CoC Program Environmental Review Flow Chart

advertisement
What level of Environmental Review is needed for
CoC Program projects?
1. Is this a Tenant-Based Leasing or
Tenant Based Rental Assistance (TBRA)
Project, AND did all program participants
determine the location of their unit?
2. Does this project contain ONLY
operating costs that are NOT used as a
reserve for replacement costs?
3. Does this project contain ONLY
supportive services costs?
4. Does this project contain ONLY HMIS
costs, not used for leasing office space?
If YES to 1,
2, 3, or 4
Exempt/CENST
Exempt/CENST
Categorically
Excluded
Categorically
Excluded
Not Subject
To 58.5Not
Subject To 58.5
Subject to 58.6
Subject to 58.6
www.onecpd.info/
https://www.hudexchange.in
resources/documents/
fo/resource/3141/part-58Part-58-Exemptenvironmental-reviewCENST.docx
exempt-or-censt-format/
NO
Is this a Project-Based Leasing,
Project-Based Rental Assistance,
Sponsor-Based Rental Assistance, or
Acquisition project without any
associated repairs or rehabilitation?
CEST
"Limited
CEST
“LimitedScope"
Scope”
Review
Review
Subject
58.5,58.6
58.6
Subject
toto
58.5,
YES
https://www.hudexchange.in
www.onecpd.info/
fo/resource/3800/limitedresources/documents/Li
scope-environmental-reviewmited-Scopecoc/
Environmental-ReviewFormat-CoC.docx
NO
Does this project include major
rehabiliation,* conversion of land use,
new construction of more than 4 units,**
or demolition of more than 4 units**?
NO
If none of the above apply, the project is
CEST. The Limited Scope format cannot be
used.
YES
EA
EA
Environmental
Environmental
Assessment
Assessment
Subject
to 58.5, 58.6, EA
SubjectAnalysis
to 58.5, 58.6,
https://www.hudexchange
EA Analysis
.info/resource/3140/partwww.onecpd.info/
58-environmentalresources/documents/
assessment-form/
Part-58-EA-Format.docx
CEST
CEST
Categorically
Excluded
Categorically Excluded
Subject To
Subject To58.5
58.5
Subject
to 58.5,
Subject
to 58.5,
58.658.6
https://www.hudexchange.info/res
www.onecpd.info/
ource/3139/part-58resources/documents/
environmental-review-cest-format/
Part-58-CEST-Format.docx
This document applies ONLY to CoC Program projects.
For more information on determining level of review, consult 24 CFR 58.
*For purposes of determining level of review, “major rehabilitation” is rehabilitation that does not conform to
the limitations listed in 24 CFR 58.35(a)(3).
**Select “yes” if new construction or demolition falls outside the definition of an “individual action” in 24 CFR
58.35(a)(4). If proposed construction or demolition conforms to the requirements in that section, select “no.”