MCAO Adaptive Optics Module Mechanical Design Eric James Major Design Issues MCAO •Packaging •Weight and balance •Volume •Access to components •Structural •ISS interface •Flexure/vibrations •Thermal expansion •Performance •Minimize surfaces •Minimize reflection angles May 24-25, 2001 MCAO Preliminary Design Review 2 8 meter Primary Mirror MCAO AOM Location Cassegrain Rotator Instrument support structure AO Module May 24-25, 2001 MCAO Preliminary Design Review 3 MCAO May 24-25, 2001 MCAO Preliminary Design Review 4 MCAO Optical Paths Science path Beam splitters LGS focus NGS focus LGS path NGS path May 24-25, 2001 MCAO Preliminary Design Review Science focus 5 Optical Bench May 24-25, 2001 MCAO Preliminary Design Review MCAO 6 Bench Support May 24-25, 2001 MCAO Preliminary Design Review MCAO 7 Electronics Enclosures May 24-25, 2001 MCAO Preliminary Design Review MCAO 9U 19”rack mount chasses (12 total) 8 Electronics Bay Open May 24-25, 2001 MCAO Preliminary Design Review MCAO 9 Thermal Management MCAO Heat exchanger 100 mm foam insulation at optics bay 50 mm foam insulation elsewhere Calculated heat loss to dome: 35 –85 Watts May 24-25, 2001 MCAO Preliminary Design Review 10 Finite Element Analysis MCAO • Static (Gravity Induced) Flexure Analysis • Telescope at zenith • Zenith angle = 45º • Zenith angle = 60º • Dynamic (Vibration Induced) Flexure Analysis • Natural frequency • Vibration Amplitude • Seismic (Earthquake Induced) Stress Analysis May 24-25, 2001 MCAO Preliminary Design Review 11 Static Analysis at Zenith MCAO Telescope at Zenith: Maximum deflection ~50 mm Gravity May 24-25, 2001 MCAO Preliminary Design Review 12 MCAO Static Analysis at 60º from Zenith Telescope at 60º from Zenith: Maximum deflection ~200 mm Gravity May 24-25, 2001 MCAO Preliminary Design Review 13 Dynamic Analysis MCAO Dynamic Analysis Mode 1: “fishtailing” motion Lowest natural frequency: 39 Hz May 24-25, 2001 MCAO Preliminary Design Review 14 Seismic Analysis Seismic Analysis MCAO Maximum Stress: ~ 8 x 106 Pascals May 24-25, 2001 MCAO Preliminary Design Review 15 MCAO Alignment • Initial Alignment (acquire image) – Align elements within major components to datum surface. • Done by vendor at vendor facility. – Align components and single elements to the optical bench. – Align optical bench to the telescope. • Done by Gemini on the telescope at Gemini south. • Final Alignment (optimize image) – Wave front analysis using source simulators and wave front sensors. – Image analysis using stars and science detector. May 24-25, 2001 MCAO Preliminary Design Review 16 AO Module Sensitivity Analysis MCAO • Optical fabrication and alignment sensitivities computed • Modeling accounts for partial compensation of errors by the AO control loops – Initial alignment in the lab – Flexure/thermal errors during closed-loop operation • Sensitivities computed for – – – – Higher order wave front errors (science, NGS, LGS paths) Pupil alignment/distortion (science, LGS paths) Boresight (tip/tilt) errors (science, LGS paths) DM adjustments to compensate errors May 24-25, 2001 MCAO Preliminary Design Review 17 Error Budget chart May 24-25, 2001 MCAO Preliminary Design Review MCAO 18 MCAO Sensors and compensators for final alignment in the lab Astronomer Distortion map Mean tip/tilt and higher order correction (3 x 35 Zernikes) Source simulator DMs Diagnostic WFS Science Instrument NGS WFS Tip/tilt/focus adjustment LGS WFS •Tip/tilt/focus adjustments •Pupil alignment Non-common path calibration Influence function measurements May 24-25, 2001 MCAO Preliminary Design Review 19 Sensors and compensators for closed•M2 focus loop AO MCAO •Telescope pointing On-axis Tip/tilt/focus Telescope DMs OIWFS 3 by 35 Zernikes •LGS WFS focus Least-squares fit 3 x tip/tilt •NGS WFS boresight NGS WFS Pupil mirror 5 by 35 Zernikes LGS WFS 5 x tip/tilt (tilt removed) LGS pointing May 24-25, 2001 MCAO Preliminary Design Review 20 MCAO Wave front error budget results Error budget study results summary Line No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Error Optical Category Path Wave front error Science " " " " " " " " " " " Laser GS " " " " " " " " " " " Natural GS " " " " Pupil Variables Science " " " Laser GS " " " " DM adjustments DM0 DM4.5 DM9.0 Description Tilt removed " " RMS 2-axis tip/tilt " " Tilt removed " " RMS 2-axis tip/tilt " " Tilt removed " " 20-Apr-01 Zenith Angle Pupil Motion Pupil Mag RMS 2-axis Pupil Motion Induced LGS motion RMS Pupil distortion 0 45 60 0 45 60 0 45 60 0 45 60 0 45 60 Dsgn res. 1.294E+01 1.294E+01 1.294E+01 Calibrated Calibrated Calibrated 3.528E+01 3.528E+01 3.528E+01 Calibrated Calibrated Calibrated 4.558E+01 4.558E+01 4.558E+01 Fabric. 