1 AGENCY JUSTIFICATION The project will focus on implementing a new solution for document imaging with EMC Documentum; migrating existing content from the obsolete IBM FileNet system into Documentum; and applying appropriate retention per NMDOT’s retention policies. This will enable the NMDOT to achieve the following strategic goals: NUMBER DESCRIPTION NMDOT 1 Create a paperless, web-based environment that allow NMDOT users to access vital information statewide in order to perform their jobs NMDOT 2 Find and retrieve electronic document images quickly without having to search manually through filing cabinets or boxes of paper. NMDOT 3 Reduce the labor costs of moving content from one section of the agency to another. NMDOT 4 Reduce the number of redundant and obsolete data records. NMDOT 5 Minimize the need for physical storage of boxes and paper. NMDOT 6 Increase productivity and user satisfaction by quickly locating the correct information. NMDOT 7 Improve the audit-readiness of NMDOT records with better-organized, electronic records that can be located and searched much faster than paper records. NMDOT 8 Improve the agency’s ability to identify the records needed to perform their jobs adequately. NMDOT 9 Improve the agency’s record-keeping of backup copies, archives, and remote storage for disaster recovery. NMDOT 10 Applying the appropriate retention policies for all vital records 2.2 BUSINESS OBJECTIVES NUMBER DESCRIPTION BUSINESS OBJECTIVE 1 BUSINESS OBJECTIVE 2 BUSINESS OBJECTIVE 3 Increased efficiency and productivity through a well-managed records environment Optimize business processes, decreasing number of steps, saving time Lower the cost of government, more effective Electronic Records Administration Management PAGE 2 PROJECT CHARTER [PROJECT NAME] NUMBER BUSINESS OBJECTIVE 4 BUSINESS OBJECTIVE 5 BUSINESS OBJECTIVE 6 BUSINESS OBJECTIVE 7 BUSINESS OBJECTIVE 8 BUSINESS OBJECTIVE 9 3 DESCRIPTION Improve service delivery to constituency Substantial NMDOT business process improvements are achievable through implementing document scanning, electronic document management and electronic records management. Streamline traditional claims inefficiencies and reduce manual, paperbased processes, which contribute to high claims costs and overhead expenses. Provide records management for long-term archiving and the automation of retention and compliance policies, and to ensure legal or regulatory record compliance System will provide document management for check-in/check-out, version control, security and library services for business documents Revisions to NMDOT Imaging System Plan are approved by SRCA 2.3 TECHNICAL OBJECTIVES NUMBER DESCRIPTION TECHNICAL OBJECTIVE 1 Web-Based System - will be designed on a public facing network with a web based Java platform front-end to allow NMDOT staff and vendor remote access Data will be easily converted and migrated. Metadata will be tagged and follow standards Support portal architecture TECHNICAL OBJECTIVE 2 TECHNICAL OBJECTIVE 3 TECHNICAL OBJECTIVE 4 TECHNICAL OBJECTIVE 5 TECHNICAL OBJECTIVE 6 TECHNICAL OBJECTIVE 7 TECHNICAL OBJECTIVE 8 TECHNICAL OBJECTIVE 9 TECHNICAL OBJECTIVE 10 TECHNICAL OBJECTIVE 11 System will have indexing and archiving functionality System will integrate with the Centralized Electronic Records Repository managed by State Records and Archives System Interface - Provide an architecture that will easily interface with SHARE and GSD RMIS systems Open Architecture - Provide an open architecture infrastructure and scalable to allow for growth IT Architecture – ensure system aligns with enterprise-wide IT architecture Efficiency, High Performance – Application will be server independent and can be deployed on an open source application server such as Apache Tomcat Authentication - System will support Microsoft Active Directory Systems Integration - System will be connected to Hitachi SAN PAGE 3 PROJECT CHARTER [PROJECT NAME] 4 NUMBER DESCRIPTION TECHNICAL OBJECTIVE 12 TECHNICAL OBJECTIVE 13 Redundancy - System will be configured to support system fail over TECHNICAL OBJECTIVE 14 Extensibility - ensure system is designed to easily allow the addition of new-features later,, using hooks, an application programming interface or plug-ins. Include a Reports Writer module TECHNICAL OBJECTIVE 15 TECHNICAL OBJECTIVE 16 Security/User Roles - System will support a secure front end user system log in and security role level authentication System must support up to 1,500 concurrent users 2.4 IMPACT ON ORGANIZATION AREA DESCRIPTION END USER Training will be defined and all