Contractor Orientation Quiz 2-2015

advertisement
2015 CONTRACTOR QUIZ
CONTRACTOR QUALIFIED PERSON ORIENTATION
NORTHROP GRUMMAN SPACE SYSTEMS, SPACE PARK, CALIFORNIA
Instructions: Choose the correct response. You must answer all the questions correctly to receive a certificate (valid for one
year) which meets the minimum Environmental Safety and Health (ESH) training orientation requirements. Answers to all
questions can be obtained by reviewing the orientation video, the SP excavation protocol and pamphlet posted in OASIS.
1. Can a contractor initiate a project by installing perimeter fencing or dust controls without a Job Hazard Analysis?
a.
True
b.
False
2. Which of the following is false with respect to the security requirements?
a.
Remain is sight of the escort in Classified areas
b.
Permissible to tailgate when entering Unclassified areas
c.
Picture taking is not permitted on site unless you have written authorization
d.
Must wear your badge whether inside any building or outside on the premises
3. It is acceptable for a subcontractor notify the General Contractor the day after for a minor injury?
a.
True
b.
False
4. Can a contractor notify ESHM in writing the following day of a regulatory inspection?
a.
True
b.
False
5. Which of the following is true?
a.
Disciplinary actions must be in writing
b.
Recognitions must be in writing and accompanied with a check
c.
If a subsurface survey of underground utilities is completed, then reviewing of drawings are not necessary
d.
Abatement of asbestos or lead can proceed without the notification of ESH department point of contact
e.
A qualified worker will be required to perform electrical work “energized” because of NG SP critical work
schedule
6. Labels indicating safety precautions or weight capacities are required to be posted on the item for which of the following except?
a.
Chemical use
b.
Trash bin
c.
A portable ladder
d.
Personnel protective equipment
7.
An NG representative is responsible to post the building of potential noise and dust hazards even if the hazards are scheduled
for off hours?
a.
True
b.
False
8.
A harness and lanyard is required to be worn at all times except?
a.
Erecting a scaffold without railings
b.
Reaching beyond the railing of an extension ladder when ladder is not secured
c.
On a roof 20 foot high and working about 8 feet from the unprotected edge
d.
Insulating AC ducting which is approximately 8 feet high above the roof
9.
All the following are true regarding gas cylinders except?
a.
Back flow protection on both oxygen and fuel cylinders
b.
Oxygen and fuel gas cylinders can be separated by a 5 foot noncombustible barrier during storage
c.
Oxygen and fuel gas cylinders can be stored 10 feet from each other
d.
Cylinders must be secured to prevent tipping regardless if or not being used
10. What must you know or have completed prior to the start of today’s work?
a.
The type of personal protective equipment to be worn
b.
Reviewed the Job Hazard Analysis
c.
Location of the emergency evacuation staging area and first aid kit
d.
Any required motorized equipment inspections (e.g. Forklifts)
e.
Site emergency no. and all exit routes
f.
Location of evacuation staging area
g.
Chemical approval status
h.
All of the above