© ABB AB, Corporate Research - 1 3/12/2016 Project Breakdown Structure Creation abb Project Planning Course Overview Project Planning Overview © ABB AB, Corporate Research - 2 Work Breakdown Structure Logical Network Plan Product Anatomy Estimation Resource Planning Organic Integration Plan Facilitating Processes Time Schedule Budgeting Project Planning Result Project Planning Pre-conditions Project Breakdown Structure Integration Plan Risk Management abb © ABB AB, Corporate Research - 3 Purpose The Project Breakdown Structure (PBS) defines all Work Products, produced by a project. The purpose is to first focus on what the project shall produce, not the activities to perform. abb Input & Output © ABB AB, Corporate Research - 4 INPUT Product Requirements Specification Project Breakdown Structure from earlier versions of the product and previous projects, if available Know-how from experienced personnel Architecture Organizational Demands OUTPUT Project Breakdown Structure including; Technical Product Breakdown Structure Management Product Breakdown Structure Quality Product Breakdown Structure The PBS is used as input when defining the Work Breakdown Structure later in the planning process. abb Work Products A project always delivers tangible things like documents, code, models, executables, plans etc. which all are Work Products. Some examples; Customer deliverables Software components © ABB AB, Corporate Research - 5 design models, prototypes, tools etc. Management artifacts source code files, DLLs, executables etc. Development components software on a CD-ROM, user documentation etc. plans, budgets, progress reports etc. Quality assessment artifacts test results, inspection reports etc. abb © ABB AB, Corporate Research - 6 Project Breakdown Structure The Project Breakdown Structure should identify all Work Products of the project and the final product. The highest level represents the total set of Work Products. At the lowest level every Work Product is either a Management Product, a Technical Product or a Quality Product. abb Req 1 X © ABB AB, Corporate Research - 7 Req 6 Req 7 Req 8 X X X X X X X X Req 9 Req 10 WP 10 WP 9 WP 8 X Req 3 Req 5 WP 7 X Req 2 Req 4 WP 6 WP 5 WP 4 WP 3 WP 2 WP 1 Requirement-Work Product traceability matrix X abb Management Work Products © ABB AB, Corporate Research - 8 The Management Work Products are those that; Assist in project management and control issues Gives the answer to the business requirements Typical Management Work Products are; Requirement specifications Project plans Risk list Status reports Budget specification Project (gate) assessments Minutes of meetings abb Technical Work Products © ABB AB, Corporate Research - 9 The Technical Work Products are; Project deliverables, i.e. the final product Intermediate products needed during development The answer to the technical requirements Typical Technical Work Products are; Hardware and Software User documentation Prototypes Design models Education products Testing products Executables abb Quality Work Products © ABB AB, Corporate Research - 10 The Quality Work Products; Exists to define, assure, verify and record quality issues Gives the answer to the quality requirements Typical Quality Work Products are; Test records Inspection (review) records Error (problem) reports Follow-up reports abb © ABB AB, Corporate Research - 11 Summary The Project Breakdown Structure is a tree structure reflecting the Work Products on all levels produced by a project. The Project Breakdown Structure should contain all the items included in the final product, needed to build the final product and needed to support the development of the final product. The Work Breakdown Structure is later identified by defining what activities are needed to produce the Work Products to the required quality. abb abb © ABB AB, Corporate Research - 13 Revisions Rev. New Slide (N) Slide (S) Description Date Dept./Init. 04 All Update from Version C 2004-01-08/ Fredrik Ekdahl 05 Page17 Planning package should not include the work product… picture redrawn 2005-01-12 / Christer Persson abb Relation between PBS & WBS WBS Work Product How © ABB AB, Corporate Research - 14 What PBS Activity Planning Package Description Planning Package abb