Learning Objectives

Describe the Project Management Body of Knowledge (PMBOK®) area called
project quality management (PQM) and how it supports plan quality, perform
quality assurance, and perform quality control to provide continuous improvement
of the project’s products and supporting processes.

Identify several quality gurus, or founders of the quality movement, and their role in
shaping quality philosophies worldwide.

Describe some of the more common quality initiatives and management systems
that include ISO certification, Six Sigma, and the capability maturity model (CMM)
for software engineering.

Distinguish between validation and verification activities and how these activities
support IT project quality management.

Describe the software engineering discipline called configuration management and
how it is used to manage the changes associated with all of the project’s
deliverables and work products.

Apply the quality concepts, methods, and tools introduced in this chapter to
develop a project quality plan.
10-3
Copyright 2012 John Wiley & Sons, Inc.
What is Quality?


“an inherent or distinguishing characteristic; a property;
having a high degree of excellence”
Features & functionality


10-4
“fitness for use”
“conformance to requirements”
Copyright 2012 John Wiley & Sons, Inc.
PMBOK® – Project Quality Management
(PQM)

Project Quality Management includes the processes and
activities of the performing organization that determine
quality policies, objectives, and responsibilities so that the
project will satisfy the needs for which it was undertaken.
It implements the quality management system through
policy and procedures with continuous process
improvement activities conducted throughout, as
appropriate.
10-5
Copyright 2012 John Wiley & Sons, Inc.
PMBOK® – PQM Processes



Plan Quality
 Determining which quality requirements and/or standards are
important for the project and the product and then documenting
how compliance will be demonstrated.
Perform Quality Assurance
 Provides the basis for continuous improvement by auditing and
evaluating the results from quality control measurements so that
appropriate quality standards and operational definitions are used.
Perform Quality Control
 Monitoring and documenting the results of executing project quality
activities to eliminate causes of unsatisfactory performance and
implement new processes and techniques to improve project quality
throughout the organization.
10-6
Copyright 2012 John Wiley & Sons, Inc.
PQM Focuses on

The project’s products





Business Case
Project Plan
The IT Solution
Etc.
And the project’s processes






10-7
Scope management
Risk management
Requirements Analysis
Design
Implementation
Etc.
Copyright 2012 John Wiley & Sons, Inc.
The Quality Chain
More efficient & effective use of resources
Minimize errors
Meet or exceed stakeholder expectations
More rework, waste, & errors
Negative impact on project goal &
objectives
Poor quality can be an embarrassment!
Project and IT development processes support the project’s products
Customers may be internal or external
10-8
Copyright 2012 John Wiley & Sons, Inc.
Project Quality Management
10-9
Copyright 2012 John Wiley & Sons, Inc.
Quality Tools & Philosophies





Scientific Management
Control Charts
The Total Quality Movement (TQM)
Quality Planning, Improvement, & Control
Cause & Effect Diagrams, Pareto Charts, and Flow Charts
10-10
Copyright 2012 John Wiley & Sons, Inc.
Scientific Management

Fredrick W. Taylor (1856 – 1915)

Management would set arbitrary rules of thumb
 Workers produced so much each day – no more,
no less
 Believed the production process could be more
efficient
 Break
a task down into smaller tasks & study it to find
the best and most efficient way of doing it
 Time – motion studies

10-11
Did not sit well with labor unions because many
ignored the human factors & believed profits
could be increased by speeding up the workers
Copyright 2012 John Wiley & Sons, Inc.
Control Charts

Walter A. Shewhart (1891 – 1967)



Worked for Western Electric Company (Bell Telephones)
Quality improvements needed for underground equipment
Applied statistical theory to control production processes
10-12
Copyright 2012 John Wiley & Sons, Inc.
The Total Quality Movement
 W. Edwards Deming (1900 – 1993)
Worked with Shewhart at Western Electric
Hawthorne Plant in Chicago, IL in the 1920s
 Management treated the worker as a cog in the
machinery
 Final inspection used to control quality

 Worker
not directly responsible
 Scrap & rework reduced per piece rate

10-13
Invited to give series of day-long lectures in Japan
in the 1950s
Copyright 2012 John Wiley & Sons, Inc.
Deming’s 14 Points
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
Have a purpose (improve products and services, be competitive, stay in business, and
provide jobs).
Adopt the new philosophy of management.
Don’t depend on inspection at the end.
Don’t award business based on price tag.
Keep improving constantly.
Institute training on the job.
Institute leadership.
Drive out fear.
Break down barriers between departments.
Eliminate slogans.
a) Eliminate quotas.
b) Eliminate management by objective and by numbers.
Take pride in your work.
Focus education and self-improvement.
It takes everyone to accomplish the transformation.
From Out of the Crisis by W. Edwards Deming (1986)
10-14
Copyright 2012 John Wiley & Sons, Inc.
Quality Planning, Improvement, &
Control