end-users within NMDOT will be thoroughly trained. Tests will be conducted with random end-users to ensure performance and ease-of-use BUSINESS PROCESSES General procedures for handling form data will change for many business units with the implementation of electronic form routing. Employees will begin using electronic signatures frequently. IT OPERATIONS AND STAFFING Training will be defined and all IT Operations Staff will be thoroughly trained. Tests will be conducted with each key staff member to ensure performance and ease-of-use. 2.5 TRANSITION TO OPERATIONS AREA DESCRIPTION PRELIMINARY OPERATIONS LOCATION AND STAFFING PLANS Initial needs assessment by vendor at no charge. Project management, and scope of work adjustments will ensure the new system is run in parallel with old system before we switch over. Training. Imaging committee. Bi-weekly status reports. DATA SECURITY, BUSINESS CONTINUITY Security parameters for data will be built into system to include any info or records that are deemed confidential by law. This is an internal system for agency employees. PAGE 4 PROJECT CHARTER [PROJECT NAME] 5 AREA DESCRIPTION MAINTENANCE STRATEGY Annual software/hardware maintenance agreement from vendor. specific deliverables will be in a binding contract agreement. INTEROPERABILITY All hardware/software components are industry standard and compatible with NMDOT’s platform and security requirements. RECORD RETENTION Retention policies will be built into new system. CONSOLIDATION STRATEGY 3.0 PROJECT/PRODUCT SCOPE OF WORK 3.1 DELIVERABLES 3.1.1 PROJECT DELIVERABLES Project Charter Certification Form Project Management Plan IV&V Contract & Reports IT Service Contracts Risk Assessment and Management Project Schedule Monthly Project Status Reports to DoIT Project Closeout Report 3.2 SUCCESS AND QUALITY METRICS NUMBER DESCRIPTION QUALITY METRICS 1 Project does not exceed budget QUALITY METRICS 2 The project schedule, assigned tasks and milestones are met within project plan. QUALITY METRICS 3 System can provide reports. QUALITY METRICS 4 All NMDOT Image Server Data is successfully converted and PAGE 5 PROJECT CHARTER [PROJECT NAME] NUMBER 6 DESCRIPTION migrated into the Documentum platform. QUALITY METRICS 5 System is Secure and stable. QUALITY METRICS 6 Staff is Trained to maintain is operability. QUALITY METRICS 7 Data Integrity is maintained. PAGE 6 PROJECT CHARTER [PROJECT NAME] 7 4.0 SCHEDULE ESTIMATE 5.0 BUDGET ESTIMATE 5.1 FUNDING SOURCE(S) SOURCE AMOUNT NMDOT Road Funds (ONM) $1,336,091 ASSOCIATED RESTRICTIONS 5.2. BUDGET BY MAJOR DELIVERABLE OR TYPE OF EXPENSE IT E M COST ESTIMATE Software Licenses $ 595,824 FY14 Software Maintenance $ 134,220 Consulting Services $ 525,099 Training Estimate $17,325 Contingency Reserve (5%) $ 63,623 TOTAL $ 1,336,091 5.3 BUDGET BY PROJECT PHASE OR CERTIFICATION PHASE PHASES PLANNED CERTIFICATION Initiation January 2014 Planning/Project Manager Hired January 2014 Implementation July 2014 Closing December 2014 PAGE 7 PROJECT CHARTER [PROJECT NAME] 8 6.0 PROJECT AUTHORITY AND ORGANIZATIONAL STRUCTURE 6.1 STAKEHOLDERS NAME STAKE IN PROJECT ORGANIZATION TITLE Tom Church Overall Program NMDOT Secretary Eric Roybal Program Admin Responsibility NMDOT CIO Bruce Oakeley Overall Program NMDOT ISM Manager David Coriz Project Management NMDOT Records Management Supervisor PAGE 8 PROJECT CHARTER [PROJECT NAME] 9 6.2 PROJECT GOVERNANCE PLAN Executive Steering Committee Tom Church Eric Roybal Project Director Bruce Oakeley Project Team Member Project Manager Jeff Woodman Project team member David Coriz Business Operations Review Team: Benefits Financial/Training Legal Construction Contracts Records Management Reports/HIPAA Regulations Technical Review DoIT / NMDOT Tech Staff PAGE 9 PROJECT CHARTER [PROJECT NAME] 10 6.3 PROJECT MANAGER 6.3.1 PROJECT MANAGER CONTACT INFORMATION NAME ORGANIZATION PHONE #(S) AMIR AFZALI WAVE TECHNOLOGIES (949) 453-9283 USMAN GHANI WAVE TECHNOLOGIES (949) 453-9283 ADAM TORAB WAVE TECHNOLOGIES (949) 453-9283 EMAIL 6.3.2 PROJECT MANAGER BACKGROUND WAVE TECHNOLOGIES HAS EXTENSIVE KNOWLEDGE AND EXPERIENCE IN IMPLEMENTING LARGE AND SMALL SCALE DOCUMENT IMAGING SOLUTIONS WORLDWIDE. THEY HAVE ALSO IMPLEMENTED LARGE SYSTEMS FOR STATE GOVERNMENT IN NM AND CALIFORNIA. 