Homework #1: (Test yourself) The Garrett Company produces goods at its three plants and sells them at its three retail outlets. After production, the goods are stored in the company’s two warehouses until needed by the retail outlets. Trucks are used to transport the goods from the plants to the warehouses, and ultimately from the warehouses to the retail outlets. The following table shows the cost of shipping a unit from each plant to a warehouse. Warehouse Plant P1 P2 P3 W1 425 510 450 W2 560 600 610 The daily production capacities of P1, P2, and P3 are 200, 200, and 100 units, respectively. The next table shows the unit shipping cost from a warehouse to a retail outlet. Warehouse W1 W2 RO1 550 390 Retail Outlets RO2 505 410 RO3 490 440 The daily demand at RO1, RO2, and RO3, are 130, 200, and 150 units, respectively. (a) Create a linear program which determines the shipping schedule which meets demand and minimizes the shipping cost. (b) (Create a new copy of your spreadsheet in part (a).) Highway construction has blocked the truck route from W1 to RO3. By changing the objective function (and not by adding or changing a constraint), revise your model to determine the new minimum cost transportation schedule. In this spreadsheet compute and label the change in costs due to the highway construction. Homework#2: WellsCo is a fully integrated company that both produces goods and sells them at its retail outlets. WellsCo produces product at two plants and stores the product at one of two warehouses until shipment to one of WellsCo’s three retail outlets. Using units of full truckloads, the table below shows each plant’s monthly output, its shipping cost per truckload sent to each warehouse, and the maximum amount that it can ship per month to each warehouse. From\To Plant 1 Plant 2 Unit Shipping Cost Warehouse1 Warehouse2 425 560 510 600 Shipping Capacity Warehouse1 Warehouse2 125 150 175 200 Output 300 300 For each retail outlet (RO), the next table shows its monthly demand, its shipping cost per truckload from each warehouse, and the maximum amount that can be shipped per month from each warehouse. From\To Warehouse1 Warehouse2 Demand Unit Shipping Cost RO1 RO2 RO3 470 505 490 390 410 440 150 200 150 Shipping Capacity RO1 RO2 RO3 100 150 100 125 150 75 You have been asked formulate and solve a linear program that will determine a distribution plan (number of truckloads per month from each plant to each warehouse and from each warehouse to each retail outlet) that will minimize the total shipping cost.