Joseph Juran (1904 - 2007)



Viewed quality as “fitness for use”
Also invited to Japan to conduct seminars in the 1950s
Message is that quality does not happen by accident – it must
be planned in
10-15
Copyright 2012 John Wiley & Sons, Inc.
Quality Planning, Improvement, & Control

Juran’s Quality Planning Road Map (Quality Trilogy)

Quality Planning
1. Identify who are the customers.
2. Determine the needs of those customers.
3. Translate those needs into our language.
4. Develop a product that can respond to those needs.
5. Optimize the product features so as to meet our needs as well as customer
needs.

Quality Improvement
6. Develop a process that is able to produce the product.
7. Optimize the process.

Quality Control
8. Prove that the process can produce the product under operating conditions.
9. Transfer the process to Operations.
10-16
Copyright 2012 John Wiley & Sons, Inc.
Cause & Effect Diagrams, Pareto Charts,
and Flow Charts

Kaoru Ishikawa (1915 - 1989)



Studied under Deming
Believed quality is a continuous process that relies on all levels of
the organization
Advocated the use of easy-to-use statistical tools



10-17
Ishikawa, or Fishbone Diagram
Pareto Diagram
Flow Charts
Copyright 2012 John Wiley & Sons, Inc.
Ishikawa, or Fishbone Diagram
10-18
Copyright 2012 John Wiley & Sons, Inc.
Pareto Chart
10-19
Copyright 2012 John Wiley & Sons, Inc.
Flow Chart
for Project
Scope
Verification
10-20
Copyright 2012 John Wiley & Sons, Inc.
Quality Systems



ISO
6 – Sigma
Capability Maturity Model
10-21
Copyright 2012 John Wiley & Sons, Inc.
ISO

International Organization for Standardization (ISO)




Derived from Greek word “isos,” meaning “equal”
Formed in 1947
Today has over 130 members “to facilitate the international
coordination and unification of industrial standards.”
Standards make up the ISO 9000 (organizations) and ISO
14000 (environmental) families
10-22
Copyright 2012 John Wiley & Sons, Inc.
6-Sigma
Originated by Motorola in Schaumburg, IL
Based on competitive pressures in 1980s – “Our quality
stinks”


Sigma
Defects Per Million
3δ
6δ
1δ
690,000
2δ
308,537
Five short or long landings at any
major airport
One short or long landing in 10 years at
all airports in the US
3δ
66,807
4δ
6,210
Approximately 1,350 poorly performed
surgical operations in one week
One incorrect surgical operation in 20
years
5δ
233
Over 40,500 newborn babies dropped
by doctors or nurses each year
Three newborn babies dropped by
doctors or nurses in 100 years
6δ
3.4
Drinking water unsafe to drink for
about 2 hours each month
Water unsafe to drink for one second
every six years
10-23
Copyright 2012 John Wiley & Sons, Inc.
6-Sigma D-M-A-I-C Cycle

Define


Measure


With data in hand, the team can analyze the data for trends, patterns, or relationships.
Statistical analysis allows for testing hypotheses, modeling, or conducting experiments.
Improve


The Six Sigma team is responsible for identifying a set of relevant metrics.
Analyze


The first step is to define customer satisfaction goals and subgoals; for example, reduce
cycle time, costs, or defects. These goals then provide a baseline or benchmark for the
process improvement.
Based on solid evidence, improvements can be proposed and implemented. The MeasureAnalyze-Improve steps are generally iterative to achieve target levels of performance.
Control

Once target levels of performance are achieved, control methods and tools are put into
place in order to maintain performance.
10-24
Copyright 2012 John Wiley & Sons, Inc.
6-Sigma Roles & Responsibilities

Master black belts


Black belts


Should be technically competent and held in high esteem by their peers. They
are actively involved in the Six Sigma change process.
Green belts


People within the organization who have the highest level of technical and
organizational experience and expertise. Master black belts train black.
Are Six Sigma team leaders or project managers. Black belts generally help green
belts choose their projects, attend training with them, and then assist them with
their projects once the project begins.
Champions

