APPROVED BY Order of the Samara region Government from _____________ № _____ List of Strategic Investment Projects of the Samara region № in sequence Object Initiator Lead Time Investment Volume, RUB. bn Stage of Implementation Petrochemical Complex 1. Construction of energy-efficient cyclohexanone production facility 2. 3. OJSC “KuibyshevAzot” 2011-2015 6,17 Construction installation and pre-commissioning works Construction of ammonia genOJSC eration unit with capacity of “KuibyshevAzot”, 1340 tpd LLC “Linde Gaz Rus” 2013-2016 10,5 Development of design specifications and estimates. Agreement between OJSC “KuibyshevAzot” and Linde Group on creation of a joint-venture company is completed Construction of purification facilities of the North industrial hub, Togliatti 2011-2016 4 Development of design specifications and estimates OJSC “KuibyshevAzot” 2 № in sequence 4. 5. 6. 7. 8. Object Initiator Reconstruction of machines for OJSC ammonia production with ex“Togliattiazot” pansion of capacity up to 3000 tpd and for carbamide production with expansion of capacity up to 2600 tpd. Construction of pyrolysis comCJSC plex on the basis of CJSC “No- “Novokuibyshevskaya vokuibyshevskaya Petrochemi- Petrochemical Comcal Company” industrial site pany” Organization of new floor covCJSC “Tarkett” ering production with advanced running characteristics Lead Time Investment Volume, RUB. bn 2010-2018 17,5 Construction installation and pre-commissioning works 2013-2020 292 Development of design specifications and estimates 2011-2018 3,2 Development of design specifications and estimates, construction and installation works 1,8 At the and works tion At the and works tion Production of Machinery and Equipment Organization of mass producOJSC “KUZ2014-2016 tion of rocket engine NK-33A NETSOV” Assimilation of mass production of engine NK-361 for gasturbine locomotive and gears for gas-compressor units and electric generators with power OJSC “KUZNETSOV” 2014-2016 1,07 Stage of Implementation stage of research developmental and preproducstage of research developmental and preproduc- 3 № in sequence 9. 10. Object up to 32MW (NK-36ST-32) Construction of hightechnology production of smallsized space platforms, information technologies and hardware and software package for receiving and processing of hyperspectral data Construction of manufacturing facility for assembling automotive wire harnesses in urban district Chapayevsk Initiator Lead Time Investment Volume, RUB. bn Federal State Unitary Enterprise “ Progress State Research and Production Space Centre “TsSKBProgress” 2013-2015 1,04 Design specifications and estimates are prepared, preparatory work for project implementation is carried out CJSC “PES/SKK 2013-2019 1,12 Investment Memorandum is signed. The first stone in the foundation of the future enterprise is laid, construction is carried out. The project implementation is started Stage of Implementation 11. Engines manufactured by OJSC “AVTOVAZ” OJSC “AVTOVAZ” 2013-2020 2,7 12. Research and Technological Development “Automobiles with LADA-B/C platform” Automobile line with Kalina platform: LADA Granta (2190/2191), Kalina (2192/2194), contract assembly of Datsun automobiles OJSC “AVTOVAZ” 2013-2017 2,7 The project implementation is started OJSC “AVTOVAZ” 2013-2020 9,9 The project implementation is started 13. 4 № in sequence Object Initiator Lead Time OJSC “AVTOVAZ” 2013-2020 Investment Volume, RUB. bn 18,9 Stage of Implementation 14. Local content of the engine N4 The project implementation is started 15. Reconstruction of an electric furnace melting shop OJSC “Volgotsemmash” 2008-2015 9,3 Project documentation is made. Positive findings of examination are reported 16. Reconstruction of a steel continuous casting machine and a rolling mill OJSC “Volgotsemmash” 2009-2016 7,7 Project documentation is carried out 17. Technical re-equipment and reorganization of regional jet AN140-100 production OJSC “Aviakor – Aviation Plant” 3 years 1,9 At the stage of research and developmental works 10 years 2,1 The project concept and master plan are elaborated, design limits are coordinated, location for the project implementation is reserved 2014-2017 1,5 Land plot development Tourism / Sports 18. All-seasoned Active Recreation Center “Volzhskaya Skazka” (“Volga Fairytale”) Syzran Municipal Administration; LLC “RIK” 19. Golf and Spa Resort “Staraya LLC “Golf Federation 5 № in sequence 20. Object Initiator Binaradka” of the Samara region” Touristic Recreation Complex “Zhigulyovskaya Zhemchuzhina” (“Zhigulyovsk Pearl”) Department of Tourism of the Samara region Lead Time Investment Volume, RUB. bn Stage of Implementation plan is prepared, public project hearings and negotiations with main suppliers have been held 2012-2027 16,5 Design plan of TRC “Zhigulyovskaya Zhemchuzhina” land plot is implemented. Design plan of territory within boundaries of u.d. Zhigulyovsk and Rozhdestveno village of the municipal district Volzhsky (the Samara region), including territory of Federal State Institution “National Park “Samarskaya Luka” is approved by Resolution of the Samara region Government from December 23, 2012 № 869-r 6 № in sequence Object Initiator Lead Time LLC “Zeleny Bereg Group” 2013-2022 Investment Volume, RUB. bn 10,5 Stage of Implementation 21. Resort “PORTO VERDE” 22. Ropeway Rozhdestveno” “Samara- Government of the Samara region, Administration of the Samara urban district, Administration of municipal district “Volzhsky”, Association “Versivo” 5 years 2,2 Project concept is developed; land plot for construction of boarding-alighting station in Rozhdestveno village is legally titled. Project preparation completed. 