Analysis of Site Schedule Changes and Corresponding Budget Impacts In order to assess site schedule changes, the Percent Project Progress data was evaluated. At the beginning of the fiscal year, sites indicated an initial percent completion as well as a target percent completion that they anticipated reaching by the end of the FY. Additionally, in each site’s AWP, an associated budget for each project was developed. This budget information was also evaluated to compare the amount of funds spent on research support to the amount of progress made on each of the research project. This information is analyzed in Part 1 of this appendix. Criteria used to assess if a project was behind on its target completion was if the reported Q1 percent completion deviated from the target by more than 10 percent. This deviation was selected based on the overall network average deviation reported in the FY10 Q4 report. The corresponding budget impacts of these projects were evaluated. If funds were shifted out of the research support WBS category, which categories these funds shifted to were identified. This data used in the analysis is summarized and provided in the tables provided in Part 2 of this appendix. Additionally, at the beginning of Q4, NEES equipment sites began generating multiyear project schedules. NEEScomm collected initial schedules from the sites at that time. Sites updated schedules in Q1 and these are presented in Part 3 of this appendix. Part 1 – Schedule and Budget Analyses NEES@Berkeley Berkeley is on schedule for its percent completion targets on all of their projects in the site’s AWP. The new site manager has adjusted the completion targets in the AWP to be much more realistic. Whittaker’s project was completed in the first quarter. McMullin Specimen #3 was in assembly phase. Due to some delays associated with troubleshooting of the site's equipment, changes in setup's design and logistics of panel delivery and installation, this specimen was not tested in Q1. The test of Specimen #3 is scheduled for Q2 and will utilize extensive usage of Krypton system to monitor position of the panels in space during the test. Ryan - Specimen #1 was in assembly and instrumentation phases. The instrumentation list utilizes more than 200 data acquisition channels. Newly fabricated instrumentation fixtures measuring rotation at clevises of REPEAT frame were installed. Due to space limitations any work around the specimen is complicated and time consuming, that is why the assembly and instrumentation phases had been taking much more time than it was anticipated. Details of a safety system preventing catastrophic collapse of the specimen were developed. The specimen is scheduled for testing in Q2. Miranda - SURF and ETP of the project were finalized. Kanvinde - SURF and ETP of the project were finalized. The site has expended 13% of its project budget while advancing the projects 15.6%. Multiyear schedule – no schedule changes. NEES@Buffalo The UB site has 17 projects in its AWP. Q1 reporting indicates that the projects are progressing as planned. Status reports of the key projects are as follows. Dobry - No new laminar box testing was done at UB-NEES for this project during this reporting period. The project team completed uploading the meta data for all tests to the NEES depository. With further approval from NEEScomm and NSF, the project team plans to complete the remaining four planned tests according to the schedule reported on the annual work plan submitted on May 4, 2011. It is the project group understands that UB-NEES is making plans to accommodate these tests commencing in April 2012 assuming the availability of a new replacement membrane currently under the direction of the NEEScomm design task-force. All project testing will be completed by the end of the FY if the membrane is available per the preceding. Whittaker - Over the period, October 1st thru December 31st, testing of the 6th wall was completed. Core samples were taken and tested along with cylinders that were cast on the day of specimen construction. Reinforcing bars have been removed, from the tested specimens, for tensile testing. All acquired data (including the unique “Crack Propagation” data) is being processed and will be uploaded to the NEES HUB website in the near future. Post experiment numerical modeling calculations using the exact loading protocol and material properties at the day of testing is currently being done. Set-up of the 7th specimen is done and testing will be completed in January 2012. Berman - During this quarter testing has commenced related to the quasi-static test phase. There are 3 different test frames each with a different rocking joint connection (i.e. rocking about HBE flanges conn., NewZ-BREAKSS conn. and rocking about HBE centerline conn.). For each test frame three tests are scheduled (i.e. full infill web plate, bare frame and infill web strips), leading to a total of nine tests on the strong-floor comprising the quasi-static tests. At the end of this quarter testing of Frame #1 (rocking about HBE flanges) is complete. Frame #1’s third test was completed by the second week of November. At the end of this third test, the floor mass plates used in the test setup were given to the NEES-ADAPTS project for the remainder of the quarter whom also needed the plates for their test-setup and testing. Although this has affected the project schedule, sharing of