6.4 PROJECT TEAM ROLES AND RESPONSIBILITIES ROLE RESPONSIBILITY Executive Project Sponsor The point person will be the highest level of NMDOT. Steering Committee Tasked with overall direction and support of the project Participate in meetings Review and accept deliverables Review and provide comment on documentation provided by project team. Review project funding and its sources. Responsibilities include: Champion project Consider changes facing the organization and its impacts Responsible for finding budget to complete project Participate in planning sessions Ultimate project responsibility PAGE 10 PROJECT CHARTER [PROJECT NAME] 11 ROLE RESPONSIBILITY Business Owners Persons within the OIG and IT that are responsible for all operations and management of all activities of the LiveCycle project. Maintain responsibility for project direction/implementation Ensure staff availability Empower Project Manager and IT Staff. Project Manager Person responsible to the participating entities who make decisions related to the operation of the project. Problem Solving Reviews of work of Consultants Participate in Changes to project Diagnose potential problems on project Determine roles of IT personnel Ultimate project success Budget planning Project Schedule Training plans Contract Management Ensure Communications between vendor and project owner. Project Team Members Staff assigned to Project. Define Business Needs Scheduling of meetings System Administration Testing Purchasing and processing Data integrity Data Input Technical Staff Staff assigned to defining infrastructure requirements and providing support to project indefinitely Duties Include: System infrastructure Specifications Integration of other NMDOT systems Data backups Storage requirements Security Data Migration Systems install and updates Network connectivity Provide test/development environments System Maintenance PAGE 11 PROJECT CHARTER [PROJECT NAME] ROLE 12 RESPONSIBILITY System Reporting Database tools (reporting) Disaster recovery Anti-Virus Protection Provide OEM 6.5 PROJECT MANAGEMENT METHODOLOGY The Project will be structured using a mixture of process-based and agile approaches. In addition, project reporting structures will be adjusted to meet timelines and phase gates defined by the PCC. 7.0 CONSTRAINTS NUMBER DESCRIPTION 1. Adequate resources 2. State requirements for oversight and project delays 3. Delays in processing contracts and purchasing 8.0 DEPENDENCIES Mandatory dependencies are dependencies that are inherent to the work being done. D- Discretionary dependencies are dependencies defined by the project management team. This may also encompass particular approaches because a specific sequence of activities is preferred, but not mandatory in the project life cycle. E-External dependencies are dependencies that involve a relationship between project activities and nonproject activities such as purchasing/procurement NUMBER DESCRIPTION TYPE M,D,E 1. DoIT Oversight Committee approval M 2. Contract approvals and purchases E 3. Funding for software Maintenance M 4. Design and infrastructure Dependencies M PAGE 12 PROJECT CHARTER [PROJECT NAME] 13 NUMBER DESCRIPTION TYPE M,D,E 5. Data conversions M 6. Application and Server installs M 7. Software Management M 9.0 ASSUMPTIONS NUMBER DESCRIPTION 1. Adequate budget will be available 2. Adequate Staffing levels 3. Staff will be trained on the use of software 4. Vendor will provide patches and updates 5. Data will be easily converted 6. Software will integrate with other system software 10.0 SIGNIFICANT RISKS AND MITIGATION STRATEGY Risk 1 Description – Funds will not readily be available to support the project Probability: VERY low Impact: LOW Mitigation Strategy: Allocate funding in excess of projected funding needs. Contingency Plan: If this occurs, NMDOT Staff will need to implement solution independently without vendor assistance or guidance. 11.0 COMMUNICATION PLAN FOR EXECUTIVE REPORTING The Project Manager will be responsible for creating periodic internal reports for NMDOT stakeholders, and will also assist in preparing materials for presentation to DoIT and the PCC. PAGE 13 PROJECT CHARTER [PROJECT NAME] 14 The Project Manager will work in conjunction with the Technical Lead and the vendor to gather data for these reports. 12.0 INDEPENDENT VERIFICATION AND VALIDATION - IV&V Project/Product Area Include – Yes/No Project Management yes Quality Management yes Training yes Requirements Management yes Operating Environment yes Development Environment yes Software Development yes System and Acceptance Testing yes Data Management yes Operations Oversight yes Business Process Impact yes PAGE 14 PROJECT CHARTER [PROJECT NAME] 15 13.0 PROJECT CHARTER AGENCY APPROVAL SIGNATURES SIGNATURE DATE EXECUTIVE SPONSOR BUSINESS OWNER PROJECT MANAGER 14.0 PROJECT CHARTER CERTIFICATION APPROVAL SIGNATURE SIGNATURE DOIT / PCC APPROVAL PAGE 15 DATE