TexManage Manufacturing Solutions- Spinning TexManage Spinning Covers all operations of Ring Spinning, Open-End and Knitting TexManage Modules Manufacturing Solutions Production Planning Production Management Product Costing Manufacturing Modules Quality Management Raw material Management TexManage Maintenance Management Production Planning Planning Characteristics Sales Orders •Planning based on Product Characteristics Process Route Raw material •Interactive Spin Plan :selection of right product mix •Rules based allocation for each product (Ratio, fixed machinery, priority based machinery allocation) •Forward and Backward Planning; Planning adjusted to maintenance calendar •Output: Man power required, machinery required and material required •Product Data Base: Product wise, machine wise process details like speed, settings, etc. •Vendor Planning •Integration with Production and Sales TexManage Sales Plan Manufacturing Plan Spin Plan Production Program Plan Status Product Costing Target Costing • Target Costing for a Sales plan / Forecast • Detailed basis of costing for Revenue and Expense cost elements • Integration with Planning • “What if Analysis” for Profit optimisation • Quick cost work out for Sale enquiry • Output: Profit per kg; Profit per m; profit per machine day Actual Costing • Period Specific Actual cost calculation • Comparison of Actual Costing Vs Target Costing • Identification of weak cost elements • Daily Profit/ Loss statement TexManage Target Costing Actual Costing Target Vs Actual Department wise Contribution Daily Profit & Loss Production Management • • • Production Functions of Spinning Preparatory Spinning (OE & Ring Spinning) Post Spinning including Yarn Dyeing Lot/ sub lot concept to track from packed material to raw material for quality analysis including customer complaints Planning Production Program Production Booking of all processes through any input, Kg., hank meters, run hours, etc. Produce • Yarn Realisation and In- Process stock • Operator performance Analysis • Waste Inventory and Analysis • Provision to Link to Automatic data collection systems Productivity Analysis Accessories planning for a count change • • TexManage Material, Men, Machinery, Waste Lot Status Raw Material Management Floating of enquiries based on requirement and receiving offers Sample Testing: Testing of material and passing based on standards (sample plan included) Purchase Orders: Raising PO / advice including delivery schedule and quantity Lot Testing: Bulk testing of material and passing based on sample/ standard results (sample plan included) Lot Approval: Based on Quality, acceptance of lots to a mix including reallocation to other mixes than intended Samples Bulk Inspection & Passing Integration with Finance on payment advice and also premium / discount based on quality Stock Mix Issue: Interface with Manufacturing for request and issue of RM including waste addition Issue Inventory Status: Fibre, variety, station, crop year, supplier, station, quality wise, contamination TexManage Quality Management Scheduling for Quality Control Activities and tracking Maintenance of In- Process study results, process control results (spinning: wrapping) Schedule Maintenance of Laboratory experiments and results Lab/ Process/ Wrapping/ Final Statistical Analysis: To conclude process deviations and for interpretation of test results Customer Interface: Requirements & Complaints handling Quality tracking: Lot history Analysis Action Process parameters Data base & Utilisation of manpower & machinery Improve Analysis Tool: Trends and graphs Provision to Link to Automatic data collection system TexManage Q Maintenance Management Budgetary and Tracking of various maintenance activities Scheduling and monitoring Preventive Routine Contractual Budget Schedule Work Flow based operations Maintenance based on pre - defined quality ,production parameters and flow meter inputs Activity Break Down: Reporting, Responsive and Analysis Machine Bio-Data Breakdowns Supportive Check list for carrying out all maintenance activities Consumption Analysis: Machine wise, Yearly per spindle Utilities- Performance & Schedules TexManage Utilities Thank you 40, Thasami Park, Singanallur, Coimbatore -641 005 Ph: +91 422 3233345 Fax: +91 422 4348479 Email: info@indotexnology.com, Thirupathi@indotexnology.com Also: texmanage@indotexnology.com