Case Introduction of Consistent Environmental Consideration through Planning and Designing Stages in Okinawa Prefecture, JAPAN NIPPON KOEI CO., LTD. as Project Environmental Study Team Ritsuko SATO Yasusuke KUROSAKI Masanao NISHIMURA Cooperate with: Okinawa Development and Promotion Bureau CABINET OFFICE Hiroshi TOMITA Okinawa Institute of Science and Technology Promotion Corporation Shozo ENOKITA , Tmeichi NAGAHAMA NIKKEN SEKKEI LTD , Kuniken LTD, Kornberg assoiate JV Takeshi OKAMOTO OHBA CO.,LTD. Kazuhiro HAGINO CONTENTS • Condition of Japanese Environmental Impact Assessment • Summary of Project • Work Flow and Environmental Approach • Environmental Consideration on Land Preparation Area • Comparison of the Project Area and Development Alternative • Environmental Consideration on Detail Design • Afterword Condition of Japanese Environmental Impact Assessment • EIA was legalized for 10 years and generalized in Japan • Issues on EIA was clalified – Needs on introduction of SEA → Case Introduction on Consistent Environmental Consideration through Planning and Designing Stages > Intimate Cooperation with Design Team for Environmental Consideration Summary of Project • Establishment of World Class Graduate University • Social Needs: – Contribution of Okinawa Pref. on science and technology development – Contribution on self- growth in economy and sustainable development • Planning Site: Onna Village (middle of Okinawa island), Okinawa Pref. • Planning Area: 222ha, included land preparation area of approximately 21ha. Planning Site and Project Area Jimun River Okinawa Island Ohminato River Shirin River Maekawa River River Planning Site Project Area Natural Environment of Planning Site • Rich of Natural Environmental Resources Columba janthina Scleria rugosa Important Animals Approx. 130 species Important Plants Approx. 90 species Heterotropa sp. Community of Aristida takeo Tylototriton andersoni Work Flow and Environmental Approach 【Work Flow】 【Environmental Approach】 Planning area was decided for Onna Village Start of Environmental Survey Jan 2004 Apr. 2003 Scoping Document May 2005 Evaluation of possible land preparation area on the planning site Evaluation of the environmental protection area Preparation of 4 alternatives Environmental comparison study for 4 alternatives Selection of SOUTH part development alternative and preparation of MP by compromising 2 alternatives Nov. 2005 Determination of Master Plan Drafts EIS Jan. 2006 Determination of Detail Design Feb. 2006 Final EIS Feb. 2007 Environmental Approach on Selection of Land Preparation Area • River conservation(plants,animals,red cray, erc) • Evaluation of the Environmental protection area [Examples of indexes] • Scrub forest of Pinus • Basin of intake luchuensis weir • communities of Aristida takeoi • Area of elevation over 100m • Wetlands etc. • Heterotropa sp. • Gastrodia sp. • Tylototriton andersoni lalva Prepareration of Altanative Plan A N Plan B Alt. Concentrate North Alt. Spread South Project Area Future Expansion Alternative Indicators Jimun river SOUTH Alt. concentrate SOUTH Alt. spread NORTH Alt. A NORTH Alt. B 0.0% 0.0% 14.9% 14.4% Basin Ohminato river modification Shirin river rates 1.1% 1.1% 9.3% 6.9% 44.1% 43.1% 0.0% 0.0% Maekawa river 18.1% 20.1% 11.7% 11.3% Change ratio of Marine Terrace 16.0% 16.4% 11.9% 8.9% 8.4% 9.0% 11.4% 9.8% approx. 240 approx. 240 approx. 260 approx. 310 approx. 180 approx. 160 approx. 200 approx. 200 geography & geology Environ mental Plant Impacts Animal Landscape Change ratio of natural plant comunity with 7grade and over Change number of important plant’s breeding point Change number of important animal’s verified point Landscape for major spot viewable from 6 points among 7 points Not exist Outdoor recreations Historical & Cultural Environment viewable from all 7 points No modification Modify former charcoal kiln site Environmental Consideration on D/D Modification evasion of habitat of important land shelfish Important land shellfish Avoidance M/P D/D Fishway Design A Fishway Natural Stones +52m Path A ’ Detailed Section Drawing +56.5 m Design of Selected Plan • • • Not the plan to cut the ridge and fill the river. Allocate the buildings at narrow ridge area. The buildings was linked by skywalk to conserve the various environment of valley. Conclusion • Environmental consideration since initial planning stage to decide land preparation area inside the huge planning site. • Consistent environmental consideration through planning and designing stages by intimate cooperation between environmental and design teams. Afterword • At initial stage, comments to consider natural environment was given by Academic Expert. However, He evaluated us “this is the only plan can be satisfied under harsh environmental conditions” finally. • Construction works was started on April 2007. Environmental monitoring is on-going.