Leaders who are committed to the success of the Six Sigma project and can
ensure that barriers to the Six Sigma project are removed. Usually a high-level
manager who can remove obstacles that may involve funding, support,
bureaucracy, or other issues that black belts are unable to solve on their own.
10-25
Copyright 2012 John Wiley & Sons, Inc.
The Capability Maturity Model
Integration (CMMI)


Developed by the Software Engineering Institute at
Carnegie Mellon University in 1986
Mitre Corporation and Watts Humphrey developed a
framework to assess and evaluate the capability of
software processes and their maturity

Called the Capability Maturity Model (CMM), but has evolved
to the CMMI which is not limited to a specific area but can be
used across different disciplines
10-26
Copyright 2012 John Wiley & Sons, Inc.
Immature Software Organization






Software processes are improvised
Or not followed!
Managers continually “fight fires”
No basis for judging quality
Schedules & budgets are usually exceeded
Functionality & quality often compromised to meet
schedules
10-27
Copyright 2012 John Wiley & Sons, Inc.
Mature Software Organization





Has organization-wide ability to manage software
development
Software process is communicated to staff
Processes are consistent with the way work gets done
Processes are updated when necessary
Roles & responsibilities are well-defined
10-28
Copyright 2012 John Wiley & Sons, Inc.
Other CMMI Concepts

Software process
 A set of activities, methods, or practices and transformations used by people to
develop and maintain software and the deliverables associated with software projects.
Included are such things as project plans, design documents, code, test cases, user
manuals, and so forth.

Software process capability
 The expected results that can be achieved by following a particular software process.
More specifically, the capability of an organization’s software processes provides a way
of predicting the outcomes that can be expected if the same software processes are
used from one software project to the next.

Software process performance
 The actual results that are achieved by following a particular software process.
Therefore, the actual results achieved through software process performance can be
compared to the expected results achieved through software process capability.

Software process maturity
 The extent to which a particular software process is explicitly and consistently
defined, managed, measured, controlled, and effectively used throughout the
organization.
10-29
Copyright 2012 John Wiley & Sons, Inc.
Levels of Software Process Maturity
10-30
Copyright 2012 John Wiley & Sons, Inc.
CMMI

Level 1: Initial


Characterized by an immature software
organization in which the software process is ad
hoc and often reactive to crises. Does not have a
stable environment for software projects, and
success of a project rests largely with the people on
the project and not the processes that they follow.
Key Process Area
 no key process areas are in place
10-31
Copyright 2012 John Wiley & Sons, Inc.
CMMI

Level 2:


Repeatable - Basic policies, processes, and controls for
managing a software project are in place. Previous project
successes can be repeated by other project teams on other
projects.
Key Process Area






10-32
Software Configuration Management
Software Quality Assurance
Software Subcontract Management
Software Project Tracking and Oversight
Software Project Planning
Requirements Management
Copyright 2012 John Wiley & Sons, Inc.
CMMI

Level 3:


Defined - Software engineering and management processes are
documented and standardized throughout the organization and
become the organizations standard process.
Key Process Area







10-33
Peer Reviews
Intergroup Coordination
Software Product Engineering
Integrated Software Management
Training Programs
Organization Process Definition
Organization Process Focus
Copyright 2012 John Wiley & Sons, Inc.
CMMI

Level 4:


Managed - Quantitative metrics for measuring and assessing
productivity and quality are established for both software
products and processes which are characterized as being
quantifiable and predictable.
Key Process Areas


10-34
Software Quality Management
Quantitative Process Management
Copyright 2012 John Wiley & Sons, Inc.
CMMI

Level 5:


Optimizing at the highest level of software process maturity,
the whole organization is focused on continuous process
improvement.
Key Process Areas



10-35
Process Change Management
Technology Change Management
Defect Prevention
Copyright 2012 John Wiley & Sons, Inc.
The IT Project Quality Plan
10-36
Copyright 2012 John Wiley & Sons, Inc.
Quality Philosophies & Principles





Focus on customer satisfaction
Prevention, not inspection
Improve the process to improve the product
Quality is everyone’s responsibility
Fact-based management
10-37
Copyright 2012 John Wiley & Sons, Inc.
Developing Standards & Metrics
10-38
Copyright 2012 John Wiley & Sons, Inc.
Project Quality Metrics



