Machine Elements and Manufacturing Engineering joint project

advertisement
Project work, spring 2002
Machine Elements and Manufacturing Engineering
joint project, Y2, spring 2002
Introducing a Design-build experience
CHALMERS
Machine and Vehicle Systems
CHALMERS
Production Engineering
Project work, spring 2002
Overall project aims
• Practice collaboration and project management (Concurrent
engineering)
• Apply theory from courses in Machine Elements and
Manufacturing Engineering
• Gain insight and understanding on how to use design and analysis
methods throughout the product realization process
• Practice oral and written communication skills
• Utilize projects from industry
CHALMERS
Machine and Vehicle Systems
CHALMERS
Production Engineering
Project work, spring 2002
The Design Process
The purpose
Who? Why?
When?
Assignment
What ? (Max, min,
number, weight etc.)
Measurable criteria
How?
Concept development
The process
Functional verification
Problem definition
Project planning
State requirements
spec
Functional analysis
Idea generation
Concept evaluation
Concept refinement
Prototype buidl
Kravuppfyllnad
CHALMERS
Machine and Vehicle Systems
Analyse and test of
prototype
Further
development of
concept
CHALMERS
Production Engineering
Project work, spring 2002
Scope
1
2
3
Activity
Method/Tool
Purpose/aim
Problem definition
Project planning
Requirement specification
Handouts
Gantt chart
Freddy Olssons matrix
Checklist - Pugh’s Design Core
Information search
Blackbox
Brainstorming
Handouts
Define project purpose and aims
Identify project steps, time and resource planning
4
5
6
Functional analysis
Idea generation
Idea selection
7
8
10
11
12
Idea systematization
Combination of partial
solutions
Further development of
selected concepts
Evaluation 1
Concept refinement
Evaluation 2
13
Prototype manufacturing
14
15
Analysis of prototype
Sel of manufacturing
process, cost estimation
Evaluation 3
Further development of
the selected concept
Documentation and
presentation
9
16
17
18
Classification scheme
Morfological matrix
Handouts
Pugh’s relative decision matrix
Handouts
Pugh’s relative decision matrix
(choose new reference)
Select one concept for prototype
manufacturing
Handouts
SWIFT
Concept scoring + Kesselring
Handouts
Handouts, course memo
CHALMERS
Machine and Vehicle Systems
Tutoring
1
Measurable criteria
Identify main function and subfunctions
Find/create solutions for subfunctions
Reject solutions that cannot be realized or that
are not safe
Create additional solutions
Document sub-solutions and combine these into
system solution
Develop the concepts to a similar degree of
detail
Identify strengths and weaknesses wrt the criteria
Improve concepts wrt minus (-) scores
Select 3-4 concepts for futher development
ProE CAD modelling
Manufacture one prototype variant
Analyse function and requirements fulfillment
Redesign concepts for manufacturing
Selection of final concept
Detaila dimensions, tolerances,
materials selection etc.
Dokumentation of working process and
final design
2
4
6
7
8
CHALMERS
Production Engineering
Project work, spring 2002
Prototype build - purpose
• Physical/geometric verification of the concept solution
• Verify requirements fulfillment
• Functional analysis
• DFM – DFA
• Form – Aestethics - Feel
• Identify weaknesses/improvements
Requirements fulfillment & functional verification
State requirements
specification
Functional analysis
CHALMERS
Machine and Vehicle Systems
Concept evalution
Concept refinement
Analysis and test of
the prototype
CHALMERS
Production Engineering
Project work, spring 2002
Prototype
Select concept for
prototype manufacturing
Koncept
1
2
3
4
5
6
7
8
9
+
0
+
+
+
4
1
1
3
1
0
+
+
0
2
2
2
0
3
+
0
0
+
2
2
2
0
3
R
E
F
E
R
E
N
S
6
0
3
+
0
0
+
+
3
1
2
2
2
+
0
1
4
1
-3
5
+
0
0
0
+
0
2
0
4
2
2
+
+
0
2
3
1
-1
4
+
+
0
2
3
1
-1
4
Kriterie
A
B
C
D
E
F
+
0
Tot. 
Placering
CAD modeling
(ProE)
Manufacturing
SLA, SLS (CARAN)
Analysis
Function and requirements
fulfillment
CHALMERS
Machine and Vehicle Systems
CHALMERS
Production Engineering
Project work, spring 2002
Project assignment
• All projects were from industry
– Added realism and motivation
• Passenger car handle (Volvo Car Corp)
• Fan valve for airfreight container (Envirotainer)
• Adjustable bracket for radio link antenna (Viking
Microwave)
CHALMERS
Machine and Vehicle Systems
CHALMERS
Production Engineering
Project work, spring 2002
Adjustable bracket for radio link antenna
CHALMERS
Machine and Vehicle Systems
CHALMERS
Production Engineering
Project work, spring 2002
Results from
prototype
manufacturing
• Total 71 pcs
• SLA & SLS
”Full” prototypes
were built by
adding standard
parts
CHALMERS
Machine and Vehicle Systems
CHALMERS
Production Engineering
Project work, spring 2002
CHALMERS
Machine and Vehicle Systems
CHALMERS
Production Engineering
Project work, spring 2002
Reflections
• Positive reactions from the students
–
–
–
–
”it’s was fun with physical feedback”
”realistic and meaningful - motivating”
”oops … it didn’t work ….”
”the physical prototype made it easier to find weaknesses
and come up with improvements”
– ”deeper understanding of the function”,
• Teacher:
–
–
–
–
more motivated students
industry relevance, deadlines, milestones, deliverables
more work
reasonable cost (5 700 USD for 71 “prototypes”)
CHALMERS
Machine and Vehicle Systems
CHALMERS
Production Engineering
Project work, spring 2002
Future
• Plan to run the project with similar scope
next year
• Improved student design-build facilities