TSSC-2012Apr24-023_TR

advertisement
Activity in TIA TR-42
Bob Jensen
TR-42 Chair
TR-42 Responsibility
•
•
Premises Telecommunications Cabling Standards
All Optical Fiber Standards
Election results from the February meeting
TR-42 Chair: Bob Jensen
• TR-42 Vice Chair: Valerie Maguire
• TR-42.2 Chair: Ray Emplit
• TR-42.2 Vice Chair: Bob Jensen
• TR-42.6 Chair: Steve Huffaker
• TR-42.6 Vice Chair: Jonathan Jew
• TR-42.12 Chair: Mike Kinard
• TR-42.12 Vice Chair: Brett Lane
• TR-42.16 Chair: Mark Harger
• TR-42.16 Vice Chair: Rich Jones
•
3
Initiatives
•
Operational Guide
– Open item regarding Scope
The TIA Engineering Manual requires elections of Formulating Group Chair’s
and Vice-chairs. These elections provide a method of having peers choose
their leadership. However, when leadership changes, it can cause difficulty in
understanding the needs of the committee and TIA process. This guide is
offered to enhance the smooth transition of leadership and provide a structure
to the Engineering Committee.
The TIA Engineering Manual and its Advisory Notes, along with the TIA
Style Guide take precedence over this guide.
4
Initiatives
•
TAG meetings being held in conjunction with TR-42
meetings
– US TAG to TC86, SC86A, SC86B and SC86C
• These TAGs are becoming more “correspondence only”
– US TAG to ISO/IEC JTC1 SC25 WG3
• These meetings began this year and are found to be beneficial towards
harmonization
5
Initiatives
•
•
Loss Budget Task Group (TR-42.11)
Encircled Flux Round Robin (TR-42.11)
– TSB is being worked on
•
Bend insensitive multimode fiber
– Being worked in TR-42.11 and TR-42.12
– Attempting to ensure encircled flux compliance
•
•
Task Group is pursuing the next edition of premises
standards in TR-42 (e.g., 568-D Series)
Next generation balanced twisted-pair cabling Task Groups
have identified objectives
– Developed Editor's draft 0.2 of PN-568-C.2-1 (to be
published as ANSI/TIA-568-C.2-1, "Specifications for 100Ω
Next Generation Cabling”) to work with 40GBASE-T
6
Initiatives
•
Educational Facilities
– Draft under review by Subcommittee
•
Large facilities (e.g., stadiums, airports)
– Task Group established beginning investigations
•
Ensuring security of cabling (physical)
– Task Group draft established
– Includes Electronics, cabling, physical damage, terrorism,
industrial sabotage, data security for wired and wireless
•
Fabric architecture for data centers
– Document out for ballot
•
STEP will be proposing a new Subcommittee within TR-42
at June meeting
7
Initiatives
•
•
M2M will be monitored (joining TR-50)
Telecommunications Cabling Guidelines for Wireless
Access Points
– Written in 2006 and will be revised to include current and
future wireless access points (e.g., 802.11ac)
•
Distributed antenna systems (DAS)
– Currently included in educational facilities document
•
Energy Management Systems
– Will be discussed in TR-42.1 to determine whether an
addendum to TIA-862-A is favorable.
•
Addendum to TIA-607-B, Bonding and Grounding
– Grounding electrodes and their testing
8
Initiatives
•
Began working with BICSI Standards to coordinate efforts
on standards development
– TIA developing requirements
– BICSI developing “best practices”
9
Issues being worked on by TIA
•
Document management (processing)
– What documents are due for committee action?
• Hundreds of documents are the responsibility of TR-42 and its Subcommittees
• System is needed to alert Subcommittees or Engineering Committee of pending
action (notification after 3-year mark and 5-year mark)
– Assigning ballot numbers
• Keep the list current on TIA WEB site
• Allow automated ballot numbers for new projects
– What is the status of a publication?
• Is the document in TIA? ANSI? Projected publication date?
•
Voting member status
– Expand to have primary and alternate
• Allow as a choice of each company
• Useful for operational efficiency of member company
10
Issues being worked on by TIA
•
Document searches (numbering)
– Difficult to search
• Need specifics to search (TIA-, TIA/EIA-, EIA/TIA-, EIA-)
• Some documents have additional punctuation (TIA/EIA-492.AAAC)
– Better (more forgiving) search engine may be needed
•
Resolving issues will likely free-up Standards Secretariat’s
time, ease work-flow in Subcommittees, allow timely
updates to standards documents
Training session after February Opening Plenary;
will likely continue at each meeting
11
Standards being published
ANSI/TIA-568-C.0-2, Generic cabling
• ANSI/TIA-942-A, Data Centers
• ANSI/TIA-570-C, Residential
• ANSI/TIA-606-B, Administration
• ANSI/TIA-1183, Test fixtures for balunless network
analyzer measurements
•
•
Some glitches had been fixed by TIA to further the process
of publication
12
Standards Update
Annex
TIA-568-C.0
•
Generic Telecommunications Cabling for Customer
Premises, February 2, 2009
– Addendum 1 – Updated Reference for Balanced Twisted-Pair
• Published September 2010
– Addendum 2 – General Updates
• Agreed to publish at February 2012 meeting
• This addendum updates various optical fiber topics including polarity, fieldtesting, revisions to application tables and to the MICE table.
