List of Strategic Investment Projects of the Samara region
№ in sequence
Object
Initiator
Lead Time
Investment
Volume,
RUB. bn
Stage of Implementation
Petrochemical Complex
1.
Construction of energy-efficient
cyclohexanone production facility
2.
3.
OJSC
“KuibyshevAzot”
2011-2015
6,17
Construction installation
and pre-commissioning
works
Construction of ammonia genOJSC
eration unit with capacity of
“KuibyshevAzot”,
1340 tpd
LLC “Linde Gaz Rus”
2013-2016
10,5
Development of design
specifications and estimates. Agreement between OJSC “KuibyshevAzot” and Linde
Group on creation of a
joint-venture company
is completed
Construction of purification facilities of the North industrial
hub, Togliatti
2011-2016
4
Development of design
specifications and estimates
OJSC
“KuibyshevAzot”
2
№ in sequence
4.
5.
6.
7.
8.
Object
Initiator
Reconstruction of machines for
OJSC
ammonia production with ex“Togliattiazot”
pansion of capacity up to 3000
tpd and for carbamide production with expansion of capacity
up to 2600 tpd.
Construction of pyrolysis comCJSC
plex on the basis of CJSC “No- “Novokuibyshevskaya
vokuibyshevskaya Petrochemi- Petrochemical Comcal Company” industrial site
pany”
Organization of new floor covCJSC “Tarkett”
ering production with advanced
running characteristics
Lead Time
Investment
Volume,
RUB. bn
2010-2018
17,5
Construction installation
and pre-commissioning
works
2013-2020
292
Development of design
specifications and estimates
2011-2018
3,2
Development of design
specifications and estimates, construction and
installation works
1,8
At the
and
works
tion
At the
and
works
tion
Production of Machinery and Equipment
Organization of mass producOJSC “KUZ2014-2016
tion of rocket engine NK-33A
NETSOV”
Assimilation of mass production
of engine NK-361 for gasturbine locomotive and gears
for gas-compressor units and
electric generators with power
OJSC “KUZNETSOV”
2014-2016
1,07
Stage of Implementation
stage of research
developmental
and preproducstage of research
developmental
and preproduc-
3
№ in sequence
9.
10.
Object
up to 32MW (NK-36ST-32)
Construction
of
hightechnology production of smallsized space platforms, information technologies and hardware and software package for
receiving and processing of hyperspectral data
Construction of manufacturing
facility for assembling automotive wire harnesses in urban district Chapayevsk
Initiator
Lead Time
Investment
Volume,
RUB. bn
Federal State Unitary
Enterprise “ Progress
State Research and
Production Space
Centre “TsSKBProgress”
2013-2015
1,04
Design
specifications
and estimates are prepared, preparatory work
for project implementation is carried out
CJSC “PES/SKK
2013-2019
1,12
Investment Memorandum is signed. The first
stone in the foundation
of the future enterprise
is laid, construction is
carried out.
The project implementation is started
Stage of Implementation
11.
Engines manufactured by OJSC
“AVTOVAZ”
OJSC “AVTOVAZ”
2013-2020
2,7
12.
Research and Technological
Development
“Automobiles
with LADA-B/C platform”
Automobile line with Kalina
platform:
LADA
Granta
(2190/2191),
Kalina
(2192/2194), contract assembly
of Datsun automobiles
OJSC “AVTOVAZ”
2013-2017
2,7
The project implementation is started
OJSC “AVTOVAZ”
2013-2020
9,9
The project implementation is started
13.
4
№ in sequence
Object
Initiator
Lead Time
OJSC “AVTOVAZ”
2013-2020
Investment
Volume,
RUB. bn
18,9
Stage of Implementation
14.
Local content of the engine N4
The project implementation is started
15.
Reconstruction of an electric
furnace melting shop
OJSC
“Volgotsemmash”
2008-2015
9,3
Project documentation is
made. Positive findings
of examination are reported
16.
Reconstruction of a steel continuous casting machine and a
rolling mill
OJSC
“Volgotsemmash”
2009-2016
7,7
Project documentation is
carried out
17.
Technical re-equipment and reorganization of regional jet AN140-100 production
OJSC “Aviakor –
Aviation Plant”
3 years
1,9
At the stage of research
and
developmental
works
10 years
2,1
The project concept and
master plan are elaborated, design limits are
coordinated, location for
the project implementation is reserved
2014-2017
1,5
Land plot development
Tourism / Sports
18.
All-seasoned Active Recreation
Center “Volzhskaya Skazka”
(“Volga Fairytale”)
Syzran Municipal
Administration; LLC
“RIK”
19.
Golf and Spa Resort “Staraya LLC “Golf Federation
5
№ in sequence
20.
Object
Initiator
Binaradka”
of the Samara region”
Touristic Recreation Complex
“Zhigulyovskaya Zhemchuzhina” (“Zhigulyovsk Pearl”)
Department of Tourism of the Samara
region
Lead Time
Investment
Volume,
RUB. bn
Stage of Implementation
plan is prepared, public
project hearings and negotiations with main
suppliers have been held
2012-2027
16,5
Design plan of TRC
“Zhigulyovskaya Zhemchuzhina” land plot is
implemented.
Design
plan of territory within
boundaries
of
u.d.