4.150E+01 4.150E+01 4.150E+01 Calibrated Calibrated Calibrated 5.840E+01 5.840E+01 5.840E+01 Calibrated Calibrated Calibrated 4.810E+01 4.810E+01 4.810E+01 Error Source Init. Align Flex/therm 7.700E-03 4.050E+01 7.700E-03 7.960E+01 7.700E-03 8.560E+01 Calibrated 1.160E-02 Calibrated 3.500E-02 Calibrated 3.800E-02 7.540E+01 4.410E-01 7.540E+01 1.290E+00 7.540E+01 1.440E+00 Calibrated 5.040E-01 Calibrated 9.030E-01 Calibrated 1.015E+00 6.540E+01 5.380E+01 6.540E+01 7.590E+01 6.540E+01 8.400E+01 45 45 45 45 45 8.600E-03 1.600E-02 1.130E-04 1.164E-03 1.722E-03 2.000E-02 2.000E-02 0.000E+00 0.000E+00 2.600E-03 1.090E-03 1.680E-02 0.000E+00 0.000E+00 2.260E-03 45 2.760E+01 1.200E+02 3.500E+01 45 3.840E+01 1.200E+02 5.670E+00 45 2.920E+01 1.200E+02 1.330E+01 Legend Allocation Includes 20 nm allocation for LGS WFS spot relay lens May 24-25, 2001 MCAO Preliminary Design Review 4.110E-04 4.460E-03 3.500E-02 3.605E-01 1.180E-03 Rad/index 1.210E-01 1.210E-01 1.210E-01 1.309E-05 1.309E-05 1.309E-05 3.430E-05 3.430E-05 3.430E-05 4.580E-04 4.580E-04 4.580E-04 5.800E-02 5.800E-02 5.800E-02 8.740E-04 2.140E-05 3.110E-05 3.203E-04 3.050E-06 1.780E+01 4.434E+00 2.630E+01 4.434E+00 6.150E+01 4.434E+00 Overall (RSS) 5.941E+01 9.070E+01 9.601E+01 1.160E-02 3.500E-02 3.800E-02 1.017E+02 1.017E+02 1.017E+02 5.040E-01 9.030E-01 1.015E+00 1.075E+02 1.201E+02 1.254E+02 units nm " " arc sec " " nm " " arc sec " " nm " " 2.182E-02 beam diam 3.095E-02 " 3.500E-02 " 3.605E-01 arc sec 4.028E-03 beam diam 1.293E+02 nm OPD 1.289E+02 " 1.387E+02 " Red numbers indicate the value is over budget or at least of some concern 21 Error Budget points of interest MCAO •Most areas meet goals. All goals are met at the zenith position. •Flexure at 45º and 60º are about 50% over the goals. This suggests special design effort at a few areas. •Science path tip/tilt errors must be carefully calibrated out. •Within goals for: •LGS pupil displacement (input to simulations) •LGS WFS boresight errors (input to simulations) •LGS RMS pupil distortion (input to simulations) •RMS wave front errors in LGS and NGS paths •DM adjustments May 24-25, 2001 MCAO Preliminary Design Review 22 Active Components MCAO •Source simulators •Science ADC •DM0 aperture stop •Beam splitter changer •Diagnostic wave front sensor •Shutters •NGS wave front sensor •NGS ADC •LGS zoom corrector •LGS wave front sensor May 24-25, 2001 MCAO Preliminary Design Review 23 LGS wave front sensor MCAO Active lenses Commercial tip/tilt mirrors CCD detectors 5 beam paths – 2 omitted for clarity May 24-25, 2001 MCAO Preliminary Design Review 24 MCAO NGS Wave front sensor Probe arms NGS path NGS path X-Z translation stages May 24-25, 2001 MCAO Preliminary Design Review 25 MCAO Diagnostic WFS/Source simulators •LGS Source •5-star constellation •LEDs at ~.589 microns •NGS Source •5x5 array of 4 micron diameter fiber sources •8 200 micron diameter sources at ~ 1 arc minute radius NGS Source LGS Source CCD detector Video camera (not shown) Diagnostic WFS May 24-25, 2001 MCAO Preliminary Design Review 26 MCAO LGS Zoom Corrector LGS wave front sensor Fixed elements May 24-25, 2001 MCAO Preliminary Design Review 27 MCAO Beam splitter changer Rotation to change beam splitters Science path To Science instrument Science path From DMs Science ADC LGS/NGS path May 24-25, 2001 MCAO Preliminary Design Review 28 Misc. Active components MCAO • Science ADC • Counter-rotating prisms • Retractable • Calcium fluoride and silica prisms • NGS ADC • Counter-rotating prisms • Flint and crown prisms • Shutters • Baseline same as Altair • Aperture stop • Normally retracted, used only with source simulator to overfill DM0 for flattening. May 24-25, 2001 MCAO Preliminary Design Review 29 Mass and Center of Gravity MCAO Goal center of mass 900kg 970kg (estimated) May 24-25, 2001 MCAO Preliminary Design Review 30 Procurement strategy 5 work packages: 1. AO Bench (including enclosures and most electronics) 2. Deformable mirrors 3. Diagnostic WFS & source simulators 4. LGS wave front sensor 5. NGS wave front sensor May 24-25, 2001 MCAO Preliminary Design Review MCAO 31 Procurement Strategy – Acceptance testing & Integration Vendor facilities: Pre-ship tests AO Bench DMs LGS WFS NGS WFS MCAO DWFS/ Sources Hilo: Acceptance tests, integration, & closed-loop AO Cerro Pachon: reassembly, realignment, & commissioning May 24-25, 2001 MCAO Preliminary Design Review 32 MCAO PDR Agenda Thursday, 5/24 0800 Welcome 0805 Project overview 0830 Science case 0930 Break 0945 System overview 1015 System modeling 1100 AO Module optics 1145 Lunch May 24-25, 2001 1245 AO Module mechanics 1340 AO Module electronics 1400 Break 1415 Beam Transfer Optics 1510 Laser Launch Telescope 1545 Closed committee session 1800 Adjourn MCAO Preliminary Design Review 33