23. Multifunctional Sportsexhibition Complex “Samara LLC “Samara-Ring” Under definition 2 Complex master plan is developed; geological Concept design stage (285 ha land sector is bought, agreement about buying adjacent 1500 ha sector is reached, marketing analysis is fulfilled, concept and business-plan of the project are worked out), tender documentation for contractors designation is being developed 7 № in sequence Object Initiator Lead Time Investment Volume, RUB. bn Ring” 24. Designing and construction of stadium with infrastructure in the Samara urban district 25. Construction of modern complex for poultry meat production and processing with a productivity rate of 50 kilotons annually in the territory of Sergievsky district (the Samara region) Construction of livestock breeding complexes for milk herd of 2400 beasts in Bogatovsky and Borsky municipal districts 26. 27. Construction of milk processing plant with a capacity of 500 tpd in Otradny urban district in the Samara region Stage of Implementation and geodetic works have been carried out Government of the 2013-2017 Russian Federation, Government of the Samara region Agricultural Industry OJSC “Samara Re2012-2015 gion Development Corporation” 16,2 Design works are carried out, land plot for construction is determined 9,7 Pre-investment stage OJSC “Samara Region Development Corporation” 2013-2018 4,13 Pre-investment stage OJSC “Samara Region Development Corporation” 2013-2018 2,46 Pre-investment stage 8 № in sequence Object Initiator Lead Time 28. Creation of agro-industrial park of the Samara region Government of the Samara region Under development 29. Reconstruction of the Timo- LLC “Timoshavskaya shavskaya Poultry Farm Poultry Farm” 30. Construction of complex for commercial cultivation and processing of champignon mushrooms grown with selfproduced compost in the Samara region 31. Construction of Cardiac Surgery Center 32. Construction of Positron Emission and Computerized Tomography Center Investment Volume, RUB. bn 4 2009-2015 11 2013-2023 2 Healthcare Service LLC “Modern Medi2013-2015 cal Technology” 3 LLC “Oriks” LLC “PETTechnology” Not exceeding two years from the date of agreement of terms and conditions and as- 0,8 Stage of Implementation Primary stage of the project implementation The first stage is completed. Turnout of initial production batch Primary stage of the project implementation Investment memorandum on the project implementation is signed, design specifications and estimates are being developed Order of the Samara region Government approving land plot assignment act is signed 9 № in sequence Object Initiator Lead Time Investment Volume, RUB. bn Stage of Implementation signment of land plot Infrastructure CJSC 2013-2018 “Promtransstroy” 33. Development of the Samara Light Rail System 34. Construction of “Frunzensky” Ministry of Transport bridge crossing Samara river and Roads of the Saand merging with highway mara region “Highway route “CenterPovolzhye-Ural” (4 lines) Construction of “Kirovsky” Ministry of Transport bridge crossing Samara river and Roads of the Samara region 2011-2016 21,8 2007-2014 12 Construction is being carried out Construction of a new airport OJSC “Samara Reterminal, reconstruction and gion Development modernization of engineering Corporation”, OJSC systems and communications of “International Airport the international airport “Ku“Kurumoch” rumoch” 2012-2025 12,3 Construction of the building superstructure is being carried out; tender for designation of contractor for carrying out new terminal interior finishing is being held 35. 36. 37. 8,2 Construction and Production of Construction Materials Ceramic Wall Materials ProducCJSC “SKKM” 2013-2014 1,78 tion Plant in Kinelsky municipal Concept of project implementation in Samara urban district is developed Project documentation is prepared Positive findings of examination are reported 10 № in sequence Object Initiator Lead Time Investment Volume, RUB. bn 2013-2016 16 Project preparation is carried out 2012-2032 18 Concept is developed, the first stage of the project is being built 2013-2018 15,4 Government Expert Review Stage of Implementation district 38. 39. 40. Modernization of CJSC CJSC “Eurocement “Zhigulyovsk Building Materials” Group” with change to dry process of production Construction of Residential Development CompaComplex “Yuzhny Gorod” ny “Drevo” (“South City”) Construction of Residential Complex “Ecodolye-Samara” “Ecodolye” Group