Zhigulyovsk and Rozhdestveno village of the
municipal
district
Volzhsky (the Samara
region), including territory of Federal State Institution “National Park
“Samarskaya Luka” is
approved by Resolution
of the Samara region
Government from December 23, 2012 №
869-r
6
№ in sequence
Object
Initiator
Lead Time
LLC “Zeleny Bereg
Group”
2013-2022
Investment
Volume,
RUB. bn
10,5
Stage of Implementation
21.
Resort “PORTO VERDE”
22.
Ropeway
Rozhdestveno”
“Samara-
Government of the
Samara region,
Administration of the
Samara urban district,
Administration of
municipal district
“Volzhsky”,
Association
“Versivo”
5 years
2,2
Project concept is developed; land plot for
construction of boarding-alighting station in
Rozhdestveno village is
legally titled. Project
preparation completed.
23.
Multifunctional
Sportsexhibition Complex “Samara
LLC “Samara-Ring”
Under definition
2
Complex master plan is
developed; geological
Concept design stage
(285 ha land sector is
bought, agreement about
buying adjacent 1500 ha
sector is reached, marketing analysis is fulfilled, concept and business-plan of the project
are worked out), tender
documentation for contractors designation is
being developed
7
№ in sequence
Object
Initiator
Lead Time
Investment
Volume,
RUB. bn
Ring”
24.
Designing and construction of
stadium with infrastructure in
the Samara urban district
25.
Construction of modern complex for poultry meat production and processing with a
productivity rate of 50 kilotons
annually in the territory of Sergievsky district (the Samara region)
Construction of livestock breeding complexes for milk herd of
2400 beasts in Bogatovsky and
Borsky municipal districts
26.
27.
Construction of milk processing
plant with a capacity of 500 tpd
in Otradny urban district in the
Samara region
Stage of Implementation
and geodetic works have
been carried out
Government of the
2013-2017
Russian Federation,
Government of the
Samara region
Agricultural Industry
OJSC “Samara Re2012-2015
gion Development
Corporation”
16,2
Design works are carried out, land plot for
construction is determined
9,7
Pre-investment stage
OJSC “Samara Region Development
Corporation”
2013-2018
4,13
Pre-investment stage
OJSC “Samara Region Development
Corporation”
2013-2018
2,46
Pre-investment stage
8
№ in sequence
Object
Initiator
Lead Time
28.
Creation of agro-industrial park
of the Samara region
Government of the
Samara region
Under development
29.
Reconstruction of the Timo- LLC “Timoshavskaya
shavskaya Poultry Farm
Poultry Farm”
30.
Construction of complex for
commercial cultivation and processing of champignon mushrooms grown with selfproduced compost in the Samara region
31.
Construction of Cardiac Surgery
Center
32.
Construction of Positron Emission and Computerized Tomography Center
Investment
Volume,
RUB. bn
4
2009-2015
11
2013-2023
2
Healthcare Service
LLC “Modern Medi2013-2015
cal Technology”
3
LLC “Oriks”
LLC “PETTechnology”
Not exceeding
two years from
the date of
agreement of
terms and conditions and as-
0,8
Stage of Implementation
Primary stage of the
project implementation
The first stage is completed. Turnout of initial
production batch
Primary stage of the
project implementation
Investment memorandum on the project implementation is signed,
design
specifications
and estimates are being
developed
Order of the Samara region Government approving land plot assignment act is signed
9
№ in sequence
Object
Initiator
Lead Time
Investment
Volume,
RUB. bn
Stage of Implementation
signment of
land plot
Infrastructure
CJSC
2013-2018
“Promtransstroy”
33.
Development of the Samara
Light Rail System
34.
Construction of “Frunzensky” Ministry of Transport
bridge crossing Samara river and Roads of the Saand merging with highway
mara region
“Highway
route
“CenterPovolzhye-Ural” (4 lines)
Construction of “Kirovsky” Ministry of Transport
bridge crossing Samara river
and Roads of the Samara region
2011-2016
21,8
2007-2014
12
Construction is being
carried out
Construction of a new airport OJSC “Samara Reterminal, reconstruction and
gion Development
modernization of engineering Corporation”, OJSC
systems and communications of “International Airport
the international airport “Ku“Kurumoch”
rumoch”
2012-2025
12,3
Construction of the
building superstructure
is being carried out; tender for designation of
contractor for carrying
out new terminal interior
finishing is being held
35.
36.
37.
8,2
Construction and Production of Construction Materials
Ceramic Wall Materials ProducCJSC “SKKM”
2013-2014
1,78
tion Plant in Kinelsky municipal
Concept of project implementation in Samara
urban district is developed
Project documentation is
prepared
Positive findings of examination are reported
10
№ in sequence
Object
Initiator
Lead Time
Investment
Volume,
RUB. bn
2013-2016
16
Project preparation is
carried out
2012-2032
18
Concept is developed,
the first stage of the project is being built
2013-2018
15,4
Government Expert Review
Stage of Implementation
district
38.
39.
40.
Modernization
of
CJSC CJSC “Eurocement
“Zhigulyovsk Building Materials”
Group”
with change to dry process of
production
Construction of Residential Development CompaComplex “Yuzhny Gorod”
ny “Drevo”
(“South City”)
Construction of Residential
Complex “Ecodolye-Samara”
“Ecodolye” Group