Fieldbus Physical Layer as an
Asset
Randy Durick
Business Development Manger
TURCK Inc.
March 31st and April 1st, 2009
Mile High Industrial and Automation Conference
Plant Asset Management
 Why Plant Asset Management?
Currently Plant Asset Management
focuses on instrumentation performance
What about the infrastructure for the
instrumentation?
March 31st and April 1st, 2009
Mile High Industrial and Automation Conference
Traditional Analog Circuits
Only 1 value is transmitted
Only one direction
4-20
mA
March 31st and April 1st, 2009
Mile High Industrial and Automation Conference
Enabling Factors with FF
•Increased intelligence closer the process
•online performance indication through process &
device diagnostics
•increased process stability
•Improvements
•increasing plant availability
•increasing productivity and product quality
•less raw & waste material
•During longest lifecycle period of the plant: operation
March 31st and April 1st, 2009
Mile High Industrial and Automation Conference
Foundation fieldbus Capabilities
ST_REV, TAG_DESC, STRATEGY, ALERT_KEY, MODE_BLK, BLOCK_ERR, RS_STATE,
TEST_RW, DD_RESOURCE, , MANUFAC_ID, DEV_TYPE, DEV_REV, DD_REV, GRANT_DENY,
HARD_TYPES, RESTART, FEATURES, FEATURE_SEL, CYCLE_TYPE, CYCLE_SEL,
MIN_CYCLE_T, MEMORY_SIZE, NV_CYCLE_T, FREE_SPACE, FREE_TIME, SHED_RCAS,
SHED_ROUT, FAIL_SAFE, SET_FSAFE, CLR_FSAFE, MAX_NOTIFY, LIM_NOTIFY,
CONFIRM_TIME, WRITE_LOCK, UPDATE_EVT, BLOCK_ALM, ALARM_SUM
ACK_OPTION, WRITE_PRI, WRITE_ALM
ST_REV, TAG_DESC, STRATEGY, ALERT_KEY, MODE_BLK, BLOCK_ERR,
PV
OUT, SIMULATE, XD_SCALE, OUT_SCALE, GRANT_DENY, IO_OPTS,
STATUS_OPTS, CHANNEL, L_TYPE, LOW_CUT, PV_FTIME, FIELD_VAL,
UPDATE_EVT, BLOCK_ALM, ALARM_SUM, ACK_OPTION, ALARM_HYS,
HI_HI_PRI, HI_HI_LIM, HI_PRI, HI_LIM, LO_PRI, LO_LIM, LO_LO_PRI,
LO_LO_LIM, HI_HI_ALM, HI_ALM, LO_ALM, LO_LO_ALM
ST_REV, TAG_DESC, STRATEGY, ALERT_KEY, MODE_BLK, BLOCK_ERR, PV, SP, OUT,
PV_SCALE, OUT_SCALE, GRANT_DENY, CONTROL_OPTS, STATUS_OPTS, IN,
PV_FTIME, BYPASS, CAS_IN, SP_RATE_DN, SP_RATE_UP, SP_HI_LIM, SP_LO_LIM
ST_REV, TAG_DESC, STRATEGY, ALERT_KEY, MODE_BLK, BLOCK_ERR, PV
SP, OUT, PV_SCALE, OUT_SCALE, GRANT_DENY, CONTROL_OPTS, STATUS_OPTS,
IN
PV_FTIME, BYPASS, CAS_IN, SP_RATE_DN, SP_RATE_UP, SP_HI_LIM, SP_LO_LIM,
GAIN
RESET, BAL_TIME, RATE, BKCAL_IN, OUT_HI_LIM, OUT_LO_LIM, BKCAL_HYS,
BKCAL_OUT, RCAS_IN, ROUT_IN, SHED_OPT, RCAS_OUT, ROUT_OUT, TRK_SCALE,
TRK_IN_D, TRK_VAL, FF_VAL, FF_SCALE, FF_GAIN, UPDATE_EVT, BLOCK_ALM,
ALARM_SUM, ACK_OPTION, ALARM_HYS, HI_HI_PRI, HI_HI_LIM, HI_PRI, HI_LIM,
LO_PRI, LO_LIM, LO_LO_PRI, LO_LO_LIM, DV_HI_PRI, DV_HI_LIM, DV_LO_PRI,
DV_LO_LIM, HI_HI_ALM, HI_ALM, LO_ALM, LO_LO_ALM, DV_HI_ALM. DV_LO_ALM
March 31st and April 1st, 2009
Mile High Industrial and Automation Conference
Field Device Asset Management
March 31st and April 1st, 2009
Mile High Industrial and Automation Conference
What About the Infrastructure?
