Kuwait University Faculty of Engineering & Petroleum CHEMICAL ENGINEERING DEPARTMENT First Semester 2011/2012 Prof. Mohamed A. Fahim PLANT DESIGN (ChE 491) Problem Statement Project 3 (5 Members Group) Project Title: Production of Natural Gas Liquids (NGL) Plant Capacity: 100 Million lb/yr of Butane Feed Compositions (mol%) Feed 1 Feed 2 Feed 3 Feed 4 Refinery Gas Feed CO2 Feed Refinery Liquid Feed NGL Feed Hydrogen 20.70 0.00 0.46 0.00 CO2 0.00 88.80 0.00 0.00 H2S 0.23 0.00 0.29 0.00 Methane 13.84 0.00 0.23 0.00 Ethane 17.38 8.64 1.20 0.00 Propane 18.12 1.92 11.24 2.39 I-Butane 11.49 0.32 25.30 38.36 Butane 12.29 0.32 53.88 39.83 I-Pentane 2.40 0.00 6.14 7.21 Pentane 1.09 0.00 1.20 8.21 Hexane 2.46 0.00 0.06 4.00 Nonane 0.00 0.00 0.00 0.00 Decane 0.00 0.00 0.00 0.00 Undecane 0.00 0.00 0.00 0.00 174.80 30.80 174.30 280.00 Component Total Flow Rate (lb mol/hr) Hydrogen is added in stoichiometric ratio to the CO2 feed and then fed to the reactor at 400oC and 1 atm to produce 26.80 lb mol/hr of CH4 Reaction CO2 + 4H2 → CH4 + 2H2O (Sabatier Reaction) Final Product Propane Product (mol%) Ethane 1.07 Propane 97.86 I-Butane 1.07 I-Butane Product (mol%) Propane 1.25 I-Butane 92.59 Butane 6.15 Butane Product (mol%) I-Butane 3.19 Butane 79.93 I-Pentane 10.41 Pentane 6.48 The other by-products from this process are Fuel gas and C6+. You are required to carry out the project by completing the following tasks and submit a formal report on each task. TASK LIST Task 1: Literature Survey (Report submission date: 04/03/2012) 1. Various process routes to produce Natural Gas Liquids. 2. Properties of raw materials and final products. 3. Uses of Natural Gas Liquids. Task 2: HYSYS Simulation (Report submission date: 01/04/2012) Simulation of the production of the Natural Gas Liquids using one selected process flow-sheet. Task 3: Equipment Design (Report submission date: 29/04/2012) Perform detailed design calculations of all the major and minor equipments in your plant and report its size, construction details, material of construction and instrumentation & control. Task 4: Safety and Health Hazard (Report submission date: 13/05/2012) Assessment of safety features taken in the plant design and report health hazards. Task 5: Economic evaluation (Report submission date: 13/05/2012) Perform economic study and project evolution for the selected petrochemical plant. Task 6: Final Report (Report submission date: 23/05/2012) Submit final report for whole project.