Process
 Control the defects introduced by the processes required to create the
project deliverables
 Can be used to improve software development or maintenance
 Should focus on the effectiveness of identifying and removing defects or
bugs
Product
 Focuses on the intrinsic quality of the deliverables and satisfaction of the
customer, client, or sponsor with these deliverables
 Attempt to describe the characteristics of the project’s deliverables and
final product
Project
 Focus on the control of the project management processes to ensure
that the project meets its overall goal as well as its scope, schedule, and
budget objectives
10-39
Copyright 2012 John Wiley & Sons, Inc.
Process, Product, & Project Metrics
Examples
Type
Process
Product
Project
10-40
Metric
Description
Defect Arrival Rate
The number of defects found over a specific period of time.
Defects by Phase
The number of defects found during each phase of the project.
Defect Backlog
The number of defects waiting to be fixed.
Fix Response Time
The average time it takes to fix a defect.
Defective Fixes
The number of fixes that created new defects.
Mean Time to Failure
Average or mean time elapsed until a product fails.
Defect Density
The number of defects per lines of code (LOC) or function points.
Customer Found Defects
The number of defects found by the customer.
Customer Satisfaction
An index to measure customer satisfaction – e.g., scale from 1 (very unsatisfied) to 5 (very
satisfied)
Scope Change Requests
The number of scope changes requested by the client or sponsor.
Scope Change Approvals
The number of scope changes that were approved.
Overdue tasks
The number of tasks that were started but not finished by the expected date or time.
Tasks that should have started
The number of task that should have started but have been delayed.
Over budgeted tasks
The number of tasks (and dollar amount) of tasks that have cost more to complete than expected
Earned Value
SV, CV, SPI, CPI, ETC, EAC
Over allocated Resources
The number of resources assigned to more than one task.
Turnover
The number of project team members who quit or terminated.
Training Hours
The number of training hours per project team member.
Copyright 2012 John Wiley & Sons, Inc.
Verification & Validation (V&V)

Verification

Focuses on process-related activities to ensure that
the products & deliverables meet specified
requirements before final testing
 Technical Reviews
 Walk-throughs
Business Reviews
 Management Reviews
Are we building the product the right way?


10-41
Copyright 2012 John Wiley & Sons, Inc.
Verification & Validation (V&V)

Validation



Product-oriented activities that attempt to
determine if the system or project deliverables
meet the customer or client’s expectations
Testing
 Does the system function as intended and have all
the capabilities & features defined in the project’s
scope and requirements definition
Did we build the right product?
10-42
Copyright 2012 John Wiley & Sons, Inc.
Software Testing Approaches
Unit Testing Focuses on the module, program, or object level to determine whether
specific functions work properly.
•Black Box Testing – Tests the program against specified requirements or
functionality.
•White Box Testing – Examines paths of logic or the structure inside a
program.
•Gray Box Testing – Focuses on the internal structure of the program.
Integration
Testing
Tests whether a set of logically related units (e.g., functions, modules,
programs, etc.) work together properly after unit testing is complete.
Systems
Testing
Tests the system as a whole in an operating environment to verify
functionality and fitness for use. May include tests to verify usability,
performance, stress, compatibility, and documentation.
Acceptance
Testing
10-43
Certifies that the system satisfies the end user or customer’s scope and
detailed requirements after systems testing is complete. It is the user’s or
client’s responsibility to assure that all features and functionality are
included so that the project’s MOV will be achieved.
Copyright 2012 John Wiley & Sons, Inc.
Change, Control, & Configuration
Management

Changes to the project work must be managed





What changes were made?
Who made the changes?
When were the changes made?
Why were the changes made?
Configuration management includes a set of processes and
tools that allow the project team to manage its various
documents and files as various configurations of IT solutions
and project deliverables are derived. It may include specifying
and enforcing various policies that restrict access to specific
individuals or preventing two people from changing the same
document or file at the same time.
10-44
Copyright 2012 John Wiley & Sons, Inc.
Quality Control Activities
Quality Control Activities should focus on the inputs
and outputs of each process.
10-45
Copyright 2012 John Wiley & Sons, Inc.
Learn, Mature, and Improve

Lessons learned


Provide the basis for continual improvement
Can be the basis for identifying and implementing best
practices
A quality plan should do more that attempt to build a better IT solution,
it should also support the organization in searching for ways to manage
projects better.
10-46
Copyright 2012 John Wiley & Sons, Inc.
Copyright 2012 John Wiley & Sons, Inc.
All rights reserved. Reproduction or translation of this work beyond that
permitted in section 117 of the 1976 United States Copyright Act without
express permission of the copyright owner is unlawful. Request for further
information should be addressed to the Permissions Department, John
Wiley & Sons, Inc. The purchaser may make back-up copies for his/her own
use only and not for distribution or resale. The Publisher assumes no
responsibility for errors, omissions, or damages caused by the use of these
programs or from the use of the information herein.
10-47
Copyright 2012 John Wiley & Sons, Inc.