March 31st and April 1st, 2009
Mile High Industrial and Automation Conference
Physical Layer Diagnostics
Temperature ?
Ripple
?
Multi-barrier
Power Voltage ?
Conditioner
Busload ?
EEx-e
Current ?
Jitter ?
March 31st and April 1st, 2009
EEx-i
Noise
?
Mile High Industrial and Automation Conference
Life Cycle of Fieldbus Physical Layer:
 Design
Environment
Bus topologies
Component selection
 Commissioning
“great view at the abyss”
A new view to the physical layer “black
hole”
 Operation
Modification
Expansions
Maintenance
March 31st and April 1st, 2009
Mile High Industrial and Automation Conference
Environment of the Fieldbus Infrastructure
 Fieldbus Installations have to resist a lot of
influences
 the drop of signal-quality of older field devices
 degrading of shielding, earthing and grounding
 noise & ripple, caused by other peripheral
devices, causing a drop of signal quality and
interfere communication
 negative effects of temperature, humidity, UVlight, vibrations
 These are well known effects and their
influence needs to be reduced by
monitoring the fieldbus physical layer – no
more “black hole”
March 31st and April 1st, 2009
Mile High Industrial and Automation Conference
Fieldbus Physical Layer Diagnostics
HSE FD
Maintenance
∑ 4 Power Conditioner
Multi-barrier
Power
Conditioner
EEx-e
EEx-i
March 31st and April 1st, 2009
Mile High Industrial and Automation Conference
Fieldbus Physical Layer Diagnostics
Maintenance
HSE FD
Advanced Diagnostic Unit
∑ 4 Power Conditioner
Multi-barrier
Power
Conditioner
EEx-e
EEx-i
March 31st and April 1st, 2009
Mile High Industrial and Automation Conference
Why HSE for the Diagnostics?
 Separate bus recieves diagnostic information regardless of DCS
 Vender neutral protocol
 Integration of Ethernet-based networks into FF-system architecture
 FF-Function blocks
 FF-Alarms
 Ethernet – Accepted Physical Layer
 Use of standard ethernet hardware
 Virtually Unlimited number of stations are possible
 Virtually Unlimited Ethernet Network length
 High transmission speed of HSE
What are the Online Diagnostics?
 Monitoring electrical values including alarming







voltage level bus power supply
ambient temperature
segment current load
ripple
noise
jitter (each device)
signal level at each device
 Monitoring communication values
 address/ live list for devices on the segment
 Communication statistics




frame errors
PDU (protocol data units)
bus idle times
cyclic – and acyclic communication
March 31st and April 1st, 2009
Mile High Industrial and Automation Conference
Setpoints for Alarms (defaults)
Temperature
Ripple
Noise
Jitter
Las Level
Device Level
Power Supply 1
Power Supply 2
Segment current
March 31st and April 1st, 2009
High
Low
High
High High
High
High High
High
High High
Low
Low Low
Low
Low Low
Low
Low Low
Low
Low Low
High
High High
Mile High Industrial and Automation Conference
Fieldbus Physical Layer as Asset
16
Fieldbus Physical Layer as Asset
17
Fieldbus Physical Layer as Asset
18
Questions??
March 31st and April 1st, 2009
Mile High Industrial and Automation Conference
Download