limited laboratory resources by different project teams is good research practice. During this time, work still progressed forward; test Frame #2 (NewZ-BREAKSS conn.) was prepped for continuation of testing in January 2012. Testing is scheduled to recommence with test #4 during the week of January 16th. Buffalo expended 17.7% of its project budget while only progressing projects by 7%. NEEScomm will work with Buffalo to make sure expenses follow progress. Multiyear Schedule – The UB did not change their schedule from FY11 Q4. They appear to be on schedule. NEES@Cornell Cornell has one project that is on schedule. The site expended 24.8% of its project budget and made 33.3% progress on project completion. Multiyear Schedule - no schedule changes. NEES@Lehigh Lehigh has eight projects in their FY12 AWP. There are no projects that are not adequately meeting the targets. Lehigh spent 15% of its project dollars while making 19% progress on their projects. Multiyear Schedule – All projects have moved slightly by one to two months from the FY11 Q4 schedule, but progress is being made as per the schedule. NEES@OSU Five projects were included in the OSU AWP. The Liu project (Measuring run-up and bed shear stress using long stroke wave-makers) is behind schedule due to the failure of the Large Wave Flume. All other projects are progressing according to schedule. OSU made 19% progress while expending only 13% of their project monies. Multiyear Schedule – No schedule changes NEES@RPI RPI has five projects in its FY12 AWP. Progress was made on four of the five including testing done for Zeghal and El Shamy. The site progressed their projects by 35% while only expending 11.5% of their budget. NEEScomm will monitor RPI’s progress. Multiyear Schedule – Updated schedule not provided. NEES@UCDavis Davis has 7 projects in their FY12 AWP. Progress and experiments reported in Q1 on 2 of the projects. The site experienced significant downtime in October due to the accident involving the work table. The research schedule at UC Davis has been impacted, at least in the short term, by the incidents this summer. Two project teams have had direct impacts on their work, and other teams have had to alter their schedules according to equipment availability. The shift in focus of site staff effort and budget allocation has also impacted our planned MO&M activities for the fiscal year. Davis made 12% progress while expending 15% of their project budget. This is in line. Multiyear Schedule – Updated schedule provided. No major changes. NEES@UCLA UCLA has 6 projects in its FY12 AWP. Progress reported on 5 of the 6. UCLA made 21.6% progress on their projects while spending 15% of their project budget. Multiyear Schedule - no significant schedule changes. NEES@UCSB UCSB did not submit Q1 activity or financial reports. Thus, it is not possible to analyze project progress or budget impacts. NEES@UCSD There are three projects in the UCSD AWP. The Hutchinson project made good progress in Q1. During Q1 the following major phases were completed: (1) Exterior balloon framing was installed on the first three floors, (2) 75% of the interior partition walls were installed (3) Exterior precast concrete panels were installed on the fourth and fifth floors (4) 75% of Mechanical, Electrical and Plumbing installation was completed (4) 66% of the fire sprinkler systems were installed (5) On the roof, the penthouse was constructed, the air handling unit (AHU) was installed, the cooling tower assembly including load cells, vibration isolators and tower was installed (6) 25% of the elevator was completed (7) The stair installation was completed. During the construction phase, instruments were added as the building was erected and we recorded data in different construction stages. In October we ran two sets of white noise tests to take base line data information regarding the response of the structural assembly only. During the addition of the non-structural components we will take measurements at different construction stages to determine evolution of dynamic characteristics of the whole structure. The full instrumentation will start in February. The 5-story building project has been rescheduled to end on March 31, 2012. The second phase of the Shing’s project will continue on April-July, 2012, followed by Cheng’s project on August –Sept, 2012. San Diego made 31% progress while spending 17% of their monies for projects. Multiyear Schedule – No schedule changes. NEES@UIUC UIUC has six projects in their AWP. Progress was made on four of the six projects. Illinois spent 18% of their project money while making 16% progress on projects. Multiyear Schedule – No significant schedule changes. NEES@Minnesota Six projects are in the UMN FY12 AWP. The Hassan project was completed in the first quarter as well as Gustavo’s additional testing. UMN made 34% progress while spending 27.5% of their project budget. Multiyear Schedule – No significant schedule changes. NEES@UNR The FY12 AWP for UNR contains four projects. All projects are on target. UNR spent 7% of their project budget, but made 11% progress on their projects. Multiyear Schedule - no schedule changes. NEES@Texas UT Austin has six projects in their AWP. Progress reported on 3 of the projects. Texas reported 4% progress while expending 15% of their project dollars. NEEScomm will monitor their progress. Multiyear Schedule – no significant schedule changes.