Evaluation Volumetrics GEOL 4233 Class April 29, 2008 Dan Boyd Oklahoma Geological Survey Norman, Oklahoma Volumetrics 1) Definitions / Conversions (Handy Facts) 2) Assumptions (The ‘Art’ of Volumetrics) 3) Mechanics (Input Variables) 4) Reserves (Recovery Factors / Probabilistic Calculations) Volumetrics Definitions / Conversions OOIP OGIP RF FVF: (Bo, Bg) Saturations / Residual Saturations (So, Sg, Sw – Soirr, Sgirr, Swirr) EUR Resources (In-Place) vs. Reserves (Economically Producible) Definitions / Conversions (I) 14.7 psi = Atmospheric (@ S.L.) 5,280 feet per mile 43,560 sq ft per acre 640 acres per sq mile – Section (160 ac per quarter section) 247 ac/sqkm 3.281 ft per meter (39.37 inches per meter) 1.609 kilometers per mile 2.54 centimeters per inch 35.32 cubic feet per cubic meter 7,758 STBarrels per acre-foot Specific Gravity (crude); .80-.97 Btu value for gas: avg ~1Btu / cubic foot (1000Btu/MCF), rich - higher, a lot of non-hydrocarbons - lower API gravity: 25=specific gravity .904, 42=specific gravity .816 BOE: 6,000 cubic feet per barrel (average) Definitions / Conversions (II) To calculate pressure (if mud weight balanced precisely): Under vs. Over Balanced Mud Weight (in ppg) x .052(conversion factor) x depth (in feet) = (BH)Pressure (in psi) If mud is exactly balanced with formation pressure: Calculated Pressure = BHP (reservoir) Hydrostatic pressure gradient = 0.43 psi/ft (43 psi/100’) Volumetric Parameters Definitions / Conversions (III) FVFs: Bo - Oil (dead) ~ 1.0 (RSB/STB), oil moderately gassy ~1.2RSB/STB, very gassy ~ 1.4 RSB/STB Bg – Normally pressured (hydrostatic) FVF = Depth (in ft)/36.9 Example @ 5,000’ FVF = 136 RCF/SCF Underpressured (Brooken Field example): .23 psi/ft (normal = .43 psi/ft) @ 1,400’ Bgi = 28 RCF/SCF (38 RCF/SCF if normally pressured) Overpressured The ‘Art’ of Volumetrics (Assumptions) • Wells drilled are representative of reservoir as a whole • Average Porosity, Sw, So, and Sg are accurate • Reservoir homogeneous and all parts will be swept • The size, thickness and structure of the reservoir is correctly mapped • The area is calculated precisely (planimeters +- 5%) • The OWC and GOC are sharp and known precisely, or …. the porosity saturation cutoffs for pay are accurate, with good sweep above and no feed-in from below these cutoffs Well Log of Incised Valley-Fill Sandstone Oklahoma’s Brooken Field (Booch) Average Porosity = ? ‘Sharp’ Fluid Contacts ? B-184 Horizontal Lateral (Elan Plus Interpretation) ‘Sharp’ Fluid Contacts ? Badak-185 Horizontal Lateral (Elan Plus Interpretation) ‘Sharp’ Fluid Contacts ? Pressure Gradients ‘Sharp’ Fluid Contacts ? Here: + or – 5’ Oil rim estimate: + or – 10% Gas cap estimate: + or – 15% Transition Zone Transition Zone Volumetric Mechanics (Equations) GAS: Area (Ac) x Thickness (Ft) x Avg Porosity (%) x Avg Sgi (%) x Bgi (SCF/RCF) x 43,560 sqft/ac = OGIP (SCF) OIL: Area (Ac) x Thickness (Ft) x Avg Porosity (%) x Avg Soi (%) / Boi (RB/STB) x 7758.4 Bbls/AcFt = OOIP (STB) Volumetric Mechanics (Gross Reservoir Volume) AREA: Productive area (map view), in acres Subdivide overall area into components that are calculated (planimetered) separately based on similar average reservoir thickness THICKNESS: From reservoir or fluid top to contact or saturation cutoff, in feet SUMMED (AREA(S) X THICKNESS) = GROSS RESERVOIR VOLUME in AcreFeet Volumetric Mechanics (Pore Volume) GROSS RESERVOIR VOLUME (AcFt) x Average Porosity (%) within productive reservoir = GROSS STORAGE (PORE) VOLUME (AcreFeet) Volumetric Mechanics (Gross Oil/Gas Volume) GROSS STORAGE (PORE) VOLUME (AcreFeet) x AVERAGE OIL (Soi) or GAS (Sgi) SATURATION (%) = GROSS OIL or GAS VOLUME (AcreFeet) =========================== Conversion to standard units of RBbls or RCF AcreFeet x 7,758 Bbls/AcreFoot = Oil in Reservoir Barrels AcreFeet x 43,560 Cubic Feet/AcreFoot = Gas in Reservoir Cubic Feet Volumetric Mechanics (Oil) (Conversion to Stock Tank Barrels) FORMATION VOLUME FACTOR (Bo): Rules of Thumb ‘Dead’ Oil (no dissolved gas): Bo ~ 1.0 (RB/STB) ‘Gassy’ (deepish) Oil: Bo ~ 1.4 (RB/STB) ‘Typical’ (shallower) Oil: Bo ~ 1.2 (RB/STB) Oil Volume (RB) / Bo (RB/STB) = OOIP (STB) Volumetric Mechanics (Gas) (Conversion to Standard Cubic Feet) FORMATION VOLUME FACTOR (Bg): Rules of Thumb • Bg – If normally pressured (hydrostatic) Bg = Depth (in feet) / 36.9 Example: @ 5,000’ FVF = 136 SCF/RCF ----------------------------- • Underpressured (Brooken Field example): .23 psi/ft (normal = .43 psi/ft) @ 1,400’ Bgi = 28 SCF/RCF (38 SCF/RCF if normally pressured) ----------------------• Overpressured Gas Volume (RCF) X Bg (SCF/RCF) = OGIP (SCF) Reserves From OOIP / OGIP (What can you take to the bank ?) RECOVERY FACTOR (RF): Function of – • Reservoir Quality, Depth, Pressure, Temperature • Fluid Properties • Drive Mechanism(s) • Reservoir Management Rules of Thumb The better the reservoir, the better the recovery factor • Even fluid movement • Larger pore throats (better sweep, more moveable oil/gas) • Better water support (if any to be had) • Better effectiveness in secondary/ tertiary recovery projects Recovery Factors (Ballpark Rules of Thumb) OIL: • Poor reservoir (low poro-perm): • Dual Porosity (low matrix reservoir quality): • Good Poro-Perm (Primary = Secondary): • Excellent reservoir (good water support): • Ideal (reservoir quality, management): • Tar Sands (mined): < 10% ~ 20% ~ 30% ~ 40-50% ~ 60-70% ~ 100% GAS: • CBM, Shale Gas: • Good Quality (depletion): • Excellent Reservoir (depletion, + compression): < 10% (generally) ~ 70% (GOM average) 90%+ (Lake Arthur Ex.) Probabilistic Volumetrics (Because there is no single answer) • Calculate a range of values based on confidence in variables. P = Probability Factor P 100 – dead certainty P 80 to 90 – high confidence P 10 to 30 – low confidence • For each variable with significant uncertainty Assign P 90 , P 50, and P 10 values to create distribution Example: Productive area – P 90 = smallest reasonable area, P 50 = most likely area, and P 10 = maximum area (but not unreasonable) • Qualitative (‘fudgability’ - what do you want it to be ?) Usefulness a function of experience in area Requires objective assessment Most beneficial when comparing large projects in which data is sparse Probabilistic Reserves (Taking Credit Now for Future Additions) (P + P + P) • Proved. Highest level of certainty (assigned $ value) PDP – Proved-Developed-Producing (decline curve) PUD – Proved-Undeveloped (Nonproducing) • Probable. Undrilled, but based on known areas has high likelihood of producing Examples: Undrilled fault-block in area where faults do not seal Area adjacent to existing production with quantifiable DHI • Possible. Higher risk, but based on incomplete information meets known requirements for production Volumetric Computations (1) Prerequisites – Net Pay Isopach (which requires) Structure Map (on top of the pay) Elevation of fluid contacts Net Reservoir Isopach Accurate Pay Cutoffs (Porosity, Sw, Shale Content ie: k measure) Knowledge of Potential Flow-Barriers (each compartment calculated separately) Structure Map - identify isolated fault blocks Cross-Section(s) – identify potential stratigraphic barriers Volumetric Computations (2) Mechanics – Work Station (high-tech, but still just a tool) Log analyses, tops, net pay thicknesses are usually digital and internal Computer-generated maps/cross-sections must be ‘truthed’ and edited Advantage – can sift vast amounts of data and quickly analyze wide range of possibilities Disadvantage – GIGO (garbage in, garbage out) – but it’s nice looking garbage Paper (much slower, but often results in better geological understanding ) PC computer aid only, interpretation on paper (hand-contouring & log analysis) Planimeter usually used for calculating areas, or…………. Eyeball entire pay map with an average pay thickness, or box-out into bite-size chunks Given the assumptions – the experienced eyeballer has the edge Reservoir Volume Mechanics (Work station’s crashed &/or planimeter’s been stolen) Bite-Size Chunks Technique • Box out areas into rectangles-triangles • Calculate areas • Assign each area an average thickness • Sum the volumes calculated Reservoir Volume Mechanics Slab and Wedge Technique (Useful in areas of shallow dip) • Reservoir thickness ~ constant • Area inside of where water contact is at reservoir bottom assigned full thickness value • Area outside of this, to the edge of the water contact, is assigned half of the full thickness value Blanket 40’ Reservoir with 80’ of Closure Slab Area + Wedge Area / 2 = Gross Reservoir Volume In this example reservoir ~40’ thick Slab Area Net Pay maximum line Wedge Area Net Pay zero-line Assume OWC @ Base of reservoir Net Oil Reservoir Isopach (Well control good, Zero line conforms to OWC) Planimeter 2-3 areas: ~ 0-20, 20-30, 30+ Volumetric Map Set Rigorous ‘By the Book’ (This is usually overkill) Brooken Field Net Sandstone Isopach Reams Southeast Field Middle Booch Structure Map Trapping Fault Reams Southeast Field Study PS-0 Net Sand Isopach Reams Southeast Field Study PS-2 Net Sand Isopach Reams Southeast Field Middle Booch Net Sandstone Isopach (Showing Combination Trap) Fault Contact Reservoir Limits Water Contact Reams Southeast Field Study Volumetric Input Reams Southeast Field Study Gas Volumes Exercises Exercise 1a: Calculate OGIP Exercise 1b: (Alternative Interpretation) Calculate OGIP Exercise 1c: (Yet another alternative Interpretation) Calculate OGIP Exercise 1 (Sparse Data) Volumetrics Sensitivity: • Gross Reservoir Volume - varies by a factor of 4 (at least) in 3 reasonable interpretations that honor all data. This is made possible both by changing the productive area and the thickness within it. If the porosity cutoff (8%) for reservoir were moved up or down, results would vary even more. • Porosity - for each percent the average value goes up or down, the OGIP estimate is changed by 10%. In heterogeneous reservoirs the porosity range can be large (8 - 18% not unusual). 118° 40' 118° 50' 118° 45' S B -6 -2 4 S B -6 Real Life Example -1 3 S B -6 -3 0 (One penetration) S B -6 -2 5 NYM PHE NORTH 1 B E N R IN N E S 1 5° 50' 5° 50' K91 -6 - -4 8 SB 12 -6 -5 S B -6 -2 7 SB NYM PHE 1 S B -6 -2 6 KUDA TE RB AN G 1 SB 5° 45' S p ill P o in t 4 -4 91 K 0 2 2 -4 ARCO NYM PHE SO UTH 1 1:50000 0 5° 45' -6 118° 40' 4 Kilometers P h illip in e s N 118° 45' N ym p h e A r e a T ra p p in g S tyle T o p M 2 D e p th S t ru c t u re C .I. = 2 0 0 m 4 Miles J W /D B Dec, 1999 Interpretation based on inferred environment of deposition and analog comparisons (in some cases seismic DHI’s can help) With production history, the geologic model can be refined (and then used as a template elsewhere) Exercise 2: Calculate OGIP North Dome Field (Qatar/Iran) North Dome Field Ghawar Field Regional Location Map From Fredrick Robelius Uppsala Universitet, 2005 Exercise 2 North Dome Field: Productive Area: ~ 40 x 70 mi Average Thickness: ~ 510’ Average Porosity: ~ 20% Average Swi: ~ 20% DEPTH ~ 11,000’ (assume normal pressure) Carbonate reservoir Calculate: OGIP_______________ Reserves (assuming 65% RF) __________________________ Get ready for a lot of zeros Exercise 3 Location Map Exercise 3 Greater Ghawar Field Area: ~ 110 x 15 miles Avg thickness: ~ 185’ Avg porosity: ~ 18% Average Swi: ~ 11% Boi – 1.32 Avg perm: ~ 350 md API-32 degrees GORi = 550 Depth -6600’OWC Calculate: OOIP________________ EUR_________________ (given various RF’s) Get ready for a lot more zeros Exercise 4 Assume: Depth ~ 8,000’ (normally pressured) Reservoir – 20’ blanket SS (no wedges) Avg por – 15%, Avg Sw 10% (gas cap), 20% (oil rim) Bo – 1.20 RB/STB Calculate: OGIP (up/downthrown) OOIP Exercise 4 Schematic Cross-Section Exercise 5 Lessons Learned: • Outcome sensitive to reasonable changes to input • Where data are sparse, a wide range of OGIP/OOIP values possible • Structural Issues: attic oil, undrained fault blocks • Stratigraphic Issues: depositionally or structurally isolated ‘pods’ • How to improve the quality of volumetrics ? (The Value of Experience) • Mapping of analog areas where more data available • If in rank area, may need to go far afield • Comparison to fields with production history (material balance ?) • Improved understanding of reservoir architecture • Thickening rates • Reservoir heterogeneities • Pay cutoffs • Recovery factors Geological Objectivity (Ethics) • The company needs drillable prospects / reserve adds, but…….. • The play you’re assigned is weak economically Be Objective Without Being Pessimistic • Understand your area as completely as possible • Geologic history (petroleum system) • Environments of deposition (log-core-outcrop) • Reservoir properties (keys to pay quality) • Successful explorationists understand and map producing fields • Integrate geological interpretation into engineering data • Pressures • Drive mechanisms • Fluid properties (do they change ?) • Justify and document all assumptions (data mining) • Keep an eye out for ‘upside’ • Explaining anomalies is the key to new geologic plays • Shallower objective(s) • Deeper objective(s) • A different way to drill, complete (?) Remember: Quality work will be recognized May Mother Nature Smile Upon You Cushing Field