6532 West Lake Street St Louis Park, MN 55426 888.233.1012 www.TrafficDataInc.com Tube Count Checklist Project No.: Site Location: Client: Received authorization from client to perform counts. Create a location count sheet for the counts (an example is in the manual). Call the city and/or county to notify them we will be counting (give them times and locations). Ask about street cleaning or snow plowing schedules. Make sure the counters and hammer drill are sufficiently charged. Checklist for going to do the count: Enough tube counters Extra batteries (counters & drill) Location count sheets Business cards Flasher Orange cones Green vest Enough gas in vehicle? Enough tubes (epdm or natural?, mini & standard, 35’, 50’, 65’, 100’) Notepad and pen Concrete anchors Hammer Drill Screw driver Nylon “chinese fingers” Inverter Vehicle gassed and maintained Note returning mileage. Tape measure Trash bag Twine Duct tape Nylon Webbing Straps Claw Hammer Maul PK Nails Spikes (for gravel) Masonary bits Powder Actuated Tool (PAT) PAT nails & shells JAMAR counter manual Note starting mileage 6532 West Lake Street St Louis Park, MN 55426 888.233.1012 www.TrafficDataInc.com Manual Count Field Checklist Project No.: Site Location: Client: COUNT PREPARATION Receive written authorization from client to perform counts. Review requirements and select team members to be contacted based on proximity to count site when possible. Contact team via telephone to schedule appropriate team members. It is critical everyone knows where and when. 1. Designate a very specific team meet site. Gas stations or fast food restaurants are good because they are visible, open early, and have restrooms. Make sure the meet site is at a major intersection. 2. Schedule the team members to be there ½ hour before the count starts (minimum). 3. Confirm all information in an e-mail if possible including Mapquest link to meet site. 4. Schedule breaks if count is over 3 hours. Complete a site survey to verify intersection configurations and determine best locations for team members to park during count. Create count paperwork 1. Create location count sheets for each count including recommended parking location. 2. Create an aerial/map of entire count area noting locations of all count intersections and location of meet site. 3. Fill out payroll time sheets with date/location/hours to be worked (team member will add mileage for each count time period.) Jamar DB100 or TDC8 Counter setup 1. Clear all old count data. 2. Check battery level – should say “ok”. 3. Check under utilities for date/time – synchronize with US Time Clock http://www.time.gov/timezone.cgi?Central/d/-6/java 4. Put the number of the count and the name of the team member assigned on a piece of tape at the top of the machine. 5. Put tape on the count board over the buttons not used for the count. Assemble Count Equipment 1. Put counter, location sheet/area map and Payroll Time Sheet inside carrying box for each team member. 2. Put name of team member on outside of counter carrying box. Call the city police 1. Notify them when and where we will be counting. 2. Add notification time/date/contact information to Count Notification Log. 6532 West Lake Street St Louis Park, MN 55426 888.233.1012 www.TrafficDataInc.com CHECKLIST FOR ADDITIONAL EQUIPMENT TO BRING TO COUNT: 1. At least one more count board than needed (spare) 2. Extra AA batteries 3. Business cards 4. “To Our Counter” cards if needed 5. Spare “Traffic Count” signs 6. Lawnchairs & umbrellas ONSITE TEAM COORDINATION Meet team members at the designated time/place. For new team members not familiar with process: 1. Explain how the boards work – i.e. point north arrow north, 15 minute intervals, “any key to start” at exact count start time, etc. 2. Program count boards with appropriate site ID number. 3. Provide sign for vehicle exterior (Traffic Count In Progress) 4. Provide “to our counter” information cards. 5. Review location of count intersection with information on where to park for count. 6. Tell them to return to meet site at the end of the count. 7. Tell them not to turn off count boards! For regular team members, 1. Hand out counter boxes. 2. Review location of count intersection with information on where to park for count. Collect the counter boards at the end of the count and turn off. 6532 West Lake Street St Louis Park, MN 55426 888.233.1012 www.TrafficDataInc.com Tube Count Sheet Site Code: 23712104 MSAS Code: 35687 Location: Anderson Lakes Pkwy west of TH212 (Flying Cloud Drive) Counter Serial #: Configuration: Hourly & Directional Date & Time Placed: Date & Time Removed: Location Sketch: Note street names Note relevant addresses or driveways Draw tubes and counter location Label tubes A,B,C, and D 6532 West Lake Street St Louis Park, MN 55426 888.233.1012 www.TrafficDataInc.com Manual Turning Movement Count Sheet pedestrians-1 2 3 4 5-pedestrians 16 15 14 North 6 7 8 pedestrians-13 12 11 10 9-pedestrians Site Code: Date/Time: Location: Counter Serial #: COUNT PEDESTRIANS! Notes for counters: 1. Make sure the count board is oriented per the above sketch (with north facing the same direction on the board and the sketch). 2. If there are two lanes for one movement, use the corresponding single button. i.e. If there are two southbound through lanes, count all of the southbound through traffic with button 3. 3. Do not turn off the count board! 4. Count u-turns as left turns. Let us know if there are a lot of them. 5. Let us know if you see anything that doesn’t look right. 6532 West Lake Street St Louis Park, MN 55426 888.233.1012 www.TrafficDataInc.com Video Recording Sheet Site Code: 105-12-03-1 Location: US 169 & CSAH 83 North Ramp - Shakopee, MN Recording Period: 48 hours 6/14-6/15 (Thurs-Fri) Recorder Serial #: Camera #: USB/SD #: Date & Time Placed: 6/13/2012 Date & Time Removed: North Location Sketch: Note street names Draw camera location and arrow indicating field of view. 6532 West Lake Street St Louis Park, MN 55426 888.233.1012 www.TrafficDataInc.com Video Counting Sheet Site Code: 1241107-050 Location: Lyndale Ave S & 50th St W - Minneapolis, MN Computer ID: Video count start date: Count Period: Count Complete 12am-4am 4am-8am 8am-12pm 12pm-4pm 4pm-8pm 8pm-12am Data Exported Data Merged & checked 6532 West Lake Street St Louis Park, MN 55426 888.233.1012 www.TrafficDataInc.com 2012 Metro Area Price List Price per Each Price per Each Video Only Mechanical (Tube) Data 1. 2. 3. 4. 5. Price per Count Manual Data + Video Traffic Control at Intersection 2 Hour Turning Movement Count (NO video provided) 13 Hour Turning Movement Count (includes video) 24 Hour Turning Movement Count (includes video) 48 Hour Turning Movement Count (includes video) Stop Signs Traffic Signal Roundabout $200 $275 $550 $525 $675 $1,350 $725 $975 $1,950 $1,175 $1,500 $3,400 24 Hour Video (delivered electronically on returnable USB flash drive) $200 48-Hour ADT Mechanical Tube Count $185 48-Hour Directional & Hourly - Volume $200 48-Hour Directional & Hourly - Volume + Speed + Classification $250 The above prices include all expenses (mileage, redoing if there is a miscount, drive time, downloading, etc.). Prices are good for the 7 County, Twin Cities Metro Area. Mechanical count prices are not valid during snowplow season. Quotes provided on a project by project basis for winter mechanical counts or services outside of the 7 County Area. Data and video are not guaranteed to be stored by Traffic Data Inc. after successful delivery to the client. Video provided electronically on USB drives. USB drives to be returned to Traffic Data Inc. within a reasonable timeframe. * Discounts available on large projects – call to inquire. ** All of our equipment is available for rent & sale through www.CountingCars.com