• Field testing harmonizes with IEC 61280-4-1
14
TIA-568-C.1
•
Commercial Building Telecommunications Cabling
Standard, February 2, 2009
– Addendum 1 – Pathways and Spaces
• Approved for publication at October 2011 meeting
• This Addendum specifies additional requirements, exceptions and allowances to
ANSI/TIA-569-C for commercial buildings.
– Addendum 2 -- General Updates
• Approved for publication at June 2011 meeting
• Updates references, revises entrance facility description, and refers to
ANSI/TIA-568-C.0 for centralized cabling,
15
TIA-568-C.2
•
Balanced Twisted-Pair Telecommunications Cabling and
Components Standards, August 2009
– No addenda published to date
– Task Group working on next-generation cabling
•
TSB-190, Guidelines on Shared Pathways and Shared
Sheaths
– Published June, 2011
•
TIA-1183, Test fixtures for balunless measurements of
balanced components and systems
– Agreed to publish at February 2012 meeting
16
TIA-568-C.3
•
Optical Fiber Cabling Components Standard, June 18,
2008
– Addendum 1 -- Addition of OM4 Cabled Optical Fiber and
24-fiber array connectors
• Approved for publication, June 2011
17
TIA-568-C.4
•
Broadband Coaxial Cabling and Components Standard,
March, 2011
– Approved for publication February, 2011
– Includes topology, performance requirements, installation
requirements, field-testing
– Will be referenced in TIA-570-C (Residential)
18
TIA-569-B
•
Commercial Building Standard for Telecommunications
Pathways and Spaces, October 2004
– Addendum 1 – Temperature and Humidity Requirements for
Telecommunications Spaces
• Published
•
Telecommunications Pathways and Spaces
– Developing “Generic” requirements
– Not specific to commercial buildings
– Approved for publication at October 2011 meeting
19
TIA-570-C
•
Residential Telecommunications Infrastructure Standard,
April 2012
– References 568-C.4 for coaxial cabling
– Approved for publication in February 2012
20
TIA-606-B
•
Administration Standard for Telecommunications
Infrastructure
– Approved for publication February 2012
– This standard is intended to harmonize with ISO/IEC
14763-2-1
– An optional PoE and PoE+ symbol
21
TIA-607-B
•
Generic Telecommunications Bonding and Grounding
(Earthing) for Customer Premises
– Published
– Includes information for bonding and grounding from the
entrance facility to the equipment racks in
telecommunications rooms
– Allows larger gauges of bonding conductors
– Includes a 2-point ground test using a earth ground
resistance tester
– Addendum being balloted for ground electrodes and ground
testing
22
TIA-758
•
Customer-owned Outside Plant Telecommunications
infrastructure Standard
– Published
– Few changes made to the standard
– Testing includes technologies such as XDSL
23
TIA-862-A
•
Building Automation Systems Cabling Standard
– Published
– Few changes made to the standard
24
TIA-942-A
•
Telecommunications Infrastructure Standard for Data Centers
– Agreed to be published at February 2012 meeting
– Harmonized with TIA-568-C.0 Series
– Recommendations for energy efficiency added
– Recognized optical fiber connectors are LC for one or two fibers and
MPO for more than two optical fibers.
– Recognized multimode optical fiber cable for horizontal and backbone
cabling has been changed to OM3 and OM4 850nm laser-optimized
50/125 um multimode fiber cable. OM1 and OM2 are no longer
recognized in this standard.
– Category 3 and category 5e are no longer recognized for horizontal
cabling. Recognized balanced twisted-pair cable types for horizontal
cabling are category 6 or category 6A.
25
TIA-1005-A
•
Telecommunications Infrastructure Standard for Industrial
Premises
– Approved for publication at October 2011 meeting
– Based on the TIA-568-C.0 standard and TIA-569-C and
includes appropriate allowances and exceptions to those
standards for industrial premises.
26
TIA-1152
•
Requirements for Field Test Instruments and
Measurements for Balanced Twisted-Pair Cabling
– Published September 2009
– Includes accuracy of balanced twisted-pair test instruments
27
TIA-1179
•
Healthcare Facility Telecommunications Infrastructure
Standard
– Published July 2010
– For telecommunications infrastructure of healthcare facilities
(e.g. hospitals, clinics).
– It specifies cabling, cabling topologies, cabling distances and
pathways and spaces (e.g. sizing and location).
28
Download